Medford Drive Walkway Improvements

57 visualizaciones

Publicado el

This project was approved in the 2014 bond referendum and consisted of the construction of approximately 560 feet of five-foot wide sidewalk with associated stormwater drainage and curb and gutter works along the east side of Medford Drive between Four Year Run and Davian Drive.

  • Sé el primero en comentar

  • Sé el primero en recomendar esto

Medford Drive Walkway Improvements

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Contract No. CN18304132 Project No. 5G25-060-031 Mason District Tax Map No. 71-1 July 18, 2019 MEDFORD DRIVE WALKWAY IMPROVEMENTS
  2. 2. Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch
  3. 3. Project Details Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Description: The Medford Drive Walkway Improvements Project has been substantially completed. This project is part of the 2014 Bond Referendum projects and consists of the construction of approximately 560 ft of 5 ft wide sidewalk with associated stormwater drainage and curb and gutter works along the east side of Medford Drive between Four Year Run and Davian Drive. Project Team: Department of Transportation – Syed Nabavi Utilities Design and Construction Division (UDCD) - Abul M. Syed UDCD Inspections - Kenneth Giles and Jim Cooper Engineer - Ricker Design Associates, P.C. Contractor - Finley Asphalt & Sealing, Inc.
  4. 4. Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Mason District, Tax Map 71-1 Limits of Improvements, Project No. 5G25-060-031PROJECT SITE
  5. 5. Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Pre-Existing Conditions
  6. 6. Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Pre-Existing Conditions
  7. 7. Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Installation of Storm Drainage
  8. 8. Before After Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch
  9. 9. Before After Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch
  10. 10. Before After Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch
  11. 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Medford Drive Walkway Improvements Capital Facilities/Utilities Design and Construction Division, Transportation Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov

×