Se ha denunciado esta presentación.
Se está descargando tu SlideShare. ×

CtrlS launch @ Mumbai

Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio

Eche un vistazo a continuación

1 de 33 Anuncio

Más Contenido Relacionado

Presentaciones para usted (19)

Similares a CtrlS launch @ Mumbai (20)

Anuncio

Más reciente (20)

CtrlS launch @ Mumbai

  1. 1. Creating new paradigms
  2. 2. In the mind of the CIO I need IT infrastructure Priorities Mindset Reality that is reliable and always Should not be restricted by Growth the lack of DC & IT Already run out of it available; infrastructure one that works for me! Connectivity to data Teleco’s rule the Connectivity could be much better roost Captive facilities lock us Keep costs low but Costs productivity high in, 3rd party DC’s are expensive Outsource to vendors who Most DC vendors do Outsourcing understand the business not understand
  3. 3. The CIOs challenge Growth 1 Scalable infrastructure Connectivity 2 Ensure better Connectivity Costs 3 Decrease bottom-line Outsourcing 4 Find a visionary partner
  4. 4. The CIOs challenge Growth 1 Scalable infrastructure Connectivity 2 Ensure better Connectivity Costs 3 Decrease bottom-line Outsourcing 4 Find a visionary partner
  5. 5. 1 Scalable infrastructure Priorities Challenges Solution 1. How do we build Our growth should not be restricted by infrastructure that is flexible Your business needs the lack of to our needs? infrastructure that will space, power or 2. Cost of power is rising and keep pace with your cooling the quality is dropping. How growth can we achieve stability? • INFRASTRUCTURE We have already run 3. Our DCs are not made for ON TAP out of it efficient cooling and this • CAPEX ON STOP costs us a lot.
  6. 6. 1 Scalable infrastructure Scalability for a decade Keep it running at all costs Always plugged in Sound Construction Always guarded Flood safe custom built DC
  7. 7. Scalability for a decade 2.1 lakh sq feet space 5,000 racks, to be scaled up to 7,000 racks in 2 years Typical floor plan 1 Scalable infrastructure
  8. 8. Keep it running at all cost 600 seat BCP and WAR room space 2-side approach to ensure accessibility to DC WAR Room and customer office space layout 1 Scalable infrastructure
  9. 9. Always plugged in Dual active power source Captive gas based 18 MW power plant Electric power source from 2 sources 1 Scalable infrastructure
  10. 10. Always plugged in DG plant with 210 KL capacity HSD tanks for back-up – India's largest capacity in DCs 1 Scalable infrastructure
  11. 11. Sound construction Perimeter walls designed to withstand collision with 10 ton truck at 80 kmph 1 Scalable infrastructure
  12. 12. Always guarded Armed guards to prevent any attack/sabotage 1 Scalable infrastructure
  13. 13. Flood-safe custom-built DC Flood safe at 20 mtr above sea level, >2000 mtr from coast/inland 1 Scalable infrastructure
  14. 14. The CIOs challenge Growth 1 Scalable infrastructure Connectivity 2 Ensure better Connectivity Costs 3 Decrease bottom-line Outsourcing 4 Find a visionary partner
  15. 15. 2 Ensure better connectivity Priorities Challenges Solution 1. We are at the mercy of Connectivity to our carriers. They dictate Outsource your datacenter could be terms primary systems and much better yet ensure the least 2. Latency as well as possible latency availability is an issue • HIGH Teleco’s are ruling AVAILABILITY the roost. How can • LOW LATENCY we fight them?
  16. 16. Carrier neutral datacenter Directly connected to the NIXI nodes in India 2 self-sufficient MMR's with a capacity of 60 racks each 2 in, 2 out redundancy to address cable cutting instances All major Teleco’s connected MMR Layout 2 Ensure better connectivity
  17. 17. The CIOs challenge Growth 1 Scalable infrastructure Connectivity 2 Ensure better Connectivity Costs 3 Decrease bottom-line Outsourcing 4 Find a visionary partner
  18. 18. 3 Decrease bottom line Priorities Challenges Solution 1. Taxes, tariffs and capex We need to keep are killing us our costs low yet Engage with a maintain a high 2. Higher productivity with Datacenter that breathes business level of productivity rising costs and lower sense budgets? Captive facilities 3. 60% of our budget goes • TCO DOWN lock us in and 3rd • PRODUCTIVITY into IT operations. How do UP party datacenter costs are high we cut it down?
  19. 19. Vantage Location
  20. 20. Location analysis Navi Mumbai Mumbai A total TCO Taxes 5.5% No Octri benefit of 30% (Octroi) delivered due to location Rs. 100 to 200 Rs. 40 to 100 Rental advantage per Sq ft per Sq ft Power Rs. 8 to 10 Rs. 6 per unit tariff per unit 3 Decrease Bottom line
  21. 21. Guaranteed power efficiency 1.42 Heavy investment in energy efficient system Cost of PUE over 1.7 will be borne by us With a PUE of 1.42, we are the most power efficient datacenter in the country Every 0.1 unit saved in PUE on a 1 MW system can save you Rs 60 lakhs per annum 3 Decrease Bottom line
  22. 22. Plans to suit every need Not a one size fits all approach to business Minimize risk with pay- per-use Scale up or down at will with on- demand services 3 Decrease Bottom line
  23. 23. Bandwidth up, cost down Carrier neutral, hence Teleco’s cannot dictate terms on cost and connectivity 3 Decrease Bottom line
  24. 24. Overall TCO advantage Overall Location advantage Advantage from on- demand services TCO Benefits of upto 40% PUE advantage Bandwidth driven advantages The CtrlS Advantage 3 Decrease Bottom line
  25. 25. The CIOs challenge Growth 1 Scalable infrastructure Connectivity 2 Ensure better Connectivity Costs 3 Decrease bottom-line Outsourcing 4 Find a visionary partner
  26. 26. 4 Find a visionary partner Priorities Challenges Solution 1. We cannot quality control a Outsource? But Datacenter vendors third party datacenter. A datacenter provider don’t really 2. They sell space. We need understand my who understands the services. Managed Services business 3. The quality of their Landscape manpower is never Most DC vendors do • INFRASTRUCTURE not understand consistent. They have high churn rates WITH SERVICE Managed Services Business 4. They lack ownership and vision
  27. 27. Established systems and processes Certifications TIA Tier 4 certification , ISO 20000, ISO 27001, BS 25999 Processes ITIL + Lean Six Sigma model of operation TOI Index An average TOI rating of 4.5 in 2010 4 Find a visionary partner
  28. 28. Skilled manpower on tap 240 employees slated to grow to 600 in 1 year Bench strength of 50 people at all times to handle emergency 4 Find a visionary partner
  29. 29. Cloud SAP Linux Program management CtrlS Academy CRM IT Databases Network Windows Team Infrastructure Data Security Messaging assurance and OS DR on Demand Our Services Framework 4 Find a visionary partner
  30. 30. WHAT DOES THIS MEAN FOR YOU?
  31. 31. Infrastructure Largest, First T- Solutions Services IV DC that are Disaster disrupting Recovery DR on Demand current Managed CtrlS delivery business Services Framework paradigms CtrlS Cloud MyCloud On-Demand private Datacenters Computing cloud Core Value - Total ownership to meet and surpass commitments
  32. 32. The CIO’s dilemma, answered Mindset Reality Solution Should not be restricted by Scalability for the lack of DC & IT Already run out of it Largest T-IV DC infrastructure 10 years Connectivity to data Teleco’s rule the Carrier neutral Bandwidth could be much better roost MMR surplus Captive facilities lock us Keep costs low but TCO benefit Saved cost on in, 3rd party DC’s are productivity high expensive of 40% intangibles Outsource to vendors who Most DC vendors do Tested services understand the business Total ownership not understand framework
  33. 33. Thank you

Notas del editor

  • In FMCG,Retail and hospitality business, it is said that most important factor is Location, the 2nd most important factor is Loaction and the 3rd most important factor is location

×