DESIGN OF REINFORCED CONCRETE
STRUCTURES
1SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
UNIT-II
WATER TANKS
2SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Needs (or) uses for water tanks
• Water tank is a container for storing liquids
Needs :
Drinking purpose
Irrigation process
Fire suspension
Chemical manufacture
 preparation for well, etc
3SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• What is design…????
• why is it????
4SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
RCC WATER TANK DESIGN BASIS
• RCC Water tank design is based on IS 3370: 2009
(Parts I – IV).
• The design depends on the location of tanks, i.e.
overhead, on ground or underground water tanks.
• The tanks can be made in different shapes usually
circular and rectangular shapes are mostly used.
5SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• The tanks can be made of RCC or even of
steel.
• The overhead tanks are usually elevated
from the roof top through column.
• In the other hand the underground tanks are
rested on the foundation.
6SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
TYPES OF WATER TANKS
• Based on the location of the tank in a building s
tanks can be classified into three categories. Those
are:
 Underground tanks
 Tank resting on grounds
 Overhead tanks
7SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
 In most cases the underground and on ground tanks are
circular or rectangular is shape.
 The shape of the overhead tanks are influenced by the
aesthetical view of the surroundings and as well as the design
of the construction.
8SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
 A special type of tank named Intze tank is used for
storing large amount of water for an area.
Intze tank 9SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Spherical
Steel tanks are also used specially in railway yards.
Basing on the shape the tanks can be circular, rectangular,
square, polygonal, spherical and conical.
Conical
10SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
PERMISSIBLE STRESSES IN CONCRETE
• To ensure impervious concrete mixture linear than M20
grade is not normally recommended to make the walls
leak proof the concretes near the water face need to such
that no crack occurs.
• To ensure this member thicknesses are so designed that
stress in the concrete is lesser then the permissible as
given in table 1.
11SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Grade of
Concrete
Permissible Stresses Shear stress
N/mm2Direct Tension
N/mm2
Tension due to
bending
N/mm2
M15 1.1 1.5 1.5
M20 1.2 1.7 1.7
M25 1.3 1.8 1.9
M30 1.5 2.0 2.2
M35 1.6 2.2 2.7
M40 1.7 2.4 2.7
Table 1 Permissible Stresses In Concrete
(For calculations relating to resistance to concrete)
12SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
THE PERMISSIBLE STRESS IN STEEL
• The stress in steel must not be allowed to exceed the following values
under different positions to prevent cracking of concrete.
• When steel is placed near the face of the members in contact with liquid
 115 N/mm2 for ms Bars and
 150 N/mm2 for HYSD bars.
• When steel is placed on the face away from the liquid for members 225
mm or more in thickness:
 125 N/mm2 for M.S. bars and
 190 N/mm2 for HYSD bars.
 HYSD bars– High Yielding Strength Deformed bars.
13SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
BASE FOR FLOOR SLAB
• The floor slab should be strong enough to transmit the load
from the liquid and the structure itself to the ground without
subsidence. The floor slab is usually 150 to 200 mm thick.
• Before laying the slab the bed has to be rammed and
leveled then a 75 mm thick layer of lean concrete of M100
grade should be laid and cured.
14SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
MINIMUM REINFORCEMENT FOR WATER
TANK
• Minimum reinforcement required for 200mm thick sections is
0.3 % of the area of concrete section which reduced linearly to
0.2% for 450 mm thick sections.
• In case of floor slab for tank resting on ground the minimum
reinforcement from practical consideration should not be less
than 0.3% of the gross sectional area of the floor slab.
15SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
UNDER GROUND WATER TANKS
EXAMPLE : 1
To Design an underground RC rectangular water tank of 10m x 3m x
3m. The soil surrounding the tank is in dry states & sometimes wet
state. Angle of repose of soil in dry state is 30° and in wet state 6°.
Density of soil is 20kN/m3. Adopt M20 grade of concrete & Fe415
steel.
16SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
DESIGN PROCEDURE
• Given data:
Size = 10m x 3m x 3m
Angle of repose @ dry soil = 30o
Angle of repose @ wet soil = 6o
Density (or) unit wt of soil= 20 kN/m3
17SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
 Step:1 permissible & design values:
Tension due to bending ( concrete),
σct = 1.7 N/mm2 (Pg.no.:2,table- 1, IS 3370;part-II)
Compression due to bending ( concrete),
σcbc = 7 N/mm2 (Pg.no.:3, table – 2, IS 3370;part-II)
or (IS 456, page no.81)
Steel reinforcement for strength,
σst = 115 N/mm2 (Pg.no.:3, table- 4)
Design constant, m = 280 / 3* σcbc
= 280 / 3*7
= 13.33
18SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
j =1 –(n/3)
n = (1/( 1+ (σst /m* σcbc)))
= (1/(1+(115/13.33*7)))
=0.447
j = 1-(0.447/3)
= 0.85
Q = (1/2)* σcbc * n * j
= (1/2) * 7 * 0.447 * 0.85
= 1.32
SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II 19
 Step : 2 design of long walls:
Ratio for long wall = L/H = 10 / 3 = 3.33 >2
Ratio for short wall = B/H = 3/3 = 1 < 2
Long walls are designed as vertical cantilevers and
Short walls are designed as continuous slab.
pressure intensity @ wet soil,
P = w*h* (1-sinφ/1+sin φ)
= 20 *3*(1-sin 6o
/1+sin6o
)
= 48.64 kN/m2
20SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Step:3 Design of long wall
By considering 1m run of wall
BM calculation for vertical reinforcement:
Max B.M at top (tension near water face )
Max BM @ top = pH2/33.5
= (48.65 * 3 * 3 ) / 33.5
= 13.06kNm
Max B.M @ bottom = pH2/15
= 48.64 * 3 * 3 / 15
= 29.18kNm
Walls of underground water tank must also be designed cracking stress
consideration.
21SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Step 4 Thickness of wall:
Max BM, M = (σct * bD2) / 6
29.18x 106 = (1.7 * 1000 * D2 ) / 6
29.18x 106 = 283.33 * D2
D2 = 29.18x 106 / 283.33
D = 323mm
provide overall depth, D = 320mm
cover, d’ = 40mm
Effective depth, d eff = 320-40
= 280 mm
22SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• step-5 Area of steel required for long wall:
for outer face:
Ast = (max BM / σst * j *d)
= (29.18x 10 6 / 115* 0.85*280 )
= 1066.13 mm2
provide 16mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(162)/1066.13)*1000
= 189.15 mm = 180mm
Provide 16mmΦ at 180 mm c/c along vertical direction
23SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Step:6 Area of steel for inner face:
Ast = (max BM / σst * j *d)
= (13.07x 10 6 / 115* 0.85* 280)
= 477.5 mm2
provide 12mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(122)/477.5)*1000
= 236.85mm = 230mm
Provide 12mmΦ at 230 mm c/c along vertical direction
24SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Step 7: Horizontal reinforcement for long wall:
Area of distribution bar = 0.3% (b*D)
= (0.3/100) (1000*320)
= 960 mm2
provide 10 mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(102)/960)*1000
= 81.87mm = 100mm
Provide 10mmΦ at 100 mm c/c along horizontal direction
on both faces.
25SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• step-8 Design Of Short Wall
intensity of earth pressure, p = 48.64 kN/m2
Max BM = pH2/12
= 48.64 * 3*3/ 12
= 36.48 kNm
Effective span = clear span +( thickness/2)
= 3 + (0.32/2)+(0.32/2)
= 3.32 m
Effective depth, d = √M/ Q.b
= √(36.48x106/1.33*1000)
= 165.61 < 280 mm
adopt, d = 280 mm
26SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Step-9 Area of steel for short wall:
Ast = (max BM / σst * j *d)
= (36.48x 10 6 / 115* 0.85* 280)
= 1332.84 mm2
provide 16mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(162)/1332.84)*1000
= 150mm
Provide 16mmΦ at 150 mm c/c on both faces.
27SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Step 10: Horizontal reinforcement for short wall:
Area of distribution bar = 0.3% (b*D)
= (0.3/100) (1000*320)
= 960 mm2
provide 10 mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(102)/960)*1000
= 81.87mm = 100mm
Provide 10mmΦ at 100 mm c/c.
28SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Step-11 Design Of Roof Slab :
Let us assume the overall thickness as slab , t = 150mm
Assume cover = 25mm
Eff.depth provided = 150 -((25/2)+(25/2))
= 125mm
• Load calculation
self wt of slab/ m2 = (1 * 0.15* 1 * 20) = 3 kN/m2
Live load/ m2 = 2.5 kN/m2
Floor finish = 0.5 kN/m2
Total load = 6 kN/m2
Ratio of Ly/Lx = 10.35 / 3.35 = 3.09 > 2
Hence one way slab Max.
29SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
Moment calculation:
BM (M) = W* D2/ 8
= 6 * 3.32* 3.32/ 8
= 8.26 kNm
check for depth :
d = √M/ Q.b
= √(8.26x106/1.33*1000)
= 78.80 < 100 mm
adopt, d= 100 mm
30SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Area of steel:
Ast = (max BM / σst * j *d)
= (8.26x 10 6 / 115* 0.85* 125)
= 676.01 mm2
provide 10mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(162)/761.12)*1000
= 103.198mm = 100mm
Provide 10mmΦ at 100 mm c/c.
31SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
• Distribution bar :
Area of distribution bar = 0.3% (b*D)
= (0.3/100) (1000*150)
= 450 mm2
provide 8 mm dia bar
Spacing:
s = ( ast / Ast )*1000
= ( (π/4*(82)/450)*1000
= 111.70mm = 110mm
Provide 8mmΦ at 110 mm c/c spacing.
32SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II 33

More Related Content

What's hot

Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
hlksd
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
Saleem Malik
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
Subham Kundu
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
Md Tanvir Alam
 

What's hot (20)

Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
Rcc design by working stress method
Rcc design by working stress methodRcc design by working stress method
Rcc design by working stress method
 
Design of rcc structures
Design of rcc structuresDesign of rcc structures
Design of rcc structures
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Well foundation
Well foundationWell foundation
Well foundation
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 
Sheet pile presentation
Sheet pile presentationSheet pile presentation
Sheet pile presentation
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Limit state method
Limit state methodLimit state method
Limit state method
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
Compression member
Compression memberCompression member
Compression member
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss
 
Slabs -Design steps
Slabs -Design steps Slabs -Design steps
Slabs -Design steps
 

Viewers also liked

Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
aryan kumar
 
Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
Mannu Amrit
 

Viewers also liked (20)

Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
Selecting topic 4 FYP v3
Selecting topic 4 FYP v3Selecting topic 4 FYP v3
Selecting topic 4 FYP v3
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
Stv cc ppt unit i (1.1)em&ce  introduction-construction layoutStv cc ppt unit i (1.1)em&ce  introduction-construction layout
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc road
 
Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
 
Minor Project Report On Construction of Pipe Culvert
Minor Project Report  On Construction of  Pipe CulvertMinor Project Report  On Construction of  Pipe Culvert
Minor Project Report On Construction of Pipe Culvert
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 

Similar to Introduction & under ground water tank problem

350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
Harish Mahavar
 

Similar to Introduction & under ground water tank problem (20)

350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
Abhishek khandelwal
Abhishek khandelwalAbhishek khandelwal
Abhishek khandelwal
 
Properities Of Plain & Slag Concrete
Properities Of Plain & Slag ConcreteProperities Of Plain & Slag Concrete
Properities Of Plain & Slag Concrete
 
strip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxstrip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docx
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
 
Important Technical Terms in Concrete Design
Important Technical Terms in Concrete DesignImportant Technical Terms in Concrete Design
Important Technical Terms in Concrete Design
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORT
 
Structural Design
Structural DesignStructural Design
Structural Design
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
 
Design of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an Auditorium
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Concrete cloth
Concrete cloth Concrete cloth
Concrete cloth
 
Intze Tank.ppt
Intze Tank.pptIntze Tank.ppt
Intze Tank.ppt
 
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkkskIntze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Introduction & under ground water tank problem

  • 1. DESIGN OF REINFORCED CONCRETE STRUCTURES 1SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 2. UNIT-II WATER TANKS 2SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 3. Needs (or) uses for water tanks • Water tank is a container for storing liquids Needs : Drinking purpose Irrigation process Fire suspension Chemical manufacture  preparation for well, etc 3SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 4. • What is design…???? • why is it???? 4SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 5. RCC WATER TANK DESIGN BASIS • RCC Water tank design is based on IS 3370: 2009 (Parts I – IV). • The design depends on the location of tanks, i.e. overhead, on ground or underground water tanks. • The tanks can be made in different shapes usually circular and rectangular shapes are mostly used. 5SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 6. • The tanks can be made of RCC or even of steel. • The overhead tanks are usually elevated from the roof top through column. • In the other hand the underground tanks are rested on the foundation. 6SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 7. TYPES OF WATER TANKS • Based on the location of the tank in a building s tanks can be classified into three categories. Those are:  Underground tanks  Tank resting on grounds  Overhead tanks 7SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 8.  In most cases the underground and on ground tanks are circular or rectangular is shape.  The shape of the overhead tanks are influenced by the aesthetical view of the surroundings and as well as the design of the construction. 8SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 9.  A special type of tank named Intze tank is used for storing large amount of water for an area. Intze tank 9SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 10. Spherical Steel tanks are also used specially in railway yards. Basing on the shape the tanks can be circular, rectangular, square, polygonal, spherical and conical. Conical 10SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 11. PERMISSIBLE STRESSES IN CONCRETE • To ensure impervious concrete mixture linear than M20 grade is not normally recommended to make the walls leak proof the concretes near the water face need to such that no crack occurs. • To ensure this member thicknesses are so designed that stress in the concrete is lesser then the permissible as given in table 1. 11SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 12. Grade of Concrete Permissible Stresses Shear stress N/mm2Direct Tension N/mm2 Tension due to bending N/mm2 M15 1.1 1.5 1.5 M20 1.2 1.7 1.7 M25 1.3 1.8 1.9 M30 1.5 2.0 2.2 M35 1.6 2.2 2.7 M40 1.7 2.4 2.7 Table 1 Permissible Stresses In Concrete (For calculations relating to resistance to concrete) 12SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 13. THE PERMISSIBLE STRESS IN STEEL • The stress in steel must not be allowed to exceed the following values under different positions to prevent cracking of concrete. • When steel is placed near the face of the members in contact with liquid  115 N/mm2 for ms Bars and  150 N/mm2 for HYSD bars. • When steel is placed on the face away from the liquid for members 225 mm or more in thickness:  125 N/mm2 for M.S. bars and  190 N/mm2 for HYSD bars.  HYSD bars– High Yielding Strength Deformed bars. 13SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 14. BASE FOR FLOOR SLAB • The floor slab should be strong enough to transmit the load from the liquid and the structure itself to the ground without subsidence. The floor slab is usually 150 to 200 mm thick. • Before laying the slab the bed has to be rammed and leveled then a 75 mm thick layer of lean concrete of M100 grade should be laid and cured. 14SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 15. MINIMUM REINFORCEMENT FOR WATER TANK • Minimum reinforcement required for 200mm thick sections is 0.3 % of the area of concrete section which reduced linearly to 0.2% for 450 mm thick sections. • In case of floor slab for tank resting on ground the minimum reinforcement from practical consideration should not be less than 0.3% of the gross sectional area of the floor slab. 15SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 16. UNDER GROUND WATER TANKS EXAMPLE : 1 To Design an underground RC rectangular water tank of 10m x 3m x 3m. The soil surrounding the tank is in dry states & sometimes wet state. Angle of repose of soil in dry state is 30° and in wet state 6°. Density of soil is 20kN/m3. Adopt M20 grade of concrete & Fe415 steel. 16SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 17. DESIGN PROCEDURE • Given data: Size = 10m x 3m x 3m Angle of repose @ dry soil = 30o Angle of repose @ wet soil = 6o Density (or) unit wt of soil= 20 kN/m3 17SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 18.  Step:1 permissible & design values: Tension due to bending ( concrete), σct = 1.7 N/mm2 (Pg.no.:2,table- 1, IS 3370;part-II) Compression due to bending ( concrete), σcbc = 7 N/mm2 (Pg.no.:3, table – 2, IS 3370;part-II) or (IS 456, page no.81) Steel reinforcement for strength, σst = 115 N/mm2 (Pg.no.:3, table- 4) Design constant, m = 280 / 3* σcbc = 280 / 3*7 = 13.33 18SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 19. j =1 –(n/3) n = (1/( 1+ (σst /m* σcbc))) = (1/(1+(115/13.33*7))) =0.447 j = 1-(0.447/3) = 0.85 Q = (1/2)* σcbc * n * j = (1/2) * 7 * 0.447 * 0.85 = 1.32 SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II 19
  • 20.  Step : 2 design of long walls: Ratio for long wall = L/H = 10 / 3 = 3.33 >2 Ratio for short wall = B/H = 3/3 = 1 < 2 Long walls are designed as vertical cantilevers and Short walls are designed as continuous slab. pressure intensity @ wet soil, P = w*h* (1-sinφ/1+sin φ) = 20 *3*(1-sin 6o /1+sin6o ) = 48.64 kN/m2 20SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 21. Step:3 Design of long wall By considering 1m run of wall BM calculation for vertical reinforcement: Max B.M at top (tension near water face ) Max BM @ top = pH2/33.5 = (48.65 * 3 * 3 ) / 33.5 = 13.06kNm Max B.M @ bottom = pH2/15 = 48.64 * 3 * 3 / 15 = 29.18kNm Walls of underground water tank must also be designed cracking stress consideration. 21SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 22. • Step 4 Thickness of wall: Max BM, M = (σct * bD2) / 6 29.18x 106 = (1.7 * 1000 * D2 ) / 6 29.18x 106 = 283.33 * D2 D2 = 29.18x 106 / 283.33 D = 323mm provide overall depth, D = 320mm cover, d’ = 40mm Effective depth, d eff = 320-40 = 280 mm 22SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 23. • step-5 Area of steel required for long wall: for outer face: Ast = (max BM / σst * j *d) = (29.18x 10 6 / 115* 0.85*280 ) = 1066.13 mm2 provide 16mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(162)/1066.13)*1000 = 189.15 mm = 180mm Provide 16mmΦ at 180 mm c/c along vertical direction 23SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 24. • Step:6 Area of steel for inner face: Ast = (max BM / σst * j *d) = (13.07x 10 6 / 115* 0.85* 280) = 477.5 mm2 provide 12mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(122)/477.5)*1000 = 236.85mm = 230mm Provide 12mmΦ at 230 mm c/c along vertical direction 24SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 25. • Step 7: Horizontal reinforcement for long wall: Area of distribution bar = 0.3% (b*D) = (0.3/100) (1000*320) = 960 mm2 provide 10 mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(102)/960)*1000 = 81.87mm = 100mm Provide 10mmΦ at 100 mm c/c along horizontal direction on both faces. 25SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 26. • step-8 Design Of Short Wall intensity of earth pressure, p = 48.64 kN/m2 Max BM = pH2/12 = 48.64 * 3*3/ 12 = 36.48 kNm Effective span = clear span +( thickness/2) = 3 + (0.32/2)+(0.32/2) = 3.32 m Effective depth, d = √M/ Q.b = √(36.48x106/1.33*1000) = 165.61 < 280 mm adopt, d = 280 mm 26SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 27. Step-9 Area of steel for short wall: Ast = (max BM / σst * j *d) = (36.48x 10 6 / 115* 0.85* 280) = 1332.84 mm2 provide 16mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(162)/1332.84)*1000 = 150mm Provide 16mmΦ at 150 mm c/c on both faces. 27SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 28. • Step 10: Horizontal reinforcement for short wall: Area of distribution bar = 0.3% (b*D) = (0.3/100) (1000*320) = 960 mm2 provide 10 mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(102)/960)*1000 = 81.87mm = 100mm Provide 10mmΦ at 100 mm c/c. 28SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 29. • Step-11 Design Of Roof Slab : Let us assume the overall thickness as slab , t = 150mm Assume cover = 25mm Eff.depth provided = 150 -((25/2)+(25/2)) = 125mm • Load calculation self wt of slab/ m2 = (1 * 0.15* 1 * 20) = 3 kN/m2 Live load/ m2 = 2.5 kN/m2 Floor finish = 0.5 kN/m2 Total load = 6 kN/m2 Ratio of Ly/Lx = 10.35 / 3.35 = 3.09 > 2 Hence one way slab Max. 29SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 30. Moment calculation: BM (M) = W* D2/ 8 = 6 * 3.32* 3.32/ 8 = 8.26 kNm check for depth : d = √M/ Q.b = √(8.26x106/1.33*1000) = 78.80 < 100 mm adopt, d= 100 mm 30SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 31. • Area of steel: Ast = (max BM / σst * j *d) = (8.26x 10 6 / 115* 0.85* 125) = 676.01 mm2 provide 10mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(162)/761.12)*1000 = 103.198mm = 100mm Provide 10mmΦ at 100 mm c/c. 31SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II
  • 32. • Distribution bar : Area of distribution bar = 0.3% (b*D) = (0.3/100) (1000*150) = 450 mm2 provide 8 mm dia bar Spacing: s = ( ast / Ast )*1000 = ( (π/4*(82)/450)*1000 = 111.70mm = 110mm Provide 8mmΦ at 110 mm c/c spacing. 32SKCET / CIVIL / FINAL YEAR/ DRC-II / UNIT-II