Due Diligence for
Solar PV Projects
    Daniel Belin, AICP

ecology and environment, Inc.
       www.ene.com
Enhancing Due Diligence
and Streamlining Permitting

        June 14-15, 2011


       Daniel Belin, AICP

  ecology and environment, Inc.
         www.ene.com
   Project Development Overview
   Due Diligence – Real Estate vs. Environmental
   GIS Demo
   The Permitting Process
   Streamlining Tips
Phase I & II ESA
   Legal standard - ASTM
   Real Estate document
   Contamination liabilities
   CERCLA
   Benefits – addresses legal liability for
    contamination
   Limitation – does not address other
    regulatory liability
Phase I & II ESA
   Not a green light
    to start design
   Don’t rush into
    development
 Did not
  invest in
  early issue
  identification

 Adjusting
  layout after
  design

 Wastes time
  and money
   Database searches
   GIS investigation
   Site reconnaissance
   Agency consultation
   Permitting matrix
   Critical Issues Analysis
Natural Environment             Built Environment
   Wildlife and Habitat           Land use
   Special Status and State-      Flat-panel PV -- 2.5~12.5
    Listed species                  acre/MW
   Habitat fragmentation or       Solar-thermal -- 5.0~12.5
    removal                         acre/MW
   Microclimate/habitat           Aesthetics/Visual Resources,
    changes                         glare
   Water availability             Recreation
   Cultural resources             Public involvement
Must be compatible with
other uses, immediate
and adjacent
   Mining and Agriculture often
    compatible
   Recreation/Tourism requires
    consideration
   Federal land: recreation use classes
    may preclude large-scale solar
    developments:
       Off-Highway Vehicles (OHV)
       Near Designated Wilderness Areas
        and Wilderness Study Areas
       Wild and Scenic Rivers
       National Trails
       Scenic Byways
       National, state, and local parks
   Cumulative impacts
   Disruption of wildlife
    movement corridors
   Direct loss of or
    change in native
    species habitat
   Shading from solar
    arrays can create a
    microclimate
   Disturbance due to
    human activity,
    roads, fences, and
    light
   Includes archaeology,
    paleontology, and historic
    structures
   Consultation with State
    Historic Preservation Office
   Tribal and federal agency
    consultation
   Varying levels of assessment
       Phase I survey where resources
        possible
       Phase II survey where
        resources known
       Monitoring during construction
   Historic buildings 50+ years
    old. Can include structures
    (cemeteries, bridges, dams)
   Often the most significant public
    concern
   Landscapes differ in their ability
    to accommodate change
   Technical approaches can quantify
    impacts. BLM and USFS have
    standard protocols.
   Strategies to minimize impacts
    and ease public controversy
   Determine visual sensitivity level
   Reduce impacts with careful array
    and road placement, vegetation
    screens
   Water for thermal-solar
    project cooling and
    mirror washing
    requirements can
    be significant
   Impacts to wetlands
    and streams (arroyos)
    must be avoided or
    mitigated
   Runoff / erosion from
    impervious surface
Water Use by Fuel Source and Generation Technology1

                                Wet Cooling                                                                                    Wet Cooling
                                Water                                     Other Water                                          Water       Other Water
                                Consumtion                                Consumptionb Generation                              Consumtion Consumptionb
          Generation Technology (gal/MWh)a                                (gal/MWh)    Technology                              (gal/MWh)a (gal/MWh)


                                                                                                                                       irrigation
          Solar Trough                         760-920                    8                      Biomass2                      300-480 dependentd
                                                                                                 Natural Gas
                                                                                                 Combined
          Solar Tower        750                                          8                      Cycle                  18-21  180
          Photovoltaic Solar 0                                            5c                     Coal (IGCC)f           140    200
                                                                                                                        avg. 4,500
          Wind                                 0                          0                      Hydroelectric          (evap)
          Fossil                               300-480                    35-104                 Nuclear       400-720e 75-180
1 Data calculated from U.S. Department of Energy, Energy Demands on Water Resources: Report to Congress on the Interdependency of Energy and Water (Dec. 2006), available at
http://www.sandia.gov/energy-water/docs/121-RptToCongress-EWwEIAcomments-FINAL.pdf. Carter provided notes. See Carter & Campbell, supra note 8, at 8.
a. Data is for cooling tower technology.
b. Includes water consumed in producing or enhancing the fuel source and in generation; excluding cooling water consumption.
c. National Renewable Energy Laboratory (NREL), Fuel from the Sky: Solar Power’s Potential for Western Energy Supply, NREL/SR-550-32160 (July 2002), at 99.
d. CRS provided note.
e. Cooling ponds which are commonly used at nuclear facilities consume roughly 720 gal/MWh.
f. IGCC is Integrated Gasification Combined-Cycle.
22 The biomass referenced in Table 2 does not include woody biomass.
» Case Study – Silver State Solar
  Predicted Water Consumption
     400 MW PV
     Ivanpah Valley, NV
     600 Acre-Feet-Annually (AFA) / 4 years
      (construction)
     21 AFA (operations)
     Average industrial development in
      region – 4,717 AFA
14: Easements,
                                                                                                                                                                            ROWs, Legal Issues
                       1:                                                  4: Visual        5/6:                                 8:                                               15: Other
                                 2: T & E Species        3: Open Space/                                  7: Floodplain/                    9: Waterways 10: Prime
Acres    Zoning   Conservation                                            Resources      Hist./Cult.                          Wetlands                                        Encumbrances,
                                         (c)                Parks (d)                                     Drainage (g)                          (i)     Ag. Land (j)
                   Areas (b)                                                  (e)        (miles) (f)                            (h)                                         17: Other Significant
                                                                                                                                                                               Resources and
                                                                                                                                                                                   Notes:
                                  Swainson's
                                     hawk 0.8 miles                                                      Yes. Floodplain
                                     away                                                               borders northern                     Stream/River                   Site is located in an
                                                                           8.15 miles    7.79 miles
                                  Delta button-                                                       part of property and                   crosses the                   Enterprise Zone
                                                                              from          from                                                                Prime
 160     AG-40        No.            celery 1.5 miles         No                                         stream through          No            property;                    Site has an Agricultural
                                                                           designated     Historic                                         canal/ditch along   Farmland
                                     and                                                                     property/                                                      Preserve R-69-C1
                                                                          scenic route     House                                            northern border
                                  giant garter                                                          Moderately well                                                    designation
                                     snake approx 3                                                           drained
                                     miles
                                  California tiger
                                     salamander
                                  Northern
                                     Hardpan Vernal
                                                                                                                              Freshwater
                                     Pool                                                                                                                                   Site is located in an
                                                                            1.42miles    9.15 miles                            Emergent
                                  vernal pool fairy                                                                                        Stream/River                    Enterprise Zone
                                                                               from         from       No/Moderately well     Wetland on                       Grazing
40.09    AG-40        Yes.           shrimp                   No                                                                                borders                     Site has an Agricultural
                                                                           designated     Historic         drained              eastern    northwest corner     land
                                  valley elderberry                                                                                                                        Preserve R-69-C1
                                                                          scenic route      Farm                               property
                                     longhorn beetle                                                                                                                        designation
                                                                                                                                border.
                                  western
                                     spadefoot are
                                  < 5 miles from the
                                  site but not on site
                                                                                                                                                 One
                                  Swainson's hawk                          22.96 from                    Yes. Floodplain                    Stream/River                    Site is located in an
                                                                                         4.89 miles                                          crosses the        Eastern
                                 0.29 miles from the                           the                      covers southern                                                     Enterprise Zone
                                                         Park 2.3 miles                     from                                            property, one      portion is
106.62   AG-40        No         site, burrowing owl                      intersection                       end of              No          stream/river
                                                                                                                                                                            Site has an Agricultural
                                                          from the site                   Historic                                                               prime
                                  0.6 miles from the                        of HWY                     property/somewhat                     borders the                    Preserve R-80-8
                                                                                           House                                                               farmland
                                          site                               580/5.                      poorly drained                    south end of the
                                                                                                                                                 site
                                  Swainson's hawk
                                       0.8 miles                          23.24 miles                                                                          Farmland
                                                                                         4.22 miles                                                                         Site is located in an
                                  Burrowing owl 2.6                         from the                                                                               of
                                                         Park 1.7miles                      from         No/Somewhat                        No streams or                   Enterprise Zone
43.31    AG-40        No           miles. California                      intersection                                           No             rivers
                                                                                                                                                               Statewide
                                                         from the site                    Historic       poorly drained                                                     No Agricultural
                                  tiger salamander                          of HWY                                                                             Importanc
                                                                                           House                                                                            Preserve designation
                                    within 5 miles.                          580/5.                                                                                e
GIS Online Siting Tool
1. Define regulatory process and involved agencies
2. Conduct initial surveys and studies to identify
   potential environmental impacts and required
   permits
3. Hold agency consultations
4. Complete detailed environmental surveys
5. Develop permit applications
6. Agency review
7. Public hearings
8. Final permits issued
   Bureau of Land
    Management
    ROW Application
    and Plan of
    Development

   National
    Environmental
    Policy Act

   State Siting
    Committee

   Conditional Use
    Permit Applications
    (County level)
Pre- application meeting

     Submit preliminary application
                                           30 day public
                                            notice and
County scheduled public hearing with P&Z     comment
            Board and BOCC                    period


                                           30 day public
      Submit final 1041 application         notice and
                                             comment
                                              period
 Joint public hearing with Planning and
        Zoning Board and BOCC

                                              Total:
P&Z Board hold meeting on same day and
                                           3-4 Months
    issue recommendations to BOCC


             BOCC Meeting
   Final Approval issued within 7 days
Preliminary Discussions        0-2 Months


    Pre- Application Period       6-9 Months


 Application Submittal Period     3 Months


Hearing and Service of Decision   0-2 Months


       Appeal Window               1 Month


                                    Total:
                                  18 Months
Application            30 days

   Notice of Intent Published
                                 45 days
        Public Scoping

           Draft EIS             6-9 months
                                 45 days
Comment Period / Agency Review

           Final EIS             6-9 months
Comment Period / Agency Review   45 days

   Record of Decision (ROD)
                                 Total:
        Appeal Period            18-24 months
       What takes so long?
        Seasonal field studies
        NEPA/State equivalent
         applicability
        Permit linkages and
         Agency communication
        Agency expertise and
         workload
        Statutory review times
        Quality and
         completeness of
         applications
        Agency and community
         relationships
“By putting these renewable energy
projects on a fast track, we are managing
our public lands not just for conventional
energy development but also for
environmentally responsible renewable
energy production that will power our clean
energy future.”

  Secretary of Interior, Ken Salazar
    November 5, 2009
   NEPA Fast Tracked Projects
       2 Solar PV projects
       Silver State – 400 MW PV
       Start to Finish – 14 months
       Agency schedule pre-set
       RECO office
       Statutory review times
       Strong management on all sides
       Project completely vetted
         before initiating NEPA
   Streamlining process                                    Desert tortoise

    Identification of key issues for
    timely resolution - 9 months
    before filing the application
   Shaved 6 months by
    establishing pre-filing process
   Issues raised during pre-filing:
       Quantitative cumulative impacts
        approach for desert tortoise
       New alternatives
       Dry lakes recreation
       Visual resources
       Mojave National Preserve
                                          Transmission lines in Ivanpah Valley
   Get your team talking details for a complete
    Project Description
   Dual state and federal lead agencies
   Cover needs for both agencies at once
   Added complexity can mean delays
   Plan ahead even more with two lead
    agencies
Frequent Data Gaps in Project Descriptions
 Complete land use tables
 GIS Data for access roads, tower locations
 Helicopter use plans
 Noxious weed plan
 Construction schedule – realistic?
 Work force requirements for O&M
 Decommissioning
 All project components covered?
 Construction equipment used – air emissions
   Expect a
    sophisticated public
   Document all
    outreach efforts
   Identify key public
    issues for your
    project
   Explain alternatives
    development
    process
   Take public
    recommendations
    for alternatives
    seriously
   Track all alternatives screened
   Address system alternatives
    (PV vs. CSP)
   Develop an adequate range of
    alternatives: BLM to require 3 to 4
    alternatives for renewable projects
   Agencies expect public engagement to
    develop alternatives for contentious
    projects
   No longer
    business as usual
   The bar has been
    raised
   Early agency
    attention equals
    feedback for your
    developing
    project and most
    likely a quicker
    decision process
Questions?
  Dan Belin
(703) 522-6065
dbelin@ene.com

More Related Content

Viewers also liked

Environmental and Social Due Diligence ESG Assessments
Environmental and Social Due Diligence ESG AssessmentsEnvironmental and Social Due Diligence ESG Assessments
Environmental and Social Due Diligence ESG AssessmentsRSM GC
 
Social & Environmental Due Diligence: From the Impact Case to the Business Case
Social & Environmental Due Diligence: From the Impact Case to the Business CaseSocial & Environmental Due Diligence: From the Impact Case to the Business Case
Social & Environmental Due Diligence: From the Impact Case to the Business CaseThe Rockefeller Foundation
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceAllen Matkins
 
Benefits Of Comprehensive Environmental Due Diligence
Benefits Of Comprehensive Environmental Due DiligenceBenefits Of Comprehensive Environmental Due Diligence
Benefits Of Comprehensive Environmental Due Diligencepaulhhayden
 
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...Monica Pollard
 
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...mtingle
 
The Accessible Office: Making Your Documents More Accessible to Users with Di...
The Accessible Office: Making Your Documents More Accessible to Users with Di...The Accessible Office: Making Your Documents More Accessible to Users with Di...
The Accessible Office: Making Your Documents More Accessible to Users with Di...Sharon Rosenblatt
 
gtFace: Salesforce (presentation)
gtFace: Salesforce (presentation)gtFace: Salesforce (presentation)
gtFace: Salesforce (presentation)kostienko2
 
Akka Clusterの耐障害設計
Akka Clusterの耐障害設計Akka Clusterの耐障害設計
Akka Clusterの耐障害設計TanUkkii
 
Kent State University Makerspace (proposal)
Kent State University Makerspace (proposal)Kent State University Makerspace (proposal)
Kent State University Makerspace (proposal)kate harmon
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVEversheds Sutherland
 
SearchLove London 2016 | Bas van den Beld | The Secrets of Storytelling
SearchLove London 2016 | Bas van den Beld | The Secrets of StorytellingSearchLove London 2016 | Bas van den Beld | The Secrets of Storytelling
SearchLove London 2016 | Bas van den Beld | The Secrets of StorytellingDistilled
 
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016Anatomy of an Intranet (Triangle SharePoint User Group) January 2016
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016Michael Greene
 
IT Automation: Rise of the Process Robots
IT Automation: Rise of the Process RobotsIT Automation: Rise of the Process Robots
IT Automation: Rise of the Process RobotsCapgemini
 
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.victoriacrespog
 
Pharmacohoreppt
PharmacohorepptPharmacohoreppt
PharmacohorepptAbhik Seal
 
UX and the Product Manager (ProductCamp Boston 2016)
UX and the Product Manager (ProductCamp Boston 2016)UX and the Product Manager (ProductCamp Boston 2016)
UX and the Product Manager (ProductCamp Boston 2016)ProductCamp Boston
 

Viewers also liked (20)

LSG_Wind_2015
LSG_Wind_2015LSG_Wind_2015
LSG_Wind_2015
 
Environmental and Social Due Diligence ESG Assessments
Environmental and Social Due Diligence ESG AssessmentsEnvironmental and Social Due Diligence ESG Assessments
Environmental and Social Due Diligence ESG Assessments
 
Social & Environmental Due Diligence: From the Impact Case to the Business Case
Social & Environmental Due Diligence: From the Impact Case to the Business CaseSocial & Environmental Due Diligence: From the Impact Case to the Business Case
Social & Environmental Due Diligence: From the Impact Case to the Business Case
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
 
Benefits Of Comprehensive Environmental Due Diligence
Benefits Of Comprehensive Environmental Due DiligenceBenefits Of Comprehensive Environmental Due Diligence
Benefits Of Comprehensive Environmental Due Diligence
 
Inversores
InversoresInversores
Inversores
 
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...
Environmental Due Diligence and Managing Environmental Risk in Saskatchewan b...
 
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...
Managing Technical &amp; Project Risks on Small Renewable Energy Projects (...
 
The Accessible Office: Making Your Documents More Accessible to Users with Di...
The Accessible Office: Making Your Documents More Accessible to Users with Di...The Accessible Office: Making Your Documents More Accessible to Users with Di...
The Accessible Office: Making Your Documents More Accessible to Users with Di...
 
gtFace: Salesforce (presentation)
gtFace: Salesforce (presentation)gtFace: Salesforce (presentation)
gtFace: Salesforce (presentation)
 
Akka Clusterの耐障害設計
Akka Clusterの耐障害設計Akka Clusterの耐障害設計
Akka Clusterの耐障害設計
 
actividad 2.4
actividad 2.4actividad 2.4
actividad 2.4
 
Kent State University Makerspace (proposal)
Kent State University Makerspace (proposal)Kent State University Makerspace (proposal)
Kent State University Makerspace (proposal)
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PV
 
SearchLove London 2016 | Bas van den Beld | The Secrets of Storytelling
SearchLove London 2016 | Bas van den Beld | The Secrets of StorytellingSearchLove London 2016 | Bas van den Beld | The Secrets of Storytelling
SearchLove London 2016 | Bas van den Beld | The Secrets of Storytelling
 
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016Anatomy of an Intranet (Triangle SharePoint User Group) January 2016
Anatomy of an Intranet (Triangle SharePoint User Group) January 2016
 
IT Automation: Rise of the Process Robots
IT Automation: Rise of the Process RobotsIT Automation: Rise of the Process Robots
IT Automation: Rise of the Process Robots
 
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.
150 años de Telégrafo en Murcia y Cartagena. Breve historia del telégrafo.
 
Pharmacohoreppt
PharmacohorepptPharmacohoreppt
Pharmacohoreppt
 
UX and the Product Manager (ProductCamp Boston 2016)
UX and the Product Manager (ProductCamp Boston 2016)UX and the Product Manager (ProductCamp Boston 2016)
UX and the Product Manager (ProductCamp Boston 2016)
 

Similar to Solar PV - Environmental Due Diligence

Shale Gas and Water.
Shale Gas and Water.Shale Gas and Water.
Shale Gas and Water.Philippe Tob
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptxDonald Jones
 
20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awiDonald Jones
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectMitchellDong
 
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...Private Consultants
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRIRJET Journal
 
sewage infrastructure management
sewage infrastructure managementsewage infrastructure management
sewage infrastructure managementTareq Zarouni
 
FLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTFLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTIRJET Journal
 
FLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTFLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTIRJET Journal
 
Solar On Brownfields
Solar On BrownfieldsSolar On Brownfields
Solar On Brownfieldscanelson
 
GEO_Water_Energy_Nexus
GEO_Water_Energy_NexusGEO_Water_Energy_Nexus
GEO_Water_Energy_NexusConor Merrigan
 
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...Egyptian Engineers Association
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilYamen Nanne
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination studyJeffrey Pickett
 
Repurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainableRepurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainablemabartl
 
EPA MSGP and California IGP Presentation
EPA MSGP and California IGP PresentationEPA MSGP and California IGP Presentation
EPA MSGP and California IGP PresentationJarrod Yoder
 

Similar to Solar PV - Environmental Due Diligence (20)

Shale Gas and Water.
Shale Gas and Water.Shale Gas and Water.
Shale Gas and Water.
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
 
20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
 
Gq2512111220
Gq2512111220Gq2512111220
Gq2512111220
 
Gq2512111220
Gq2512111220Gq2512111220
Gq2512111220
 
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
 
sewage infrastructure management
sewage infrastructure managementsewage infrastructure management
sewage infrastructure management
 
FLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTFLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANT
 
FLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANTFLOATING SOLAR PV PLANT
FLOATING SOLAR PV PLANT
 
Solar On Brownfields
Solar On BrownfieldsSolar On Brownfields
Solar On Brownfields
 
GEO_Water_Energy_Nexus
GEO_Water_Energy_NexusGEO_Water_Energy_Nexus
GEO_Water_Energy_Nexus
 
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
 
3 pablo ferrada, francisco araya, bifi pv psda, antofagasta (chile) 2015
3 pablo ferrada, francisco araya, bifi pv psda, antofagasta (chile) 20153 pablo ferrada, francisco araya, bifi pv psda, antofagasta (chile) 2015
3 pablo ferrada, francisco araya, bifi pv psda, antofagasta (chile) 2015
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Repurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainableRepurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainable
 
EPA MSGP and California IGP Presentation
EPA MSGP and California IGP PresentationEPA MSGP and California IGP Presentation
EPA MSGP and California IGP Presentation
 

Recently uploaded

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Recently uploaded (20)

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Solar PV - Environmental Due Diligence

  • 1. EUCI Due Diligence for Solar PV Projects Daniel Belin, AICP ecology and environment, Inc. www.ene.com
  • 2. Enhancing Due Diligence and Streamlining Permitting June 14-15, 2011 Daniel Belin, AICP ecology and environment, Inc. www.ene.com
  • 3.
  • 4. Project Development Overview  Due Diligence – Real Estate vs. Environmental  GIS Demo  The Permitting Process  Streamlining Tips
  • 5.
  • 6. Phase I & II ESA  Legal standard - ASTM  Real Estate document  Contamination liabilities  CERCLA  Benefits – addresses legal liability for contamination  Limitation – does not address other regulatory liability
  • 7. Phase I & II ESA  Not a green light to start design  Don’t rush into development
  • 8.  Did not invest in early issue identification  Adjusting layout after design  Wastes time and money
  • 9. Database searches  GIS investigation  Site reconnaissance  Agency consultation  Permitting matrix  Critical Issues Analysis
  • 10. Natural Environment Built Environment  Wildlife and Habitat  Land use  Special Status and State-  Flat-panel PV -- 2.5~12.5 Listed species acre/MW  Habitat fragmentation or  Solar-thermal -- 5.0~12.5 removal acre/MW  Microclimate/habitat  Aesthetics/Visual Resources, changes glare  Water availability  Recreation  Cultural resources  Public involvement
  • 11. Must be compatible with other uses, immediate and adjacent  Mining and Agriculture often compatible  Recreation/Tourism requires consideration  Federal land: recreation use classes may preclude large-scale solar developments:  Off-Highway Vehicles (OHV)  Near Designated Wilderness Areas and Wilderness Study Areas  Wild and Scenic Rivers  National Trails  Scenic Byways  National, state, and local parks  Cumulative impacts
  • 12. Disruption of wildlife movement corridors  Direct loss of or change in native species habitat  Shading from solar arrays can create a microclimate  Disturbance due to human activity, roads, fences, and light
  • 13. Includes archaeology, paleontology, and historic structures  Consultation with State Historic Preservation Office  Tribal and federal agency consultation  Varying levels of assessment  Phase I survey where resources possible  Phase II survey where resources known  Monitoring during construction  Historic buildings 50+ years old. Can include structures (cemeteries, bridges, dams)
  • 14. Often the most significant public concern  Landscapes differ in their ability to accommodate change  Technical approaches can quantify impacts. BLM and USFS have standard protocols.  Strategies to minimize impacts and ease public controversy  Determine visual sensitivity level  Reduce impacts with careful array and road placement, vegetation screens
  • 15. Water for thermal-solar project cooling and mirror washing requirements can be significant  Impacts to wetlands and streams (arroyos) must be avoided or mitigated  Runoff / erosion from impervious surface
  • 16. Water Use by Fuel Source and Generation Technology1 Wet Cooling Wet Cooling Water Other Water Water Other Water Consumtion Consumptionb Generation Consumtion Consumptionb Generation Technology (gal/MWh)a (gal/MWh) Technology (gal/MWh)a (gal/MWh) irrigation Solar Trough 760-920 8 Biomass2 300-480 dependentd Natural Gas Combined Solar Tower 750 8 Cycle 18-21 180 Photovoltaic Solar 0 5c Coal (IGCC)f 140 200 avg. 4,500 Wind 0 0 Hydroelectric (evap) Fossil 300-480 35-104 Nuclear 400-720e 75-180 1 Data calculated from U.S. Department of Energy, Energy Demands on Water Resources: Report to Congress on the Interdependency of Energy and Water (Dec. 2006), available at http://www.sandia.gov/energy-water/docs/121-RptToCongress-EWwEIAcomments-FINAL.pdf. Carter provided notes. See Carter & Campbell, supra note 8, at 8. a. Data is for cooling tower technology. b. Includes water consumed in producing or enhancing the fuel source and in generation; excluding cooling water consumption. c. National Renewable Energy Laboratory (NREL), Fuel from the Sky: Solar Power’s Potential for Western Energy Supply, NREL/SR-550-32160 (July 2002), at 99. d. CRS provided note. e. Cooling ponds which are commonly used at nuclear facilities consume roughly 720 gal/MWh. f. IGCC is Integrated Gasification Combined-Cycle. 22 The biomass referenced in Table 2 does not include woody biomass.
  • 17. » Case Study – Silver State Solar Predicted Water Consumption  400 MW PV  Ivanpah Valley, NV  600 Acre-Feet-Annually (AFA) / 4 years (construction)  21 AFA (operations)  Average industrial development in region – 4,717 AFA
  • 18. 14: Easements, ROWs, Legal Issues 1: 4: Visual 5/6: 8: 15: Other 2: T & E Species 3: Open Space/ 7: Floodplain/ 9: Waterways 10: Prime Acres Zoning Conservation Resources Hist./Cult. Wetlands Encumbrances, (c) Parks (d) Drainage (g) (i) Ag. Land (j) Areas (b) (e) (miles) (f) (h) 17: Other Significant Resources and Notes:  Swainson's hawk 0.8 miles Yes. Floodplain away borders northern Stream/River Site is located in an 8.15 miles 7.79 miles  Delta button- part of property and crosses the Enterprise Zone from from Prime 160 AG-40 No. celery 1.5 miles No stream through No property; Site has an Agricultural designated Historic canal/ditch along Farmland and property/ Preserve R-69-C1 scenic route House northern border  giant garter Moderately well designation snake approx 3 drained miles  California tiger salamander  Northern Hardpan Vernal Freshwater Pool Site is located in an 1.42miles 9.15 miles Emergent  vernal pool fairy Stream/River Enterprise Zone from from No/Moderately well Wetland on Grazing 40.09 AG-40 Yes. shrimp No borders Site has an Agricultural designated Historic drained eastern northwest corner land  valley elderberry Preserve R-69-C1 scenic route Farm property longhorn beetle designation border.  western spadefoot are < 5 miles from the site but not on site One Swainson's hawk 22.96 from Yes. Floodplain Stream/River Site is located in an 4.89 miles crosses the Eastern 0.29 miles from the the covers southern Enterprise Zone Park 2.3 miles from property, one portion is 106.62 AG-40 No site, burrowing owl intersection end of No stream/river Site has an Agricultural from the site Historic prime 0.6 miles from the of HWY property/somewhat borders the Preserve R-80-8 House farmland site 580/5. poorly drained south end of the site Swainson's hawk 0.8 miles 23.24 miles Farmland 4.22 miles Site is located in an Burrowing owl 2.6 from the of Park 1.7miles from No/Somewhat No streams or Enterprise Zone 43.31 AG-40 No miles. California intersection No rivers Statewide from the site Historic poorly drained No Agricultural tiger salamander of HWY Importanc House Preserve designation within 5 miles. 580/5. e
  • 20. 1. Define regulatory process and involved agencies 2. Conduct initial surveys and studies to identify potential environmental impacts and required permits 3. Hold agency consultations 4. Complete detailed environmental surveys 5. Develop permit applications 6. Agency review 7. Public hearings 8. Final permits issued
  • 21. Bureau of Land Management ROW Application and Plan of Development  National Environmental Policy Act  State Siting Committee  Conditional Use Permit Applications (County level)
  • 22. Pre- application meeting Submit preliminary application 30 day public notice and County scheduled public hearing with P&Z comment Board and BOCC period 30 day public Submit final 1041 application notice and comment period Joint public hearing with Planning and Zoning Board and BOCC Total: P&Z Board hold meeting on same day and 3-4 Months issue recommendations to BOCC BOCC Meeting Final Approval issued within 7 days
  • 23. Preliminary Discussions 0-2 Months Pre- Application Period 6-9 Months Application Submittal Period 3 Months Hearing and Service of Decision 0-2 Months Appeal Window 1 Month Total: 18 Months
  • 24. Application 30 days Notice of Intent Published 45 days Public Scoping Draft EIS 6-9 months 45 days Comment Period / Agency Review Final EIS 6-9 months Comment Period / Agency Review 45 days Record of Decision (ROD) Total: Appeal Period 18-24 months
  • 25. What takes so long?  Seasonal field studies  NEPA/State equivalent applicability  Permit linkages and Agency communication  Agency expertise and workload  Statutory review times  Quality and completeness of applications  Agency and community relationships
  • 26. “By putting these renewable energy projects on a fast track, we are managing our public lands not just for conventional energy development but also for environmentally responsible renewable energy production that will power our clean energy future.” Secretary of Interior, Ken Salazar November 5, 2009
  • 27. NEPA Fast Tracked Projects  2 Solar PV projects  Silver State – 400 MW PV  Start to Finish – 14 months  Agency schedule pre-set  RECO office  Statutory review times  Strong management on all sides  Project completely vetted before initiating NEPA
  • 28. Streamlining process Desert tortoise Identification of key issues for timely resolution - 9 months before filing the application  Shaved 6 months by establishing pre-filing process  Issues raised during pre-filing:  Quantitative cumulative impacts approach for desert tortoise  New alternatives  Dry lakes recreation  Visual resources  Mojave National Preserve Transmission lines in Ivanpah Valley
  • 29.
  • 30. Get your team talking details for a complete Project Description
  • 31. Dual state and federal lead agencies  Cover needs for both agencies at once  Added complexity can mean delays  Plan ahead even more with two lead agencies
  • 32. Frequent Data Gaps in Project Descriptions  Complete land use tables  GIS Data for access roads, tower locations  Helicopter use plans  Noxious weed plan  Construction schedule – realistic?  Work force requirements for O&M  Decommissioning  All project components covered?  Construction equipment used – air emissions
  • 33. Expect a sophisticated public  Document all outreach efforts  Identify key public issues for your project  Explain alternatives development process  Take public recommendations for alternatives seriously
  • 34. Track all alternatives screened  Address system alternatives (PV vs. CSP)  Develop an adequate range of alternatives: BLM to require 3 to 4 alternatives for renewable projects  Agencies expect public engagement to develop alternatives for contentious projects
  • 35. No longer business as usual  The bar has been raised  Early agency attention equals feedback for your developing project and most likely a quicker decision process
  • 36. Questions? Dan Belin (703) 522-6065 dbelin@ene.com