The implementation stage delivers the new system to users. It involves major organizational changes and must be carefully planned with training, conversion, and testing. The implementation plan details participant training, the conversion method from old to new systems, and system testing to ensure successful adoption. Training methods depend on user skills and scope of changes, and may involve leaders training others or manuals. Conversion can be direct, parallel, phased, or pilot testing in some areas before full rollout. Testing examines the system under all conditions using various data volumes, simulations, and live data to refine processes over time.
2. • The implementation stage delivers the
new system to the participants
• It often involves a major change in the
way that the organisation operates.
• To ensure that the new system is
implemented successfully, it must be
carefully planned.
• This implementation plan details
participant training, the conversion
method and the system testing.
3. • Training ensures participants can use the
new system.
• The type of training is dependent upon the
existing knowledge of the participants and
the scope of the change.
• Management may decide to train some
leaders who then instruct others.
• They may also employ training specialists or
create training manuals.
• Technical support staff are often employed
or out-sourced for use on an ‘as-needed’
basis.
4. • There are four main methods of conversion.
• They are:
• direct
• parallel
• phased
• pilot
• Direct involves the immediate change from
the old to the new system.
• It is not often used even though the costs are
minimal, because it does not allow any ‘real
world’ checking of the system.
5. • Another reason is that the old system is not
available as a backup if the new system fails.
• Parallel involves the old and new systems
working simultaneously.
• If there are any problems, they can be
resolved before the old system is
discontinued.
• It does, however, result in additional
workload since everything needs to be done
twice.
• It can also lead to confusion if there are
discrepancies between the data.
6. • Phased implementation involves the
gradual change to the new system.
• Certain operations are brought on line
first, while areas of the old system
remain.
• Each operation is individually tested, if
there is a problem it is possible to
switch back
• Phased conversion is often confusing
as the users are not sure whether they
are using the old or new system.
7. • Pilot conversion is where the full
system is trialed in a few branches of
the organisation.
• Once all the problems are sorted out
with the system it is implemented to
every branch.
• [Complete Figure 1.20 on p.28]
9. • Testing a system is a very important
part of the implementation process.
• Tests must be designed to examine
the system under all possible
conditions.
• Hardware should be tested using
diagnostic software and through
general use.
• Backup systems should also be
tested by deleting and restoring
data.
10. • Software is tested using data that has
been structured to test all decisions to be
made by the system.
• The test data should be based upon the
original specifications.
• There are a variety of tests using various
kinds of data including:
• Volume data
• Simulated data
• Live data
• Volume data is used to test that the
system can cope with a large amount of
data all at once.
11. • Simulated data aims to replicate many
expected situations.
• Live data is using the actual data and this
takes place once the system is installed.
• The various operational processes are
continually tested during implementation
and refined over time.
• Evaluation is ongoing; if the system is not
performing then changes need to be
made.
• If a major upgrade is required then the
system development cycle starts again.
12. • Evaluation should also review the effect
on the users.
• Ergonomic issues, as well as usability,
should be addressed.
• The operational manual should also be
trialed and tested.
• It should be modified as feedback is given
from users.
• Maintenance is any minor changes that
are made to the system.
• Any of these changes should be
documented and passed on to users.