Smart




By Darren Wellard
About Smart

• Privately Owned Company
• Established in 1995
• Specialises in Data and Electrical Solutions
• Members of BICSI, TIA, FIA & ECA
• Certified to EN ISO 9001 Quality Standards
• Accredited installers for Panduit; Brand Rex,
  Conectix and Hellerman Tyton solutions.
• EMEA Coverage
Smart
            Management Services

• Consultants are TIA accredited
• RCDD qualified Design Team
• BICSI, FIA ECA approved
• Certified Project Managers
• Cisco certified Networking Consultants
• Work carried out to ISO9001 Quality Standards
Smart
    Operations Services
•   Structured Data Cabling
                   - Copper Solutions
                   - Optical Fibre
                   - Blown Fibre
•   Electrical Services
                     - CCTV
                     - Fire & Security
                     - Access Control Systems
                     - Infrastructure Design & Installation
•   Networking Solutions
                   - Design
                   - Supply & Installation
                   - Configuration
                   - Diagnostic Testing
Smart Projects
    • WHAT WE HAVE DONE
•   Case Studies
•   THE HUB, Regents Park
•   THE HUB : A prestigious electrical and data
    installation recently completed in Central
    London
•   CRS CISCO Router Installation
•   CRS Paris : A routine installation was identified
    as being potentially dangerous by SMART
    technicians, and a dynamic solution was offered
•   NHS critical systems development
•   NHS Winchester : Metro had secured the
    refurbishment project of The South Central
    Ambulance Service in Winchester and needed
    an experienced, reliable electrical contractor to
    take on the demanding roles of designers,
    consultants and installers for the various new
    critical installations. SMART was there to help
A CRS CASE STUDY

Smart were engaged by one of the leading suppliers of networking
equipment and network management for the Internet to assist with the
deployment of their CRS1-16 Core Routers across a number of major
European cities.

Smart’s involvement within this project was for the supply of resource
and materials to:

Project Manage

Survey

Installation

Configuration
For this project the Client arranged delivery of each Cisco CRS16 to the site, with Smart
having responsibility for relocating the Cisco CRS 1-16 to the footprint within the data
centre from the loading bay.
During the survey of the Paris data centre,
Smart raised concerns as to the maximum
loading the existing raised floor would be able
to safely accommodate.

Smart were then asked by the client to
undertake further investigations to ascertain
the implications of the proposed installation.
                                                                 CRS1-16 In final Location

Smart engaged a Structural Engineer to
undertake a detailed survey in direct
relationship to the raised floor, the building
fabrication and the site access to confirm the
viability of the proposed installation.
As a result of the Structural survey it was ascertained that with a maximum existing floor
loading of 500kg and a fully loaded CRS1-16 weighing in at 750kg some additional works
would have to be undertaken to facilitate the installation.
                                                 Smart then worked closely with the Structural
                                                 Engineer, the client and the management
                                                 department of the Paris data centre to
                                                 design, install and test a suitable strengthened
                                                 floor support solution to permit the
                                                 installation of the CRS1-16.

                                                 Upon completion of the alterations to the
                 DC Powered CRS1-16
                                                 raised floor Smart continued with the
                                                 installation of the CRS1-16 including:
                                                 Siting of the CRS1-16 on the footprint
                                                 Installation and connection of the DC power
                                                 connectivity, First power up, Configuration,
                                                 Final testing, Hand over
Smart Projects

          Colt Telecom
Smart has carried out numerous
projects for Colt direct and their
             clients




                                             Fidelity
                                     Hiscox – London & Paris
                                         RS Components
                                              Oracle
                                         LastMinute.Com
Some of the Companies
    we work with
Where we Work

           •UK
           •Ireland
           •Spain
           •Hungary
           •France
           •Germany
           •Turkey
           •Greece
           •Egypt
           •Holland
CISCO
• SMART have worked with CISCO on many projects for over
  6 years. We have installed, tested and commissioned all
  current switching and routing equipment. Some of the
  projects in which we have worked in partnership with
  CISCO on are:
• TELE2; CRS1-16’s into 4 sites in Europe
• SAVVIS; CRS1-8’s and GSR 12416’s across 6 sites in Europe
• BT21CN; CRS1-16’s, 6509’s, MGX’s and 3845’s over 130+
  sites throughout the UK.
• EASYNET; CRS1-16’s, GSR 12410’s across 30 sites including
  managing specialist deliveries required due to obscure
  locations.
Smart
Design & Implementation Process
            Handover                     Initial
                                      Consultancy




                           DESIGN                      Provisional
Implementation                                           Design
                             &
                       IMPLEMENTATION
                          PROCESS

      Project                                     Detailed
    Management                                  Consultancy

                         Definitive
                          Design
Initial Consultancy

           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Initial Consultancy



• Understand Business Objectives (short and medium term)
• Understand Business Constraints (budgets and timescale)
• Understand Building Environment
• Overview of Existing Infrastructure
• Identify Technology Preferences (existing investments)
• Capture Technical Objectives & Constraints
    o High Bandwidth users CAD, Design etc
    o Communal Areas
    o Planned Technology refreshes over cabling lifecycle
    o Understanding the customers technical capabilities
    o Level of resilience required
Provisional Design


           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Provisional Design




• Based on Information Gleaned from Initial Consultancy
• Usually Includes Options
• Output in the form of a Discussion Document which may include;
    o Solution overview (may include several options)
    o Schematics, Layouts and Routing diagrams
    o Top level project plan
    o Budgetary costs
Detailed Consultancy

           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Detailed Consultancy



Recommendations based on Initial Consultancy


   • Proposed Cabling solution based on:
       o Technology Plans
       o Business plans
       o Physical building constraints
       o Space Planning
   • Standards Compliant
   • Unique design fit for purpose
Detailed Consultancy



Project Planning & Resources


   • Installation plan and phases
   • Scope of initial phase(s)
   • Major activities
   • Responsibility client representation ( Sign off, Change Control)
   • Testing requirements – Phased, Witness, Sign off
   • Documentation requirements – content, format CAD, Test Results
Definitive Design

           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Definitive Design



• Full schedule of equipment, components and variables
• Schematics
• Project Plan
• Scope of Works document
• Pricing Schedule
Project Management

           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Project Management




   PLANNING, COMMUNICATION & CHANGE CONTROL

INITIATION

                 DESIGN



                          IMPLEMENTATION


                                           CLOSE

      RISK MANAGEMENT & LESSONS LEARNED
Project Management




• Full schedule of equipment, software and licences
• Logical and physical schematics of LAN
• WAN schematic
• Project Plan
• Scope of Works document (maybe a draft PID)
• Pricing Schedule
Implementation

           Handover               Initial
                               Consultancy



                     DESIGN                  Provisional
Implementation                                 Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                            Detailed
   Management                         Consultancy

                      Definitive
                       Design
Implementation




• Full schedule of equipment, software and licences
• Logical and physical schematics of LAN
• WAN schematic
• Project Plan
• Scope of Works document (maybe a draft PID)
• Pricing Schedule
Handover             Initial
                             Consultancy



                     DESIGN                Provisional
Implementation                               Design
                       &
                 IMPLEMENTATION
                    PROCESS

     Project                          Detailed
   Management                       Consultancy

                    Definitive
                     Design
Handover




• Full inspection of all works.
• Quality Assurance Checklists
• Final Inspection and Walk About
• Documentation
• Testing Certificates
• O&M Manuals

Más contenido relacionado

La actualidad más candente

Career Portfolio For Bryan Hill Oct 09
Career Portfolio For Bryan Hill   Oct 09Career Portfolio For Bryan Hill   Oct 09
Career Portfolio For Bryan Hill Oct 09Bryan_Hill
 
Latest Resume latest uploaded wala
Latest Resume latest uploaded walaLatest Resume latest uploaded wala
Latest Resume latest uploaded walaAmit Mishra
 
Cv Fc Nov2009
Cv Fc Nov2009Cv Fc Nov2009
Cv Fc Nov2009fcardinal
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012Colin Harrop
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016Will Loyal
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Introsemackler
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericssonabbasz
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 
Carl Dean - CV
Carl Dean - CVCarl Dean - CV
Carl Dean - CVCarl Dean
 
Resume Faure Remus
Resume Faure RemusResume Faure Remus
Resume Faure RemusRemus Faure
 
Gross, Alex
Gross, AlexGross, Alex
Gross, Alexalexzg
 
Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1drottmayer
 
Resume Wynn R Pettitt
Resume Wynn R PettittResume Wynn R Pettitt
Resume Wynn R PettittWynn Pettitt
 
Mohamed ElSadat Resume Nov - 2016
Mohamed ElSadat Resume Nov - 2016Mohamed ElSadat Resume Nov - 2016
Mohamed ElSadat Resume Nov - 2016Mohamed El Sadat
 

La actualidad más candente (17)

Career Portfolio For Bryan Hill Oct 09
Career Portfolio For Bryan Hill   Oct 09Career Portfolio For Bryan Hill   Oct 09
Career Portfolio For Bryan Hill Oct 09
 
Latest Resume latest uploaded wala
Latest Resume latest uploaded walaLatest Resume latest uploaded wala
Latest Resume latest uploaded wala
 
Cv Fc Nov2009
Cv Fc Nov2009Cv Fc Nov2009
Cv Fc Nov2009
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Intro
 
D.G.Webber CV
D.G.Webber CVD.G.Webber CV
D.G.Webber CV
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericsson
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
Carl Dean - CV
Carl Dean - CVCarl Dean - CV
Carl Dean - CV
 
Resume Faure Remus
Resume Faure RemusResume Faure Remus
Resume Faure Remus
 
Gross, Alex
Gross, AlexGross, Alex
Gross, Alex
 
Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1
 
Resume Wynn R Pettitt
Resume Wynn R PettittResume Wynn R Pettitt
Resume Wynn R Pettitt
 
CV Lukas 20161216
CV Lukas 20161216CV Lukas 20161216
CV Lukas 20161216
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 
Mohamed ElSadat Resume Nov - 2016
Mohamed ElSadat Resume Nov - 2016Mohamed ElSadat Resume Nov - 2016
Mohamed ElSadat Resume Nov - 2016
 

Similar a Smart PPT Presentation

Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutionsabbasz
 
Fal Telecom Qatar Profile
Fal Telecom Qatar ProfileFal Telecom Qatar Profile
Fal Telecom Qatar ProfileVenkata Reddy
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012NEERAJ SRIVASTAVA
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_cSteveCummings20
 
Sdt Brochure V2.0
Sdt Brochure V2.0Sdt Brochure V2.0
Sdt Brochure V2.0Adept Space
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
CIS Infrastructure Group Don Mori Profile 2016
CIS Infrastructure Group Don Mori Profile 2016CIS Infrastructure Group Don Mori Profile 2016
CIS Infrastructure Group Don Mori Profile 2016Don Mori
 
Smart Presentation - Pdf
Smart Presentation - PdfSmart Presentation - Pdf
Smart Presentation - PdfHECTOR TORRES
 
Swindon the making of an asic
Swindon the making of an asicSwindon the making of an asic
Swindon the making of an asicSWINDONSilicon
 
Swindon the making of an asic
Swindon the making of an asicSwindon the making of an asic
Swindon the making of an asicSwindinSilicon
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Processd_mackay
 
Nagaraj Nayakar Resume IBM
Nagaraj Nayakar Resume IBMNagaraj Nayakar Resume IBM
Nagaraj Nayakar Resume IBMnagaraj nayakar
 
Darsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo
 

Similar a Smart PPT Presentation (20)

Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutions
 
Fal Telecom Qatar Profile
Fal Telecom Qatar ProfileFal Telecom Qatar Profile
Fal Telecom Qatar Profile
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_c
 
Sdt Brochure V2.0
Sdt Brochure V2.0Sdt Brochure V2.0
Sdt Brochure V2.0
 
Sdt Brochure V2.0
Sdt Brochure V2.0Sdt Brochure V2.0
Sdt Brochure V2.0
 
Sdt brochure
Sdt brochureSdt brochure
Sdt brochure
 
Alfa Tech VestAsia 2012
Alfa Tech VestAsia 2012Alfa Tech VestAsia 2012
Alfa Tech VestAsia 2012
 
Ravi-apr30
Ravi-apr30Ravi-apr30
Ravi-apr30
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
CIS Infrastructure Group Don Mori Profile 2016
CIS Infrastructure Group Don Mori Profile 2016CIS Infrastructure Group Don Mori Profile 2016
CIS Infrastructure Group Don Mori Profile 2016
 
Smart Presentation - Pdf
Smart Presentation - PdfSmart Presentation - Pdf
Smart Presentation - Pdf
 
Swindon the making of an asic
Swindon the making of an asicSwindon the making of an asic
Swindon the making of an asic
 
Swindon the making of an asic
Swindon the making of an asicSwindon the making of an asic
Swindon the making of an asic
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Process
 
Ons Company Presentation
Ons Company PresentationOns Company Presentation
Ons Company Presentation
 
Nagaraj Nayakar Resume IBM
Nagaraj Nayakar Resume IBMNagaraj Nayakar Resume IBM
Nagaraj Nayakar Resume IBM
 
Darsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo- Linkedin
Darsh Dharamdeo- Linkedin
 
Company Bio
Company BioCompany Bio
Company Bio
 
Company Bio
Company BioCompany Bio
Company Bio
 

Smart PPT Presentation

  • 2. About Smart • Privately Owned Company • Established in 1995 • Specialises in Data and Electrical Solutions • Members of BICSI, TIA, FIA & ECA • Certified to EN ISO 9001 Quality Standards • Accredited installers for Panduit; Brand Rex, Conectix and Hellerman Tyton solutions. • EMEA Coverage
  • 3. Smart Management Services • Consultants are TIA accredited • RCDD qualified Design Team • BICSI, FIA ECA approved • Certified Project Managers • Cisco certified Networking Consultants • Work carried out to ISO9001 Quality Standards
  • 4. Smart Operations Services • Structured Data Cabling - Copper Solutions - Optical Fibre - Blown Fibre • Electrical Services - CCTV - Fire & Security - Access Control Systems - Infrastructure Design & Installation • Networking Solutions - Design - Supply & Installation - Configuration - Diagnostic Testing
  • 5. Smart Projects • WHAT WE HAVE DONE • Case Studies • THE HUB, Regents Park • THE HUB : A prestigious electrical and data installation recently completed in Central London • CRS CISCO Router Installation • CRS Paris : A routine installation was identified as being potentially dangerous by SMART technicians, and a dynamic solution was offered • NHS critical systems development • NHS Winchester : Metro had secured the refurbishment project of The South Central Ambulance Service in Winchester and needed an experienced, reliable electrical contractor to take on the demanding roles of designers, consultants and installers for the various new critical installations. SMART was there to help
  • 6. A CRS CASE STUDY Smart were engaged by one of the leading suppliers of networking equipment and network management for the Internet to assist with the deployment of their CRS1-16 Core Routers across a number of major European cities. Smart’s involvement within this project was for the supply of resource and materials to: Project Manage Survey Installation Configuration
  • 7. For this project the Client arranged delivery of each Cisco CRS16 to the site, with Smart having responsibility for relocating the Cisco CRS 1-16 to the footprint within the data centre from the loading bay. During the survey of the Paris data centre, Smart raised concerns as to the maximum loading the existing raised floor would be able to safely accommodate. Smart were then asked by the client to undertake further investigations to ascertain the implications of the proposed installation. CRS1-16 In final Location Smart engaged a Structural Engineer to undertake a detailed survey in direct relationship to the raised floor, the building fabrication and the site access to confirm the viability of the proposed installation.
  • 8. As a result of the Structural survey it was ascertained that with a maximum existing floor loading of 500kg and a fully loaded CRS1-16 weighing in at 750kg some additional works would have to be undertaken to facilitate the installation. Smart then worked closely with the Structural Engineer, the client and the management department of the Paris data centre to design, install and test a suitable strengthened floor support solution to permit the installation of the CRS1-16. Upon completion of the alterations to the DC Powered CRS1-16 raised floor Smart continued with the installation of the CRS1-16 including: Siting of the CRS1-16 on the footprint Installation and connection of the DC power connectivity, First power up, Configuration, Final testing, Hand over
  • 9. Smart Projects Colt Telecom Smart has carried out numerous projects for Colt direct and their clients Fidelity Hiscox – London & Paris RS Components Oracle LastMinute.Com
  • 10. Some of the Companies we work with
  • 11. Where we Work •UK •Ireland •Spain •Hungary •France •Germany •Turkey •Greece •Egypt •Holland
  • 12. CISCO • SMART have worked with CISCO on many projects for over 6 years. We have installed, tested and commissioned all current switching and routing equipment. Some of the projects in which we have worked in partnership with CISCO on are: • TELE2; CRS1-16’s into 4 sites in Europe • SAVVIS; CRS1-8’s and GSR 12416’s across 6 sites in Europe • BT21CN; CRS1-16’s, 6509’s, MGX’s and 3845’s over 130+ sites throughout the UK. • EASYNET; CRS1-16’s, GSR 12410’s across 30 sites including managing specialist deliveries required due to obscure locations.
  • 13. Smart Design & Implementation Process Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 14. Initial Consultancy Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 15. Initial Consultancy • Understand Business Objectives (short and medium term) • Understand Business Constraints (budgets and timescale) • Understand Building Environment • Overview of Existing Infrastructure • Identify Technology Preferences (existing investments) • Capture Technical Objectives & Constraints o High Bandwidth users CAD, Design etc o Communal Areas o Planned Technology refreshes over cabling lifecycle o Understanding the customers technical capabilities o Level of resilience required
  • 16. Provisional Design Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 17. Provisional Design • Based on Information Gleaned from Initial Consultancy • Usually Includes Options • Output in the form of a Discussion Document which may include; o Solution overview (may include several options) o Schematics, Layouts and Routing diagrams o Top level project plan o Budgetary costs
  • 18. Detailed Consultancy Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 19. Detailed Consultancy Recommendations based on Initial Consultancy • Proposed Cabling solution based on: o Technology Plans o Business plans o Physical building constraints o Space Planning • Standards Compliant • Unique design fit for purpose
  • 20. Detailed Consultancy Project Planning & Resources • Installation plan and phases • Scope of initial phase(s) • Major activities • Responsibility client representation ( Sign off, Change Control) • Testing requirements – Phased, Witness, Sign off • Documentation requirements – content, format CAD, Test Results
  • 21. Definitive Design Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 22. Definitive Design • Full schedule of equipment, components and variables • Schematics • Project Plan • Scope of Works document • Pricing Schedule
  • 23. Project Management Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 24. Project Management PLANNING, COMMUNICATION & CHANGE CONTROL INITIATION DESIGN IMPLEMENTATION CLOSE RISK MANAGEMENT & LESSONS LEARNED
  • 25. Project Management • Full schedule of equipment, software and licences • Logical and physical schematics of LAN • WAN schematic • Project Plan • Scope of Works document (maybe a draft PID) • Pricing Schedule
  • 26. Implementation Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 27. Implementation • Full schedule of equipment, software and licences • Logical and physical schematics of LAN • WAN schematic • Project Plan • Scope of Works document (maybe a draft PID) • Pricing Schedule
  • 28. Handover Initial Consultancy DESIGN Provisional Implementation Design & IMPLEMENTATION PROCESS Project Detailed Management Consultancy Definitive Design
  • 29. Handover • Full inspection of all works. • Quality Assurance Checklists • Final Inspection and Walk About • Documentation • Testing Certificates • O&M Manuals