Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.
STEEL STRUCTURES SUPPLIER STEEL CONSTRUCTION CONTRACTOR|
ENGINEERING SUPPLY CONSTRUCTION| |
www.energobv.ro
SC ENERGO SA
Z...
ENERGY - POWER PLANTS
Boiler Plant based on circulating fluidized bed (CFB) technology
Works included: Execution , deliver...
Próxima SlideShare
Cargando en…5
×

ENERGO Brasov - Renewable projects ed2015

252 visualizaciones

Publicado el

Latest experience in Renewable Projects in Energy Sector

Publicado en: Empresariales
  • Sé el primero en comentar

  • Sé el primero en recomendar esto

ENERGO Brasov - Renewable projects ed2015

  1. 1. STEEL STRUCTURES SUPPLIER STEEL CONSTRUCTION CONTRACTOR| ENGINEERING SUPPLY CONSTRUCTION| | www.energobv.ro SC ENERGO SA Zizinului Street 123, 500407 - Brasov, Romania Tel: 0040 268 333 492 Fax: 0040 268 330 652 e-mail: office@energobv.ro www.energobv.ro Imagine your future, we will build it for you! Quality is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skillful execution; it represents the wise choice of many alternatives. William A. Foster “The company sees in the quality of delivered products the main goal to follow. Company conception regarding quality is proven by getting and maintaining the certified quality system SR EN ISO 9001:2008; SR EN ISO 14001:2005; SR OHSAS 18001:2008 as well the certified quality for Factory Production Control and welding EN 1090-1 and certification of our capability to manufacture welded steel structure according with DIN 18000-7. “ ENERGO QUALITY
  2. 2. ENERGY - POWER PLANTS Boiler Plant based on circulating fluidized bed (CFB) technology Works included: Execution , delivery and installation at the building Site Location: Duhaujvaros Client: Valmet Oy Final Client: Hamburger Hungaria Power II ENERGY - POWER PLANTS Waste Power Plant Project Bydgoszcz Works included: Execution , delivery and installation at the building Site Location: Waste Steam Boiler Generation Client: SICES group - Pensotti FCL SpA Final Client: Aster TM.E. Ecologia I

×