FY 2013 BUDGET RECOMMENDATIONS:
                       SUMMARY

• Balanced budget with limited increases in General Fund
  disbursements and direct expenditures

• Maintain consistent support for FCPS budget at 52.5% of
  General Fund disbursements

• No Real Estate Tax rate increase
   •   Keep impact on average taxpayer relatively flat


• Increase in the Stormwater fees and several other fee and
  fare increases




                          Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                     1
FY 2013 BUDGET RECOMMENDATIONS:
                         SUMMARY

• Spending increases cover only critical requirements
   •   2.18% Market Rate Adjustment (MRA) for all public safety and
       non-public safety employees
   •   Limited infrastructure investment

• Made strategic reductions while retaining core and critical
  services
   •   ($10.64) million in General Fund agency expenditure reductions

• Net reduction of 2 positions
  • FY 2013 budget includes 34/33.27
    SYE new positions
  • Budget recommendation includes
    36 positions for abolishment as part
    of recommended agency reductions
  • Positions per capita ratio @ 11.24
    positions per 1,000 residents
                            Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                       2
GENERAL FUND REVENUE GROWTH




      Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                 3
FY 2013 GENERAL FUND RECEIPTS
                                              (“WHERE IT COMES FROM”)
                                                        REVENUE FROM THE
       CHARGES FOR SERVICES
                                                                                                                             (subcategories in
                                                         COMMONWEALTH*
              $66,981,067                                    $94,267,447                             PERMITS, FEES &

                                                                                                                                 millions)
   SACC Fees              $34.7                      VA Public Assistance $44.6                 REGULATORY LICENSES
   EMS Transport Fees     $15.5                      Law Enforcement      $23.7                         $34,802,539
   Clerk Fees              $4.6                      Other                $26.0              Building Permits/
   Other                  $12.2                                                                   Inspection Fees   $24.7
                                                                                             Other                  $10.1
                                              1.9%        2.7%                                                               REAL ESTATE TAXES
          REVENUE FROM THE                                                                                                       $2,106,652,081
        FEDERAL GOVERNMENT                                         1.0%                                                     Current        $2,097.0
                                             1.0%
                $34,270,839                                                                                                 Delinquent          $9.7
        Social Services Aid $34.1
        Other                $0.2

         LOCAL TAXES
          $523,937,338
Local Sales Tax          $166.9                                                                         60.9%
B.P.O.L.                 $159.7             15.1%
Communications Tax        $50.7
Other                    $146.6


                                    0.4%
   RECOVERED COSTS/                            0.5%
    OTHER REVENUE
      $12,096,329

                                                       16.0%
         REVENUE FROM THE
         USE OF MONEY AND
             PROPERTY
                                                                                                                              * For presentation purposes, Personal
             $17,286,968
                                                                                                                              Property Taxes of $211,313,944 that are
                                                                                                                              reimbursed by the Commonwealth as a
                                                                                                                              result of the Personal Property Tax Relief
                  PERSONAL PROPERTY                            0.5%                                                           Act of 1998 are included in the Personal
                           TAXES *                                                                                            Property Taxes category.
                        $552,566,873
                Current            $543.3
                                                                                                                              ** Total County resources used to support
                Delinquent           $9.3                                       FINES AND                                     the budget include the revenues shown
                                                                              FORFEITURES
                                                                                                                              here, as well as a beginning balance and
                                                                                $16,579,948
                                                                          District Court                                      transfers in from other funds.
                                                                          Fines              $7.7
                                                                          Parking Violations $3.3
                                                                          Other              $5.6


                          FY 2013 GENERAL FUND RECEIPTS** = $3,459,441,429
                                                    Fairfax County, Virginia: FY 2013 Advertised Budget Plan                                                               4
REAL ESTATE TAX BASE
                     1993       1994                 1995                1996                1997     1998     1999
Equalization         (6.48)%   (2.46)%              (1.29)%              0.36%               0.57%    0.80%   1.77%
 - Residential       (3.74)    (0.52)                0.01                0.49               (0.23)   (0.50)   0.04
 - Nonresidential   (13.22)    (7.86)               (5.28)              (0.09)               3.27     5.05    7.12
Growth                0.40      1.08                 1.97                2.16                2.13     1.93    2.19
TOTAL                (6.08)%   (1.38)%               0.68%               2.52%               2.70%    2.73%   3.96%

                     2000       2001                 2002                2003                2004     2005     2006
Equalization         2.96%     5.13%                9.70%              11.72%               9.94%     9.54%   20.80%
 - Residential       0.77      5.13                11.26               16.27               14.55     11.29    23.09
 - Nonresidential    9.24      5.15                 5.92                0.52               (2.94)     3.74    12.74
Growth               3.37      3.81                 3.94                3.42                2.54      2.50     2.69
TOTAL                6.33%     8.94%               13.64%              15.14%              12.48%    12.04%   23.49%

                     2007       2008                 2009                2010                2011     2012     2013
Equalization        19.76%      2.47%               (1.02)%           (10.52)%             (8.98)%   2.67%    2.53%
 - Residential      20.57      (0.33)               (3.38)            (12.55)              (5.56)    2.34      0.71
 - Nonresidential   16.64      13.57                 7.00              (4.51)             (18.29)    3.73      8.21
Growth               2.94       1.68                 1.53               0.57               (0.22)    0.60      0.74
TOTAL               22.70%      4.15%                0.51%             (9.95)%             (9.20)%   3.27%    3.27%




      Projected Value of “One Penny” in FY 2013 = $19.95 million in revenue




                                       Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                                       5
RESIDENTIAL MARKET


Residential Market – Calendar Year 2011:
  • The number of homes sold fell 13.1% from
    13,894 to 12,077

  •   Home prices
      •   Average price of $472,344, rose 3.3%

  •   Average days on the market in 2011 are
      in-line with the time it took to sell a home in
      2006 - prior to the downturn

  •   The percentage of seriously delinquent loans
      continues to decline:

      •   Prime loans that are seriously delinquent (90+
          days past due) fell to 1.4% in the 3rd quarter
          of 2011 from 2.0% in the 3rd quarter of 2010.
          Subprime mortgage delinquencies fell from
          14.6% to 10.0%



                               Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                          6
RESIDENTIAL EQUALIZATION

          Residential
          Approximately 74.05% of total base

                        Residential Equalization Percent Changes

Housing Type                  FY            FY                FY               FY          FY        FY       FY
(Percent of Base)            2007          2008              2009             2010        2011      2012     2013
Single Family (72.8%)       20.37           (0.43)            (3.12)         (11.34)       (5.50)   2.10     0.70
Townhouse/Duplex (18.8%)    22.69            0.64            (4.96)          (16.06)       (4.44)   3.73     1.20
Condominiums (7.7%)         25.97           (2.23)           (4.54)          (19.51)      (10.45)   2.53     (0.06)
Vacant Land (0.5%)          25.44            3.86              7.66            (7.08)      (6.68)   (3.50)   (1.66)
Other (0.2%)                 9.67            2.97              6.46            (4.99)      (3.60)   2.69     2.56
Total Residential
                            20.57           (0.33)            (3.38)         (12.55)       (5.56)   2.34     0.71
Equalization (100%)




                               Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                                      7
NONRESIDENTIAL REAL ESTATE

Fairfax County’s Office Vacancy Rates at
Year-end 2011:
  • Direct – 13.8% up from 13.3%
  • Including sublet space – 15.7% up from 15.3%

Total 113.6 million Square Feet of Office Space in
the County
  • 9 buildings totaling 1.6 million square feet are under
    construction


Renewed Interest in Speculative Building
  • Nearly three-quarters of the construction activity is
    100% speculative

Leasing Activity was Strong at 11.5 million Square
Feet
  • Below record of 13.6 million square feet in 2010
  • Well above the five year average of 10.8 million square
    feet
                            Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                       8
NONRESIDENTIAL EQUALIZATION


                           Nonresidential Equalization Percent Changes

Category (Percent of Base)       FY 2007        FY 2008          FY 2009          FY 2010      FY 2011    FY 2012   FY 2013

Apartments (21.2%)                11.65            22.59             6.41            (6.96)    (12.69)     14.54     12.60
Office Condominiums (4.3%)         1.96            13.76             4.78             (1.10)     (7.57)    (1.53)    (0.31)
Industrial (6.6%)                 12.61            14.34            14.08             (1.08)   (23.48)     (0.31)    6.75
Retail (14.0%)                    15.95             8.78             6.47             (1.74)   (16.07)     1.90      7.16
Office Elevator (37.5%)           24.16            15.93             5.68            (6.62)    (24.31)     1.88      11.34
Office – Low Rise (3.8%)          23.94            10.18             9.16             (3.35)   (23.86)     0.49      7.18
Vacant Land (3.8%)                21.88            14.99              7.67            (3.87)   (26.53)     (2.07)    2.01
Hotels (3.4%)                     25.54             9.58            11.28             (7.06)   (34.03)     11.35     3.87
Other (5.4%)                      12.19            10.05              7.63           (2.07)    (12.84)     2.37      3.27

Total Nonresidential
                                  16.64            13.57             7.00            (4.51)    (18.29)     3.73      8.21
Equalization (100%)




                                   Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                                              9
NONRESIDENTIAL REAL ESTATE REVENUE

Nonresidential
Commercial/Industrial percentage of total real estate assessment
base:

  • FY 1990 = 26.76% (highest rate in two decades)

  • FY 2000 = 24.32%

  •   FY 2005 = 18.20%
  •   FY 2006 = 17.36%
  •   FY 2007 = 17.22%
  •   FY 2008 = 19.23%
  •   FY 2009 = 21.06%
  •   FY 2010 = 22.67%
  •   FY 2011 = 19.70%
  •   FY 2012 = 19.64%
  •   FY 2013 = 20.77%


                         Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                    10
IMPACT ON TYPICAL
                FAIRFAX COUNTY HOUSEHOLD


                    Mean Assessed                      Real Estate
                  Value of Residential                  Tax Rate                   Tax per
    Fiscal Year        Property                         per $100                  Household
      FY 2007           $544,541                            $0.89                 $4,846.41
      FY 2008           $542,409                            $0.89                 $4,827.44
      FY 2009           $525,132                            $0.92                 $4,831.21
      FY 2010           $457,898                            $1.04                 $4,762.14




                                                                                              ]
      FY 2011           $433,409                            $1.09                 $4,724.16

      FY 2012           $445,533                            $1.07                 $4,767.20

      FY 2013           $448,696                            $1.07                 $4,801.05



                                                           ($45.36) $33.85
Projected value of “One Penny” on FY 2013 Real Estate Revenue = $19.95 million
                     Each penny change = $45 on the tax bill
                       Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                  11
OTHER REVENUE CATEGORIES

 Comprise less than 40% of total General Fund Revenue


       Projected Growth Rates of Selected Categories
                                          PERCENTAGE                                     PROJECTED
            SOURCE                          OF BASE                                    FY 2013 CHANGE
Personal Property Tax                            16.0%                                      5.7%
Local Sales Tax                                   4.8%                                     4.3%
BPOL Tax                                          4.6%                                     4.4%
Federal and State Revenue                         3.7%                                     (1.0%)




                            Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                        12
FY 2013 BUDGET PROPOSAL

The total recommended FY 2013 budget for All Funds is $6.729 billion

General Fund Disbursements total is $3.521 billion
  • 1.71% increase from the FY 2012 Revised Budget

  • 4.26% increase over FY 2012 Adopted Budget Plan


General Fund Direct Expenditures total is $1.287 billion
  • (0.90%) decrease from the FY 2012 Revised Budget

  • 4.10% increase over the FY 2012 Adopted Budget Plan




                         Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                    13
FY 2013 GENERAL FUND DISBURSEMENTS
                                                        (“WHERE IT GOES”)
                                                    TRANSFERS                      PUBLIC SAFETY
                                                    $152,319,371                      $428,496,613
            PUBLIC WORKS
                $67,457,373
                                             County Transit        $36.5          Police
                                                                                  Fire
                                                                                               $168.0
                                                                                               $166.8      PARKS AND LIBRARIES               (subcategories in
                                             Capital               $16.0
        Facilities Mgt.     $51.1            Metro                 $11.3          Sheriff       $43.6
                                                                                                           Library
                                                                                                                   $49,022,338
                                                                                                                               $26.6
                                                                                                                                             millions)
        Other               $16.4            Information Technology $5.3          E-911         $14.7
                                                                                  Other         $35.4      Parks               $22.4
                                             Other                 $83.2

                                                                                                                                  COMMUNITY DEVELOPMENT
                      JUDICIAL                                                                                                               $43,977,804
                ADMINISTRATION                                 1.9%                    12.2%                                  Land Development Services  $12.3
                    $32,668,849                                            4.3%                                               Planning & Zoning           $9.5
              Sheriff          $17.5                       0.9%                                         1.4%                  Transportation              $7.1
              Circuit Court    $10.4                                                                                          Other                      $15.1
              Other             $4.8                                                                           1.3%
                                                                                                                                         NONDEPARTMENTAL
       HEALTH AND WELFARE                                                                                                                    $284,318,188
            $395,224,382                                                                                        8.1%                   Employee Benefits  $284.2
   Family Services         $194.7                                                                                                      Other                $0.1
                                                  11.2%
   Community Services Board $99.2
   Health                   $52.0                                                                               2.1%                           CENTRAL SERVICES
   Neighborhood &           $26.0                                                                                                                   $74,291,569
   Community Services                                                                                             0.7%                    Information Technology $28.6
   Other                    $23.3       3.4%                                                                                              Tax Administration     $22.2
                                                                                                                                          Finance                 $9.6
                                                                                                                                          Other                  $13.9


          COUNTY DEBT
           $120,035,364                                                                                                  LEGISLATIVE-EXECUTIVE
                                                       52.5%                                                                   FUNCTIONS
                                                                                                                               $25,457,374
                                                                                                                         County Executive        $6.4
                                                                                                                         County Attorney         $6.2
                        SCHOOLS                                                                                          Board of Supervisors    $5.1
                      $1,848,079,349                                                                                     Other                   $7.8
               Transfer           $1,683.3
               Debt Service         $164.8




                 FY 2013 GENERAL FUND DISBURSEMENTS = $3,521,348,574 *
* In addition to FY 2013 revenues, available balances and transfers in are also utilized to support disbursement requirements.


                                                       Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                                                                                         14
FAIRFAX COUNTY PUBLIC SCHOOLS

•   The combined transfer for School operating and School debt service is $1.85 billion
     • The County’s support of FCPS represents 52.5% of total County
         disbursements.

     •   FY 2013 Transfer for School Operations = $1.68 billion
          •   An increase of $72.5 million or 4.5% over the FY 2012 level


     •   School Board Request = $1.75 billion:
          •   An increase of $135.8 million or 8.4% over FY 2012
          •   $63.3 million more than recommended in the County Advertised Budget


     •   FY 2013 Transfer for School Debt Service = $164.8 million
          •   Increase of $1.3 million over FY 2012
          •   School bond sales at $155 million per year


•   The County also provides additional support for the Schools in the amount of $69.6
    million for programs such as Head Start, School Health, School Resource Officers,
    School Crossing Guards, after-school programming, field maintenance and
    recreational programs, among others



                               Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                          15
FY 2013 DISBURSEMENTS

FY 2013 Disbursements increase $143.87 million or 4.26% over FY 2012 Adopted
Budget:


Total Increase for FCPS                                                     $73.77 million

Cost of County Operations                                                          $64.60 million
Major Human Services Requirements                                                      $5.35 million
Transportation                                                                         $3.60 million
Community Development                                                                  $3.76 million
Public Safety                                                                          $2.18 million
Capital Construction, Debt and Environment                                             $1.25 million
Subtotal                                                                           $80.74 million
Agency Reductions                                                                 ($10.64) million
Total County                                                                      $70.10million



                            Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                       16
COST OF COUNTY OPERATIONS                                                           $64.60 MILLION

•   2.18% Market Rate Adjustment (MRA)                                               $22.35 million
    for FY 2013


•   Full-Year Impact of 2.0% FY 2012 MRA                                             $19.40 million


•   Retirement Funding                                                                $7.48 million


•   Other Post-Employment Benefit
    (OPEB) Requirements                                                               $8.00 million


•   Health Insurance and Other Benefits                                               $3.20 million
    • Projected premium increases of 10% for all health
      insurance plans, effective January 1, 2013
                         Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                      17
COST OF COUNTY OPERATIONS                                                            $ 64.60 MILLION

•    Audit and Implementation Costs                                                            $0.93 million

•    Department of Vehicle Services Charges                                                    $0.82 million

•    Office of Elections                                                                       $0.56 million
     • Primarily associated with required costs to support the
       November 2012 Presidential election

•    Streetlight Utility Costs                                                                 $0.80 million


•    New Facilities Maintenance Costs                                                          $0.48 million




                              Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                               18
MAJOR HUMAN SERVICES REQUIREMENTS                                                          $5.35 MILLION

 •   Contract Rate Increases                                                                   $3.38 million

 •   School-Age Child Care (SACC)                                                              $0.50 million
     • Funding included for 3/2.27 SYE positions associated with
       opening three SACC rooms (two rooms at the new Mason Crest Elementary School
       and one room at the renovated Graham Road Elementary School)
     • The expenditure increase is partially offset by an increase of
       $373,026 in SACC revenue for a total net impact to the County
       of $124,342

 •   Consolidated Community Funding Pool                                                       $0.45 million

 •   Grants – Local Cash Match Requirements                                                    $0.38 million

 •   Human Services Contributories                                                             $0.30 million
     • Includes $0.28 million in funding increase for
       Birmingham Green Adult Care Residence


                                Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                               19
TRANSPORTATION                                                                            $3.60 MILLION

 •   Metro Operations and Construction
     • Washington Metropolitan Area Transit Authority (WMATA)
       staff project an increased FY 2013 operating subsidy
       requirement from local jurisdictions of $5.6 million, which
       will be partially offset by additional State Aid and Gas Tax revenue


 •   County Transit
     • Increased funding of $3.60 million in General Fund support
       for Fund 100, County Transit Systems, which supports
       FAIRFAX CONNECTOR and Virginia Railway Express (VRE)

     • Primarily required to support additional CONNECTOR bus
       replacement requirements in FY 2013, help support the
       purchase of 15 new buses associated with expanded
       Dulles Rail Phase I-related routes, and support an
       increase in VRE subsidy requirements




                               Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                          20
COMMUNITY DEVELOPMENT                                                                       $3.76 MILLION

•   Lorton Arts Foundation (LAF)                                                              $2.6 million
    • The total funding for the Foundation is $3.35 million in
      FY 2013, which includes $0.75 million for the annual
      operating support and $2.6 million to address debt
      service requirements. A similar adjustment will be forthcoming
      at the FY 2012 Third Quarter Review to meet debt service
      requirements prior to June 30, 2012.


•   Tysons Redevelopment                                                                      $0.76 million
    • Included in this amount is funding for 2/2.0 SYE new positions
      within the Department of Transportation, and funding for
      previously unfunded positions which will support Tysons
      redevelopment in the Office of Community Revitalization,
      Department of Public Works and Environmental Services and
      Park Authority.


•   Community Development Contributories                                                      $0.40 million
    • Funding includes $0.25 million to support the Fairfax 2015
      World Police and Fire Games

                                 Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                              21
PUBLIC SAFETY                                                                               $2.18 MILLION

 •   Police Department Personnel Services                                                     $2.0 million
     • Based on a review of current staffing, overtime and
       programmatic requirements consistent with Board of
       Supervisors’ direction that staff monitor the impact of
       reductions to public safety


 •   Animal Shelter Positions                                                                 $0.18 million
     • Funding included for 2/2.0 SYE positions required to
       provide additional support for the expanded Animal Shelter
       facility to be completed in mid FY 2013
            • 1/1.0 SYE position for Shelter Operations and Business Manager
              and 1/1.0 SYE position for Assistant Kennel Manager
            • Square footage to nearly double from 15,000 sq. ft. to over 29,000 sq. ft.




                                 Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                              22
CAPITAL CONSTRUCTION, DEBT                                                            $1.25 MILLION
    AND ENVIRONMENT

•    Capital Construction (Total - $16.0 million)                                             $0.59 million


•    County Debt Service (Total - $120.0 million)                                             $0.66 million


•    Stormwater Services Fee
    • Proposed to increase $0.01 for a total of $0.025 per $100 of assessed real estate
      value in FY 2013
    • Impact of rate increase on the average homeowner is $45
    • Required to meet the increasing federal and state regulatory requirements pertaining
      to the Municipal Separate Storm Sewer System (MS4) Permit requirements, and
      State and Federal mandates associated with the Chesapeake Bay
    • Will support increased capital funding and 22/22.0 SYE new positions




                               Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                              23
AGENCY REDUCTIONS                                                               ($10.64) MILLION

Agency Budget Reductions                                                                ($10.64) million

  • Requires agencies to hold positions vacant longer, and to maintain
    work and service levels within reduced resources

  • Recommended fee increases:
       • Rec-PAC program fees
       • SACC fees
       • CONNECTOR fares

  • Have not recommended all reductions submitted by agencies
       • Complete list of FY 2013 reduction options which are not recommended is
         available online at http://www.fairfaxcounty.gov/dmb/fy2013/advertised/FY2013-other-reductions.pdf




                             Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                                           24
LOOKING AHEAD

Significant challenges loom on the horizon:

  • Addressing needs of Fairfax County Public Schools

  • Appropriately compensating County
    employees

  • Maintaining County’s safety net of
    services

  • Funding Public Portion of the ongoing
    transformation of Tysons

  • Meeting our transportation requirements

  • Seeking revenue diversification

                       Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                  25
FOR MORE INFORMATION
                AND HOW TO SHARE YOUR INPUT

     Your feedback on this budget proposal is appreciated:

      www.fairfaxcounty.gov/budget/fy13-advertised-input.htm

The entire FY 2013 Advertised Budget Plan and the FY 2013 – FY 2017
Capital Improvement Program (CIP) are available on the Internet:
•http://www.fairfaxcounty.gov/budget


All of these County documents are available on one compact disc
from the Department of Management and Budget (DMB).
In addition, one reference copy of the budget is available at each County
library facility.




                          Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                     26
FY 2013 BUDGET SCHEDULE

   February 28, 2012              County Executive presents FY 2013
                                  Advertised Budget Plan

   March 6, 2012                  Advertisement of FY 2013 tax rates and
                                  FY 2012 Third Quarter Review

   April 10-12, 2012              Public Hearings on FY 2013 Budget, FY 2012
                                  Third Quarter and FY 2013-FY 2017 Capital
                                  Improvement Program

   April 24, 2012                 Budget Mark-Up

   May 1, 2012                    Budget Adoption


    To sign up to speak at one of the public hearings, call the Clerk to the
Board’s Office at (703) 324-3151 or (703) 324-2391 (TTY 711) or to access the
                         form to sign up to speak, go to
      https://www.fairfaxcounty.gov/bosclerk/speaker_bos.htm
The public can send written testimony or communicate with the Clerk’s Office by
                 email at: clerktothebos@fairfaxcounty.gov

                          Fairfax County, Virginia: FY 2013 Advertised Budget Plan
                                                                                     27

More Related Content

What's hot

Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5channinggibson
 
Lenox Financial Forecast v3
Lenox Financial Forecast v3Lenox Financial Forecast v3
Lenox Financial Forecast v3channinggibson
 
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...Fairfax County
 
Alameda County Budget Workgroup May 16, 2011
Alameda County Budget Workgroup May 16, 2011Alameda County Budget Workgroup May 16, 2011
Alameda County Budget Workgroup May 16, 2011Keith Carson
 
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13cityofevanston
 
BFHS Referendum Election Information 20130303
BFHS Referendum Election Information 20130303BFHS Referendum Election Information 20130303
BFHS Referendum Election Information 20130303kjblakeman
 
2012 Budget Day Presentation
2012 Budget Day Presentation2012 Budget Day Presentation
2012 Budget Day PresentationEmpowerLA
 
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)Brad Keithley
 
Making sense of the city budget
Making sense of the city budgetMaking sense of the city budget
Making sense of the city budgetPost-Bulletin Co.
 
Posted Version 1
Posted Version 1Posted Version 1
Posted Version 1wpotvin
 
Ways and means presentation 01262011 final
Ways and means presentation 01262011 finalWays and means presentation 01262011 final
Ways and means presentation 01262011 finalJennifer Hurtubise
 
Local self governance in 2012
Local self governance in 2012Local self governance in 2012
Local self governance in 2012Iryna Skaliy
 

What's hot (19)

Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5
 
Lenox Financial Forecast v3
Lenox Financial Forecast v3Lenox Financial Forecast v3
Lenox Financial Forecast v3
 
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...
Joint Meeting of the Fairfax County Board of Supervisors and the Fairfax Coun...
 
Zahradnik
ZahradnikZahradnik
Zahradnik
 
Alameda County Budget Workgroup May 16, 2011
Alameda County Budget Workgroup May 16, 2011Alameda County Budget Workgroup May 16, 2011
Alameda County Budget Workgroup May 16, 2011
 
Pence Tax Cut White Paper
Pence Tax Cut White PaperPence Tax Cut White Paper
Pence Tax Cut White Paper
 
Pence 10 percent tax cut
Pence 10 percent tax cutPence 10 percent tax cut
Pence 10 percent tax cut
 
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
 
BFHS Referendum Election Information 20130303
BFHS Referendum Election Information 20130303BFHS Referendum Election Information 20130303
BFHS Referendum Election Information 20130303
 
2012 Budget Day Presentation
2012 Budget Day Presentation2012 Budget Day Presentation
2012 Budget Day Presentation
 
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)
LegFin: Preliminary Overview of the Governor's FY22 Budget (1.8.2021)
 
Making sense of the city budget
Making sense of the city budgetMaking sense of the city budget
Making sense of the city budget
 
Posted Version 1
Posted Version 1Posted Version 1
Posted Version 1
 
Jo anneleznoffjune 25 2012
Jo anneleznoffjune 25 2012Jo anneleznoffjune 25 2012
Jo anneleznoffjune 25 2012
 
XEL_092005
XEL_092005XEL_092005
XEL_092005
 
Ways and means presentation 01262011 final
Ways and means presentation 01262011 finalWays and means presentation 01262011 final
Ways and means presentation 01262011 final
 
2013 Adopted Budget
2013 Adopted Budget2013 Adopted Budget
2013 Adopted Budget
 
Local self governance in 2012
Local self governance in 2012Local self governance in 2012
Local self governance in 2012
 
XEL_091205
XEL_091205XEL_091205
XEL_091205
 

Viewers also liked

BBBS of San Diego, Board Retreat 1-24-09
BBBS of San Diego, Board Retreat 1-24-09BBBS of San Diego, Board Retreat 1-24-09
BBBS of San Diego, Board Retreat 1-24-09jfrager
 
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...Fairfax County
 
Big Brothers Big Sisters Board Retreat 2010
Big Brothers Big Sisters Board Retreat 2010Big Brothers Big Sisters Board Retreat 2010
Big Brothers Big Sisters Board Retreat 2010jfrager
 
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)Board Governance, Strategic Planning, and Board Retreats (in a perfect world)
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)iowachamberexecs
 
Balanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementBalanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementKenny Ong
 
Balanced Scorecard Presentation
Balanced Scorecard PresentationBalanced Scorecard Presentation
Balanced Scorecard Presentationtimadams2323
 

Viewers also liked (6)

BBBS of San Diego, Board Retreat 1-24-09
BBBS of San Diego, Board Retreat 1-24-09BBBS of San Diego, Board Retreat 1-24-09
BBBS of San Diego, Board Retreat 1-24-09
 
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...
2016 Joint Board of Supervisors and School Board Retreat Facilitator presenta...
 
Big Brothers Big Sisters Board Retreat 2010
Big Brothers Big Sisters Board Retreat 2010Big Brothers Big Sisters Board Retreat 2010
Big Brothers Big Sisters Board Retreat 2010
 
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)Board Governance, Strategic Planning, and Board Retreats (in a perfect world)
Board Governance, Strategic Planning, and Board Retreats (in a perfect world)
 
Balanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementBalanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and Measurement
 
Balanced Scorecard Presentation
Balanced Scorecard PresentationBalanced Scorecard Presentation
Balanced Scorecard Presentation
 

Similar to County Executive Presentation of the FY 2013 Advertised Budget Plan

Carlsbad Unified: Pie Chart Finances
Carlsbad Unified: Pie Chart FinancesCarlsbad Unified: Pie Chart Finances
Carlsbad Unified: Pie Chart Financesdvodicka
 
County Budget Forecast FY 2014 and FY 2015
County Budget Forecast FY 2014 and FY 2015County Budget Forecast FY 2014 and FY 2015
County Budget Forecast FY 2014 and FY 2015Fairfax County
 
interpublic group _ar00
interpublic group _ar00interpublic group _ar00
interpublic group _ar00finance44
 
interpublic group _ar00
interpublic group _ar00interpublic group _ar00
interpublic group _ar00finance44
 
danaher 03-4QREL
danaher 03-4QRELdanaher 03-4QREL
danaher 03-4QRELfinance24
 
time warner View the slide presentation
time warner View the slide presentationtime warner View the slide presentation
time warner View the slide presentationfinance5
 
danaher 02-4qrel
danaher 02-4qreldanaher 02-4qrel
danaher 02-4qrelfinance24
 
integrys 2003 wpsr
integrys 2003 wpsrintegrys 2003 wpsr
integrys 2003 wpsrfinance26
 
Fy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget PresentationFy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget Presentationdarrekferrell
 
rmk_111303operating
rmk_111303operatingrmk_111303operating
rmk_111303operatingfinance22
 
rmk_111303operating
rmk_111303operatingrmk_111303operating
rmk_111303operatingfinance22
 

Similar to County Executive Presentation of the FY 2013 Advertised Budget Plan (20)

2011-2012 Adopted Budget
2011-2012 Adopted Budget2011-2012 Adopted Budget
2011-2012 Adopted Budget
 
Carlsbad Unified: Pie Chart Finances
Carlsbad Unified: Pie Chart FinancesCarlsbad Unified: Pie Chart Finances
Carlsbad Unified: Pie Chart Finances
 
County Budget Forecast FY 2014 and FY 2015
County Budget Forecast FY 2014 and FY 2015County Budget Forecast FY 2014 and FY 2015
County Budget Forecast FY 2014 and FY 2015
 
interpublic group _ar00
interpublic group _ar00interpublic group _ar00
interpublic group _ar00
 
interpublic group _ar00
interpublic group _ar00interpublic group _ar00
interpublic group _ar00
 
danaher 03-4QREL
danaher 03-4QRELdanaher 03-4QREL
danaher 03-4QREL
 
Second Quarter 2008 Earnings Presentation
Second Quarter 2008 Earnings PresentationSecond Quarter 2008 Earnings Presentation
Second Quarter 2008 Earnings Presentation
 
YouthCivics_agenda_CLT
YouthCivics_agenda_CLTYouthCivics_agenda_CLT
YouthCivics_agenda_CLT
 
time warner View the slide presentation
time warner View the slide presentationtime warner View the slide presentation
time warner View the slide presentation
 
danaher 02-4qrel
danaher 02-4qreldanaher 02-4qrel
danaher 02-4qrel
 
dte_3q1999
dte_3q1999dte_3q1999
dte_3q1999
 
dte_3q1999
dte_3q1999dte_3q1999
dte_3q1999
 
dte_3q2000
dte_3q2000dte_3q2000
dte_3q2000
 
dte_3q2000
dte_3q2000dte_3q2000
dte_3q2000
 
integrys 2003 wpsr
integrys 2003 wpsrintegrys 2003 wpsr
integrys 2003 wpsr
 
Fy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget PresentationFy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget Presentation
 
First Quarter 2008 Earnings Presentation
First Quarter 2008 Earnings PresentationFirst Quarter 2008 Earnings Presentation
First Quarter 2008 Earnings Presentation
 
Third Quarter 2008 Earnings Presentation
Third Quarter 2008 Earnings PresentationThird Quarter 2008 Earnings Presentation
Third Quarter 2008 Earnings Presentation
 
rmk_111303operating
rmk_111303operatingrmk_111303operating
rmk_111303operating
 
rmk_111303operating
rmk_111303operatingrmk_111303operating
rmk_111303operating
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreiebhavenpr
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 

Recently uploaded (20)

Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 

County Executive Presentation of the FY 2013 Advertised Budget Plan

  • 1. Fairfax County Department of Management and Budget 12000 Government Center Parkway, Suite 561 Fairfax, VA 22035 703-324-2391 County Executive Presentation of the FY 2013 Advertised Budget Plan Budget Information: www.fairfaxcounty.gov/budget Provide feedback on the FY 2013 February 28, 2012 Advertised Budget Plan at: www.fairfaxcounty.gov/budget/fy13-advertised-input.htm
  • 2. FY 2013 BUDGET RECOMMENDATIONS: SUMMARY • Balanced budget with limited increases in General Fund disbursements and direct expenditures • Maintain consistent support for FCPS budget at 52.5% of General Fund disbursements • No Real Estate Tax rate increase • Keep impact on average taxpayer relatively flat • Increase in the Stormwater fees and several other fee and fare increases Fairfax County, Virginia: FY 2013 Advertised Budget Plan 1
  • 3. FY 2013 BUDGET RECOMMENDATIONS: SUMMARY • Spending increases cover only critical requirements • 2.18% Market Rate Adjustment (MRA) for all public safety and non-public safety employees • Limited infrastructure investment • Made strategic reductions while retaining core and critical services • ($10.64) million in General Fund agency expenditure reductions • Net reduction of 2 positions • FY 2013 budget includes 34/33.27 SYE new positions • Budget recommendation includes 36 positions for abolishment as part of recommended agency reductions • Positions per capita ratio @ 11.24 positions per 1,000 residents Fairfax County, Virginia: FY 2013 Advertised Budget Plan 2
  • 4. GENERAL FUND REVENUE GROWTH Fairfax County, Virginia: FY 2013 Advertised Budget Plan 3
  • 5. FY 2013 GENERAL FUND RECEIPTS (“WHERE IT COMES FROM”) REVENUE FROM THE CHARGES FOR SERVICES (subcategories in COMMONWEALTH* $66,981,067 $94,267,447 PERMITS, FEES & millions) SACC Fees $34.7 VA Public Assistance $44.6 REGULATORY LICENSES EMS Transport Fees $15.5 Law Enforcement $23.7 $34,802,539 Clerk Fees $4.6 Other $26.0 Building Permits/ Other $12.2 Inspection Fees $24.7 Other $10.1 1.9% 2.7% REAL ESTATE TAXES REVENUE FROM THE $2,106,652,081 FEDERAL GOVERNMENT 1.0% Current $2,097.0 1.0% $34,270,839 Delinquent $9.7 Social Services Aid $34.1 Other $0.2 LOCAL TAXES $523,937,338 Local Sales Tax $166.9 60.9% B.P.O.L. $159.7 15.1% Communications Tax $50.7 Other $146.6 0.4% RECOVERED COSTS/ 0.5% OTHER REVENUE $12,096,329 16.0% REVENUE FROM THE USE OF MONEY AND PROPERTY * For presentation purposes, Personal $17,286,968 Property Taxes of $211,313,944 that are reimbursed by the Commonwealth as a result of the Personal Property Tax Relief PERSONAL PROPERTY 0.5% Act of 1998 are included in the Personal TAXES * Property Taxes category. $552,566,873 Current $543.3 ** Total County resources used to support Delinquent $9.3 FINES AND the budget include the revenues shown FORFEITURES here, as well as a beginning balance and $16,579,948 District Court transfers in from other funds. Fines $7.7 Parking Violations $3.3 Other $5.6 FY 2013 GENERAL FUND RECEIPTS** = $3,459,441,429 Fairfax County, Virginia: FY 2013 Advertised Budget Plan 4
  • 6. REAL ESTATE TAX BASE 1993 1994 1995 1996 1997 1998 1999 Equalization (6.48)% (2.46)% (1.29)% 0.36% 0.57% 0.80% 1.77% - Residential (3.74) (0.52) 0.01 0.49 (0.23) (0.50) 0.04 - Nonresidential (13.22) (7.86) (5.28) (0.09) 3.27 5.05 7.12 Growth 0.40 1.08 1.97 2.16 2.13 1.93 2.19 TOTAL (6.08)% (1.38)% 0.68% 2.52% 2.70% 2.73% 3.96% 2000 2001 2002 2003 2004 2005 2006 Equalization 2.96% 5.13% 9.70% 11.72% 9.94% 9.54% 20.80% - Residential 0.77 5.13 11.26 16.27 14.55 11.29 23.09 - Nonresidential 9.24 5.15 5.92 0.52 (2.94) 3.74 12.74 Growth 3.37 3.81 3.94 3.42 2.54 2.50 2.69 TOTAL 6.33% 8.94% 13.64% 15.14% 12.48% 12.04% 23.49% 2007 2008 2009 2010 2011 2012 2013 Equalization 19.76% 2.47% (1.02)% (10.52)% (8.98)% 2.67% 2.53% - Residential 20.57 (0.33) (3.38) (12.55) (5.56) 2.34 0.71 - Nonresidential 16.64 13.57 7.00 (4.51) (18.29) 3.73 8.21 Growth 2.94 1.68 1.53 0.57 (0.22) 0.60 0.74 TOTAL 22.70% 4.15% 0.51% (9.95)% (9.20)% 3.27% 3.27% Projected Value of “One Penny” in FY 2013 = $19.95 million in revenue Fairfax County, Virginia: FY 2013 Advertised Budget Plan 5
  • 7. RESIDENTIAL MARKET Residential Market – Calendar Year 2011: • The number of homes sold fell 13.1% from 13,894 to 12,077 • Home prices • Average price of $472,344, rose 3.3% • Average days on the market in 2011 are in-line with the time it took to sell a home in 2006 - prior to the downturn • The percentage of seriously delinquent loans continues to decline: • Prime loans that are seriously delinquent (90+ days past due) fell to 1.4% in the 3rd quarter of 2011 from 2.0% in the 3rd quarter of 2010. Subprime mortgage delinquencies fell from 14.6% to 10.0% Fairfax County, Virginia: FY 2013 Advertised Budget Plan 6
  • 8. RESIDENTIAL EQUALIZATION Residential Approximately 74.05% of total base Residential Equalization Percent Changes Housing Type FY FY FY FY FY FY FY (Percent of Base) 2007 2008 2009 2010 2011 2012 2013 Single Family (72.8%) 20.37 (0.43) (3.12) (11.34) (5.50) 2.10 0.70 Townhouse/Duplex (18.8%) 22.69 0.64 (4.96) (16.06) (4.44) 3.73 1.20 Condominiums (7.7%) 25.97 (2.23) (4.54) (19.51) (10.45) 2.53 (0.06) Vacant Land (0.5%) 25.44 3.86 7.66 (7.08) (6.68) (3.50) (1.66) Other (0.2%) 9.67 2.97 6.46 (4.99) (3.60) 2.69 2.56 Total Residential 20.57 (0.33) (3.38) (12.55) (5.56) 2.34 0.71 Equalization (100%) Fairfax County, Virginia: FY 2013 Advertised Budget Plan 7
  • 9. NONRESIDENTIAL REAL ESTATE Fairfax County’s Office Vacancy Rates at Year-end 2011: • Direct – 13.8% up from 13.3% • Including sublet space – 15.7% up from 15.3% Total 113.6 million Square Feet of Office Space in the County • 9 buildings totaling 1.6 million square feet are under construction Renewed Interest in Speculative Building • Nearly three-quarters of the construction activity is 100% speculative Leasing Activity was Strong at 11.5 million Square Feet • Below record of 13.6 million square feet in 2010 • Well above the five year average of 10.8 million square feet Fairfax County, Virginia: FY 2013 Advertised Budget Plan 8
  • 10. NONRESIDENTIAL EQUALIZATION Nonresidential Equalization Percent Changes Category (Percent of Base) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Apartments (21.2%) 11.65 22.59 6.41 (6.96) (12.69) 14.54 12.60 Office Condominiums (4.3%) 1.96 13.76 4.78 (1.10) (7.57) (1.53) (0.31) Industrial (6.6%) 12.61 14.34 14.08 (1.08) (23.48) (0.31) 6.75 Retail (14.0%) 15.95 8.78 6.47 (1.74) (16.07) 1.90 7.16 Office Elevator (37.5%) 24.16 15.93 5.68 (6.62) (24.31) 1.88 11.34 Office – Low Rise (3.8%) 23.94 10.18 9.16 (3.35) (23.86) 0.49 7.18 Vacant Land (3.8%) 21.88 14.99 7.67 (3.87) (26.53) (2.07) 2.01 Hotels (3.4%) 25.54 9.58 11.28 (7.06) (34.03) 11.35 3.87 Other (5.4%) 12.19 10.05 7.63 (2.07) (12.84) 2.37 3.27 Total Nonresidential 16.64 13.57 7.00 (4.51) (18.29) 3.73 8.21 Equalization (100%) Fairfax County, Virginia: FY 2013 Advertised Budget Plan 9
  • 11. NONRESIDENTIAL REAL ESTATE REVENUE Nonresidential Commercial/Industrial percentage of total real estate assessment base: • FY 1990 = 26.76% (highest rate in two decades) • FY 2000 = 24.32% • FY 2005 = 18.20% • FY 2006 = 17.36% • FY 2007 = 17.22% • FY 2008 = 19.23% • FY 2009 = 21.06% • FY 2010 = 22.67% • FY 2011 = 19.70% • FY 2012 = 19.64% • FY 2013 = 20.77% Fairfax County, Virginia: FY 2013 Advertised Budget Plan 10
  • 12. IMPACT ON TYPICAL FAIRFAX COUNTY HOUSEHOLD Mean Assessed Real Estate Value of Residential Tax Rate Tax per Fiscal Year Property per $100 Household FY 2007 $544,541 $0.89 $4,846.41 FY 2008 $542,409 $0.89 $4,827.44 FY 2009 $525,132 $0.92 $4,831.21 FY 2010 $457,898 $1.04 $4,762.14 ] FY 2011 $433,409 $1.09 $4,724.16 FY 2012 $445,533 $1.07 $4,767.20 FY 2013 $448,696 $1.07 $4,801.05 ($45.36) $33.85 Projected value of “One Penny” on FY 2013 Real Estate Revenue = $19.95 million Each penny change = $45 on the tax bill Fairfax County, Virginia: FY 2013 Advertised Budget Plan 11
  • 13. OTHER REVENUE CATEGORIES Comprise less than 40% of total General Fund Revenue Projected Growth Rates of Selected Categories PERCENTAGE PROJECTED SOURCE OF BASE FY 2013 CHANGE Personal Property Tax 16.0% 5.7% Local Sales Tax 4.8% 4.3% BPOL Tax 4.6% 4.4% Federal and State Revenue 3.7% (1.0%) Fairfax County, Virginia: FY 2013 Advertised Budget Plan 12
  • 14. FY 2013 BUDGET PROPOSAL The total recommended FY 2013 budget for All Funds is $6.729 billion General Fund Disbursements total is $3.521 billion • 1.71% increase from the FY 2012 Revised Budget • 4.26% increase over FY 2012 Adopted Budget Plan General Fund Direct Expenditures total is $1.287 billion • (0.90%) decrease from the FY 2012 Revised Budget • 4.10% increase over the FY 2012 Adopted Budget Plan Fairfax County, Virginia: FY 2013 Advertised Budget Plan 13
  • 15. FY 2013 GENERAL FUND DISBURSEMENTS (“WHERE IT GOES”) TRANSFERS PUBLIC SAFETY $152,319,371 $428,496,613 PUBLIC WORKS $67,457,373 County Transit $36.5 Police Fire $168.0 $166.8 PARKS AND LIBRARIES (subcategories in Capital $16.0 Facilities Mgt. $51.1 Metro $11.3 Sheriff $43.6 Library $49,022,338 $26.6 millions) Other $16.4 Information Technology $5.3 E-911 $14.7 Other $35.4 Parks $22.4 Other $83.2 COMMUNITY DEVELOPMENT JUDICIAL $43,977,804 ADMINISTRATION 1.9% 12.2% Land Development Services $12.3 $32,668,849 4.3% Planning & Zoning $9.5 Sheriff $17.5 0.9% 1.4% Transportation $7.1 Circuit Court $10.4 Other $15.1 Other $4.8 1.3% NONDEPARTMENTAL HEALTH AND WELFARE $284,318,188 $395,224,382 8.1% Employee Benefits $284.2 Family Services $194.7 Other $0.1 11.2% Community Services Board $99.2 Health $52.0 2.1% CENTRAL SERVICES Neighborhood & $26.0 $74,291,569 Community Services 0.7% Information Technology $28.6 Other $23.3 3.4% Tax Administration $22.2 Finance $9.6 Other $13.9 COUNTY DEBT $120,035,364 LEGISLATIVE-EXECUTIVE 52.5% FUNCTIONS $25,457,374 County Executive $6.4 County Attorney $6.2 SCHOOLS Board of Supervisors $5.1 $1,848,079,349 Other $7.8 Transfer $1,683.3 Debt Service $164.8 FY 2013 GENERAL FUND DISBURSEMENTS = $3,521,348,574 * * In addition to FY 2013 revenues, available balances and transfers in are also utilized to support disbursement requirements. Fairfax County, Virginia: FY 2013 Advertised Budget Plan 14
  • 16. FAIRFAX COUNTY PUBLIC SCHOOLS • The combined transfer for School operating and School debt service is $1.85 billion • The County’s support of FCPS represents 52.5% of total County disbursements. • FY 2013 Transfer for School Operations = $1.68 billion • An increase of $72.5 million or 4.5% over the FY 2012 level • School Board Request = $1.75 billion: • An increase of $135.8 million or 8.4% over FY 2012 • $63.3 million more than recommended in the County Advertised Budget • FY 2013 Transfer for School Debt Service = $164.8 million • Increase of $1.3 million over FY 2012 • School bond sales at $155 million per year • The County also provides additional support for the Schools in the amount of $69.6 million for programs such as Head Start, School Health, School Resource Officers, School Crossing Guards, after-school programming, field maintenance and recreational programs, among others Fairfax County, Virginia: FY 2013 Advertised Budget Plan 15
  • 17. FY 2013 DISBURSEMENTS FY 2013 Disbursements increase $143.87 million or 4.26% over FY 2012 Adopted Budget: Total Increase for FCPS $73.77 million Cost of County Operations $64.60 million Major Human Services Requirements $5.35 million Transportation $3.60 million Community Development $3.76 million Public Safety $2.18 million Capital Construction, Debt and Environment $1.25 million Subtotal $80.74 million Agency Reductions ($10.64) million Total County $70.10million Fairfax County, Virginia: FY 2013 Advertised Budget Plan 16
  • 18. COST OF COUNTY OPERATIONS $64.60 MILLION • 2.18% Market Rate Adjustment (MRA) $22.35 million for FY 2013 • Full-Year Impact of 2.0% FY 2012 MRA $19.40 million • Retirement Funding $7.48 million • Other Post-Employment Benefit (OPEB) Requirements $8.00 million • Health Insurance and Other Benefits $3.20 million • Projected premium increases of 10% for all health insurance plans, effective January 1, 2013 Fairfax County, Virginia: FY 2013 Advertised Budget Plan 17
  • 19. COST OF COUNTY OPERATIONS $ 64.60 MILLION • Audit and Implementation Costs $0.93 million • Department of Vehicle Services Charges $0.82 million • Office of Elections $0.56 million • Primarily associated with required costs to support the November 2012 Presidential election • Streetlight Utility Costs $0.80 million • New Facilities Maintenance Costs $0.48 million Fairfax County, Virginia: FY 2013 Advertised Budget Plan 18
  • 20. MAJOR HUMAN SERVICES REQUIREMENTS $5.35 MILLION • Contract Rate Increases $3.38 million • School-Age Child Care (SACC) $0.50 million • Funding included for 3/2.27 SYE positions associated with opening three SACC rooms (two rooms at the new Mason Crest Elementary School and one room at the renovated Graham Road Elementary School) • The expenditure increase is partially offset by an increase of $373,026 in SACC revenue for a total net impact to the County of $124,342 • Consolidated Community Funding Pool $0.45 million • Grants – Local Cash Match Requirements $0.38 million • Human Services Contributories $0.30 million • Includes $0.28 million in funding increase for Birmingham Green Adult Care Residence Fairfax County, Virginia: FY 2013 Advertised Budget Plan 19
  • 21. TRANSPORTATION $3.60 MILLION • Metro Operations and Construction • Washington Metropolitan Area Transit Authority (WMATA) staff project an increased FY 2013 operating subsidy requirement from local jurisdictions of $5.6 million, which will be partially offset by additional State Aid and Gas Tax revenue • County Transit • Increased funding of $3.60 million in General Fund support for Fund 100, County Transit Systems, which supports FAIRFAX CONNECTOR and Virginia Railway Express (VRE) • Primarily required to support additional CONNECTOR bus replacement requirements in FY 2013, help support the purchase of 15 new buses associated with expanded Dulles Rail Phase I-related routes, and support an increase in VRE subsidy requirements Fairfax County, Virginia: FY 2013 Advertised Budget Plan 20
  • 22. COMMUNITY DEVELOPMENT $3.76 MILLION • Lorton Arts Foundation (LAF) $2.6 million • The total funding for the Foundation is $3.35 million in FY 2013, which includes $0.75 million for the annual operating support and $2.6 million to address debt service requirements. A similar adjustment will be forthcoming at the FY 2012 Third Quarter Review to meet debt service requirements prior to June 30, 2012. • Tysons Redevelopment $0.76 million • Included in this amount is funding for 2/2.0 SYE new positions within the Department of Transportation, and funding for previously unfunded positions which will support Tysons redevelopment in the Office of Community Revitalization, Department of Public Works and Environmental Services and Park Authority. • Community Development Contributories $0.40 million • Funding includes $0.25 million to support the Fairfax 2015 World Police and Fire Games Fairfax County, Virginia: FY 2013 Advertised Budget Plan 21
  • 23. PUBLIC SAFETY $2.18 MILLION • Police Department Personnel Services $2.0 million • Based on a review of current staffing, overtime and programmatic requirements consistent with Board of Supervisors’ direction that staff monitor the impact of reductions to public safety • Animal Shelter Positions $0.18 million • Funding included for 2/2.0 SYE positions required to provide additional support for the expanded Animal Shelter facility to be completed in mid FY 2013 • 1/1.0 SYE position for Shelter Operations and Business Manager and 1/1.0 SYE position for Assistant Kennel Manager • Square footage to nearly double from 15,000 sq. ft. to over 29,000 sq. ft. Fairfax County, Virginia: FY 2013 Advertised Budget Plan 22
  • 24. CAPITAL CONSTRUCTION, DEBT $1.25 MILLION AND ENVIRONMENT • Capital Construction (Total - $16.0 million) $0.59 million • County Debt Service (Total - $120.0 million) $0.66 million • Stormwater Services Fee • Proposed to increase $0.01 for a total of $0.025 per $100 of assessed real estate value in FY 2013 • Impact of rate increase on the average homeowner is $45 • Required to meet the increasing federal and state regulatory requirements pertaining to the Municipal Separate Storm Sewer System (MS4) Permit requirements, and State and Federal mandates associated with the Chesapeake Bay • Will support increased capital funding and 22/22.0 SYE new positions Fairfax County, Virginia: FY 2013 Advertised Budget Plan 23
  • 25. AGENCY REDUCTIONS ($10.64) MILLION Agency Budget Reductions ($10.64) million • Requires agencies to hold positions vacant longer, and to maintain work and service levels within reduced resources • Recommended fee increases: • Rec-PAC program fees • SACC fees • CONNECTOR fares • Have not recommended all reductions submitted by agencies • Complete list of FY 2013 reduction options which are not recommended is available online at http://www.fairfaxcounty.gov/dmb/fy2013/advertised/FY2013-other-reductions.pdf Fairfax County, Virginia: FY 2013 Advertised Budget Plan 24
  • 26. LOOKING AHEAD Significant challenges loom on the horizon: • Addressing needs of Fairfax County Public Schools • Appropriately compensating County employees • Maintaining County’s safety net of services • Funding Public Portion of the ongoing transformation of Tysons • Meeting our transportation requirements • Seeking revenue diversification Fairfax County, Virginia: FY 2013 Advertised Budget Plan 25
  • 27. FOR MORE INFORMATION AND HOW TO SHARE YOUR INPUT Your feedback on this budget proposal is appreciated: www.fairfaxcounty.gov/budget/fy13-advertised-input.htm The entire FY 2013 Advertised Budget Plan and the FY 2013 – FY 2017 Capital Improvement Program (CIP) are available on the Internet: •http://www.fairfaxcounty.gov/budget All of these County documents are available on one compact disc from the Department of Management and Budget (DMB). In addition, one reference copy of the budget is available at each County library facility. Fairfax County, Virginia: FY 2013 Advertised Budget Plan 26
  • 28. FY 2013 BUDGET SCHEDULE February 28, 2012 County Executive presents FY 2013 Advertised Budget Plan March 6, 2012 Advertisement of FY 2013 tax rates and FY 2012 Third Quarter Review April 10-12, 2012 Public Hearings on FY 2013 Budget, FY 2012 Third Quarter and FY 2013-FY 2017 Capital Improvement Program April 24, 2012 Budget Mark-Up May 1, 2012 Budget Adoption To sign up to speak at one of the public hearings, call the Clerk to the Board’s Office at (703) 324-3151 or (703) 324-2391 (TTY 711) or to access the form to sign up to speak, go to https://www.fairfaxcounty.gov/bosclerk/speaker_bos.htm The public can send written testimony or communicate with the Clerk’s Office by email at: clerktothebos@fairfaxcounty.gov Fairfax County, Virginia: FY 2013 Advertised Budget Plan 27