Back Ache and Bamboo:
                              An alternative approach to dyke construction
                                  in flood prone communities in Nepal

Background Throughout Nepal the theory and practice of gabion box construction to protect river banks
and hill slopes is well known. In areas where rocks are abundant their construction represents a cost
effective and locally replicable way for communities to utilize relatively abundant natural resources for
local risk reduction and protection purposes1.

Practical Action has used this technique in
previous DRR2 projects, but during 2007/8, in
its DIPECHO3 supported Bardia and Banke
programme, it was faced with a number of
constraints.

In Bardia in particular vulnerable riverside
communities are some distance from the hills
meaning that rivers do not have sufficient power
to carry large rocks to their locations, instead
depositing them in the foot hills and first few
kilometers of the plains. As such rocks are either
unavailable locally or only at a prohibitive cost.
This makes gabion spur and dyke construction
expensive and ultimately unsustainable, as
beyond the resources of communities to replicate
independently.

Additionally, due to the profusion of vertical river
banks in the area, the construction of traditional
gabion spurs and dykes is simply likely to protect
one area at the expense of another. The stone
structures simply deflecting the destructive
power of the river either down-stream or to the
opposing bank (in Practical Actions previous
DDR programme in Chitwan and Nawalaparasi
this was not a major consideration, as the far
bank consisted entirely of national park, where               Cleaning bamboo before use. A practice which the
thick natural vegetation was largely impervious to               community subsequently found unnecessary.
periodic inundation).

Under this scenario there has been a need for an alternative strategy if the project is to stop erosion and
provide a technology and approach communities can replicate long term.

The theory

Regular river bank erosion and collapse take place in the Terai4 primarily due to two factors;

       1. The under cutting of vertical banks by flood waters (the water undermining the high bank,
          leading to subsidence and collapse)
       2. The creation of a rotational slippage plane, due to river bank soils becoming saturated by rain
          fall and surface run-off, leading to sections of bank losing their integrity and shearing off.
To stop this occurring both factors had to be addressed within the project. As such an approach
incorporating a number of interlinked components was proposed.




                               An example of how typical river bank failure occurs, due to;

               1. Under cutting of a vertical river bank by flood waters
               2. The creation of a slippage plane, caused by inundation and soil saturation.

Bamboo protection has been used elsewhere in Nepal, as has the use of sloping banks and sand bag
protection. What was not clear to Practical Action was if all three had been used in combination before,
and as such the idea was floated with communities as a possible ‘pilot’.

Looking at Balapur, a village within Ward 6 of Gulariya, areas of the bank looked suitable to try this
combination, with a number of factors influencing the decision;

   o   Near vertical banks, of relatively weak clay/soil mix, experiencing annual under-cutting and
       collapse, irrespective of the severity of the monsoon period flood/high water.
   o   The possible availability of land behind the bank for cutting back, to form a sloping bank, as not
       intensely cultivated at present (instead being used mainly for rough grazing and pasture)
   o   The bank side being open to the full erosive power of the river, but not being at a structurally
       weak point (such as the outside of a bend, where most cutting is likely to occur)
   o   High community mobilization and motivation to take action.
   o   The cost of stone gabion work being beyond the means of communities to support
The approach

Before the pilot could begin community members had to be convinced of the effectiveness of the
approach, particularly as it would involve a ‘voluntary’ loss of up to 8 metres (see below) of land before
the dyke could even be constructed. Given the extent of land loss experienced every year anyway,
community members eventually agreed, though there was skepticism from adjacent communities and the
residents of Balapur went as far as obtaining a written agreement from the landowner on whose land they
were testing the idea that he would not prosecute them if the project failed and even more land was lost !




                                                                              “People were not
                                                                              convinced. We had to make
                                                                              a contract with land holders
                                                                              mentioning they would not
                                                                              claim against us if their
                                                                              land was further lost !” -
                                                                              Kali Parsad Tharu (PIC
                                                                              President. Ward 6
                                                                              Gulariya).




    River bank at Balapur before slope cutting by community volunteers.

    To produce a stable slope in the sand/clay mix soil it was calculated a minimum angle of 35
    degrees (from horizontal) was required, though obviously, as a general rule, the less the degree
    from horizontal and the shallower the slope, the more stable it will be and the less likely to
    erode.




    “Previously people from
    other places said that
    we were mad, but now
    they say they appreciate
    what we have achieved
    and they also want to
    copy us” – Kali Prasad.
    President Ward 6
    project implementation
    committee.



                                              The same piece of river bank during cutting of the sloping bank

    As the vertical bank was about 6 metres high (at low water) this was eventually cut back by 8
    metres, giving an angle in the low 30 degrees. This was achieved by first digging a channel at
    30 degrees, as a guide and marker for the rest of the bank, which the rest of the slope copied.
The objective was to ultimately create not a barrier, to fight erosion (as in the case of a stone gabion
dyke), but a structure immune to erosion through its allowance of the water to non-destructively rise
up it (and later down it) without causing any obstruction likely to attract erosion by the river.

                                                        Once the slope had been created bamboo
                                                        poles when fixed both below and above the
                                                        water line. These were set up in several rows
                                                        parallel to the river bank. Strips of bamboo
                                                        were then woven between these poles to act as
                                                        a barrier.

                                                        Once this was completed old cement bags
                                                        were filled with sand from the river which also,
                                                        as a side effect, helped in part to lower the
                                                        river bed in the immediate area of the dyke.
                                                        These were used to ‘face’ the slope, making it
                                                        even more impervious to the destructive
                                                        powers of the river.

                                                        To stabalise and create long term strength to
                                                        the bank live bamboo and lemon grass
                                                        seedlings were also planted along the bank,
                                                        between the sand bags, to ultimately
   ‘naturalise’ the bank. Finally, to stop soil saturation and possible slippage due to water seeping
   in to the slope from the landward side, a lateral catchment drain was dug at the top of the bank.




   This was dug so that water emanating from the landward side of the slope could be drained to
   either end of the dyke, preventing it from percolating down and into the substance of the slope,
   so weakening it from within.
6

1. Bank before the intervention




2. Calculation for cutting back of bank to create optimum slope




3. Positioning of bamboo poles, bamboo matting fences and sand bags
4. Completion of dyke with construction of lateral drainage channel


In original calculations it was estimated that Gabion work necessary to protect this 150 meter
length of bank would cost 1,700,000Nrs (approx £13,600/€19,000/$27,200)5. This was
beyond the budget of the project, but more importantly beyond the resources of the community
to replicate themselves, un-aided, long-term.




                Sand bag filling and fence weaving during low water at Balapur during June 2008

In constructing the sloping protection work using local materials only 92,866 Nrs was spent in
total (£750/€1050/$1500). 56,000Nrs was spent on bags, while bamboo was purchased at a
subsidised price (of about 50% of market rate) from the communities own collectively owned
resources at 28,185Nrs. The remainder of the cost was made up of the cost of string, to tie
bags, and a small amount for transportation.
On top of this labour equivalent to 160 people working for 16 days (= 2,560 person days) was
contributed by the community. At a low daily wage rate of 125 Nrs per day this equates to
320,000 Nrs. However, as the community members contributed this free of charge, it was not
factored into the ‘costs’ by the community themselves.

Who contributed ?

Interestingly nearly all families contributed some labour, with families and individuals with no
real likelihood of benefiting from the dyke (living far from the river bank) also taking part. The
only minor incentive was 700Kgs of rice contributed by a local NGO, BASE, from supplies
provided by the WFP.

This equated to a one off distribution of 4.5 kg per person. At a per kg price of 35Nrs this
equated to just 158Nrs per person, or a total of 24,500Nrs for all labour volunteered.

Within the community they developed a programme where everyone contributed to all activities,
rather than individuals just working on one aspect of the programme. As such everyone
contributed some time to shelter construction, setting up early warning systems and dyke
construction, so collective ownership, as well as skills development and understanding were
spread evenly.

The experience of the 2008 monsoon

During both early and late August 2008 water levels of 4.5 metres, as measured on recently
installed flood gauges were recorded. This is about 3.5 metres from the top of the bank (so 8
meters on the locally installed gauges is the critical level for local flood, as this is the point at
which river water would over flow the banks).

Following the floods the following issues and impacts were observed;

1. Some ripping and deterioration of sand bags was observed, but oddly this was at the higher
levels of the bank, rather than the lower where the bags were almost totally submerged.

After discussion it was decided this was
most likely the result of the fabric of the
bags breaking down under extreme sun light
(whereas they were protected under water).
The bags used were old cement bags, so in
future Practical Action will advise on the use
of new, rice-type bags, as these are thought
to be of better quality and more durable.
Additionally the possibility of using bags
made of natural fibers may be explored. All
damage to the bags caused by the floods of
July/August 2008 has already been repaired
by the community, at very little cost.
       Damaged bags on the upper level of the dyke.
2. At the extreme down
                                                                            stream end of the dyke the
                                                                            lateral drain at the top was
                                                                            not fully completed before
                                                                            the on-set of the monsoon.
                                                                            As such water percolating
                                                                            through the dyke caused
                                                                            the leading edge of the
                                                                            dyke to collapse and a
                                                                            section of bags to slip
                                                                            about a meter (though they
                                                                            were not washed away).
                                                                            This has proved the value
                                                                            and effectiveness of the
                                                                            drain and as such this has
                                                                            now been extended to
                                                                            ensure protection of the
                                                                            whole dyke.
         Slippage caused by saturation of the dyke from the landward side



 3. Bamboo matting woven between the posts has almost totally been washed away, as have
 some posts. This was foreseen and is acknowledged by the community as a component which
 will have to be replaced annually. However the posts have also caught a lot of floating debris
 which community members are convinced has added to the strength and resilience of the dyke.
 The posts and matting have also encouraged the deposition of sand and silt (due to flood waters
 being forced to slow down), which have also added strength to the dyke.

 “We missed the fact that
 we should use the bamboo
 immediately after cutting,
 as live it can create a living
 barrier………this dyke
 performed very well this
 year because the dyke
 sieves and catches mud
 and other materials”

 – Kali Prasad. President
 Ward 6 project
 implementation committee.



      Bamboo shoots beginning to
spontaneously sprout from posts on
   the Balapur dyke. August 2008


 5. As the communities were not totally convinced of the effectiveness of the approach stone
 spurs were build both upstream and down stream of the sloping bank. Interestingly the gabion
spur down stream in particular was badly distorted by this years flood (indicating the floods
power and ferocity) and is unlikely to last many years before being completely destroyed.

                                                                     Beyond this the existing
                                                                     ‘natural’ vertical bank has
                                                                     again been cut back, by
                                                                     between 1.5 and 2 meters,
                                                                     with this likely to continue
                                                                     year on year. In reality
                                                                     however this level of erosion
                                                                     is very small, as only a small
                                                                     distance further down stream
                                                                     bank up to a depth of 20
                                                                     meters has been lost, which
                                                                     is more ‘normal’.

                                                                     Badly damage stone spur
                                                                     immediately below the sand bagged
                                                                     slopping dyke.

Community members are convinced the relatively small amount of land lost in the area
immediately down stream of the dyke is the result of the main channel of the river being
redirected across towards the far bank, where it was some years previously.

While it is not possible to claim this is solely the result of the dyke, the fact that the sloping
bank allows water to rise unrestricted up it, where previously the vertical bank gave only the
opportunity to undermine it, does seem to have effected the rivers morphology and made it more
likely to deposit materials than remove them.

       “We never expected the result we have achieved…. now we have seen the reality and
       seen the real effects, this is why this work is so wonderful and exciting for us” -
       Sobendra Chaudhary – PIC secretary

The Future

The community of Balapur are now keen to extend the sloping bank work both up and down
stream of the existing pilot plot and have already approached local NGOs and the municipality
for support. Similarly communities from further down stream, from Ward 10, are also interested
in using the approach, while staff from the DWIDP (Department for Water induced Disaster
Preparedness) among others have also visited, to assess the approach and gather information, as
this is not an approach currently practiced by themselves.

Practical Action itself intends to further explore technical aspects of the approach, such as
alternative materials and the influence of different soil types, while it’s also committed to using
the expertise which now exists within the community in Balapur to further disseminate the
approach both in terms of the technology used and the approach to community mobilisation.

Learning and future developments

o   Using this approach dykes can be added to, improved, or repaired incrementally as time and
    resources permit. In the case of gabion work this type of construction will always require a
    major financial outlay.
o   Unless banks are cut back to a sufficiently low angle undermining may still occur. The angle
    is likely to be less critical in structurally less critical locations, such as the inside of bends,
    but far more so in highly vulnerable areas such as the outsides of bends, where maximum
    erosion occurs.




              Balapur dyke mid-monsoon. Post-monsoon the stone gabion work was badly damaged
                            while the sloping bank remained almost totally intact.

o   The creation of upslope drainage seems critical to bank stability. To stint on this aspect is
    likely to be counter productive and could result in total slope failure.
o   In the case of Balapur the line of sandbags currently ends about 2 metres below the top/line
    of the lateral drain. Community members now realise this gives further opportunity for
    surface run-off and rain water ingress into the dyke and as such will soon extend this line of
    bags to the very top.
o   Making the slope of the bank inconsistent could offer the potential for flood water to exploit
    an area of weakness. As such the community in Balapur have decided to take greater care in
    maintaining a completely uniform slope angle in future dyke work.
o   The use of non light-degradable bags seems fairly critical. In future experimentation with
    other technologies might also be worth exploring, such as the covering of slopes with matting
    or netting and the use of natural rather than man-made fibers.
o   Originally it was planned that bags would only be 2/3 filled, with the unfilled section
    underlying the next bag above. In the event, due to bags being smaller than ideal, all bags
    were fully filled. While these have served satisfactorily in future the original plan is likely to
    be reverted to, as overlaying can only add strength.
o   It is too early to assess the success of planting bamboo within the fabric of the slope. Long
    term however it will be worth experimenting with other plant varieties as well as looking at
creating ‘live’ barriers by artificially encouraging barrier plants to inter-grow and combine
    with structural measures such as the vertical bamboo poles already used. In the construction
    of the bamboo components of the dyke bamboo which had been cut 15-20 days previously,
    and allowed to dry, was mainly used. However 6 or 7 ‘fresh’ poles were used which have
    subsequently sprouted and are setting down roots. In the past it was the practice to cut off
    all the “eyes” or “knots” on the bamboo but now the community believe they should use
    unprocessed, freshly cut bamboo, so it can grow.




                                    Keeping community participation records.




    “We will extend this work on the other bank also, by which we will save our village. To
    achieve this we will collect local materials such as bamboo, sticks and other raw
    materials” – Kali Prasad. President Ward 6 project implementation committee.

    “Yesterday (27th August) we visited the site along with other PIC members, villagers
    and people who use the place as a ferry crossing. The river level was 3.4 metres so
    we went to observe the level and to see the work was still intact. It was” – Sobendra
    Chaudhary – PIC secretary.



1
  See the Practical Action “Technical Brief” on Gabion box construction in Practical Actions previous DIPECHO
project in Chitwan and Nawalaparsi at http://practicalaction.org/practicalanswers/index.php?cPath=57
2
  Disaster Risk Reduction
3
  DIPECHO is the disaster preparedness component/funding line within the European Commissions broader
Humanitarian Aid department (ECHO)
4
  The Terai is a flat flood plain extending the entire length of Nepal, along its boarder with India.
5
  All prices and exchange rates used are as of 1st September 2008.

Más contenido relacionado

La actualidad más candente

Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSigve Hamilton Aspelund
 
Dams and their role in environment.
Dams and their role in environment.Dams and their role in environment.
Dams and their role in environment.Navjot Singh Saini
 
River Medina restoration report
River Medina restoration reportRiver Medina restoration report
River Medina restoration reportJoshua Day
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
Kenya; Water from Rock Outcrops: A handbook for Engineers and Technicians
Kenya;  Water from Rock Outcrops:  A handbook for Engineers and TechniciansKenya;  Water from Rock Outcrops:  A handbook for Engineers and Technicians
Kenya; Water from Rock Outcrops: A handbook for Engineers and TechniciansV9X
 
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...riseagrant
 
02 Coastal Stabilization And Alternative Solutions
02  Coastal Stabilization And Alternative Solutions02  Coastal Stabilization And Alternative Solutions
02 Coastal Stabilization And Alternative SolutionsKrystian Pilarczyk
 
GROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUESGROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUESAshim ghosh
 
Nepean Bay Bar
Nepean Bay BarNepean Bay Bar
Nepean Bay BarTony Smith
 
Processes and Landforms of the Willamette River and Floodplain
Processes and Landforms of the Willamette River and FloodplainProcesses and Landforms of the Willamette River and Floodplain
Processes and Landforms of the Willamette River and FloodplainWillamette River Initiative
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound SeawallSHAILESH SHUKLA
 
Mitigation strategies for flooding pdf
Mitigation strategies for flooding pdfMitigation strategies for flooding pdf
Mitigation strategies for flooding pdfDhanashri Mirajkar
 

La actualidad más candente (20)

Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systems
 
Dams and their role in environment.
Dams and their role in environment.Dams and their role in environment.
Dams and their role in environment.
 
Bmp terraces
Bmp terracesBmp terraces
Bmp terraces
 
River Medina restoration report
River Medina restoration reportRiver Medina restoration report
River Medina restoration report
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Macchu dam
Macchu dam Macchu dam
Macchu dam
 
Coasts
CoastsCoasts
Coasts
 
Kenya; Water from Rock Outcrops: A handbook for Engineers and Technicians
Kenya;  Water from Rock Outcrops:  A handbook for Engineers and TechniciansKenya;  Water from Rock Outcrops:  A handbook for Engineers and Technicians
Kenya; Water from Rock Outcrops: A handbook for Engineers and Technicians
 
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
 
Breakwater
BreakwaterBreakwater
Breakwater
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
02 Coastal Stabilization And Alternative Solutions
02  Coastal Stabilization And Alternative Solutions02  Coastal Stabilization And Alternative Solutions
02 Coastal Stabilization And Alternative Solutions
 
GROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUESGROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUES
 
Truckee River Restoration
Truckee River RestorationTruckee River Restoration
Truckee River Restoration
 
Nepean Bay Bar
Nepean Bay BarNepean Bay Bar
Nepean Bay Bar
 
Processes and Landforms of the Willamette River and Floodplain
Processes and Landforms of the Willamette River and FloodplainProcesses and Landforms of the Willamette River and Floodplain
Processes and Landforms of the Willamette River and Floodplain
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
Beach Nourishment
Beach NourishmentBeach Nourishment
Beach Nourishment
 
Mitigation strategies for flooding pdf
Mitigation strategies for flooding pdfMitigation strategies for flooding pdf
Mitigation strategies for flooding pdf
 

Destacado

Kdrri case study report english 2009 low res
Kdrri case study report english 2009 low resKdrri case study report english 2009 low res
Kdrri case study report english 2009 low resDIPECHO Nepal
 
Dipecho drr managers meet 2009 report
Dipecho drr managers meet 2009 reportDipecho drr managers meet 2009 report
Dipecho drr managers meet 2009 reportDIPECHO Nepal
 
3 drr priorities nepal dipecho presentation (unisdr)
3 drr priorities nepal dipecho presentation (unisdr)3 drr priorities nepal dipecho presentation (unisdr)
3 drr priorities nepal dipecho presentation (unisdr)DIPECHO Nepal
 
Ain emergency preparedness and response report
Ain emergency preparedness and response reportAin emergency preparedness and response report
Ain emergency preparedness and response reportDIPECHO Nepal
 
I day 3-policy on dm-moha
I day 3-policy on dm-mohaI day 3-policy on dm-moha
I day 3-policy on dm-mohaDIPECHO Nepal
 
Flip chart text low res
Flip chart text low resFlip chart text low res
Flip chart text low resDIPECHO Nepal
 
Dipecho nepal contribution2 hfa final report nov 30 _2_
Dipecho nepal contribution2 hfa final report nov 30 _2_Dipecho nepal contribution2 hfa final report nov 30 _2_
Dipecho nepal contribution2 hfa final report nov 30 _2_DIPECHO Nepal
 
Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11DIPECHO Nepal
 
Disaster impact & drr in nepal a concern july14 15-2k10
Disaster impact & drr in nepal a concern july14 15-2k10Disaster impact & drr in nepal a concern july14 15-2k10
Disaster impact & drr in nepal a concern july14 15-2k10DIPECHO Nepal
 
11. windstromet dks 11
11. windstromet dks 1111. windstromet dks 11
11. windstromet dks 11DIPECHO Nepal
 
Kdrri case study report nepali 2009 low res
Kdrri case study report nepali 2009 low resKdrri case study report nepali 2009 low res
Kdrri case study report nepali 2009 low resDIPECHO Nepal
 
13. cold wave dks 13
13. cold wave dks 1313. cold wave dks 13
13. cold wave dks 13DIPECHO Nepal
 
Ii day 8-npc presentation
Ii day 8-npc presentationIi day 8-npc presentation
Ii day 8-npc presentationDIPECHO Nepal
 
4 drr presentation[1]
4 drr presentation[1]4 drr presentation[1]
4 drr presentation[1]DIPECHO Nepal
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52DIPECHO Nepal
 

Destacado (18)

Kdrri case study report english 2009 low res
Kdrri case study report english 2009 low resKdrri case study report english 2009 low res
Kdrri case study report english 2009 low res
 
Dipecho drr managers meet 2009 report
Dipecho drr managers meet 2009 reportDipecho drr managers meet 2009 report
Dipecho drr managers meet 2009 report
 
3 drr priorities nepal dipecho presentation (unisdr)
3 drr priorities nepal dipecho presentation (unisdr)3 drr priorities nepal dipecho presentation (unisdr)
3 drr priorities nepal dipecho presentation (unisdr)
 
Ain emergency preparedness and response report
Ain emergency preparedness and response reportAin emergency preparedness and response report
Ain emergency preparedness and response report
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drr
 
I day 3-policy on dm-moha
I day 3-policy on dm-mohaI day 3-policy on dm-moha
I day 3-policy on dm-moha
 
Flip chart text low res
Flip chart text low resFlip chart text low res
Flip chart text low res
 
Climatechange
ClimatechangeClimatechange
Climatechange
 
Dipecho nepal contribution2 hfa final report nov 30 _2_
Dipecho nepal contribution2 hfa final report nov 30 _2_Dipecho nepal contribution2 hfa final report nov 30 _2_
Dipecho nepal contribution2 hfa final report nov 30 _2_
 
Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11
 
Dipecho broucher
Dipecho broucherDipecho broucher
Dipecho broucher
 
Disaster impact & drr in nepal a concern july14 15-2k10
Disaster impact & drr in nepal a concern july14 15-2k10Disaster impact & drr in nepal a concern july14 15-2k10
Disaster impact & drr in nepal a concern july14 15-2k10
 
11. windstromet dks 11
11. windstromet dks 1111. windstromet dks 11
11. windstromet dks 11
 
Kdrri case study report nepali 2009 low res
Kdrri case study report nepali 2009 low resKdrri case study report nepali 2009 low res
Kdrri case study report nepali 2009 low res
 
13. cold wave dks 13
13. cold wave dks 1313. cold wave dks 13
13. cold wave dks 13
 
Ii day 8-npc presentation
Ii day 8-npc presentationIi day 8-npc presentation
Ii day 8-npc presentation
 
4 drr presentation[1]
4 drr presentation[1]4 drr presentation[1]
4 drr presentation[1]
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52
 

Similar a Practical action balapur dyke construction

Rivers, floods and management
Rivers, floods and management Rivers, floods and management
Rivers, floods and management jamierjhill
 
PHAD Case Study Under DBI Programme
PHAD Case Study Under DBI ProgrammePHAD Case Study Under DBI Programme
PHAD Case Study Under DBI Programmelivolinkfoundation
 
Recharge Well Brochure
Recharge Well BrochureRecharge Well Brochure
Recharge Well Brochurebiomeshubha
 
design of gravity dam
design of gravity damdesign of gravity dam
design of gravity damRisso Johnny
 
Human response to flood
Human response to floodHuman response to flood
Human response to floodMs Geoflake
 
Water edge Structure
Water edge StructureWater edge Structure
Water edge StructureDms1999
 
50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]sachindk
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...IRJET Journal
 
Rivers - George Mather, Chris Hancox, Alex Owen and Michael Soley
Rivers - George Mather, Chris Hancox, Alex Owen and Michael SoleyRivers - George Mather, Chris Hancox, Alex Owen and Michael Soley
Rivers - George Mather, Chris Hancox, Alex Owen and Michael SoleyKeith Phipps
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.kaustubhpetare
 
1_interlinking of rivers_22, 26
1_interlinking of rivers_22,     261_interlinking of rivers_22,     26
1_interlinking of rivers_22, 26Gausiya Mundewadi
 
Revision booklet 2015 OCR B Geography
Revision booklet 2015 OCR B GeographyRevision booklet 2015 OCR B Geography
Revision booklet 2015 OCR B GeographyMrs Coles
 

Similar a Practical action balapur dyke construction (20)

Hard engineering
Hard engineeringHard engineering
Hard engineering
 
Rivers, floods and management
Rivers, floods and management Rivers, floods and management
Rivers, floods and management
 
PHAD Case Study Under DBI Programme
PHAD Case Study Under DBI ProgrammePHAD Case Study Under DBI Programme
PHAD Case Study Under DBI Programme
 
Iv2616901694
Iv2616901694Iv2616901694
Iv2616901694
 
Embankment
EmbankmentEmbankment
Embankment
 
Recharge Well Brochure
Recharge Well BrochureRecharge Well Brochure
Recharge Well Brochure
 
design of gravity dam
design of gravity damdesign of gravity dam
design of gravity dam
 
Human response to flood
Human response to floodHuman response to flood
Human response to flood
 
Water edge Structure
Water edge StructureWater edge Structure
Water edge Structure
 
types of dam
types of damtypes of dam
types of dam
 
50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]
 
DaMS
DaMSDaMS
DaMS
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...
 
Unit 6
Unit 6Unit 6
Unit 6
 
Rivers - George Mather, Chris Hancox, Alex Owen and Michael Soley
Rivers - George Mather, Chris Hancox, Alex Owen and Michael SoleyRivers - George Mather, Chris Hancox, Alex Owen and Michael Soley
Rivers - George Mather, Chris Hancox, Alex Owen and Michael Soley
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
 
Dams
DamsDams
Dams
 
Geological Considerations - Dam
Geological Considerations - DamGeological Considerations - Dam
Geological Considerations - Dam
 
1_interlinking of rivers_22, 26
1_interlinking of rivers_22,     261_interlinking of rivers_22,     26
1_interlinking of rivers_22, 26
 
Revision booklet 2015 OCR B Geography
Revision booklet 2015 OCR B GeographyRevision booklet 2015 OCR B Geography
Revision booklet 2015 OCR B Geography
 

Más de DIPECHO Nepal

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster developmentDIPECHO Nepal
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011DIPECHO Nepal
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on ccaDIPECHO Nepal
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepaliDIPECHO Nepal
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programmeDIPECHO Nepal
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation reportDIPECHO Nepal
 
Early warning system
Early warning systemEarly warning system
Early warning systemDIPECHO Nepal
 
Communication channel
Communication channelCommunication channel
Communication channelDIPECHO Nepal
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upcaDIPECHO Nepal
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 englishDIPECHO Nepal
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_studyDIPECHO Nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010DIPECHO Nepal
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practiceDIPECHO Nepal
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion reportDIPECHO Nepal
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09DIPECHO Nepal
 

Más de DIPECHO Nepal (20)

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster development
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on cca
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepali
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programme
 
School renovation
School renovationSchool renovation
School renovation
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
 
Rambati case
Rambati caseRambati case
Rambati case
 
Early warning system
Early warning systemEarly warning system
Early warning system
 
Communication channel
Communication channelCommunication channel
Communication channel
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upca
 
Biodyke
BiodykeBiodyke
Biodyke
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 english
 
Mason ort report
Mason ort reportMason ort report
Mason ort report
 
Inee nepal
Inee nepalInee nepal
Inee nepal
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_study
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practice
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion report
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09
 

Último

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 

Último (20)

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 

Practical action balapur dyke construction

  • 1. Back Ache and Bamboo: An alternative approach to dyke construction in flood prone communities in Nepal Background Throughout Nepal the theory and practice of gabion box construction to protect river banks and hill slopes is well known. In areas where rocks are abundant their construction represents a cost effective and locally replicable way for communities to utilize relatively abundant natural resources for local risk reduction and protection purposes1. Practical Action has used this technique in previous DRR2 projects, but during 2007/8, in its DIPECHO3 supported Bardia and Banke programme, it was faced with a number of constraints. In Bardia in particular vulnerable riverside communities are some distance from the hills meaning that rivers do not have sufficient power to carry large rocks to their locations, instead depositing them in the foot hills and first few kilometers of the plains. As such rocks are either unavailable locally or only at a prohibitive cost. This makes gabion spur and dyke construction expensive and ultimately unsustainable, as beyond the resources of communities to replicate independently. Additionally, due to the profusion of vertical river banks in the area, the construction of traditional gabion spurs and dykes is simply likely to protect one area at the expense of another. The stone structures simply deflecting the destructive power of the river either down-stream or to the opposing bank (in Practical Actions previous DDR programme in Chitwan and Nawalaparasi this was not a major consideration, as the far bank consisted entirely of national park, where Cleaning bamboo before use. A practice which the thick natural vegetation was largely impervious to community subsequently found unnecessary. periodic inundation). Under this scenario there has been a need for an alternative strategy if the project is to stop erosion and provide a technology and approach communities can replicate long term. The theory Regular river bank erosion and collapse take place in the Terai4 primarily due to two factors; 1. The under cutting of vertical banks by flood waters (the water undermining the high bank, leading to subsidence and collapse) 2. The creation of a rotational slippage plane, due to river bank soils becoming saturated by rain fall and surface run-off, leading to sections of bank losing their integrity and shearing off.
  • 2. To stop this occurring both factors had to be addressed within the project. As such an approach incorporating a number of interlinked components was proposed. An example of how typical river bank failure occurs, due to; 1. Under cutting of a vertical river bank by flood waters 2. The creation of a slippage plane, caused by inundation and soil saturation. Bamboo protection has been used elsewhere in Nepal, as has the use of sloping banks and sand bag protection. What was not clear to Practical Action was if all three had been used in combination before, and as such the idea was floated with communities as a possible ‘pilot’. Looking at Balapur, a village within Ward 6 of Gulariya, areas of the bank looked suitable to try this combination, with a number of factors influencing the decision; o Near vertical banks, of relatively weak clay/soil mix, experiencing annual under-cutting and collapse, irrespective of the severity of the monsoon period flood/high water. o The possible availability of land behind the bank for cutting back, to form a sloping bank, as not intensely cultivated at present (instead being used mainly for rough grazing and pasture) o The bank side being open to the full erosive power of the river, but not being at a structurally weak point (such as the outside of a bend, where most cutting is likely to occur) o High community mobilization and motivation to take action. o The cost of stone gabion work being beyond the means of communities to support
  • 3. The approach Before the pilot could begin community members had to be convinced of the effectiveness of the approach, particularly as it would involve a ‘voluntary’ loss of up to 8 metres (see below) of land before the dyke could even be constructed. Given the extent of land loss experienced every year anyway, community members eventually agreed, though there was skepticism from adjacent communities and the residents of Balapur went as far as obtaining a written agreement from the landowner on whose land they were testing the idea that he would not prosecute them if the project failed and even more land was lost ! “People were not convinced. We had to make a contract with land holders mentioning they would not claim against us if their land was further lost !” - Kali Parsad Tharu (PIC President. Ward 6 Gulariya). River bank at Balapur before slope cutting by community volunteers. To produce a stable slope in the sand/clay mix soil it was calculated a minimum angle of 35 degrees (from horizontal) was required, though obviously, as a general rule, the less the degree from horizontal and the shallower the slope, the more stable it will be and the less likely to erode. “Previously people from other places said that we were mad, but now they say they appreciate what we have achieved and they also want to copy us” – Kali Prasad. President Ward 6 project implementation committee. The same piece of river bank during cutting of the sloping bank As the vertical bank was about 6 metres high (at low water) this was eventually cut back by 8 metres, giving an angle in the low 30 degrees. This was achieved by first digging a channel at 30 degrees, as a guide and marker for the rest of the bank, which the rest of the slope copied.
  • 4. The objective was to ultimately create not a barrier, to fight erosion (as in the case of a stone gabion dyke), but a structure immune to erosion through its allowance of the water to non-destructively rise up it (and later down it) without causing any obstruction likely to attract erosion by the river. Once the slope had been created bamboo poles when fixed both below and above the water line. These were set up in several rows parallel to the river bank. Strips of bamboo were then woven between these poles to act as a barrier. Once this was completed old cement bags were filled with sand from the river which also, as a side effect, helped in part to lower the river bed in the immediate area of the dyke. These were used to ‘face’ the slope, making it even more impervious to the destructive powers of the river. To stabalise and create long term strength to the bank live bamboo and lemon grass seedlings were also planted along the bank, between the sand bags, to ultimately ‘naturalise’ the bank. Finally, to stop soil saturation and possible slippage due to water seeping in to the slope from the landward side, a lateral catchment drain was dug at the top of the bank. This was dug so that water emanating from the landward side of the slope could be drained to either end of the dyke, preventing it from percolating down and into the substance of the slope, so weakening it from within.
  • 5. 6 1. Bank before the intervention 2. Calculation for cutting back of bank to create optimum slope 3. Positioning of bamboo poles, bamboo matting fences and sand bags
  • 6. 4. Completion of dyke with construction of lateral drainage channel In original calculations it was estimated that Gabion work necessary to protect this 150 meter length of bank would cost 1,700,000Nrs (approx £13,600/€19,000/$27,200)5. This was beyond the budget of the project, but more importantly beyond the resources of the community to replicate themselves, un-aided, long-term. Sand bag filling and fence weaving during low water at Balapur during June 2008 In constructing the sloping protection work using local materials only 92,866 Nrs was spent in total (£750/€1050/$1500). 56,000Nrs was spent on bags, while bamboo was purchased at a subsidised price (of about 50% of market rate) from the communities own collectively owned resources at 28,185Nrs. The remainder of the cost was made up of the cost of string, to tie bags, and a small amount for transportation.
  • 7. On top of this labour equivalent to 160 people working for 16 days (= 2,560 person days) was contributed by the community. At a low daily wage rate of 125 Nrs per day this equates to 320,000 Nrs. However, as the community members contributed this free of charge, it was not factored into the ‘costs’ by the community themselves. Who contributed ? Interestingly nearly all families contributed some labour, with families and individuals with no real likelihood of benefiting from the dyke (living far from the river bank) also taking part. The only minor incentive was 700Kgs of rice contributed by a local NGO, BASE, from supplies provided by the WFP. This equated to a one off distribution of 4.5 kg per person. At a per kg price of 35Nrs this equated to just 158Nrs per person, or a total of 24,500Nrs for all labour volunteered. Within the community they developed a programme where everyone contributed to all activities, rather than individuals just working on one aspect of the programme. As such everyone contributed some time to shelter construction, setting up early warning systems and dyke construction, so collective ownership, as well as skills development and understanding were spread evenly. The experience of the 2008 monsoon During both early and late August 2008 water levels of 4.5 metres, as measured on recently installed flood gauges were recorded. This is about 3.5 metres from the top of the bank (so 8 meters on the locally installed gauges is the critical level for local flood, as this is the point at which river water would over flow the banks). Following the floods the following issues and impacts were observed; 1. Some ripping and deterioration of sand bags was observed, but oddly this was at the higher levels of the bank, rather than the lower where the bags were almost totally submerged. After discussion it was decided this was most likely the result of the fabric of the bags breaking down under extreme sun light (whereas they were protected under water). The bags used were old cement bags, so in future Practical Action will advise on the use of new, rice-type bags, as these are thought to be of better quality and more durable. Additionally the possibility of using bags made of natural fibers may be explored. All damage to the bags caused by the floods of July/August 2008 has already been repaired by the community, at very little cost. Damaged bags on the upper level of the dyke.
  • 8. 2. At the extreme down stream end of the dyke the lateral drain at the top was not fully completed before the on-set of the monsoon. As such water percolating through the dyke caused the leading edge of the dyke to collapse and a section of bags to slip about a meter (though they were not washed away). This has proved the value and effectiveness of the drain and as such this has now been extended to ensure protection of the whole dyke. Slippage caused by saturation of the dyke from the landward side 3. Bamboo matting woven between the posts has almost totally been washed away, as have some posts. This was foreseen and is acknowledged by the community as a component which will have to be replaced annually. However the posts have also caught a lot of floating debris which community members are convinced has added to the strength and resilience of the dyke. The posts and matting have also encouraged the deposition of sand and silt (due to flood waters being forced to slow down), which have also added strength to the dyke. “We missed the fact that we should use the bamboo immediately after cutting, as live it can create a living barrier………this dyke performed very well this year because the dyke sieves and catches mud and other materials” – Kali Prasad. President Ward 6 project implementation committee. Bamboo shoots beginning to spontaneously sprout from posts on the Balapur dyke. August 2008 5. As the communities were not totally convinced of the effectiveness of the approach stone spurs were build both upstream and down stream of the sloping bank. Interestingly the gabion
  • 9. spur down stream in particular was badly distorted by this years flood (indicating the floods power and ferocity) and is unlikely to last many years before being completely destroyed. Beyond this the existing ‘natural’ vertical bank has again been cut back, by between 1.5 and 2 meters, with this likely to continue year on year. In reality however this level of erosion is very small, as only a small distance further down stream bank up to a depth of 20 meters has been lost, which is more ‘normal’. Badly damage stone spur immediately below the sand bagged slopping dyke. Community members are convinced the relatively small amount of land lost in the area immediately down stream of the dyke is the result of the main channel of the river being redirected across towards the far bank, where it was some years previously. While it is not possible to claim this is solely the result of the dyke, the fact that the sloping bank allows water to rise unrestricted up it, where previously the vertical bank gave only the opportunity to undermine it, does seem to have effected the rivers morphology and made it more likely to deposit materials than remove them. “We never expected the result we have achieved…. now we have seen the reality and seen the real effects, this is why this work is so wonderful and exciting for us” - Sobendra Chaudhary – PIC secretary The Future The community of Balapur are now keen to extend the sloping bank work both up and down stream of the existing pilot plot and have already approached local NGOs and the municipality for support. Similarly communities from further down stream, from Ward 10, are also interested in using the approach, while staff from the DWIDP (Department for Water induced Disaster Preparedness) among others have also visited, to assess the approach and gather information, as this is not an approach currently practiced by themselves. Practical Action itself intends to further explore technical aspects of the approach, such as alternative materials and the influence of different soil types, while it’s also committed to using the expertise which now exists within the community in Balapur to further disseminate the approach both in terms of the technology used and the approach to community mobilisation. Learning and future developments o Using this approach dykes can be added to, improved, or repaired incrementally as time and resources permit. In the case of gabion work this type of construction will always require a major financial outlay.
  • 10. o Unless banks are cut back to a sufficiently low angle undermining may still occur. The angle is likely to be less critical in structurally less critical locations, such as the inside of bends, but far more so in highly vulnerable areas such as the outsides of bends, where maximum erosion occurs. Balapur dyke mid-monsoon. Post-monsoon the stone gabion work was badly damaged while the sloping bank remained almost totally intact. o The creation of upslope drainage seems critical to bank stability. To stint on this aspect is likely to be counter productive and could result in total slope failure. o In the case of Balapur the line of sandbags currently ends about 2 metres below the top/line of the lateral drain. Community members now realise this gives further opportunity for surface run-off and rain water ingress into the dyke and as such will soon extend this line of bags to the very top. o Making the slope of the bank inconsistent could offer the potential for flood water to exploit an area of weakness. As such the community in Balapur have decided to take greater care in maintaining a completely uniform slope angle in future dyke work. o The use of non light-degradable bags seems fairly critical. In future experimentation with other technologies might also be worth exploring, such as the covering of slopes with matting or netting and the use of natural rather than man-made fibers. o Originally it was planned that bags would only be 2/3 filled, with the unfilled section underlying the next bag above. In the event, due to bags being smaller than ideal, all bags were fully filled. While these have served satisfactorily in future the original plan is likely to be reverted to, as overlaying can only add strength. o It is too early to assess the success of planting bamboo within the fabric of the slope. Long term however it will be worth experimenting with other plant varieties as well as looking at
  • 11. creating ‘live’ barriers by artificially encouraging barrier plants to inter-grow and combine with structural measures such as the vertical bamboo poles already used. In the construction of the bamboo components of the dyke bamboo which had been cut 15-20 days previously, and allowed to dry, was mainly used. However 6 or 7 ‘fresh’ poles were used which have subsequently sprouted and are setting down roots. In the past it was the practice to cut off all the “eyes” or “knots” on the bamboo but now the community believe they should use unprocessed, freshly cut bamboo, so it can grow. Keeping community participation records. “We will extend this work on the other bank also, by which we will save our village. To achieve this we will collect local materials such as bamboo, sticks and other raw materials” – Kali Prasad. President Ward 6 project implementation committee. “Yesterday (27th August) we visited the site along with other PIC members, villagers and people who use the place as a ferry crossing. The river level was 3.4 metres so we went to observe the level and to see the work was still intact. It was” – Sobendra Chaudhary – PIC secretary. 1 See the Practical Action “Technical Brief” on Gabion box construction in Practical Actions previous DIPECHO project in Chitwan and Nawalaparsi at http://practicalaction.org/practicalanswers/index.php?cPath=57 2 Disaster Risk Reduction 3 DIPECHO is the disaster preparedness component/funding line within the European Commissions broader Humanitarian Aid department (ECHO) 4 The Terai is a flat flood plain extending the entire length of Nepal, along its boarder with India. 5 All prices and exchange rates used are as of 1st September 2008.