3. Tysons
3
TysonsTysons
• June 2010 ‐ Tysons Comprehensive Plan Amendment adopted.
• March 2011 ‐ the Board Requested of the Planning Commission to
provide recommendations for financing transportation Infrastructure.
• May 2011 – October 2012 ‐ Planning Commission Tysons Committee
(PCTC) met 24 times.
• October 2012 ‐ The Board received public comment and endorsed
Planning Commission recommendations (see handout).
• December 2012 – The Board held public hearing on proposed creation of
service district.
• January 2013 – The Board approved service district, created Service
District Advisory Board, and established rates and policies for the two
Road Funds.
• July 2013 – Service District collections began
Funding Plan Background
5. Tysons
5
TysonsTysons
Revised Costs ‐ Tysons‐Wide Roadway Projects
(mils of $$$)
[1] 2014 and 2016 estimates are higher of two options.
Tysons‐wide Table7 Projects 2014
Estimate
2016
Estimate
Rt.7 Widening (Rt.123 to I‐495) $22.0 $22.0
Rt.7 Widening (Reston Ave to DTR) $292.0 $235.0
Rt.7 Widening (Rt.123 to I‐495) $22.0 $22.0
Jones Branch Connector $42.0 $60.0
Rt.7 Widening (I‐495 to I‐66) $64.5 $75.4
Rt.123 Widening (Old Courthouse Rd to Rt.7) $22.8 $22.6
Rt.123 Widening (Rt.7 to I‐495) $46.0 $46.0
Boone Blvd Extension $36.5 $34.5
Greensboro Drive Extension $8.8 $8.8
DTR Ramp to Boone Blvd Extension $93.5 $95.5
DTR Ramp to Greensboro Drive Extension (Option 2)1 $84.5 $85.0
DTR Westbound Collector Distributor $129.0 $132.0
DTR Eastbound Collector Distributor $83.5 $88.0
Magarity Rd Widening (Lisle/Rt.7 to Great Falls St $54.0 $57.2
I‐495 Overpass at Tysons Corner Center $14.5 $15.7
Gallows Rd Widening (Rt.7 to Prosperity Ave) $228.5 $238.0
I‐495 Additional Lane (Outer Loop, Rt. 7 to I‐66) $6.8 $7.3
Ramps Connecting DTR to Jones Branch Drive $115.0 $116.0
$1,343.75 $1,338.95
(0.4%)
6. Tysons
6
Spring 2017 Timeline/Recommendation
Date Item
February 14 County Executive’s FY 2018 proposed budget;
service district rate proposed at $0.06
February 28 Board approved advertising a service district tax rate at $0.06, as part of the
Tax Rate Resolution1
March 15 First meeting of the Tysons Transportation Service District Advisory Board
(TTSDAB)
March 30 Second meeting of the TTSDAB
April 4‐6 Public Hearings on FY 2018 Budget and Tax Rates.
Advisory board recommendation due no later than April 6.
April 25 FY 2018 Budget Mark‐up
May 2 Board Adoption of FY 2018 Budget and Service district tax rate is included
as part of FY 2018 Budget Adoption
1. After advertisement, the Board can only adopt a rate equal to, or lower than the advertised rate.
12. Tysons
12
New Model Runs ‐ Key Statistics
FY 2017
Adopted
Finance
Model1,2
FY 2018 Proposed
Model/Plan w/
updated AV
(as of 1/1/17) 3
FY 2018 Proposed
Model/Plan w/
updated AV
(as of 1/1/17) 2,3
Total Tax Revenue
Needed
$396M $253.2M $254M
Final Tax Year 2045 2040 2040
FY 2018 Estimate of
Revenue Generated
$7.93M $8.33M $6.95M
1. Includes finance charges
2. FY 2017 Adopted Finance model has a rate of $0.05 in FY 2017, and $0.06 in FY 2018.
3. FY 2018 model runs for $0.05 and $0.06 include no bonding.
6cents
No bonding
5cents
No bonding
27. Tysons
27
Tysons Grid of Streets Continued
Lincoln Street
• Proposed street to connect Route 123 to Magarity Road.
• Will allow access to existing/approved developments along Old
Meadow Road from Magarity Road.
• No new development expected along most of Lincoln Street.
• Additional access to residential units on Old Meadow Road.
• On October 18, 2016, the Board approved $1.2 million for feasibility
study.
• Staff developing scope of work for consultant proposals.
39. Tysons
39
Tysons Table 7B Projects Continued
• Cleveland Ramp ‐ Modification to the eastbound off‐ramp from the
Dulles Access Road to Route 123.
• The Alternatives Analysis is complete. The analysis identified two
preferred alternatives:
• Braided Ramp Concept and an Auxiliary Lane concept, to be
carried forward in an Interchange Modification Report (IMR).
• Route 7/Route 123 Interchange to allow additional capacity.
• Advancing design based on design charrette recommendations;
four design options considered.
• Planning to meet with stakeholders in late Spring 2017 to present
findings.
• Gallows Road at Gallows Branch, to I‐495 SB Ramp
• Study to be initiated in the future.