RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Project No. WW-000008-012
Wastewater Design and Construction Division, Wastewater Collection Branch
April 14, 2022
Introductions
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
• Fairfax County
– Natasha Schmidt, P.E., Project Manager
– Department of Public Works and
Environmental Services Staff
– Mount Vernon District Board of Supervisors
• Engineering Consultant (Arcadis U.S., Inc.)
– Matt Roder, P.E., Project Manager
– Other Arcadis Staff
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 2
Meeting Agenda
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
• Wastewater Division – Who We Are
• Existing Force Main
• Project Benefits
• Proposed Force Main
• Construction Sequence, Post-Construction Pavement Restoration, and Traffic Control
• Bypass Pump Piping – Example Photo
• Anticipated Schedule
• Questions and Answers
• Adjourn Meeting
3
Wastewater Division – Who We Are
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
• Protect Public Health and Water
Quality
• Among the Nation’s Largest Sanitary
Sewer Systems
• How is Wastewater Generated?
(sinks, laundry machines, showers/tubs, and
toilets)
• Plan, Design, Operate and Maintain
- 3,250 Miles of Pipe (gravity and force main)
- 60+ Pump Stations
- 250,687 Residential Accounts
- 14,718 Commercial Accounts
• Treat 41 million gallons per day at
Noman Cole PCP
• Once Treated, Water is Released
Back Into Region’s Waterways
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 4
Visit us on the internet at:
https://www.fairfaxcounty.gov/publicworks/wastewater/about
Existing Force Main
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
• 4-Inch Diameter (Cast Iron Pipe)
• Installed in 1970 (52 years old)
• Approximately 657 Feet in
Length
(Riverwood Pump Station to Existing
Manhole #27 in Riverwood Road)
• Located in a 15-Foot Wide
Easement (Residential Property)
• Nearing the End of its Useful
and Practical Life
• Replacement is Required
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 5
Existing Force Main
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 6
Project Benefits
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 7
The new 4-inch ductile iron force main
will serve the surrounding community for
the foreseeable future. Replacement of
the force main will:
• Reduce the level and frequency of
maintenance required to keep the force
main operating.
• Prevent costly emergency repairs.
• Provide residents with safe, reliable
utility infrastructure.
• Enhance the quality of life for
residents.
• Reduce risks to public health and the
Proposed Force Main
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 8
Proposed Force Main
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 9
Construction Sequence
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 10
3. Connect new force main to pumping station and manhole.
2. Set up bypass pumping system and take existing force main out of service.
4. Remove bypass pumping system. Abandon existing force main by filling with lightweight concrete.
1. Install most of new force main while existing force main stays in operation.
Note: There will be temporary pavement repairs while construction is ongoing
Post-Construction Pavement Restoration
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch
Lane Closures
Day Night
Mon - Thur 9:00 A – 3:30 P 9:00 P – 5:00 A
Friday 9:00 A – 2:00 P 10:00 P – 9:00 A
Saturday Not Allowed 9:00 P – 9:00 A
Sunday Not Allowed 10:00 A – 5:00 A
Traffic Control
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch
Bypass Pump Piping – Example Photo
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 13
Anticipated Schedule
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 14
Complete Detailed Design
Community Outreach Meeting
Commence Construction
Complete Construction
March 2022
April 14, 2022
June 2022
December 2022
This is the anticipated schedule only. Ongoing supply
chain issues may impact necessary material deliveries and
impact the construction schedule.
Questions and Answers
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 15
Questions???
For additional information, please contact
www.fairfaxcounty.gov/publicworks
Additional Information
RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING
Natasha Schmidt
703-324-5080 (Direct) or 571-407-4529 (Mobile)
Natasha.Schmidt@fairfaxcounty.gov
Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 16

More Related Content

Similar to Riverwood Community Meeting - 04-14-2022- Presentation.pptx

Similar to Riverwood Community Meeting - 04-14-2022- Presentation.pptx (20)

Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration Project
 
Nancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationNancemond Street Outfall Stabilization
Nancemond Street Outfall Stabilization
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Armfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin RetrofitArmfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin Retrofit
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectGreat Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 
Rabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration ProjectRabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration Project
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 
Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 

Recently uploaded

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Riverwood Community Meeting - 04-14-2022- Presentation.pptx

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Project No. WW-000008-012 Wastewater Design and Construction Division, Wastewater Collection Branch April 14, 2022
  • 2. Introductions RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING • Fairfax County – Natasha Schmidt, P.E., Project Manager – Department of Public Works and Environmental Services Staff – Mount Vernon District Board of Supervisors • Engineering Consultant (Arcadis U.S., Inc.) – Matt Roder, P.E., Project Manager – Other Arcadis Staff Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 2
  • 3. Meeting Agenda RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING • Wastewater Division – Who We Are • Existing Force Main • Project Benefits • Proposed Force Main • Construction Sequence, Post-Construction Pavement Restoration, and Traffic Control • Bypass Pump Piping – Example Photo • Anticipated Schedule • Questions and Answers • Adjourn Meeting 3
  • 4. Wastewater Division – Who We Are RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING • Protect Public Health and Water Quality • Among the Nation’s Largest Sanitary Sewer Systems • How is Wastewater Generated? (sinks, laundry machines, showers/tubs, and toilets) • Plan, Design, Operate and Maintain - 3,250 Miles of Pipe (gravity and force main) - 60+ Pump Stations - 250,687 Residential Accounts - 14,718 Commercial Accounts • Treat 41 million gallons per day at Noman Cole PCP • Once Treated, Water is Released Back Into Region’s Waterways Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 4 Visit us on the internet at: https://www.fairfaxcounty.gov/publicworks/wastewater/about
  • 5. Existing Force Main RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING • 4-Inch Diameter (Cast Iron Pipe) • Installed in 1970 (52 years old) • Approximately 657 Feet in Length (Riverwood Pump Station to Existing Manhole #27 in Riverwood Road) • Located in a 15-Foot Wide Easement (Residential Property) • Nearing the End of its Useful and Practical Life • Replacement is Required Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 5
  • 6. Existing Force Main RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 6
  • 7. Project Benefits RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 7 The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will: • Reduce the level and frequency of maintenance required to keep the force main operating. • Prevent costly emergency repairs. • Provide residents with safe, reliable utility infrastructure. • Enhance the quality of life for residents. • Reduce risks to public health and the
  • 8. Proposed Force Main RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 8
  • 9. Proposed Force Main RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 9
  • 10. Construction Sequence RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 10 3. Connect new force main to pumping station and manhole. 2. Set up bypass pumping system and take existing force main out of service. 4. Remove bypass pumping system. Abandon existing force main by filling with lightweight concrete. 1. Install most of new force main while existing force main stays in operation.
  • 11. Note: There will be temporary pavement repairs while construction is ongoing Post-Construction Pavement Restoration RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch
  • 12. Lane Closures Day Night Mon - Thur 9:00 A – 3:30 P 9:00 P – 5:00 A Friday 9:00 A – 2:00 P 10:00 P – 9:00 A Saturday Not Allowed 9:00 P – 9:00 A Sunday Not Allowed 10:00 A – 5:00 A Traffic Control RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch
  • 13. Bypass Pump Piping – Example Photo RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 13
  • 14. Anticipated Schedule RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 14 Complete Detailed Design Community Outreach Meeting Commence Construction Complete Construction March 2022 April 14, 2022 June 2022 December 2022 This is the anticipated schedule only. Ongoing supply chain issues may impact necessary material deliveries and impact the construction schedule.
  • 15. Questions and Answers RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 15 Questions???
  • 16. For additional information, please contact www.fairfaxcounty.gov/publicworks Additional Information RIVERWOOD FORCE MAIN REHABILITATION – COMMUNITY MEETING Natasha Schmidt 703-324-5080 (Direct) or 571-407-4529 (Mobile) Natasha.Schmidt@fairfaxcounty.gov Capital Facilities/Wastewater Design and Construction Division/Wastewater Collection Branch 16