   CO2 STRIPPER
   (T-1101)
   Problems, Solutions & Suggestions
   Report contains stripper history in detail and advanced
   technologies introduced for stripper tubing. Style of report is
   absolutely different from traditional styles as it gives an
   excellent & immediate review of stripper.




                                   SYED ETIZAZ HASSAN
                                         U.E.T LAHORE
                                             8/25/2011
[T-1101] [INTERNSHIP 2011]


APPROVALS


SUPERVISOR
(Mr. Abdul Hakim )




MENTOR
(Mr. Azhar Rasool)




GL
(Mr. Qamar Jaleel)




                     ENGRO FERTILIZERS             Page 2
[T-1101] [INTERNSHIP 2011]


CONTENTS
 x   CO2 STRIPPER

 x   HISTORY OF CO2 STRIPPER(TURN AROUNDS)

 x   T/A 2009 ,AN EXAMPLE

 x   CURRENT ISSUES

 x   SOLUTIONS SUGGESTED

        I.          TUBES

       II.          TUBESHEETS

      III.          DISTRIBUTION TRAY

      IV.           SWIRLS

                    GASKETS
      V.

 x   T/A 2012

 x   PREVENTIVE MEASURES

 x   MY SUGGESTIONS

     WHAT I HAVE LEARNT?????

     What I DID FOR ALL OF IT????

     THINGS IMPRESSED ME HERE @ ENGRO




                                        ENGRO FERTILIZERS             Page 3
[T-1101] [INTERNSHIP 2011]


T-1101 in ACES


   • A ADVANCE

   • C COST

   • E    ENERGY

   • S    SAVING



T-1101 Installation

(October-1998)




                      ENGRO FERTILIZERS             Page 4
[T-1101] [INTERNSHIP 2011]




ENGRO FERTILIZERS             Page 5
[T-1101] [INTERNSHIP 2011]




CO2 STRIPPER (UREA STRIPPER T-1101)

              Stripper in ACES synthesis loop consists of tray part and stripping
              part with vertical tubes. The solution from Reactor is fed to tray
              part contacting with mixed gas from stripping part. NH3 and CO2
              molar ratio is reduced from 4.0 to 3.0 at tray part to achieve
              suitable composition for CO2 stripping. Solution from side down
              comer of tray part enters on distribution plate. At the
              distribution plate, solution is distributed on tube sheet through
              holes of distribution plate equally with keeping liquid level
              around 100-200mm on the distribution plate.

              On the tube sheet, the solution makes liquid level higher than
              swirl’s holes by 60-70mm. And the solution enters to swirls’ holes
              tangentially to make uniform thin falling film on the internal
              surface of tube. CO2 gas introduced at the bottom of tubes as
              stripping medium contacts with the solution in the tubes under
              the falling film condition. The solution is heated from tube
              outside by 20kg/cm2g steam during contacting with CO2 gas.
              Carbamate is decomposed and NH3 is removed and separated
              from the solution by CO2 gas under the high-pressure condition.
              Finally, NH3 content in the solution from the bottom of Stripper
              is reduced to 13-14%.




                                      ENGRO FERTILIZERS                Page 6
[T-1101] [INTERNSHIP 2011]


T-1101 Design by Toyo Engineering


SHELL SIDE

    Operating Temperature

                          417°F(214 °C)

    Design Temperature

                          464°F(240 °C)

    Operating Pressure

                          284 psig

    Design Pressure

                          355 psig



TUBE SIDE

    Operating Temperature

                             356°F/374°F(179/190°C)

    Design Temperature

                             428°F(220 °C)

    Operating Pressure

                             2490 psig

    Design Pressure

                             2613 psig




                                                      ENGRO FERTILIZERS             Page 7
[T-1101] [INTERNSHIP 2011]


METALLURGY

Outer Shell                CS           Tube                 DP-12

Internal Lining            DP-12        Sieve Tray           DP-12

Distribution Tray          DP-12        Swirl                DP-12, SUS-329, J4L, DP28W

Stay Rod                   DP-12        Gasket               Tombo 9007-SC & Comp Graph



IMPORTANT DATA

Internal diameter top      2600 mm              Length top              3060 mm

Internal diameter middle   2500 mm              Length after tubes      1000 mm

Tube Length                5963 mm              Length bottom           900 mm

No. of Tubes                3100                diameter of Tube        31.8 mm

Thickness of tube           2.9 mm              Weep Holes              69

Number of Trays             3                   No. of holes per tray     4508

Lining thickness            6mm                 Corrosion allowance      1.5 mm (tube)

Weight of shell             197000 kg




                                                   ENGRO FERTILIZERS               Page 8
[T-1101] [INTERNSHIP 2011]


HISTORY of T-1101



TURN AROUNDS’ SCHEDULE


1   TURN AROUND     2000(MARCH)


2   TURN AROUND     2001(APRIL)


3   TURN AROUND     2002(OCTOBER 15)


4   TURN AROUND     2004(MARCH-APRIL)


5   TURN AROUND     2005(APRIL)


6   FORCED OUTAGE   2006(OCTOBER)


7   TURN AROUND     2009(MARCH)




                                    ENGRO FERTILIZERS               Page 9
[T-1101] [INTERNSHIP 2011]




T/A 2000

  10 % swirls were swinging & loose

  Uneven liquid level on distribution plate




  Seal weld leakage testing




                                               ENGRO FERTILIZERS             Page 10
[T-1101] [INTERNSHIP 2011]




T/A 2001
  High bottom temperaturev

  100% ECT

  Short circulation of liquid from bottom tray




                                                   Bottom tray sagging

                                                   ‘o’ rings damaged

                                                   All the swirls were swinging

                                                   Stay rods damaged

T/A 2002

  Swirls inspection

  33% ECT

  IPRL arrange adequate inventory of stay rods

  IPRL plan repair /replacement of swirls based on
   TOYO analysis

  Steam side PSV flange gasket replacement

  Distribution holes on the distribution plate had been
   enlarged

  Sample point valves relocation required


                                                     ENGRO FERTILIZERS               Page 11
[T-1101] [INTERNSHIP 2011]




T/A 2004

  Lube oil filters Replacement

  Swirls holes diameter increased from 2.8 mm to 3.1
   mm


                                          60 % ECT

                                          Gaskets and swirl "o" rings damaged

                                          Stay rod damaged

                                          Bare wire for welding (Pak American)

  Bottom temp raised to 192 deg C

  Ammonia concentration raised to 21.19 %(NH3
   rec. system overloaded )and NH3 vapors increased
   to 50%

  Distribution holes on the distribution plate have
   been enlarged




                                                   ENGRO FERTILIZERS                Page 12
[T-1101] [INTERNSHIP 2011]




T/A 2005

  Tube and tube sheet seal welds leakage

  ‘o’ rings damaged

  Gaskets of steam inlet and outlet valves damaged




FORCED OUTAGE 2006
  Tubes leakage was detected

  Tube sheet inspection

  Swirls hole diameter increment

  Swirl guards damaged

  2.8 % ECT




                                                ENGRO FERTILIZERS                  Page 13
[T-1101] [INTERNSHIP 2011]




T/A 2009

  Thermo well corroded

  Swirls destroyed

  Vessel liner inspection
   required

  Gaskets for manhole to be
   replaced

  Swirls 'o' rings damaged

  Soft gaskets for swirls

  Washers for stay rod

  Seal welds damaged

  Distribution plate hole
   diameter increased 129%

  Chest side bleeder valve is leak
   thru

  Condensate outlet sample point valve glands repacking required

  Steam inlet sample point valve glanding required




                                                 ENGRO FERTILIZERS                 Page 14
[T-1101] [INTERNSHIP 2011]


                      OUTCOME OF T/As
T/A 2009 AN EXAMPLE




               Efficiency BEFORE & AFTER t/a 2009




                                   ENGRO FERTILIZERS              Page 15
[T-1101] [INTERNSHIP 2011]




                                SWIRLS REPLACEMENT




350



300



250



200
                                                                                            New 2009

150                                                                                         Old 2005-2006



100



50



 0
      Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
        #1      #2      #3      #4      #5      #6      #7      #8      #9      # 10




                                                         ENGRO FERTILIZERS               Page 16
[T-1101] [INTERNSHIP 2011]




DISTRIBUTION PLATE HOLE DIMENSIONS




                    ENGRO FERTILIZERS              Page 17
[T-1101] [INTERNSHIP 2011]




                             CURRENT ISSUES


ISSUES FORESEEN (HISTORY BASED)


  High bottom temperature

  Swirl's hole diameter increment

  Swirl/stay rod gasket & 'o' ring damaged

  Swirls’ guard damage

  Tubes leakage( CS lines corrosion)

  Swirls, tubes and shell corrosion

  Spurger holes diameter increment

  Carbamate condenses on the level transmitters

  Vortex breaker corroded

  Sieve trays gasket leakage




                                                   ENGRO FERTILIZERS             Page 18
[T-1101] [INTERNSHIP 2011]


ALARMING ISSUES


  Stripper efficiency dropped 2 %(02 /02/2011)

  Decreasing tube thickness (TOYO report in 2006)

  Distribution plate holes diameter increment

  Weep holes

  Seal welds leakages

  Carbamate leakage at bottom may way

  Corrosion & erosion




                                                  ENGRO FERTILIZERS               Page 19
[T-1101] [INTERNSHIP 2011]


              SOLUTIONS SUGGESTED


TUBES
  Proper adjustment of swirls

  High pressure & temperature (non chloride)steam cleaning

  Welding at lower temperature

  ECT of 100% tubes

  Tubes plugging




                                                ENGRO FERTILIZERS               Page 20
[T-1101] [INTERNSHIP 2011]


TUBE SHEET
  Arrangements for proper seal welding of tubes

  Distribution plate laser leveling

  Efficient grinding of seal welds




DISTRIBUTION PLATE

  Proper adjustment of swirl guards and stay
   rods’ gaskets

  Proper bolting with shell

  Plugging

  Change it(as in 2004)



SIEVE TRAYS
  Gasket replacement

  Level maintenance




                                                   ENGRO FERTILIZERS             Page 21
[T-1101] [INTERNSHIP 2011]




SWIRLS

  Installation procedure

  ‘O’ rings replacement

  2-passes seal welds

  Gaskets for swirl guards

  Proper adjustments for distribution plate leveling

  Proper hole testing (specially for swirls of 2004-05)

  Buy some new swirls (as swirls replaced in
   2004-05 may destroyed)




GASKETS

  Gaskets at inlets & outlets

  ‘O’ rings Teflon gaskets (tombo T #2090)

  Black gasket (Tombo #9007-SC)

  Soft gasket (Tombo T #9096)

  Man way gaskets

  Sieve trays gaskets



                                                    ENGRO FERTILIZERS                Page 22
[T-1101] [INTERNSHIP 2011]


T/A 2012 (CO2 STRIPPER) PLAN




               ENGRO FERTILIZERS              Page 23
[T-1101] [INTERNSHIP 2011]




PREVENTIVE MEASURES
  New swirls purchase

  Tombo sheets for gaskets and 'o' rings

  Stay rods replacement required

  Bare wire DP 3T

  Prepare for 100 % ECT

  Man holes gaskets replacement

  Weep holes cleaning and lining judgment

  Proper arrangement for seal welder & seal weld cutter

  Proper testing of methyl red solution for weep hole testing

  UT for shell lining

  Distribution plate needed to be replaced




                                                  ENGRO FERTILIZERS               Page 24
[T-1101] [INTERNSHIP 2011]


MY SUGGESTIONS

  Tubes replacement (FFC)

  2RE69(Cr & Ni ) by Sand vick

  Zr layering Omega Bond technology (ATI Wah
   Chang) (waiting for quotation)

  Seal welding machine & grinder (Ar cooling)

  Distributor plate plugging and boring more holes

  Thermo vision of stripper lines

  ECT report should be sent to TOYO

  Experienced persons’ involvement in T/A s

  A/C cooling during shutdown




                                                 ENGRO FERTILIZERS                 Page 25
[T-1101] [INTERNSHIP 2011]


                        OTHER THAN MY PROJECT
UREA II
  C2E Shutdown

  NH3 Line tracing

  NH3 Reservoir (D-261)

  NH3 Condensers (E-264)

  MP 262 A/B

  URACA’S Pumps(P 201’S)

  ACES Tower visit       (Thermo vision)

  Prill Tower visit



OVER ALL PLANT
  GT startup @ URUT

  Packing leak in ST @ enven

  Piston repairing @ workshop

  Visited skill shop




                                            ENGRO FERTILIZERS             Page 26
[T-1101] [INTERNSHIP 2011]




                       Shut down @ urea ii (c2e)




SHUT DOWN @ UREA II (C2E)




                                      ENGRO FERTILIZERS             Page 27
[T-1101] [INTERNSHIP 2011]



SHUT DOWN @ UREA II (C2E)




                            ENGRO FERTILIZERS             Page 28
[T-1101] [INTERNSHIP 2011]




ENGRO FERTILIZERS             Page 29
[T-1101] [INTERNSHIP 2011]




WHAT I HAVE LEARNT?????

  Technical data handling

  T/A planning

  Equipment Order & purchase for T/A

  Total maintenance procedure

  Collaboration of Operation ,Process, Maintenance ,Inspection ,I& E and Safety section

  Non-destructive techniques

  Permit protocol

  Seniority protocol

  Crisis management

  Rapid decision making



What I DID FOR ALL OF IT????
  Spent most of the time in plant premises

  Read all history files and job cards

  Visited inspection, planning ,process ,projects

  Met the technicians of FM

  Coordinated with operators & board men in CCR

  Met senior persons worked here before



                                                     ENGRO FERTILIZERS             Page 30
[T-1101] [INTERNSHIP 2011]




      THINGS IMPRESSED ME HERE @ ENGRO



 Safety and importance of life

 Line of protocol

 Team work

 Qualified staff

 Well equipped offices

 Ethics & moral values

 Well mannered workers

 Seniority honor




                                  ENGRO FERTILIZERS             Page 31

More Related Content

Viewers also liked (11)

Informe ingles double entry
Informe ingles double entryInforme ingles double entry
Informe ingles double entry
 
Tokbox
TokboxTokbox
Tokbox
 
Persun
PersunPersun
Persun
 
My ppt
My pptMy ppt
My ppt
 
Cuento la princesa pipiripesa
Cuento la princesa pipiripesaCuento la princesa pipiripesa
Cuento la princesa pipiripesa
 
Sem chudessveta
Sem chudessvetaSem chudessveta
Sem chudessveta
 
профессии
профессиипрофессии
профессии
 
Team synergy media launch
Team synergy media launchTeam synergy media launch
Team synergy media launch
 
Swa presentation
Swa presentationSwa presentation
Swa presentation
 
bp case study
bp case study bp case study
bp case study
 
Reactores
ReactoresReactores
Reactores
 

Similar to Engo report

MV 600 SS SP vapaorizer (cyroquip)
MV 600 SS SP vapaorizer (cyroquip)MV 600 SS SP vapaorizer (cyroquip)
MV 600 SS SP vapaorizer (cyroquip)
Adrian Mah Siew Hoe
 

Similar to Engo report (20)

61677859-Nooter-Eriksen-Presentation-2.pdf
61677859-Nooter-Eriksen-Presentation-2.pdf61677859-Nooter-Eriksen-Presentation-2.pdf
61677859-Nooter-Eriksen-Presentation-2.pdf
 
Moyno l10 drive end operations and assembly
Moyno l10 drive end operations and assemblyMoyno l10 drive end operations and assembly
Moyno l10 drive end operations and assembly
 
Moyno l4 drive end operations and assembly
Moyno l4 drive end operations and assemblyMoyno l4 drive end operations and assembly
Moyno l4 drive end operations and assembly
 
Metso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball ValvesMetso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball Valves
 
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. PuneABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
 
Technovision pipe & joints catalogue
Technovision pipe & joints catalogueTechnovision pipe & joints catalogue
Technovision pipe & joints catalogue
 
Knife gate valve catalogue
Knife gate valve catalogueKnife gate valve catalogue
Knife gate valve catalogue
 
GNFC problems.pdf
GNFC problems.pdfGNFC problems.pdf
GNFC problems.pdf
 
Titan Suction Diffuser - Pump Protection
Titan Suction Diffuser - Pump ProtectionTitan Suction Diffuser - Pump Protection
Titan Suction Diffuser - Pump Protection
 
Raccordi per alte pressioni - Fitok serie 15
Raccordi per alte pressioni - Fitok serie 15Raccordi per alte pressioni - Fitok serie 15
Raccordi per alte pressioni - Fitok serie 15
 
Penberthy
PenberthyPenberthy
Penberthy
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
 
Moyno l2 drive end operations and assembly
Moyno l2 drive end operations and assemblyMoyno l2 drive end operations and assembly
Moyno l2 drive end operations and assembly
 
MV 600 SS SP vapaorizer (cyroquip)
MV 600 SS SP vapaorizer (cyroquip)MV 600 SS SP vapaorizer (cyroquip)
MV 600 SS SP vapaorizer (cyroquip)
 
Catalogue pipeco 2012
Catalogue pipeco 2012Catalogue pipeco 2012
Catalogue pipeco 2012
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
Raccordi per alte pressioni - Fitok serie 60
Raccordi per alte pressioni - Fitok serie 60Raccordi per alte pressioni - Fitok serie 60
Raccordi per alte pressioni - Fitok serie 60
 
Kubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manualKubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manual
 
Kubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manualKubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manual
 
Kubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manualKubota bx24 d tractor parts catalogue manual
Kubota bx24 d tractor parts catalogue manual
 

Engo report

  • 1. 2011 CO2 STRIPPER (T-1101) Problems, Solutions & Suggestions Report contains stripper history in detail and advanced technologies introduced for stripper tubing. Style of report is absolutely different from traditional styles as it gives an excellent & immediate review of stripper. SYED ETIZAZ HASSAN U.E.T LAHORE 8/25/2011
  • 2. [T-1101] [INTERNSHIP 2011] APPROVALS SUPERVISOR (Mr. Abdul Hakim ) MENTOR (Mr. Azhar Rasool) GL (Mr. Qamar Jaleel) ENGRO FERTILIZERS Page 2
  • 3. [T-1101] [INTERNSHIP 2011] CONTENTS x CO2 STRIPPER x HISTORY OF CO2 STRIPPER(TURN AROUNDS) x T/A 2009 ,AN EXAMPLE x CURRENT ISSUES x SOLUTIONS SUGGESTED I. TUBES II. TUBESHEETS III. DISTRIBUTION TRAY IV. SWIRLS GASKETS V. x T/A 2012 x PREVENTIVE MEASURES x MY SUGGESTIONS WHAT I HAVE LEARNT????? What I DID FOR ALL OF IT???? THINGS IMPRESSED ME HERE @ ENGRO ENGRO FERTILIZERS Page 3
  • 4. [T-1101] [INTERNSHIP 2011] T-1101 in ACES • A ADVANCE • C COST • E ENERGY • S SAVING T-1101 Installation (October-1998) ENGRO FERTILIZERS Page 4
  • 5. [T-1101] [INTERNSHIP 2011] ENGRO FERTILIZERS Page 5
  • 6. [T-1101] [INTERNSHIP 2011] CO2 STRIPPER (UREA STRIPPER T-1101) Stripper in ACES synthesis loop consists of tray part and stripping part with vertical tubes. The solution from Reactor is fed to tray part contacting with mixed gas from stripping part. NH3 and CO2 molar ratio is reduced from 4.0 to 3.0 at tray part to achieve suitable composition for CO2 stripping. Solution from side down comer of tray part enters on distribution plate. At the distribution plate, solution is distributed on tube sheet through holes of distribution plate equally with keeping liquid level around 100-200mm on the distribution plate. On the tube sheet, the solution makes liquid level higher than swirl’s holes by 60-70mm. And the solution enters to swirls’ holes tangentially to make uniform thin falling film on the internal surface of tube. CO2 gas introduced at the bottom of tubes as stripping medium contacts with the solution in the tubes under the falling film condition. The solution is heated from tube outside by 20kg/cm2g steam during contacting with CO2 gas. Carbamate is decomposed and NH3 is removed and separated from the solution by CO2 gas under the high-pressure condition. Finally, NH3 content in the solution from the bottom of Stripper is reduced to 13-14%. ENGRO FERTILIZERS Page 6
  • 7. [T-1101] [INTERNSHIP 2011] T-1101 Design by Toyo Engineering SHELL SIDE  Operating Temperature 417°F(214 °C)  Design Temperature 464°F(240 °C)  Operating Pressure 284 psig  Design Pressure 355 psig TUBE SIDE  Operating Temperature 356°F/374°F(179/190°C)  Design Temperature 428°F(220 °C)  Operating Pressure 2490 psig  Design Pressure 2613 psig ENGRO FERTILIZERS Page 7
  • 8. [T-1101] [INTERNSHIP 2011] METALLURGY Outer Shell CS Tube DP-12 Internal Lining DP-12 Sieve Tray DP-12 Distribution Tray DP-12 Swirl DP-12, SUS-329, J4L, DP28W Stay Rod DP-12 Gasket Tombo 9007-SC & Comp Graph IMPORTANT DATA Internal diameter top 2600 mm Length top 3060 mm Internal diameter middle 2500 mm Length after tubes 1000 mm Tube Length 5963 mm Length bottom 900 mm No. of Tubes 3100 diameter of Tube 31.8 mm Thickness of tube 2.9 mm Weep Holes 69 Number of Trays 3 No. of holes per tray 4508 Lining thickness 6mm Corrosion allowance 1.5 mm (tube) Weight of shell 197000 kg ENGRO FERTILIZERS Page 8
  • 9. [T-1101] [INTERNSHIP 2011] HISTORY of T-1101 TURN AROUNDS’ SCHEDULE 1 TURN AROUND 2000(MARCH) 2 TURN AROUND 2001(APRIL) 3 TURN AROUND 2002(OCTOBER 15) 4 TURN AROUND 2004(MARCH-APRIL) 5 TURN AROUND 2005(APRIL) 6 FORCED OUTAGE 2006(OCTOBER) 7 TURN AROUND 2009(MARCH) ENGRO FERTILIZERS Page 9
  • 10. [T-1101] [INTERNSHIP 2011] T/A 2000  10 % swirls were swinging & loose  Uneven liquid level on distribution plate  Seal weld leakage testing ENGRO FERTILIZERS Page 10
  • 11. [T-1101] [INTERNSHIP 2011] T/A 2001  High bottom temperaturev  100% ECT  Short circulation of liquid from bottom tray  Bottom tray sagging  ‘o’ rings damaged  All the swirls were swinging  Stay rods damaged T/A 2002  Swirls inspection  33% ECT  IPRL arrange adequate inventory of stay rods  IPRL plan repair /replacement of swirls based on TOYO analysis  Steam side PSV flange gasket replacement  Distribution holes on the distribution plate had been enlarged  Sample point valves relocation required ENGRO FERTILIZERS Page 11
  • 12. [T-1101] [INTERNSHIP 2011] T/A 2004  Lube oil filters Replacement  Swirls holes diameter increased from 2.8 mm to 3.1 mm  60 % ECT  Gaskets and swirl "o" rings damaged  Stay rod damaged  Bare wire for welding (Pak American)  Bottom temp raised to 192 deg C  Ammonia concentration raised to 21.19 %(NH3 rec. system overloaded )and NH3 vapors increased to 50%  Distribution holes on the distribution plate have been enlarged ENGRO FERTILIZERS Page 12
  • 13. [T-1101] [INTERNSHIP 2011] T/A 2005  Tube and tube sheet seal welds leakage  ‘o’ rings damaged  Gaskets of steam inlet and outlet valves damaged FORCED OUTAGE 2006  Tubes leakage was detected  Tube sheet inspection  Swirls hole diameter increment  Swirl guards damaged  2.8 % ECT ENGRO FERTILIZERS Page 13
  • 14. [T-1101] [INTERNSHIP 2011] T/A 2009  Thermo well corroded  Swirls destroyed  Vessel liner inspection required  Gaskets for manhole to be replaced  Swirls 'o' rings damaged  Soft gaskets for swirls  Washers for stay rod  Seal welds damaged  Distribution plate hole diameter increased 129%  Chest side bleeder valve is leak thru  Condensate outlet sample point valve glands repacking required  Steam inlet sample point valve glanding required ENGRO FERTILIZERS Page 14
  • 15. [T-1101] [INTERNSHIP 2011] OUTCOME OF T/As T/A 2009 AN EXAMPLE Efficiency BEFORE & AFTER t/a 2009 ENGRO FERTILIZERS Page 15
  • 16. [T-1101] [INTERNSHIP 2011] SWIRLS REPLACEMENT 350 300 250 200 New 2009 150 Old 2005-2006 100 50 0 Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment #1 #2 #3 #4 #5 #6 #7 #8 #9 # 10 ENGRO FERTILIZERS Page 16
  • 17. [T-1101] [INTERNSHIP 2011] DISTRIBUTION PLATE HOLE DIMENSIONS ENGRO FERTILIZERS Page 17
  • 18. [T-1101] [INTERNSHIP 2011] CURRENT ISSUES ISSUES FORESEEN (HISTORY BASED)  High bottom temperature  Swirl's hole diameter increment  Swirl/stay rod gasket & 'o' ring damaged  Swirls’ guard damage  Tubes leakage( CS lines corrosion)  Swirls, tubes and shell corrosion  Spurger holes diameter increment  Carbamate condenses on the level transmitters  Vortex breaker corroded  Sieve trays gasket leakage ENGRO FERTILIZERS Page 18
  • 19. [T-1101] [INTERNSHIP 2011] ALARMING ISSUES  Stripper efficiency dropped 2 %(02 /02/2011)  Decreasing tube thickness (TOYO report in 2006)  Distribution plate holes diameter increment  Weep holes  Seal welds leakages  Carbamate leakage at bottom may way  Corrosion & erosion ENGRO FERTILIZERS Page 19
  • 20. [T-1101] [INTERNSHIP 2011] SOLUTIONS SUGGESTED TUBES  Proper adjustment of swirls  High pressure & temperature (non chloride)steam cleaning  Welding at lower temperature  ECT of 100% tubes  Tubes plugging ENGRO FERTILIZERS Page 20
  • 21. [T-1101] [INTERNSHIP 2011] TUBE SHEET  Arrangements for proper seal welding of tubes  Distribution plate laser leveling  Efficient grinding of seal welds DISTRIBUTION PLATE  Proper adjustment of swirl guards and stay rods’ gaskets  Proper bolting with shell  Plugging  Change it(as in 2004) SIEVE TRAYS  Gasket replacement  Level maintenance ENGRO FERTILIZERS Page 21
  • 22. [T-1101] [INTERNSHIP 2011] SWIRLS  Installation procedure  ‘O’ rings replacement  2-passes seal welds  Gaskets for swirl guards  Proper adjustments for distribution plate leveling  Proper hole testing (specially for swirls of 2004-05)  Buy some new swirls (as swirls replaced in 2004-05 may destroyed) GASKETS  Gaskets at inlets & outlets  ‘O’ rings Teflon gaskets (tombo T #2090)  Black gasket (Tombo #9007-SC)  Soft gasket (Tombo T #9096)  Man way gaskets  Sieve trays gaskets ENGRO FERTILIZERS Page 22
  • 23. [T-1101] [INTERNSHIP 2011] T/A 2012 (CO2 STRIPPER) PLAN ENGRO FERTILIZERS Page 23
  • 24. [T-1101] [INTERNSHIP 2011] PREVENTIVE MEASURES  New swirls purchase  Tombo sheets for gaskets and 'o' rings  Stay rods replacement required  Bare wire DP 3T  Prepare for 100 % ECT  Man holes gaskets replacement  Weep holes cleaning and lining judgment  Proper arrangement for seal welder & seal weld cutter  Proper testing of methyl red solution for weep hole testing  UT for shell lining  Distribution plate needed to be replaced ENGRO FERTILIZERS Page 24
  • 25. [T-1101] [INTERNSHIP 2011] MY SUGGESTIONS  Tubes replacement (FFC)  2RE69(Cr & Ni ) by Sand vick  Zr layering Omega Bond technology (ATI Wah Chang) (waiting for quotation)  Seal welding machine & grinder (Ar cooling)  Distributor plate plugging and boring more holes  Thermo vision of stripper lines  ECT report should be sent to TOYO  Experienced persons’ involvement in T/A s  A/C cooling during shutdown ENGRO FERTILIZERS Page 25
  • 26. [T-1101] [INTERNSHIP 2011] OTHER THAN MY PROJECT UREA II  C2E Shutdown  NH3 Line tracing  NH3 Reservoir (D-261)  NH3 Condensers (E-264)  MP 262 A/B  URACA’S Pumps(P 201’S)  ACES Tower visit (Thermo vision)  Prill Tower visit OVER ALL PLANT  GT startup @ URUT  Packing leak in ST @ enven  Piston repairing @ workshop  Visited skill shop ENGRO FERTILIZERS Page 26
  • 27. [T-1101] [INTERNSHIP 2011] Shut down @ urea ii (c2e) SHUT DOWN @ UREA II (C2E) ENGRO FERTILIZERS Page 27
  • 28. [T-1101] [INTERNSHIP 2011] SHUT DOWN @ UREA II (C2E) ENGRO FERTILIZERS Page 28
  • 29. [T-1101] [INTERNSHIP 2011] ENGRO FERTILIZERS Page 29
  • 30. [T-1101] [INTERNSHIP 2011] WHAT I HAVE LEARNT?????  Technical data handling  T/A planning  Equipment Order & purchase for T/A  Total maintenance procedure  Collaboration of Operation ,Process, Maintenance ,Inspection ,I& E and Safety section  Non-destructive techniques  Permit protocol  Seniority protocol  Crisis management  Rapid decision making What I DID FOR ALL OF IT????  Spent most of the time in plant premises  Read all history files and job cards  Visited inspection, planning ,process ,projects  Met the technicians of FM  Coordinated with operators & board men in CCR  Met senior persons worked here before ENGRO FERTILIZERS Page 30
  • 31. [T-1101] [INTERNSHIP 2011] THINGS IMPRESSED ME HERE @ ENGRO  Safety and importance of life  Line of protocol  Team work  Qualified staff  Well equipped offices  Ethics & moral values  Well mannered workers  Seniority honor ENGRO FERTILIZERS Page 31