4. ENERGY CONNECTS
History (1)
• 2005 Foundation REDstack BV
• 2006 - … Fundamental Research Wetsus
• 2007 – 2010 First tests on surface water
• December 2011 Public Funding Afsluitdijk project
• May 2012 Private Funding
• May 2012 Start Design Process Afsluitdijk-plant
• June 2013 Permits obtained + start building
• September 2013 First buffer tank in place
• Expected: April 2014 Start experiments Afsluitdijk
4
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
5. ENERGY CONNECTS
History (2)
5
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
6. ENERGY CONNECTS
REDstack (1)
• Company founded in 2005, office in Sneek
• 10 employees – 6 FTE
• Funding
– Private, shareholders
– Public, subsidies (regional, national and EU)
• Shareholder structure
– W&F Magneto, Production of Special Anodes
– A. Hak, Contractor and Builder for Transportation Solutions
– Alliander, Manage and Design Energy Infrastructures
6
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
7. ENERGY CONNECTS
REDstack (2)
Characteristics of RED technology:
• Electricity production from salt/fresh water
• No fossil fuels involved, no CO2-emissions
• No chimneys or high buildings
• Sustainable, no back-up required
• Contributes to political targets
Goal of REDstack:
• Development
• Up-scaling
• Commercialization
7
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
8. ENERGY CONNECTS
REDstack (3) Technology
Schematic representation of the RED process
8
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
9. ENERGY CONNECTS
REDstack (4) Technology
• Challenges of the RED pilot and demo phase
– Stack improvement
– Membrane improvement
– Facing real surface water (salt and fresh)
– (Bio) Fouling
– Cost reduction
– Environmental impact studies
• Challenges of RED in commercial phase
– Development of production facilities
– Market entry
9
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
10. ENERGY CONNECTS
Market expectations (1)
Characteristics markets:
• Surface water: large flow – low energy density
• Industrial water: small flow – high energy density
Products sales ambition worldwide:
• Key components
• Licenses
• Process design
10
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
11. ENERGY CONNECTS
Market expectations (2)
11
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Maximum practical RED potential worldwide:
• Variation in estimations between 1.4 - 2.6 TW
Potential (technical/economical) in Netherlands:
• Estimated 1,5 GW
• Is about 10-15% of total Dutch electricity
consumption
12. ENERGY CONNECTS
Market expectations (3)
Possible locations …
12
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
13. ENERGY CONNECTS
Market expectations (4)
… related to energy coconsumption worldwide
13
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
14. ENERGY CONNECTS
Afsluitdijk Project (1)
14
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Project spec’s:
• Project partners FujiFilm, Wetsus, REDstack
• Duration 4 years, start 2012
• Technical and system developments
• Stack and membrane development
• First complete system, real world conditions
• Private and public funding
15. ENERGY CONNECTS
Afsluitdijk Project (2)
15
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Funding specs:
• Public funding;
o SNN and Province of Fryslân 3.35 M€
• Private funding
o FUJIFILM 1.00 M€
o REDstack 2.36 M€
o Wetsus (in kind) 0.61 M€
• Total 7.33 M€
16. ENERGY CONNECTS
Afsluitdijk Project (3)
16
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Project planning specs:
• Final Design 4 months
• Construction 7 months
• Start-up 1 months
• Research phase 1 21 months
• Research phase 2 15 months
• Total 48 months
17. ENERGY CONNECTS
Afsluitdijk Project (4)
Scale:
• 220 m3/h Seawater input
• 220 m3/h Freshwater input
• Goal: after 4 years 50 kW installed
Research Topics;
• Pretreatment
• Membrane development
• Stack development
• Systems integration
17
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
20. ENERGY CONNECTS
Afsluitdijk project (7)
Basic process principal
20
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Buffer
IJsselmeer water
Pre-treatment
IJsselmeer water
RED stacks
Pre-treatment
Waddenzee water
Effluent buffer
Buffer
Waddenzee water
21. ENERGY CONNECTS
Afsluitdijk project (8)
The initial design
21
Prefiltration
Buffer tanks
8 Stack positions• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
22. ENERGY CONNECTS
Afsluitdijk project (9)
Actual design: 3D Impression
22
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
23. ENERGY CONNECTS
Photo shoot [June 2013]
First action on location
23
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
24. ENERGY CONNECTS
Reinforced Concrete foundation
24
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
25. ENERGY CONNECTS
First (fairly informal!) meeting with
contractors
25
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
26. ENERGY CONNECTS
First buffer tank (2013.09.02)
26
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
27. ENERGY CONNECTS
Buffer tanks in metalstructure
27
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
28. ENERGY CONNECTS
Open view on lJsselmeer
28
• History
• REDstack
• Market expectations
• Projects
• Afsluitdijk project
• Photo shoot
• Questions
29. ENERGY CONNECTS
Drumfilters on platform
29
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
30. ENERGY CONNECTS
Position intake fresh water
30
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
31. ENERGY CONNECTS
Fresh water intake
31
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
32. ENERGY CONNECTS
Position salt water intake
32
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
33. ENERGY CONNECTS
Salt water intake
33
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
34. ENERGY CONNECTS
Control unit
34
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
35. ENERGY CONNECTS
We worked from an empty location …
35
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
36. ENERGY CONNECTS
… Via …
36
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
37. ENERGY CONNECTS
… Via …
37
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
40. ENERGY CONNECTS
… With content …
40
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
41. ENERGY CONNECTS
… And with the RED team!
41
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
42. ENERGY CONNECTS
Questions
Thank you for your attention.