2. Why ICE?
Each projects are treated as SPC (Special Purpose Companies). Allowing greater flexibility,
focus and a more selective expertise.
- Build relations to: tax and audit firms, insurance
advisors, CDM advisors, etc.
- Work with lending personal and institutions
- Exist as a player in the carbon credit market
- Creating green image
SPC - Maintaining a solid interpretation of the bottom-line
- Project acquisition
- Board of Technical and Operation for the project in
question
- Working relationship to design engineering and
construction parties
- Ensuring a solid implementation of the three corporate
bottom-lines
The three bottom-line approach (Social, Environment and Community) is designed to obtain the five
fundamentals in delivering renewable supply (Accessibility, Availability, Affordability, Sustainability and
Scalability)
>> Proof of Our Word
3. The most productive location available for Dominanga Micro Hydro”
ICE carefully selected the technical team in charge. A team that has already successfully
delivered hydro projects in the region (Mobuya and Anga Anga) and in the process of delivery has
identified the most productive location in the region. A location now marked for ICE – Dominanga
Hydro.
SPC PT Dominanga Clean Energy
Power Potential 3.6 MW
Capacity Factor 80%
Energy Output 25,228,800 KWh
Estimate Project Cost US$ 1,700,000 per MW
Technology Used Water turbine, Francis, at run off river
Distance to PLN Grid (km) 1.50
Estimate Purchase Power Rp 787/ KWh
4. “Locks abundant supply for Jambi Biogas”
The location is selected to maintain an abundant and sustainable supply of resource for the
biogas plant.
The surrounding plantations are already in
agreement to supply the factory with their
waste (fiber, shell, and EFB) – used as raw
material in the project
SPC PT Sumatera Bioenergy
Project Name PLTUBS Jambi Bioenergy
Location Muaro, Jambi
Power Potential 2 x 5 MW
Capacity Factor 90%
Energy Output pa 78,840,000 KWh
EFB Requirement 108,000 ton pa
EFB Available 279,864 ton pa
Ratio EFB Required to Available 40%
Estimate Project Cost US$ 1,620,000 per MW
Technology Used Combination of biological waste
Distance to PLN Grid (km) 8-10
Estimate Purchase Power Rp 787/ KWh