SDC workshop on Signature Project Scheme

  1. 1. Signature Project Scheme in the Southern District Paul Zimmerman 23/02/2013 Work Targets of the Southern District Council (2012-2015) • Development of the Aberdeen Fish Market and its vicinity into a tourist-friendly attraction, as well as a hub for enjoyment of seafood cuisines and shopping • Waterfront promenade Photo credits: Samson So/ Eco Institute
  2. 2. Sandy Bay North Footpaths and seafront promenade connecting Victoria Road and Sandy Bay Sha Wan Drive Connect Sandy Bay waterfront and CyberPort Waterfront Park Waterfall Bay Expand Waterfall Bay park to the north and add a bridge Wah Kwai Park to be built by MTR Connect Waterfall Bay Park and Tin Wan Praya Road via ‘MTR’ park Street scape enhancement of Tin Wan Praya Road Enhance fish market Signage Waterfall Bay – Missing link –
  3. 3. Photo by Samson So/ Eco Institute Connect platform to Cyberport Road Bridge at the top of Waterfall Bridge at bottom over the beach
  4. 4. Option 1: Add a bridge on top of the waterfall and two viewing platforms below 1 p p p Option 2: Add a bridge at beach level connecting two viewing platforms 2 p p p
  5. 5. CyberPort Waterfront Park and Pier Waterfall Bay Park
  6. 6. Top of waterfall – Present top of the waterfall Option 1: Bridge at the Example of bridge Wah Fu Cyberport
  7. 7. Example of a bridge Lamma Waterfall Wah Fu Existing staircase Viewing Platform Two platforms with pagodas to overlook the waterfall and Lamma Channel and a bridge across the Bay Cyberport Viewing Platform
  8. 8. Example from Taiwan Bridge at Waterfall Bay • Historical significance • Magnificent views that the public cannot enjoy due to lack of access and platforms • Critical link in Southern District waterfront promenade
  9. 9. Project aspects • Extend existing Waterfall Bay Park from Wah Fu to Cyberport Road • Add bridge to cross waterfall • Add viewing platforms on both sides • Landscaping • Footpaths, entrances and signage • Design Criteria – Simple park design – Minimal impact on the natural environment Restaurants
  10. 10. Sai Kung Waterfront Park Sai Kung Waterfront Park
  11. 11. L16 - Hong Kong Park “Mushroom” – Lok Fu -

×