  1. 1. Burke Road Realignment (Peregrine Drive to Parakeet Drive) Citizen Information Meeting June 1, 2017, 7:00PM to 8:30PM (West Springfield Gov’t Center) (Formal Presentation Starts at 7:15) 1
  2. 2. Project Team Mr. Tom Biesiadny, Director, Fairfax County Dept. of Transportation Mr. W. Todd Minnix, P.E., Chief, Transportation Design Division Ms. Brook Khorashadi, P.E., Section Chief, Transportation Design Division Ms. Jeanmarie Roberson, Project Manager, Transportation Design Division Mr. Adam Lind, Bike/Ped Manager ___________________________________________________________ Peyton Onks, Senior Legislative Aide, Supervisor Pat Herrity’s Office (Springfield District) __________________________________________________________ 2
  3. 3. Meeting Schedule Tonight’s Agenda • Burke Road Realignment Design Plan presentation followed by Q&A • Return to display boards, one-on-one discussion, individual questions • Meeting Ends – 8:30PM 3
  4. 4. Meeting Purpose Tonight’s Purpose: • Provide an overview for the project’s improvements • Provide the public an update on on-going activities related to project, current status, and next steps • Solicit public input and comments regarding project’s improvements Tonight we will answer questions, but please submit all comments in writing to enable them to be part of the public record. 4
  5. 5. Project Background • Locally Funded Project: Est. Project Cost = $7 Million • Roadway realignment will meet VDOT standards, for VDOT maintenance • Bike and pedestrian facility will meet all VDOT & County standards for maintenance and for ADA accessibility compliance. • Part of Community Dialogue on Transportation (2012-2013) • Approved by County BOS on January 28, 2014 5
  6. 6. Project Vicinity Map Rolling Road VRE Station Liberty Bell Trail Project Limits
  7. 7. Project Overview Existing conditions: • Sharp substandard horizontal curve on Burke Road • Sight distance issues • Crash History in Project Limits • 10 reported crashes between 01/2011 and 12/2016 * *As Reported by VDOT 7
  8. 8. Project Overview Existing conditions: • Roadway flooding • Existing culvert is undersized • Two-Year storm overtops roadway. Required to pass 10 year storm event • Fairfax Police have responded to 5 road flooding events over the last 18 months • No continuous pedestrian or bike facilities 8
  9. 9. Project Overview Other Factors: • Rolling Road VRE Train Station • Liberty Bell Trail • Existing Bus Stops 9
  10. 10. Proposed Design 10 Proposed Design: • Roadway realignment to meet design standards, improve sight distance and remove sharp hazardous curve • Street intersections: Improved lines of sight • New Box Culvert: Proposed quadruple box culvert to address roadway flooding issues • Curb & Gutter and storm sewer system to minimize property impacts, tree loss, & preserve on-street parking
  11. 11. Proposed Design 11 Proposed Design Continued: • Pedestrian connectivity:  10’ wide asphalt pedestrian facility with grass strip: South side of roadway  5’ concrete sidewalk with grass strip: North side of roadway  Connectivity to Burke Lake Road via Liberty Bell Trail • On-Road Bike Lanes: From Peregrine Drive to Mill Cove Ct./ Liberty Bell Trail
  12. 12. Reduced Design 12 Reduced Burke Road Typical Section Reduced Design Original Design
  13. 13. Reduced Design 13 Reduced Burke Road Typical Section Original Design Reduced Design
  14. 14. Proposed Design 14 Proposed Design: • Reduced property impacts • Eliminated Ditches • Less permanent and temporary easements • Reduced Flooding Rte. 652, Burke Road
  15. 15. Proposed Design Exhibit (1 of 5) 15
  16. 16. Proposed Design Exhibit (2 of 5) 16
  17. 17. Proposed Design Exhibit (3 of 5) 17
  18. 18. Proposed Design Exhibit (4 of 5) 18
  19. 19. Proposed Design Exhibit (5 of 5) 19
  20. 20. Project Schedule • Tonight – FCDOT is soliciting the community’s written feedback on this project issue by June 16, 2017. If desired, please submit a comment for the record by using the comment sheet provided, email, or online form. • Tentative Project Schedule: Design Completion: Spring 2018 Land Acquisition Schedule : Summer 2018 to Spring 2019 Utility Relocation Schedule: Spring 2019 to Fall 2019 Begin Construction: Late Fall 2019 Construction Completion: Fall 2020 20
  21. 21. Citizen Input 21 Ways to Comment • Fill out & submit a comment sheet tonight (Comment Box Provided) • Comment section on project website: http://www.fairfaxcounty.gov/fcdot/burkeroad.htm • Email Jeanmarie Roberson: Jeanmarie.Roberson@fairfaxcounty.gov • Fill out and mail a comment sheet: Jeanmarie Roberson Fairfax County Dept. of Transportation 4050 Legato Road, Suite 400 Fairfax, VA 22033 Submit written comments by June 16, 2017
  22. 22. Question/Answers 22 Questions? Reminder: Please submit all comments in writing by June 16, 2017 in order for them to be considered as part of the public record.
  23. 23. 23 Burke Road Realignment (Peregrine Drive to Parakeet Drive) Thank you!

×