• Project Location and Background
• Site Study and Alternatives Analysis
• Design
• Construction
Agenda
2
© Arcadis 2017
Project Location
3
© Arcadis 2017
Project Background
• Sanitary Sewer Crossing 789 LF of Little Hunting Creek
• 12” Cast Iron Pipe
• Constructed in 1961
• Extends from west end Woodland Lane to the east by
Thomas J Stockton Parkway
• Serves approximately 480 residences
4
© Arcadis 2017
Condition Assessment of Sewer
• Site visit
• Review of available information
• Review maintenance history and
records
• Review of pipe video
• Plan and Profile Survey
5
© Arcadis 2017
Sewer Pipe Profile
6
© Arcadis 2017 7
Alternative Pro's Con's Viable Next Steps
Pipe Bursting Utilizes the existing alignment along a known
easement.
Employs technology suitable for older cast iron
pipe.
Does not allow for the pipe to be adequately
corrected in profile – pipe could still have sags.
No
Recommend no further evaluation.
Cured in Place Pipe Lining Utilizes the existing alignment along a known
easement.
Employs a rehabilitation method suitable for a
pipe of this diameter and material.
Does not allow for the pipe to be adequately
corrected in profile – pipe could still have sags.
No
Recommend no further evaluation.
New Pump Station Eliminates need for work in the creek.
Provides abandonment of the old line.
New pumping station will need to be
maintained.
Requires constructing a new small force main as
described in sub-alternatives.
Requires building pump station within HOA
property.
Yes May require flow metering to confirm flow and
flow peaking quantities.
Need to consider effects of flow to the
downstream pump station.
New 6-inch Force Main Inside the
Existing 12-inch Pipe
Minimizes extensive permitting.
Uses existing easement.
Eliminates creek crossing construction work
Requires cleaning existing pipe prior to pulling
smaller pipe through.
Need to determine if sag slopes are too steep to
accommodate HDPE pipe.
Yes Re-CCTV existing pipe with elevation readings
to make sure pipe can act as a good conduit for
a smaller pipe inside.
Tie-Into Existing 30-inch” DIP Force
Main on West Side of Creek
Reduces length of force main construction.
Eliminates creek crossing construction work.
Risk of 30” pipe integrity issues to accommodate
pipe tapping.
Yes Investigate pipe integrity.
If early phase of construction finds pipe is not
suitable, direct contractor to alternative
options.
New Pump Station for a New Force
Main on West Side of Street, Tie-In
where Existing Force Main
becomes a Gravity Sewer
Eliminates creek crossing construction work. Requires community disruption along a
significant distance.
No Cost out linear footage of pipe and street
repairs.
Jack and Bore Minimizes any work in the creek
Creates options for realignment and depth of
alignment.
Too long of a reach for most contracting
methods.
No
No further evaluation.
Horizontal Directional Drilling Creates options for realignment and depth of
alignment. Minimizes any work in the creek.
In order to achieve sufficient long-term
bedding/stability, a deeper profile may be
necessary that creates a siphon condition.
Entire 789’ has to be fused ahead of time.
HDD permit is more stringent.
No Will need to know more about the bed of the
creek to determine depth of drilling
Should be explored and costed out as a viable
alternative for comparison.
Open Cut Pipe Replacement with Dam Allows best assessment of bedding of pipe during
construction.
Reduces the amount of on-shore work in
proximity of residences.
Provides a long life expectancy.
Requires significant detailed permitting.
Requires coffer-damming and related impacts in
the creek.
May require restoration of impacted wetlands.
Yes Requires exploring permitting challenges
Should be explored and costed-out as a viable
alternative for comparison.
Do Nothing Eliminates construction in the creek.
No disruption to the community.
Continued maintenance for cleaning and
inspection.
Asset remains in poor condition and stays on the
high-risk list.
No Will be developed only as a baseline
alternative for cost comparison.
Alternatives Analysis
© Arcadis 2017
Criteria Matrix: Open Cut with Pipe
Replacement
8
© Arcadis 2017
Conceptual Replacement Design Layout
9
© Arcadis 2017
Key Design Investigations
Vegetation SurveyWetlands Delineation
Field Survey 10
Geotechnical Investigation
© Arcadis 2017
Development of Design Plans
and Specification
• Alignment
• Pipe support
• Construction: dam,
dewatering, trench
support
- Specialty contractor
• Contract documents
11
© Arcadis 2017
Permitting
• Goals
‒ Provide appropriate solution and meet basic
design criteria
‒ Environmental stewardship
• Process
‒ Early engagement
‒ Permit development
‒ Permit submissions
‒ Review by agencies
‒ Approval
12
© Arcadis 2017
Design Schedule
• Design: December 2017 – April 2019
– Permit Development
February 2018 - March 2018
– Permit Review
November 2018 – March 2019
13
© Arcadis 2017
Permitting
Regulatory Entity Permit
Virginia Department of Environmental Quality
(DEQ)
Virginia Marine Resource Commission
(VMRC)
Virginia Pollutant Discharge Elimination
System (VPDES), CWA Sec. 404/401,
VSMP-Stormwater Pollution Prevention
Plan
United States Army Corps of Engineers
(USACE)
CWA Sec. 404/401,
Nationwide Permit #6
DEQ, VMRC, USACE Tidal Water Joint Permit Application
VDOT Various
Fairfax County
Compliance with Chesapeake Bay
Preservation Ordinance
DPWES Land Development Site and
Building Permits
Virginia Department of Environmental Quality
(DEQ)
Certificate to Construct (CTC)
United States Army Corps of Engineers Nationwide Permit #12
14
© Arcadis 2017
Construction Considerations
• Creek construction
– 2-stage coffer dam
• Minimize impact to the park and
boat ramp (off-site staging,
construction parking and traffic)
• Schedule will minimize
interference with recreational
creek activities and consider
time of year restrictions
Portadam Brochure
15
© Arcadis 2017
Construction Schedule
• Estimated start: May 2019
• Anticipated time of year restriction: February 15 – June 30
• Construction: July 2019 – November 2019
• Construction Costs: $1.2 – 1.6 million dollars
16
© Arcadis 2017
Schedule
17
© Arcadis 2017
Questions/Comments
18

Más contenido relacionado

La actualidad más candente

Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerFairfax County
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveFairfax County
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairFairfax County
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationFairfax County
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Fairfax County
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationFairfax County
 
Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Fairfax County
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Fairfax County
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
 
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond RetrofitFairfax County
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsFairfax County
 

La actualidad más candente (20)

Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
 
Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020
 
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 

Similar a Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017

Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsFairfax County
 
Negdc presentation december 2013
Negdc presentation   december 2013 Negdc presentation   december 2013
Negdc presentation december 2013 carsoncorporation
 
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Senior Design Presentation - Winter Term
Senior Design Presentation - Winter TermSenior Design Presentation - Winter Term
Senior Design Presentation - Winter TermSteven E. Kreeley, EIT
 
Glenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectGlenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectFairfax County
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design PresentationBrian Weaver
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectFairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 

Similar a Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017 (20)

Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer Repairs
 
Negdc presentation december 2013
Negdc presentation   december 2013 Negdc presentation   december 2013
Negdc presentation december 2013
 
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
 
Senior Design Presentation - Winter Term
Senior Design Presentation - Winter TermSenior Design Presentation - Winter Term
Senior Design Presentation - Winter Term
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Glenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectGlenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement Project
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design Presentation
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 

Más de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
 

Más de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Último

complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Último (8)

complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 

Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017

  • 1. LITTLE HUNTING CREEK SEWER REPLACEMENT Community Meeting December 11, 2017
  • 2. © Arcadis 2017 • Project Location and Background • Site Study and Alternatives Analysis • Design • Construction Agenda 2
  • 4. © Arcadis 2017 Project Background • Sanitary Sewer Crossing 789 LF of Little Hunting Creek • 12” Cast Iron Pipe • Constructed in 1961 • Extends from west end Woodland Lane to the east by Thomas J Stockton Parkway • Serves approximately 480 residences 4
  • 5. © Arcadis 2017 Condition Assessment of Sewer • Site visit • Review of available information • Review maintenance history and records • Review of pipe video • Plan and Profile Survey 5
  • 6. © Arcadis 2017 Sewer Pipe Profile 6
  • 7. © Arcadis 2017 7 Alternative Pro's Con's Viable Next Steps Pipe Bursting Utilizes the existing alignment along a known easement. Employs technology suitable for older cast iron pipe. Does not allow for the pipe to be adequately corrected in profile – pipe could still have sags. No Recommend no further evaluation. Cured in Place Pipe Lining Utilizes the existing alignment along a known easement. Employs a rehabilitation method suitable for a pipe of this diameter and material. Does not allow for the pipe to be adequately corrected in profile – pipe could still have sags. No Recommend no further evaluation. New Pump Station Eliminates need for work in the creek. Provides abandonment of the old line. New pumping station will need to be maintained. Requires constructing a new small force main as described in sub-alternatives. Requires building pump station within HOA property. Yes May require flow metering to confirm flow and flow peaking quantities. Need to consider effects of flow to the downstream pump station. New 6-inch Force Main Inside the Existing 12-inch Pipe Minimizes extensive permitting. Uses existing easement. Eliminates creek crossing construction work Requires cleaning existing pipe prior to pulling smaller pipe through. Need to determine if sag slopes are too steep to accommodate HDPE pipe. Yes Re-CCTV existing pipe with elevation readings to make sure pipe can act as a good conduit for a smaller pipe inside. Tie-Into Existing 30-inch” DIP Force Main on West Side of Creek Reduces length of force main construction. Eliminates creek crossing construction work. Risk of 30” pipe integrity issues to accommodate pipe tapping. Yes Investigate pipe integrity. If early phase of construction finds pipe is not suitable, direct contractor to alternative options. New Pump Station for a New Force Main on West Side of Street, Tie-In where Existing Force Main becomes a Gravity Sewer Eliminates creek crossing construction work. Requires community disruption along a significant distance. No Cost out linear footage of pipe and street repairs. Jack and Bore Minimizes any work in the creek Creates options for realignment and depth of alignment. Too long of a reach for most contracting methods. No No further evaluation. Horizontal Directional Drilling Creates options for realignment and depth of alignment. Minimizes any work in the creek. In order to achieve sufficient long-term bedding/stability, a deeper profile may be necessary that creates a siphon condition. Entire 789’ has to be fused ahead of time. HDD permit is more stringent. No Will need to know more about the bed of the creek to determine depth of drilling Should be explored and costed out as a viable alternative for comparison. Open Cut Pipe Replacement with Dam Allows best assessment of bedding of pipe during construction. Reduces the amount of on-shore work in proximity of residences. Provides a long life expectancy. Requires significant detailed permitting. Requires coffer-damming and related impacts in the creek. May require restoration of impacted wetlands. Yes Requires exploring permitting challenges Should be explored and costed-out as a viable alternative for comparison. Do Nothing Eliminates construction in the creek. No disruption to the community. Continued maintenance for cleaning and inspection. Asset remains in poor condition and stays on the high-risk list. No Will be developed only as a baseline alternative for cost comparison. Alternatives Analysis
  • 8. © Arcadis 2017 Criteria Matrix: Open Cut with Pipe Replacement 8
  • 9. © Arcadis 2017 Conceptual Replacement Design Layout 9
  • 10. © Arcadis 2017 Key Design Investigations Vegetation SurveyWetlands Delineation Field Survey 10 Geotechnical Investigation
  • 11. © Arcadis 2017 Development of Design Plans and Specification • Alignment • Pipe support • Construction: dam, dewatering, trench support - Specialty contractor • Contract documents 11
  • 12. © Arcadis 2017 Permitting • Goals ‒ Provide appropriate solution and meet basic design criteria ‒ Environmental stewardship • Process ‒ Early engagement ‒ Permit development ‒ Permit submissions ‒ Review by agencies ‒ Approval 12
  • 13. © Arcadis 2017 Design Schedule • Design: December 2017 – April 2019 – Permit Development February 2018 - March 2018 – Permit Review November 2018 – March 2019 13
  • 14. © Arcadis 2017 Permitting Regulatory Entity Permit Virginia Department of Environmental Quality (DEQ) Virginia Marine Resource Commission (VMRC) Virginia Pollutant Discharge Elimination System (VPDES), CWA Sec. 404/401, VSMP-Stormwater Pollution Prevention Plan United States Army Corps of Engineers (USACE) CWA Sec. 404/401, Nationwide Permit #6 DEQ, VMRC, USACE Tidal Water Joint Permit Application VDOT Various Fairfax County Compliance with Chesapeake Bay Preservation Ordinance DPWES Land Development Site and Building Permits Virginia Department of Environmental Quality (DEQ) Certificate to Construct (CTC) United States Army Corps of Engineers Nationwide Permit #12 14
  • 15. © Arcadis 2017 Construction Considerations • Creek construction – 2-stage coffer dam • Minimize impact to the park and boat ramp (off-site staging, construction parking and traffic) • Schedule will minimize interference with recreational creek activities and consider time of year restrictions Portadam Brochure 15