Route 50 sidewalk - South Street to Aspen Lane

81 visualizaciones

Publicado el

This project consisted of constructing approximately 1,200 linear feet of five-foot wide concrete sidewalk, associated curb and gutter, water line relocation, installation of 12-inch and 15-inch reinforced concrete pipe for improved stormwater drainage, asphalt pavement, pavement marking, and other related items.

  • Sé el primero en comentar

  • Sé el primero en recomendar esto

Route 50 sidewalk - South Street to Aspen Lane

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Route 50 Sidewalk South Street To Aspen Lane Contract No. CN17102045 Project No. 1400061-2012 UPC No. 10893 Providence District July 10, 2019
  2. 2. Route 50 Sidewalk South Street To Aspen Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  3. 3. Project Details Description: The Route 50 Sidewalk South Street To Aspen Lane Project was substantially completed on June 30, 2019. This project consisted of constructing approximately 1200 LF of concrete sidewalk, associated curb & gutter, water line relocation, installation of 12” and 15” reinforced concrete pipe for improved stormwater drainage, asphalt pavement, pavement marking and other related items. Project Overview: • Installation of approximately 1200 LF of 5’ concrete sidewalk • Relocation of water line • Installation RCP concrete pipe to improve stormwater drainage flow Project Team: • Department of Transportation – Mohamad El Kaissi, Fereshteh (Brook) Khorashadi, Tan Nguyen • Land Acquisition Division – Angelica DelliCarpini • Utilities Design and Construction Division (UDCD) – Bijan (Ben) Samiyi • Project Inspector, RK&K– Rick Richardson Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Route 50 from South Street to Aspen Lane
  4. 4. Cinder Bed Road Realignment Providence District, Tax Map No. 50-4 & 51-3 Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Route 50 from South Street to Aspen Lane PROJECT SITE
  5. 5. Pre-Existing Conditions Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Route 50 from South Street to Aspen Lane
  6. 6. Installation of Storm Drainage Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Route 50 from South Street to Aspen Lane
  7. 7. Route 50 from South Street to Aspen Lane Installation of the Sidewalk Base Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  8. 8. Route 50 from South Street to Aspen Lane Installation of Concrete Curb and Gutter & Sidewalk Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  9. 9. Before After Route 50 Sidewalk South Street To Aspen Lane Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  10. 10. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Matthew Kaiser, Public Information Officer 703-324-5034, TTY 711 Matthew.Kaiser@fairfaxcounty.gov Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Route 50 from South Street to Aspen Lane

×