Minnesota State Permitting
  Process for Large Wind
Energy Conversion Systems




    Ingrid Bjorklund & Larry Hartman
        Office of Energy Security
   Minnesota Department of Commerce
Minnesota
  Energy Facility Permitting




Large Wind Energy Conversion Systems
                                       Large Electric Power Generating Plants




                                                      Pipelines
High Voltage Transmission Lines
Minnesota Program Began in 1995
  Wind Siting Act – Minnesota Statute 216F
      The siting of Large Wind Energy Conversion Systems
         (LWECS), which is 5 MW or more, is to be made in an
         orderly manner compatible with environmental
         preservation, sustainable development, and the
         efficient use of resources (Minn. Stat. § 216F.03).

      Local government may regulate projects less than 25
       MW in combined nameplate capacity.
          Less than 5 MW is a Small Wind Energy Conversion
           Systems.
          Between 5 MW and 25 MW if assume authority to
           regulate LWECS via Minn. Stat. § 216F.08.
Wind Development In Minnesota

                         More than 1,331 MW in
                         Minnesota.
                         Wide diversity of project sizes
                         from <1 MW to 200 MW.
                         Concentrated in southern
                         Minnesota.
                         Geographic expansion
                         beginning.
Public Utilities Commission Wind Permitting
 Provides consistent process and standards statewide

 Up to 6 month process

 Alternate form of Environmental Review – not required to
  prepare an EIS, EA, or EAW for Minnesota

 Public notice, participation, comments

 Site permits issued for up to 30 years and may be
  amended
PUC
 Permitting
 Process




Minnesota Rules 7836
County Delegation (Minnesota Statutes Chapter 216F)
County Delegation Program Overview
      PUC General permit standards for wind developed
      Standards apply to projects < 25 MW, variance allowed
      Counties may be more restrictive by ordinance
      Technical assistance to counties

How to Assume Authority
    Adopt permitting authority through resolution
    Written notice to PUC

Clarified Project Size Definition
    Established project sized determination procedure
    Applications to counties must include the determination
Counties with LWECS Permitting Authority
   Lyon

   Freeborn

   Murray

   Lincoln

   Stearns

   Meeker
LWECS Permitting Requirements
General Permit Standards
    Minn. Stat. § 216F.08 directed PUC to adopt standards for
     projects less than 25 MW
    PUC Order, January 11, 2008 (Docket #: 07-1102)
    Establishes minimum standards.
      Setbacks
      Size Determination
      Permittee Responsibilities
      Studies/Surveys/Plans
      Reporting
      Pre-Construction Meeting
    Adopt General Permit Standards via Ordinance
PUC General Permit Setbacks


Issue                           PUC General Permit Setback Minimums

Wind Access Buffer (setback     3 RD (760 – 985 ft) on east-west axis
from lands not in permittee’s   5 RD (1280 – 1640 ft) on north-south (RD = rotor diameter = 78
control)                        – 100 m)
Homes                           500 feet + distance to meet state noise standard.

Noise Standard                  750 – 1500 ft typically required to meet state noise standard.
                                (Minnesota Rules Chapter 7030).
Public Roads                    250 ft from edge of public road ROW.

Wetlands                        No turbines in wetlands and no setback; but Wind Access
                                Buffer setback applies to public lands.
Additional Standards

    Identify, avoid and repair drain tile damage.
    Public road permits required and repair construction related damages.
    NPDES storm water permit for construction projects.
    Utility scale, monopole design turbines, not prototypes. Off white or white
     in color.
    Lighting and safety marking limited to FAA requirements.
    Conditions for crop damage and restoration.
    Preconstruction emergency plan.
    Tower identification and “as-built” GIS data submitted to PUC.
    TV signal strength study (baseline) and preconstruction microwave beam
     path analysis.
    Decommissioning plan.
    PUC option to request post construction noise analysis.
    Special Conditions.
Setback from Public Lands, Small Parcels

General Permit Standards
 PUC imposed new setbacks from public lands,
   affording them the same property rights protections
   as private lands.
 Also affirmed rights of parties owning small parcels.
Local Review of Associated Facilities
Associated Facilities
 Transmission lines, substations, O&M building

Local Review for Transmission Lines
 Minn. Stat. § 216E.05
    HVTL between 100 and 200 kV
    Substations with a voltage designed for 100 kV
    Other facilities
    Within 10 days of notifying local government, applicant must
     notify PUC
    Local government can request PUC to assume jurisdiction
     within 60 days.
PUC Permit Prevails
PUC's permits preempt local planning and zoning –
   LWECS permit is the only site approval required.

Local governments can comment during the state
   permitting process – PUC must apply county
   standards for LWECS unless PUC finds good cause
   to not apply those setbacks.
PUC Permits the Box
Exclusion Areas Defined in Process
Details Come Through Compliance
Docket Records Define Conditions

General Permit Standards Docket

Health Effects Docket

Individual Project Dockets

If PUC's state permitting authority is to be used to
    establish conditions, the record for these conditions
    must be developed within PUC's purview.
Other Permits
Wetland and Water Impacts
       Section 404 (COE), WCA (SWCD), PWI (DNR)
       License to cross public waters (DNR)
Turbine Location and Lighting
       Proposed Construction or Alteration (FAA)
Sediment Control
       NPDES storm water permit for construction projects
Transportation and Road Permits
       State, County, Township – oversize/overweight, driveway access,
        utility crossing.
Other Project Specific Permits
       Additional permitting maybe be required for the interconnection,
        O&M building, and other project components.
For Further Information on Minnesota’s
Permitting Process for Large Wind Energy
        Conversion Systems see:

http://www.energyfacilities.puc.state.mn.us/
                wind.html


                 Deborah Pile, supervisor
                Energy Facility Permitting
                Office of Energy Security
            Minnesota Department of Commerce

Más contenido relacionado

Destacado

CERTs - All about Community Solar Gardens in Minnesota
CERTs - All about Community Solar Gardens in MinnesotaCERTs - All about Community Solar Gardens in Minnesota
CERTs - All about Community Solar Gardens in MinnesotaUniversity of Minnesota
 
Utilities Collaborating on Conservation & Efficiency
Utilities Collaborating on Conservation & EfficiencyUtilities Collaborating on Conservation & Efficiency
Utilities Collaborating on Conservation & EfficiencyUniversity of Minnesota
 
Elk River Energy City: One City's Attempt to Make a Difference
Elk River Energy City: One City's Attempt to Make a DifferenceElk River Energy City: One City's Attempt to Make a Difference
Elk River Energy City: One City's Attempt to Make a DifferenceUniversity of Minnesota
 
The Numbers Matter: Taking Measure of Green Jobs
The Numbers Matter: Taking Measure of Green JobsThe Numbers Matter: Taking Measure of Green Jobs
The Numbers Matter: Taking Measure of Green JobsUniversity of Minnesota
 
NRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingNRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingUniversity of Minnesota
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramUniversity of Minnesota
 

Destacado (20)

CERTs - All about Community Solar Gardens in Minnesota
CERTs - All about Community Solar Gardens in MinnesotaCERTs - All about Community Solar Gardens in Minnesota
CERTs - All about Community Solar Gardens in Minnesota
 
Jer-Lindy Farms Digester
Jer-Lindy Farms DigesterJer-Lindy Farms Digester
Jer-Lindy Farms Digester
 
Community Wind Development
Community Wind DevelopmentCommunity Wind Development
Community Wind Development
 
Minnesota GreenStep Cities Overview
Minnesota GreenStep Cities OverviewMinnesota GreenStep Cities Overview
Minnesota GreenStep Cities Overview
 
Utilities Collaborating on Conservation & Efficiency
Utilities Collaborating on Conservation & EfficiencyUtilities Collaborating on Conservation & Efficiency
Utilities Collaborating on Conservation & Efficiency
 
GRE: Energy Efficiency and Conservation
GRE: Energy Efficiency and ConservationGRE: Energy Efficiency and Conservation
GRE: Energy Efficiency and Conservation
 
Elk River Energy City: One City's Attempt to Make a Difference
Elk River Energy City: One City's Attempt to Make a DifferenceElk River Energy City: One City's Attempt to Make a Difference
Elk River Energy City: One City's Attempt to Make a Difference
 
Winning with Community Wind
Winning with Community WindWinning with Community Wind
Winning with Community Wind
 
Programa Arribada
Programa ArribadaPrograma Arribada
Programa Arribada
 
Food is an Energy Issue
Food is an Energy IssueFood is an Energy Issue
Food is an Energy Issue
 
The Numbers Matter: Taking Measure of Green Jobs
The Numbers Matter: Taking Measure of Green JobsThe Numbers Matter: Taking Measure of Green Jobs
The Numbers Matter: Taking Measure of Green Jobs
 
White Creek Wind Project
White Creek Wind ProjectWhite Creek Wind Project
White Creek Wind Project
 
Energy Efficiency at Great River Energy
Energy Efficiency at Great River EnergyEnergy Efficiency at Great River Energy
Energy Efficiency at Great River Energy
 
Green Jobs Creation in Minnesota
Green Jobs Creation in MinnesotaGreen Jobs Creation in Minnesota
Green Jobs Creation in Minnesota
 
Green Home Mortgage
Green Home MortgageGreen Home Mortgage
Green Home Mortgage
 
NRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingNRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable Housing
 
Community Energy in Minnesota
Community Energy in MinnesotaCommunity Energy in Minnesota
Community Energy in Minnesota
 
Energy Efficiency Overview
Energy Efficiency OverviewEnergy Efficiency Overview
Energy Efficiency Overview
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
 
Developing a Model for Success
Developing a Model for SuccessDeveloping a Model for Success
Developing a Model for Success
 

Similar a MN Wind Permitting Process

Regulatory Update - STORMWATER
Regulatory Update - STORMWATERRegulatory Update - STORMWATER
Regulatory Update - STORMWATERMark Campanale
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Amanda James
 
Regulation of Marine Renewables in the US: A 15 Minute Encapsulation
Regulation of Marine Renewables in the US: A 15 Minute EncapsulationRegulation of Marine Renewables in the US: A 15 Minute Encapsulation
Regulation of Marine Renewables in the US: A 15 Minute Encapsulationguest0c28de
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALRobert Potter
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaDan Schleck
 
Telecommunications 2016: The Challenges Facing Local Government
Telecommunications 2016: The Challenges Facing Local Government Telecommunications 2016: The Challenges Facing Local Government
Telecommunications 2016: The Challenges Facing Local Government Best Best and Krieger LLP
 
Building a Marine Renewables Industry in the United States: The Need for A "...
Building a Marine Renewables Industry in the United States:  The Need for A "...Building a Marine Renewables Industry in the United States:  The Need for A "...
Building a Marine Renewables Industry in the United States: The Need for A "...Carolyn Elefant
 
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015TWCA
 
ULS 2015 Spring Seminar - 04242015
ULS 2015 Spring Seminar - 04242015ULS 2015 Spring Seminar - 04242015
ULS 2015 Spring Seminar - 04242015Tim Rushenberg
 
Solar-friendly Permitting and Zoning
Solar-friendly Permitting and ZoningSolar-friendly Permitting and Zoning
Solar-friendly Permitting and ZoningSolarizeWC
 

Similar a MN Wind Permitting Process (20)

Regulatory Update - STORMWATER
Regulatory Update - STORMWATERRegulatory Update - STORMWATER
Regulatory Update - STORMWATER
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
 
Regulation of Marine Renewables in the US: A 15 Minute Encapsulation
Regulation of Marine Renewables in the US: A 15 Minute EncapsulationRegulation of Marine Renewables in the US: A 15 Minute Encapsulation
Regulation of Marine Renewables in the US: A 15 Minute Encapsulation
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINAL
 
Tatoa FCC Threats and Opportunities
Tatoa FCC Threats and OpportunitiesTatoa FCC Threats and Opportunities
Tatoa FCC Threats and Opportunities
 
Goodhue opinion
Goodhue opinionGoodhue opinion
Goodhue opinion
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
Telecommunications 2016: The Challenges Facing Local Government
Telecommunications 2016: The Challenges Facing Local Government Telecommunications 2016: The Challenges Facing Local Government
Telecommunications 2016: The Challenges Facing Local Government
 
Solar on Landfills - Trash or Treasure
Solar on Landfills - Trash or TreasureSolar on Landfills - Trash or Treasure
Solar on Landfills - Trash or Treasure
 
Building a Marine Renewables Industry in the United States: The Need for A "...
Building a Marine Renewables Industry in the United States:  The Need for A "...Building a Marine Renewables Industry in the United States:  The Need for A "...
Building a Marine Renewables Industry in the United States: The Need for A "...
 
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015
Howard Slobodin: Agency Rulemaking Update, TWCA Fall Conference 2015
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
Gmecpresentcefinnew
GmecpresentcefinnewGmecpresentcefinnew
Gmecpresentcefinnew
 
Gmecpresentcefinnew
GmecpresentcefinnewGmecpresentcefinnew
Gmecpresentcefinnew
 
ULS 2015 Spring Seminar - 04242015
ULS 2015 Spring Seminar - 04242015ULS 2015 Spring Seminar - 04242015
ULS 2015 Spring Seminar - 04242015
 
Solar-friendly Permitting and Zoning
Solar-friendly Permitting and ZoningSolar-friendly Permitting and Zoning
Solar-friendly Permitting and Zoning
 
Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project
 

Más de University of Minnesota

Pathways to Electric Vehicle Adoption Event
Pathways to Electric Vehicle Adoption EventPathways to Electric Vehicle Adoption Event
Pathways to Electric Vehicle Adoption EventUniversity of Minnesota
 
Solar Advancement for Schools and Institutions
Solar Advancement for Schools and InstitutionsSolar Advancement for Schools and Institutions
Solar Advancement for Schools and InstitutionsUniversity of Minnesota
 
Solar Plus Storage at Hartley Nature Center in Duluth, MN
Solar Plus Storage at Hartley Nature Center in Duluth, MNSolar Plus Storage at Hartley Nature Center in Duluth, MN
Solar Plus Storage at Hartley Nature Center in Duluth, MNUniversity of Minnesota
 
Biomass for Poultry: A Minnesota Case Study
Biomass for Poultry: A Minnesota Case StudyBiomass for Poultry: A Minnesota Case Study
Biomass for Poultry: A Minnesota Case StudyUniversity of Minnesota
 
Financing Opportunities: PACE, MDA, and USDA
Financing Opportunities: PACE, MDA, and USDAFinancing Opportunities: PACE, MDA, and USDA
Financing Opportunities: PACE, MDA, and USDAUniversity of Minnesota
 
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and Bedding
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and BeddingBiomass Opportunities for Agricultural Operations: Feed, Fuel, and Bedding
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and BeddingUniversity of Minnesota
 
Minneapolis Benchmarking Report Presentation
Minneapolis Benchmarking Report PresentationMinneapolis Benchmarking Report Presentation
Minneapolis Benchmarking Report PresentationUniversity of Minnesota
 
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014University of Minnesota
 
St. Cloud, MN: The Path to Energy Neutral
St. Cloud, MN: The Path to Energy NeutralSt. Cloud, MN: The Path to Energy Neutral
St. Cloud, MN: The Path to Energy NeutralUniversity of Minnesota
 
Woodbury Community Solar Garden Workshop & Developer Fair
Woodbury Community Solar Garden Workshop & Developer FairWoodbury Community Solar Garden Workshop & Developer Fair
Woodbury Community Solar Garden Workshop & Developer FairUniversity of Minnesota
 
Is a community solar garden subscription right for your local government?
Is a community solar garden subscription right for your local government?Is a community solar garden subscription right for your local government?
Is a community solar garden subscription right for your local government?University of Minnesota
 
USDA Rural Development Program Summary 2016
USDA Rural Development Program Summary 2016USDA Rural Development Program Summary 2016
USDA Rural Development Program Summary 2016University of Minnesota
 
Energy Efficient Dairy Production Technologies
Energy Efficient Dairy Production TechnologiesEnergy Efficient Dairy Production Technologies
Energy Efficient Dairy Production TechnologiesUniversity of Minnesota
 
Harmoney Food Cooperative Solar Awning Project in Bemidji, MN
Harmoney Food Cooperative Solar Awning Project in Bemidji, MNHarmoney Food Cooperative Solar Awning Project in Bemidji, MN
Harmoney Food Cooperative Solar Awning Project in Bemidji, MNUniversity of Minnesota
 
Minneapolis Neighborhoods Community Solar Presentation
Minneapolis Neighborhoods Community Solar PresentationMinneapolis Neighborhoods Community Solar Presentation
Minneapolis Neighborhoods Community Solar PresentationUniversity of Minnesota
 

Más de University of Minnesota (20)

Minnesota Brightfields Study Results
Minnesota Brightfields Study ResultsMinnesota Brightfields Study Results
Minnesota Brightfields Study Results
 
Pathways to Electric Vehicle Adoption Event
Pathways to Electric Vehicle Adoption EventPathways to Electric Vehicle Adoption Event
Pathways to Electric Vehicle Adoption Event
 
Solar Advancement for Schools and Institutions
Solar Advancement for Schools and InstitutionsSolar Advancement for Schools and Institutions
Solar Advancement for Schools and Institutions
 
Solar Plus Storage at Hartley Nature Center in Duluth, MN
Solar Plus Storage at Hartley Nature Center in Duluth, MNSolar Plus Storage at Hartley Nature Center in Duluth, MN
Solar Plus Storage at Hartley Nature Center in Duluth, MN
 
Metro CERT 2017 Annual Event
Metro CERT 2017 Annual EventMetro CERT 2017 Annual Event
Metro CERT 2017 Annual Event
 
Biomass for Poultry: A Minnesota Case Study
Biomass for Poultry: A Minnesota Case StudyBiomass for Poultry: A Minnesota Case Study
Biomass for Poultry: A Minnesota Case Study
 
Financing Opportunities: PACE, MDA, and USDA
Financing Opportunities: PACE, MDA, and USDAFinancing Opportunities: PACE, MDA, and USDA
Financing Opportunities: PACE, MDA, and USDA
 
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and Bedding
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and BeddingBiomass Opportunities for Agricultural Operations: Feed, Fuel, and Bedding
Biomass Opportunities for Agricultural Operations: Feed, Fuel, and Bedding
 
Minneapolis Benchmarking Report Presentation
Minneapolis Benchmarking Report PresentationMinneapolis Benchmarking Report Presentation
Minneapolis Benchmarking Report Presentation
 
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014
AdoptingSolarWindMN_ConsumerResearch_DanThiede_Aug2014
 
St. Cloud, MN: The Path to Energy Neutral
St. Cloud, MN: The Path to Energy NeutralSt. Cloud, MN: The Path to Energy Neutral
St. Cloud, MN: The Path to Energy Neutral
 
Woodbury Community Solar Garden Workshop & Developer Fair
Woodbury Community Solar Garden Workshop & Developer FairWoodbury Community Solar Garden Workshop & Developer Fair
Woodbury Community Solar Garden Workshop & Developer Fair
 
Shoreview: Community Solar Gardens 101
Shoreview: Community Solar Gardens 101Shoreview: Community Solar Gardens 101
Shoreview: Community Solar Gardens 101
 
Is a community solar garden subscription right for your local government?
Is a community solar garden subscription right for your local government?Is a community solar garden subscription right for your local government?
Is a community solar garden subscription right for your local government?
 
USDA Rural Development Program Summary 2016
USDA Rural Development Program Summary 2016USDA Rural Development Program Summary 2016
USDA Rural Development Program Summary 2016
 
Energy Efficient Dairy Production Technologies
Energy Efficient Dairy Production TechnologiesEnergy Efficient Dairy Production Technologies
Energy Efficient Dairy Production Technologies
 
2025 Minnesota Energy Action Plan
2025 Minnesota Energy Action Plan2025 Minnesota Energy Action Plan
2025 Minnesota Energy Action Plan
 
Peter lindstrom-si-presentation
Peter lindstrom-si-presentationPeter lindstrom-si-presentation
Peter lindstrom-si-presentation
 
Harmoney Food Cooperative Solar Awning Project in Bemidji, MN
Harmoney Food Cooperative Solar Awning Project in Bemidji, MNHarmoney Food Cooperative Solar Awning Project in Bemidji, MN
Harmoney Food Cooperative Solar Awning Project in Bemidji, MN
 
Minneapolis Neighborhoods Community Solar Presentation
Minneapolis Neighborhoods Community Solar PresentationMinneapolis Neighborhoods Community Solar Presentation
Minneapolis Neighborhoods Community Solar Presentation
 

Último

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 

Último (20)

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 

MN Wind Permitting Process

  • 1. Minnesota State Permitting Process for Large Wind Energy Conversion Systems Ingrid Bjorklund & Larry Hartman Office of Energy Security Minnesota Department of Commerce
  • 2. Minnesota Energy Facility Permitting Large Wind Energy Conversion Systems Large Electric Power Generating Plants Pipelines High Voltage Transmission Lines
  • 3. Minnesota Program Began in 1995 Wind Siting Act – Minnesota Statute 216F  The siting of Large Wind Energy Conversion Systems (LWECS), which is 5 MW or more, is to be made in an orderly manner compatible with environmental preservation, sustainable development, and the efficient use of resources (Minn. Stat. § 216F.03).  Local government may regulate projects less than 25 MW in combined nameplate capacity.  Less than 5 MW is a Small Wind Energy Conversion Systems.  Between 5 MW and 25 MW if assume authority to regulate LWECS via Minn. Stat. § 216F.08.
  • 4. Wind Development In Minnesota More than 1,331 MW in Minnesota. Wide diversity of project sizes from <1 MW to 200 MW. Concentrated in southern Minnesota. Geographic expansion beginning.
  • 5. Public Utilities Commission Wind Permitting  Provides consistent process and standards statewide  Up to 6 month process  Alternate form of Environmental Review – not required to prepare an EIS, EA, or EAW for Minnesota  Public notice, participation, comments  Site permits issued for up to 30 years and may be amended
  • 7. County Delegation (Minnesota Statutes Chapter 216F) County Delegation Program Overview  PUC General permit standards for wind developed  Standards apply to projects < 25 MW, variance allowed  Counties may be more restrictive by ordinance  Technical assistance to counties How to Assume Authority  Adopt permitting authority through resolution  Written notice to PUC Clarified Project Size Definition  Established project sized determination procedure  Applications to counties must include the determination
  • 8. Counties with LWECS Permitting Authority  Lyon  Freeborn  Murray  Lincoln  Stearns  Meeker
  • 9. LWECS Permitting Requirements General Permit Standards  Minn. Stat. § 216F.08 directed PUC to adopt standards for projects less than 25 MW  PUC Order, January 11, 2008 (Docket #: 07-1102)  Establishes minimum standards.  Setbacks  Size Determination  Permittee Responsibilities  Studies/Surveys/Plans  Reporting  Pre-Construction Meeting  Adopt General Permit Standards via Ordinance
  • 10. PUC General Permit Setbacks Issue PUC General Permit Setback Minimums Wind Access Buffer (setback 3 RD (760 – 985 ft) on east-west axis from lands not in permittee’s 5 RD (1280 – 1640 ft) on north-south (RD = rotor diameter = 78 control) – 100 m) Homes 500 feet + distance to meet state noise standard. Noise Standard 750 – 1500 ft typically required to meet state noise standard. (Minnesota Rules Chapter 7030). Public Roads 250 ft from edge of public road ROW. Wetlands No turbines in wetlands and no setback; but Wind Access Buffer setback applies to public lands.
  • 11. Additional Standards  Identify, avoid and repair drain tile damage.  Public road permits required and repair construction related damages.  NPDES storm water permit for construction projects.  Utility scale, monopole design turbines, not prototypes. Off white or white in color.  Lighting and safety marking limited to FAA requirements.  Conditions for crop damage and restoration.  Preconstruction emergency plan.  Tower identification and “as-built” GIS data submitted to PUC.  TV signal strength study (baseline) and preconstruction microwave beam path analysis.  Decommissioning plan.  PUC option to request post construction noise analysis.  Special Conditions.
  • 12. Setback from Public Lands, Small Parcels General Permit Standards  PUC imposed new setbacks from public lands, affording them the same property rights protections as private lands.  Also affirmed rights of parties owning small parcels.
  • 13. Local Review of Associated Facilities Associated Facilities  Transmission lines, substations, O&M building Local Review for Transmission Lines  Minn. Stat. § 216E.05  HVTL between 100 and 200 kV  Substations with a voltage designed for 100 kV  Other facilities  Within 10 days of notifying local government, applicant must notify PUC  Local government can request PUC to assume jurisdiction within 60 days.
  • 14. PUC Permit Prevails PUC's permits preempt local planning and zoning – LWECS permit is the only site approval required. Local governments can comment during the state permitting process – PUC must apply county standards for LWECS unless PUC finds good cause to not apply those setbacks.
  • 17. Details Come Through Compliance
  • 18. Docket Records Define Conditions General Permit Standards Docket Health Effects Docket Individual Project Dockets If PUC's state permitting authority is to be used to establish conditions, the record for these conditions must be developed within PUC's purview.
  • 19. Other Permits Wetland and Water Impacts  Section 404 (COE), WCA (SWCD), PWI (DNR)  License to cross public waters (DNR) Turbine Location and Lighting  Proposed Construction or Alteration (FAA) Sediment Control  NPDES storm water permit for construction projects Transportation and Road Permits  State, County, Township – oversize/overweight, driveway access, utility crossing. Other Project Specific Permits  Additional permitting maybe be required for the interconnection, O&M building, and other project components.
  • 20. For Further Information on Minnesota’s Permitting Process for Large Wind Energy Conversion Systems see: http://www.energyfacilities.puc.state.mn.us/ wind.html Deborah Pile, supervisor Energy Facility Permitting Office of Energy Security Minnesota Department of Commerce