Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 2 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
TABULATION OF REVISED PAGES
SHEET
REVISIONS
SHEET
REVISIONS
A B C D E F G H A B C D E F G H
1 X 51
2 X 52
3 X 53
4 X 54
5 X 55
6 X 56
7 X X 57
8 X 58
9 X 59
10 X 60
11 X 61
12 X X 62
13 X 63
14 X 64
15 X 65
16 X 66
17 X 67
18 X 68
19 X 69
20 X 70
21 X 71
22 X X 72
23 X 73
24 X 74
25 X 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 3 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
COMMENTS RESPONSE SHEET
DOCUMENT REF.: ID-SPA-ALL-2020-105231
No
Document/
Page Ref.
Company Comments CTR Response Initial Remarks
1 14
How about if the personnel at
platform, entrance through gang
way but incase gangway cannot
be used/emergency,
they go out through boat landing
at platform?
please consider this case or you
need to put magno bar system
near boat landing at platform or
boat landing at platform
cannot be used just only for
emergency purpose, incase it
happens the magno bar near
gangway shall be replaced near
with boat landing platform to
control people come and out of
platform.
CTR have been correction
and revision on Appendix
3, 4, & 5.
BDT
2 App. 3
how about if people out from
platform through boat landing not
using the gang way as entrance
access?
BDT
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 4 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
REVISION DETAIL TABULATION
DATE PAGE REVISION REVISION DETAILS
30 May 2013 1 UP TO 23 A Issued For Comments
10 June 2013 7 B CTR has added on section 3. SCOPE
10 June 2013 7 B
CTR has correction and added on Sub Section 7.10
Magnobar System
10 June 2013 12 B CTR has corection DONE
10 June 2013 12 B
CTR has correction and added onAppendix 3 POB System
Flow Chart
10 June 2013 13 B CTR has correction DONE
10 June 2013 22 B CTR has corection DONE
26 Aug 2013 8 C CTR has corection DONE
31 Dec 2013 14 D CTR has corection DONE
31 Dec 2013 App. 3 D CTR has corection DONE
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 5 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
Contents
1. INTRODUCTION ................................................................................................................................................7
2. PURPOSE...........................................................................................................................................................7
3. SCOPE................................................................................................................................................................7
4. REFERENCE......................................................................................................................................................7
4.1 INTERNAL...................................................................................................................................................7
4.2 EXTERNAL .................................................................................................................................................7
4.2.1 NATIONAL STATUORY REGULATION.................................................................................................7
4.2.2 INTERNATIONAL STANDARD CODE PRACTISE................................................................................7
4.2.3 COMPANY PROCEDURS......................................................................................................................7
5. ABBREVIATION.................................................................................................................................................8
6. ROLE AND RESPONSIBILITY ..........................................................................................................................8
6.1 Hook Up Manager .......................................................................................................................................8
6.2 On Shore Logistic Coordinator....................................................................................................................8
6.3 Project HSE Manager..................................................................................................................................9
6.4 HSE Senior Officer......................................................................................................................................9
6.5 HSE Officer .................................................................................................................................................9
6.6 POB Reporting ............................................................................................................................................9
6.7 Doctor and Paramedic...............................................................................................................................10
6.8 Barge master of Accommodation Work barge..........................................................................................10
6.9 HRD Representative .................................................................................................................................10
6.10 Radio Operators of CTR Shoreline base and Accommodation work barge .............................................10
6.11 Security .....................................................................................................................................................10
6.12 Project Employees ....................................................................................................................................11
7. GENERAL POB CONTROL PROCEDURE.....................................................................................................11
7.1 VALID MCU...............................................................................................................................................11
7.2 MANDATORY TRAINING .........................................................................................................................11
7.3 HSE PASSPORT ......................................................................................................................................11
7.4 CHECK IN AT DEDICATED SHORELINE BASE .....................................................................................11
7.5 ON SHORELINE BASE.............................................................................................................................12
7.6 ON ACCOMODATION WORK BARGE ....................................................................................................12
7.7 SAFETY INDUCTION ...............................................................................................................................12
7.8 EMBARKING AND DISEMBARKING .......................................................................................................12
7.9 POB REPORT...........................................................................................................................................13
7.10 MAGNOBAR SYSTEM..............................................................................................................................13
7.11 PERSONNEL MOVEMENT ......................................................................................................................14
8. POB MONITORING..........................................................................................................................................15
8.1 TOTAL PERSONS ONBOARD AT ANYTIME ..........................................................................................15
8.2 RESIDENTS PERSONNEL AND TEMPORARY PERSONNEL...............................................................15
8.3 SEPARATION OF CPY, CTR, SUB-CONTRACTOR, BARGE CREW AND VISITOR ............................15
8.4 PERSONNEL WHO WORKS ON PLATFORMS AND ONBOARD ..........................................................15
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 6 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
LIST OF APPENDIXES
APPENDIX 1 MAIN MUSTER BOARD
APPENDIX 2 TYPE OFMAGNOBAR CARD
APPENDIX 3 MAGNOBAR POSITION AT AWB
APPENDIX 4 MAGNOBAR POSITION AT BOAT LANDING
APPENDIX 5 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY
APPENDIX 6 POB SYSTEM FLOW CHART
APPENDIX 7 SAMPLE of HSE PASSPORT and HANDBOOK
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 7 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
1. INTRODUCTION
The POB Management is deployed to track the full personnel-transport process, from booking and check-in
to arrival and departure to and from offshore installations and remote locations during Platform Offshore
Hook Up operations at Sisi-Nubi Phase 2B & Peciko Phase 7B Development Project EPSC (1+2) – TOTAL
E&P INDONESIE. It provides a current account of the personnel on location at any given time.
2. PURPOSE
The purpose of this procedure is used to plan and schedule the transport of the personnel and freight
travelling to and from platforms and also to allow full overview of individual transport manifest in real-time.
3. SCOPE
This procedure applies for all personnel (CTR and Subcontractors) mobilized for working or visiting on SN2B
&Peciko 7B EPSC 1+2 during off-shore hook-up, Precommisioning and Commissioning.
4. REFERENCE
4.1 INTERNAL
• ID-SPA-ALL-2020-105229 Project HSE Plan (Offshore Scope)
• ID-SPA-ALL-2020-105230 Emergency Response Plan (Offshore Scope)
4.2 EXTERNAL
4.2.1 NATIONAL STATUORY REGULATION
• State Gazette Acts No. 1 Year 1970 on Occupational Health & Safety
• State Gazette Act No. 13 Year 2003 on Manpower
• PERMENAKER No. 5 / 1996
4.2.2 INTERNATIONAL STANDARD CODE PRACTISE
• SOLAS (Safe Of Life At Sea)
4.2.3 COMPANY PROCEDURS
• Exhibit A of Contract Document PJC SN2B&PCK7B EPSC (1+2), Scope of Work
• Exhibit L of Contract Document PJC SN2B&PCK7B EPSC (1+2), HSE Requirements.
• SOP 06 – 610 Rev.3 Medical Check Up & Fitness to Work
• SOP 07 – 701 Rev.3 HSE NC
• SOP 301 Rev.3 Personal Protective Equipment (PPE)
• TEPI Marine Procedure manual Rev. 5
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 8 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
5. ABBREVIATION
AWB Accommodation Work Barge
CPY TOTAL E&P Indonesie
CTR PT GUNANUSA UTAMA FABRICATORS
EPSC Engineering, Procurements, Supply, and Construction
POB Personnel On Board
MCU Medical Check Up
NC Notice to Contractor
SOLAS Safe Of Life At Sea
TEPI TOTAL Exploration & Production Indonesie
6. ROLE AND RESPONSIBILITY
6.1 Hook Up Manager
• To manage movement of all personnel when they traveling to and from the CTR and CPY facilities
(Shoreline base, work barge, Platform) during project duration.
• To socialize the POB management system to all personnel and ensure the are implementation.
• To ensure all POB are recorded and made available to Company.
• To submit the POB list (Shoreline base, work barge, Platform) to CPY on a daily basis,or when it
required.
6.2 On Shore Logistic Coordinator
• As Onshore support during offshore campaign will be from Balikpapan office and Sandy Jaya
Jetty, Balikpapan.
• Lead a team of competent and engaged personnel to deliver service and value excellence.
• Manage the day-to-day Subsea equipment, infrastructure and field intervention vessel activities
relating to the installation.
• Mobilize and manage internal and external logistics resources to ensureon-time and
accuratedeliveries of required materials at lowest total system cost.
• Mainly responsible for maintaining daily follow-up of Export & Import files in all Business Units and
insure efficient ,cost effective and timely delivery of the material to the final destinations.
• Defines, develops and provides input to materials Control Plan and ongoing project reports
• Ensures all offshore documentation and certification is strictly adhered to.
• Work with Offshore Quality Engineer and Construction Superintendent to ensure safe and timely
receipt, and storage and issued of goods.
• Ensures the material reconciliation upon completion of the project.
• Identify inefficiencies and areas of growth within current distribution network to continuously
improve the balance between the level and cost of service.
• Manage and reduce logistics cost via freight rate benchmarks, freight consolidations opportunities,
process flow reviews and assist with annual freight rate negotiations.
• Manage and Supervise Material Team Schedules, Training and Performance.
• Liaise with QC Eng. To manage timely inspection of materials on order.
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 9 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
• Acts as Logistic Coordinator to support timely delivery of Material to destination.
• Accurately Design and handle Material Document Control, Certificates and Vendors
Documentations.
Provide responsive logistics services for emergency situations :
• Control all materials offshore in line with the company and project specific system.
• Track all movement of materials between Prime Leasing Yard to offshore.
• Manage world class vendor relationship management practices for logistics providers.
• Development system to identify materials per Offshore Construction Work Packs, and if practical,
to job card.
• To make sure that the crew boat is safe to embark
·
6.3 Project HSE Manager
• To ensure that POB procedure is implementing and assure the POB list is recorded and reported to
the Hook up Manager on a daily basis.
• To manage safety personnel on duty during project activity at site
• To monitor implementation and or improve the awareness of employees during commencing
Offshore Hook Up activities.
6.4 HSE Senior Officer
• To assist Project HSE Manager for managing POB system
• To collect the POB list from all marine spreads and other supporting facilities and reporting to CPY
Site Representative in- charge.
• To ensure all CTR personnel on site are familiar with POB procedure and its implementation.
6.5 HSE Officer
• To conduct Safety Induction of CTR employee and new comer
• To ensure that POB management system is implemented
• To monitor and check that all CTR personnel have attached their ID badges on specific board as
required.
• Liaise with TEPI Ops on regards to POB System and CPY- Passport
• To ensure and maintain the POB management system is implemented accordingly
• To distribute necessary PPE for CTR employee or new comer prior to them entering the site
construction area
• Assist HSE Coordinator to manage POB during Emergency situation.
6.6 POB Reporting
• Keeps up with all personnel offshore.
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 10 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
• Move names from helicopter and boat manifests to the current POB list with just a few clicks. No
more re-typing information.
• Track days offshore for all personnel.
• POB lists are easily accessible online by everyone on the team in the event of an emergency. The
POB list does not “sink with the ship” in the event of a catastrophe.
• Easily view cabin assignments, life boat assignments and evacuation priorities.
6.7 Doctor and Paramedic
• To conduct and or check employee(s) medical check up certificate
6.8 Barge master of Accommodation Work barge
• To list the POB who living on the accommodation work barge and reporting to HSE Officer in
daily basis everyday
• To ensure that the POB Procedure is communicated to all CTR employees
• To manage POB during emergency situation
• To ensure all personnel on board are wearing proper Badge.
6.9 HRD Representative
• To check validity of medical check up certificate
• To check the mission order and competency of all CTR employees when they arriving at
Shoreline Base
• To coordinate with HSE Officer for Safety Induction of all new comer(s)
• To coordinate with the Barge master of accommodation work barge and arrange transportation
from Shoreline Base to the Accommodation work barge.
6.10 Radio Operators of CTR Shoreline base and Accommodation work barge
• To monitor and record marine spreads movement (arrival and departure) from or to the work
barge.
• To maintain communication with marine spread (crew boat or other vessel) prior alongside at
Accommodation work barge and Platform
• To collect the POB from Security in charge of each Posts and report to HSE Coordinator
• To provide passenger manifest prior traveling to Accommodation work barge and Platform.
6.11 Security
• To check all personnel ID badge while entering on their Post.
• To ensure the number of POB are met with the ID badge hanging on a board.
• To collect and account the ID badge quantity and report to HSE Coordinator
• Security check before embarking crew boat or surfer
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 11 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
6.12 Project Employees
• To report and register when arriving at Site construction area
• To follow and implement POB management system
• To use Mandatory ID badge at all times whilst on board barge or Accommodation work barge
and Platform
• To bring mandatory ID badge at all time while on board or Accommodation work barge and
Platform..
7. GENERAL POB CONTROL PROCEDURE
7.1 VALID MCU
Medical Check up certificate of offshore personnel shall have been submitted and validated by CPY
doctor. Where it is applicable, an MCU Pass badge will be released by CPY doctor for each personnel.
7.2 MANDATORY TRAINING
Mandatory training:
1. Sea Survival
2. Basic First Aid
3. Basic Fire Fighting
VALID SEA SURVIVAL
CTR personnel and sub-contractors personnel who involved in off-shore activity shall have sea survival
certificate as offshore minimum requirement.
The offshore personnel data will be recorded in CTR data base. CTR will forward / report the up-date
personnel record to CPY on daily basis.
7.3 HSE PASSPORT
Offshore Hook Up personnel shall have valid HSE Passport which indicate that passport holder is
permitted for mobilization to offshore area. The minimum requirement for get HSE Passport every
personnel should have a valid medical check up and valid sea survival certificate. All HSE Passport will
be recorded and register by CTR HSE Department. (refer to Appendix 3. POB System Flow Chart)
7.4 CHECK IN AT DEDICATED SHORELINE BASE
Upon arrival on site (dedicated shoreline base) all CTR employees shall pass thru the CTR Site
Representative in-charge for registration on passenger manifest and arrange their accommodations,
safety induction, PPE and transportation to offshore.
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 12 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
7.5 ON SHORELINE BASE
All new comer and CTR employees shall report upon they arrive at shoreline base prior traveling to
and/ or enter to the accommodation work barge. The CTR Shoreline Base Representative will collect
the MCU certificate; CTR employees ID badges, and HSE passport for registration and keep them in
shoreline base office.
The CTR Shoreline Base Representative shall submit the list of CTR employees to COMPANY
Shoreline Base Representative or TEPI Fields in order to get the Safety Induction. Without approval
TEPI FIELDS will not allow CTR employees traveling or entering to the AWB.
Before embarking to the crew boat at shoreline base jetty, CTR HSE or Security shall check the
offshore badge and control the number of personal before embarking to the crew boat, he shall ensure
that the number nominated passenger is not over then the allowed capacity of crew boat.
.
7.6 ON ACCOMODATION WORK BARGE
The CTR employee(s) who shall work or to be accommodated at the accommodation work barge shall
report their arrival to the Barge master or his delegated person, and then the AWB Representative will
conduct Safety Induction and delivery Magnobar Card as replacement of CTR offshore badge (on
outside accomodation and near from boat landing); for temporary visit will receive visitor offshore
badge and for permanent stay will receive Magnobar Card. The offshore badge of CTR personnel will
be kept on the AWB Radio Operator during CTR personnel on duty in offshore.
On the Magnobar Card will stated the bunk number and the life raft number and the Magnobar card
will attach on destination place of the CTR personnel.
7.7 SAFETY INDUCTION
After registration the HSE Officer on board will conduct safety induction and the content of safety
induction will include :
• Safety ruleduring transportation by boat (put on fastened your life jacket)
• Procedure of POB
• procedure of Emergency
• Request transportation by boat
• procedure of work permit
• Safety Video Induction
• Etc.
All CTR personnel who will work at Offshore HU&C have safety induction provided by CTR HSE
Personnel and All personnel attending safety induction must be recorded in a register.
All personnel attending safety induction must be recorded in a register.
7.8 EMBARKING AND DISEMBARKING
Personnel arriving at Balikpapan Office shall report to CTR Site Representative.
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 13 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
7.9 POB REPORT
Daily POB report shall be reported by HSE Administration and acknowledged by Barge master before
submitted to CTR onshore base and CPY.
7.10 MAGNOBAR SYSTEM
All personnel on board (POB) the barge shall be registered for head counting purpose by the Radio
Operator who will be responsible for but not limited to the following tasks :
 All personnel arriving offshore are required to sign in at the radio Room and will have Personalized
Magnobar Card.
 Assigning each POB with a specific life raft location for his/her mustering purpose and each life raft
shall be assigned one leader and his alternate. This assignment list shall be posted on the bulletin
boards located at strategic location.
 Personnel crossing into platform will re-locate their Magnobar Card as movement between platform
and barges. The Safety Officer at main deck shall monitor this Magnobar Card system
implementation.
7.10.1MAGNOBAR LOCATION.
This section details how the Individual Magnobar locations will be utilized during the hook up
campaign (see Appendix 3.)
• Individuals entering Platform A from the AWB will utilize the existing Magnobar station1.
• Individuals existing AWB will utilize the existing Magnobar station 2.
Figure 1.MagnoBar Model Plan
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 14 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
7.11 PERSONNEL MOVEMENT
7.11.1SHORELINE BASE
All CTR employees shall report their arrival to the CTR shoreline base – Balikpapan or his
delegated person, and then the HRD Representative will arrange Safety Induction and delivery
offshore ID badge.
Prior to departing to the accommodation work barge by crew boat, the HRD personnel shall
prepare the manifest of passenger.
7.11.2AWB
 On arrival employees is issued with Badge indicating bunk number, and mustering
station/life raft number which identified with color code.
 After briefing, employees proceed to slot the badge at mustering station/life raft
numberand in case of emergency they shall remove the badge and muster.
 All CTR and Subcontractors employee(s) will receive T-card after they pass Safety
induction at AWB.
 The POB of accommodation work barge will be recorded on the logbook and it will be
kept as per where they are living on board (accommodation work barge will be recorded
by Camp boss and Barge Master).
 Personnel on leave (departure from barge) :
 All personnel will embark from barge shall report to Radio Operator
 All personnel shall return their magnet bar before embarking from barge
 Magnobar position can see on Appendix 3.
7.11.3PLATFORM
 All CTR and Subcontractors employees who will work at PLATFORMSmodule must be
passed though the boat landing by gang way (as the check point post of CTR hook up
and commissioning area).
 Since arriving at PLATFORMSmodule all CTR and or Subcontractors employee(s) shall
report to the Security at postby filling their personal identity and the destination point on
the log book then Security will change their CTRoffshore badge with PLATFORMS
badge.
 The Security in-charge at post will attach their CTR offshore badge at a POB board as
per their destination place/work location on POB board.
 In case of emergency at PLATFORMS, muster point nearer boat landing (top of jacket)
can be used (see Appendix 4 & Appendix 5).
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 15 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
8. POB MONITORING
8.1 TOTAL PERSONS ONBOARD AT ANYTIME
All personnel coming and outgoing from the barges shall be registered in the POB list and shall keep up-
dated on daily basis. This POB list shall include name, personnel position, cabin no, life raft and
company name as per the Personalized Magnobar System.
8.2 RESIDENTS PERSONNEL AND TEMPORARY PERSONNEL
Resident personnel and temporary personnel when coming and outgoing from the barges shall be
registered in the POB list and shall keep up-dated on daily basis. This POB list shall include name,
personnel position, cabin no. life raft no, and company name as per the Personalized Magnobar
System.
8.3 SEPARATION OF CPY, CTR, SUB-CONTRACTOR, BARGE CREW AND VISITOR
Resident personnel (CPY, CTR, Sub-contractor, and Barge Crew) when coming and outgoing from the
barges shall be registered in the POB lit and shall keep up-dated on daily basis. This POB list shall
include name, personnel position, cabin no. life raft no, and company name as per the Personalized T-
card.
Visitor coming and outgoing from the barges shall be registered in the POB lit and shall keep up-dated
on daily basis. This POB lit shall include name, personnel position, cabin no. life raft no, and company
name as per the Personalized T-card.
8.4 PERSONNEL WHO WORKS ON PLATFORMS AND ONBOARD
Personnel movement can be seen and tracking by Magnobar System which displayed on master board,
remote board and also gangway crossing board.
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 16 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 1
MAIN MUSTER BOARD
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 17 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 18 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 2
TYPE OF MAGNOBAR CARD
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 19 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
ON DUTY AT ACCOMODATION WORK BARGE FOR DAY SHIFT
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
OFF DUTY / LEAVE
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
ON DUTY AT PLATFORM MODULE FOR DAY SHIFT
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
VISITORS
ON DUTY AT ACCOMODATION WORK BARGE FOR NIGHT SHIFT
NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO.
COMPANY:
ON DUTY AT PLATFORM MODULE FOR NIGHT SHIFT
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 20 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 3
MAGNOBAR POSITION AT AWB & POB CONTROL
APPENDIX 3 MAGNOBAR POSITION at AWB (Accommodation Work Barge)
12
1. Near swing
rope position
2. Near gangway
position
3. Near Boat
Landing
Legend :
3
PERSONAL ON BOARD (POB) CONTROL RELATED WITH MAGNOBAR CARD POSITION
CREW BOAT / SURFER PERSONNEL TRANSFER ACCOMODATION WORK BARGE
PROCESS
Manifest should be
borrowed for each
personnel who on go
(arrival to barge)
Manifest exchange with
Magnobar Card by
Radio Operator on AWB
Every time the personnel enter
or exit Platform through the
gangway, personnel must place
magnobar card on the muster
point station available.
GANGWAY
BOAT LANDING-AWB
If any personnel who will enter
or exit Platform through the
boat landing, shall first report
to AWB through Radio
Operator by giving manifest in
exchange for magnobar card.
SWING ROPE
If any personnel who will enter or
exit AWB through the Swing Rope,
shall first report to AWB through
Radio Operator by giving manifest
in exchange for magnobar card.IN COMING
PASSENGER
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 21 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 4
MAGNOBAR POSITION AT BOAT LANDING
APPENDIX 4 MAGNOBAR POSITION at BOAT LANDING (Top of Jacket)
Gangway
Boat Landing AWB
Wellhead
Platform
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 22 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 5
POB FLOW PROCESS DURING EMERGENCY
AT GANGWAY
APPENDIX 5 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY
EvacuationEscapePOB
Wellhead
Platform
Gangway :
In case of Emergency
cannot be used
Boat
Landing
V-Shape
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 23 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 6
POB FLOW PROCESS DURING EMERGENCY
AT GANGWAY
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 24 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 25 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB
APPENDIX 7
SAMPLE of HSE PASSPORT and HANDBOOK
Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No
PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON
BOARD (POB) CONTROL (OFFSHORE SCOPE)
ID-SPA-ALL-2020-105232
Revision: D Status: AFC
Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013
OriginatorDocument No. : N/A Page : 26 of 26
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SPA-ALL-2020-105231_revB

More Related Content

What's hot

23 IATA Storage and loading
23   IATA Storage and loading23   IATA Storage and loading
23 IATA Storage and loadingMohamed Tayfour
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentationLucy Reimer
 
Dangerous and Hazardous Goods
Dangerous and Hazardous GoodsDangerous and Hazardous Goods
Dangerous and Hazardous GoodsKJP Consulting
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety managementS P Singh
 
Ground Handling
Ground HandlingGround Handling
Ground HandlingToy Ang
 
Ramp safety
Ramp safetyRamp safety
Ramp safetymahchu12
 
14 emergency response chart ground incidents
14   emergency response chart ground incidents14   emergency response chart ground incidents
14 emergency response chart ground incidentsMohamed Tayfour
 
Dgr recurrent 2020 edition 61th
Dgr recurrent 2020 edition 61thDgr recurrent 2020 edition 61th
Dgr recurrent 2020 edition 61thsarsulis1004
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxDwarika Bhushan Sharma
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templatesDwarika Bhushan Sharma
 
Dgr for crewmember 2016 recurrent
Dgr for crewmember 2016 recurrentDgr for crewmember 2016 recurrent
Dgr for crewmember 2016 recurrenttravira
 
Near miss awareness for Petroleum Oil Refinery
Near miss awareness  for Petroleum Oil RefineryNear miss awareness  for Petroleum Oil Refinery
Near miss awareness for Petroleum Oil RefineryASHOK KUMAR SINGH
 

What's hot (20)

AEP
AEPAEP
AEP
 
23 IATA Storage and loading
23   IATA Storage and loading23   IATA Storage and loading
23 IATA Storage and loading
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Dangerous and Hazardous Goods
Dangerous and Hazardous GoodsDangerous and Hazardous Goods
Dangerous and Hazardous Goods
 
Uld control manual 2012
Uld control manual 2012Uld control manual 2012
Uld control manual 2012
 
Section 7 documentation
Section 7   documentationSection 7   documentation
Section 7 documentation
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety management
 
Ground Handling
Ground HandlingGround Handling
Ground Handling
 
Ramp safety
Ramp safetyRamp safety
Ramp safety
 
14 emergency response chart ground incidents
14   emergency response chart ground incidents14   emergency response chart ground incidents
14 emergency response chart ground incidents
 
IATA Dangerous Goods Regulations
IATA Dangerous Goods RegulationsIATA Dangerous Goods Regulations
IATA Dangerous Goods Regulations
 
Dgr recurrent 2020 edition 61th
Dgr recurrent 2020 edition 61thDgr recurrent 2020 edition 61th
Dgr recurrent 2020 edition 61th
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
 
Airline security new
Airline security newAirline security new
Airline security new
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
Safety Management System
Safety Management SystemSafety Management System
Safety Management System
 
Dgr for crewmember 2016 recurrent
Dgr for crewmember 2016 recurrentDgr for crewmember 2016 recurrent
Dgr for crewmember 2016 recurrent
 
Internal EHS Audit check sheet
Internal EHS Audit check sheetInternal EHS Audit check sheet
Internal EHS Audit check sheet
 
Near miss awareness for Petroleum Oil Refinery
Near miss awareness  for Petroleum Oil RefineryNear miss awareness  for Petroleum Oil Refinery
Near miss awareness for Petroleum Oil Refinery
 

Similar to Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope)-31 dec 2013

Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Fitri Ifony
 
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docxFaisalNadeem91
 
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...MarceloJorquera5
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...Arber Dogani
 
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdf
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdfLenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdf
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdfTriangledz Jamel
 
NSWFB CO2 Vehicle - Workshop Manual
NSWFB CO2 Vehicle - Workshop ManualNSWFB CO2 Vehicle - Workshop Manual
NSWFB CO2 Vehicle - Workshop ManualLouise Sweeney
 
Work Example -- G8D - United Fixed Fairing Door Removal Issue
Work Example -- G8D - United Fixed Fairing Door Removal IssueWork Example -- G8D - United Fixed Fairing Door Removal Issue
Work Example -- G8D - United Fixed Fairing Door Removal Issueglennramos
 
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdf
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdfDell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdf
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdfAhmedMaher181036
 
Glass Cleaning at CP121 Revised sop.doc
Glass Cleaning at CP121  Revised sop.docGlass Cleaning at CP121  Revised sop.doc
Glass Cleaning at CP121 Revised sop.docSujoySahoo1
 
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdf
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdfNM-B191 Y520_MB_N17P_SVT_20161125-1430.pdf
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdfreparacionesvya
 
WESCO_05-proxy
WESCO_05-proxyWESCO_05-proxy
WESCO_05-proxyfinance34
 
WESCO_05-proxy
WESCO_05-proxyWESCO_05-proxy
WESCO_05-proxyfinance34
 
NM-D562 REV1.0.pdf
NM-D562 REV1.0.pdfNM-D562 REV1.0.pdf
NM-D562 REV1.0.pdfQuangSngBi
 

Similar to Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope)-31 dec 2013 (20)

Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
 
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx
20221214-135-BSS-SAJ-NMS-036-034 Invetigation Report.docx
 
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
Lenovo IdeaPad 310-15IKB 510-15IKB CG413 CG513 NM-A981 Discrete Rev 1.0 Schem...
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Behringer i nuke_nu3000_sch
Behringer i nuke_nu3000_schBehringer i nuke_nu3000_sch
Behringer i nuke_nu3000_sch
 
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdf
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdfLenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdf
Lenovo G50-80 ACLU3 NM-A362 Rev04 schematic.pdf
 
NSWFB CO2 Vehicle - Workshop Manual
NSWFB CO2 Vehicle - Workshop ManualNSWFB CO2 Vehicle - Workshop Manual
NSWFB CO2 Vehicle - Workshop Manual
 
LVD report.pdf
LVD report.pdfLVD report.pdf
LVD report.pdf
 
Work Example -- G8D - United Fixed Fairing Door Removal Issue
Work Example -- G8D - United Fixed Fairing Door Removal IssueWork Example -- G8D - United Fixed Fairing Door Removal Issue
Work Example -- G8D - United Fixed Fairing Door Removal Issue
 
SGTMCDOULETTpdf
SGTMCDOULETTpdfSGTMCDOULETTpdf
SGTMCDOULETTpdf
 
Legal register
Legal registerLegal register
Legal register
 
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdf
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdfDell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdf
Dell Inspiron 17R N7110 Quanta R03_V03 UMA DAORO3MB6E0 Rev E Schematics.pdf
 
Glass Cleaning at CP121 Revised sop.doc
Glass Cleaning at CP121  Revised sop.docGlass Cleaning at CP121  Revised sop.doc
Glass Cleaning at CP121 Revised sop.doc
 
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdf
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdfNM-B191 Y520_MB_N17P_SVT_20161125-1430.pdf
NM-B191 Y520_MB_N17P_SVT_20161125-1430.pdf
 
A14 iexx
A14 iexxA14 iexx
A14 iexx
 
total report
total reporttotal report
total report
 
Finacle - Menus and F Keys
Finacle - Menus and F KeysFinacle - Menus and F Keys
Finacle - Menus and F Keys
 
WESCO_05-proxy
WESCO_05-proxyWESCO_05-proxy
WESCO_05-proxy
 
WESCO_05-proxy
WESCO_05-proxyWESCO_05-proxy
WESCO_05-proxy
 
NM-D562 REV1.0.pdf
NM-D562 REV1.0.pdfNM-D562 REV1.0.pdf
NM-D562 REV1.0.pdf
 

More from Fitri Ifony

Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013Fitri Ifony
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaFitri Ifony
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)Fitri Ifony
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015Fitri Ifony
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectFitri Ifony
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0Fitri Ifony
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Fitri Ifony
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaFitri Ifony
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00Fitri Ifony
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Fitri Ifony
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareFitri Ifony
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okFitri Ifony
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fitri Ifony
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system trainingFitri Ifony
 

More from Fitri Ifony (15)

Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit Tua
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc project
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun Yahya
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_ok
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 

Recently uploaded

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 

Recently uploaded (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope)-31 dec 2013

  • 1.
  • 2. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 2 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB TABULATION OF REVISED PAGES SHEET REVISIONS SHEET REVISIONS A B C D E F G H A B C D E F G H 1 X 51 2 X 52 3 X 53 4 X 54 5 X 55 6 X 56 7 X X 57 8 X 58 9 X 59 10 X 60 11 X 61 12 X X 62 13 X 63 14 X 64 15 X 65 16 X 66 17 X 67 18 X 68 19 X 69 20 X 70 21 X 71 22 X X 72 23 X 73 24 X 74 25 X 75 26 76 27 77 28 78 29 79 30 80 31 81 32 82 33 83 34 84 35 85 36 86 37 87 38 88 39 89 40 90 41 91 42 92 43 93 44 94 45 95 46 96 47 97 48 98 49 99 50 100
  • 3. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 3 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB COMMENTS RESPONSE SHEET DOCUMENT REF.: ID-SPA-ALL-2020-105231 No Document/ Page Ref. Company Comments CTR Response Initial Remarks 1 14 How about if the personnel at platform, entrance through gang way but incase gangway cannot be used/emergency, they go out through boat landing at platform? please consider this case or you need to put magno bar system near boat landing at platform or boat landing at platform cannot be used just only for emergency purpose, incase it happens the magno bar near gangway shall be replaced near with boat landing platform to control people come and out of platform. CTR have been correction and revision on Appendix 3, 4, & 5. BDT 2 App. 3 how about if people out from platform through boat landing not using the gang way as entrance access? BDT
  • 4. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 4 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB REVISION DETAIL TABULATION DATE PAGE REVISION REVISION DETAILS 30 May 2013 1 UP TO 23 A Issued For Comments 10 June 2013 7 B CTR has added on section 3. SCOPE 10 June 2013 7 B CTR has correction and added on Sub Section 7.10 Magnobar System 10 June 2013 12 B CTR has corection DONE 10 June 2013 12 B CTR has correction and added onAppendix 3 POB System Flow Chart 10 June 2013 13 B CTR has correction DONE 10 June 2013 22 B CTR has corection DONE 26 Aug 2013 8 C CTR has corection DONE 31 Dec 2013 14 D CTR has corection DONE 31 Dec 2013 App. 3 D CTR has corection DONE
  • 5. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 5 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB Contents 1. INTRODUCTION ................................................................................................................................................7 2. PURPOSE...........................................................................................................................................................7 3. SCOPE................................................................................................................................................................7 4. REFERENCE......................................................................................................................................................7 4.1 INTERNAL...................................................................................................................................................7 4.2 EXTERNAL .................................................................................................................................................7 4.2.1 NATIONAL STATUORY REGULATION.................................................................................................7 4.2.2 INTERNATIONAL STANDARD CODE PRACTISE................................................................................7 4.2.3 COMPANY PROCEDURS......................................................................................................................7 5. ABBREVIATION.................................................................................................................................................8 6. ROLE AND RESPONSIBILITY ..........................................................................................................................8 6.1 Hook Up Manager .......................................................................................................................................8 6.2 On Shore Logistic Coordinator....................................................................................................................8 6.3 Project HSE Manager..................................................................................................................................9 6.4 HSE Senior Officer......................................................................................................................................9 6.5 HSE Officer .................................................................................................................................................9 6.6 POB Reporting ............................................................................................................................................9 6.7 Doctor and Paramedic...............................................................................................................................10 6.8 Barge master of Accommodation Work barge..........................................................................................10 6.9 HRD Representative .................................................................................................................................10 6.10 Radio Operators of CTR Shoreline base and Accommodation work barge .............................................10 6.11 Security .....................................................................................................................................................10 6.12 Project Employees ....................................................................................................................................11 7. GENERAL POB CONTROL PROCEDURE.....................................................................................................11 7.1 VALID MCU...............................................................................................................................................11 7.2 MANDATORY TRAINING .........................................................................................................................11 7.3 HSE PASSPORT ......................................................................................................................................11 7.4 CHECK IN AT DEDICATED SHORELINE BASE .....................................................................................11 7.5 ON SHORELINE BASE.............................................................................................................................12 7.6 ON ACCOMODATION WORK BARGE ....................................................................................................12 7.7 SAFETY INDUCTION ...............................................................................................................................12 7.8 EMBARKING AND DISEMBARKING .......................................................................................................12 7.9 POB REPORT...........................................................................................................................................13 7.10 MAGNOBAR SYSTEM..............................................................................................................................13 7.11 PERSONNEL MOVEMENT ......................................................................................................................14 8. POB MONITORING..........................................................................................................................................15 8.1 TOTAL PERSONS ONBOARD AT ANYTIME ..........................................................................................15 8.2 RESIDENTS PERSONNEL AND TEMPORARY PERSONNEL...............................................................15 8.3 SEPARATION OF CPY, CTR, SUB-CONTRACTOR, BARGE CREW AND VISITOR ............................15 8.4 PERSONNEL WHO WORKS ON PLATFORMS AND ONBOARD ..........................................................15
  • 6. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 6 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB LIST OF APPENDIXES APPENDIX 1 MAIN MUSTER BOARD APPENDIX 2 TYPE OFMAGNOBAR CARD APPENDIX 3 MAGNOBAR POSITION AT AWB APPENDIX 4 MAGNOBAR POSITION AT BOAT LANDING APPENDIX 5 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY APPENDIX 6 POB SYSTEM FLOW CHART APPENDIX 7 SAMPLE of HSE PASSPORT and HANDBOOK
  • 7. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 7 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 1. INTRODUCTION The POB Management is deployed to track the full personnel-transport process, from booking and check-in to arrival and departure to and from offshore installations and remote locations during Platform Offshore Hook Up operations at Sisi-Nubi Phase 2B & Peciko Phase 7B Development Project EPSC (1+2) – TOTAL E&P INDONESIE. It provides a current account of the personnel on location at any given time. 2. PURPOSE The purpose of this procedure is used to plan and schedule the transport of the personnel and freight travelling to and from platforms and also to allow full overview of individual transport manifest in real-time. 3. SCOPE This procedure applies for all personnel (CTR and Subcontractors) mobilized for working or visiting on SN2B &Peciko 7B EPSC 1+2 during off-shore hook-up, Precommisioning and Commissioning. 4. REFERENCE 4.1 INTERNAL • ID-SPA-ALL-2020-105229 Project HSE Plan (Offshore Scope) • ID-SPA-ALL-2020-105230 Emergency Response Plan (Offshore Scope) 4.2 EXTERNAL 4.2.1 NATIONAL STATUORY REGULATION • State Gazette Acts No. 1 Year 1970 on Occupational Health & Safety • State Gazette Act No. 13 Year 2003 on Manpower • PERMENAKER No. 5 / 1996 4.2.2 INTERNATIONAL STANDARD CODE PRACTISE • SOLAS (Safe Of Life At Sea) 4.2.3 COMPANY PROCEDURS • Exhibit A of Contract Document PJC SN2B&PCK7B EPSC (1+2), Scope of Work • Exhibit L of Contract Document PJC SN2B&PCK7B EPSC (1+2), HSE Requirements. • SOP 06 – 610 Rev.3 Medical Check Up & Fitness to Work • SOP 07 – 701 Rev.3 HSE NC • SOP 301 Rev.3 Personal Protective Equipment (PPE) • TEPI Marine Procedure manual Rev. 5
  • 8. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 8 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 5. ABBREVIATION AWB Accommodation Work Barge CPY TOTAL E&P Indonesie CTR PT GUNANUSA UTAMA FABRICATORS EPSC Engineering, Procurements, Supply, and Construction POB Personnel On Board MCU Medical Check Up NC Notice to Contractor SOLAS Safe Of Life At Sea TEPI TOTAL Exploration & Production Indonesie 6. ROLE AND RESPONSIBILITY 6.1 Hook Up Manager • To manage movement of all personnel when they traveling to and from the CTR and CPY facilities (Shoreline base, work barge, Platform) during project duration. • To socialize the POB management system to all personnel and ensure the are implementation. • To ensure all POB are recorded and made available to Company. • To submit the POB list (Shoreline base, work barge, Platform) to CPY on a daily basis,or when it required. 6.2 On Shore Logistic Coordinator • As Onshore support during offshore campaign will be from Balikpapan office and Sandy Jaya Jetty, Balikpapan. • Lead a team of competent and engaged personnel to deliver service and value excellence. • Manage the day-to-day Subsea equipment, infrastructure and field intervention vessel activities relating to the installation. • Mobilize and manage internal and external logistics resources to ensureon-time and accuratedeliveries of required materials at lowest total system cost. • Mainly responsible for maintaining daily follow-up of Export & Import files in all Business Units and insure efficient ,cost effective and timely delivery of the material to the final destinations. • Defines, develops and provides input to materials Control Plan and ongoing project reports • Ensures all offshore documentation and certification is strictly adhered to. • Work with Offshore Quality Engineer and Construction Superintendent to ensure safe and timely receipt, and storage and issued of goods. • Ensures the material reconciliation upon completion of the project. • Identify inefficiencies and areas of growth within current distribution network to continuously improve the balance between the level and cost of service. • Manage and reduce logistics cost via freight rate benchmarks, freight consolidations opportunities, process flow reviews and assist with annual freight rate negotiations. • Manage and Supervise Material Team Schedules, Training and Performance. • Liaise with QC Eng. To manage timely inspection of materials on order.
  • 9. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 9 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB • Acts as Logistic Coordinator to support timely delivery of Material to destination. • Accurately Design and handle Material Document Control, Certificates and Vendors Documentations. Provide responsive logistics services for emergency situations : • Control all materials offshore in line with the company and project specific system. • Track all movement of materials between Prime Leasing Yard to offshore. • Manage world class vendor relationship management practices for logistics providers. • Development system to identify materials per Offshore Construction Work Packs, and if practical, to job card. • To make sure that the crew boat is safe to embark · 6.3 Project HSE Manager • To ensure that POB procedure is implementing and assure the POB list is recorded and reported to the Hook up Manager on a daily basis. • To manage safety personnel on duty during project activity at site • To monitor implementation and or improve the awareness of employees during commencing Offshore Hook Up activities. 6.4 HSE Senior Officer • To assist Project HSE Manager for managing POB system • To collect the POB list from all marine spreads and other supporting facilities and reporting to CPY Site Representative in- charge. • To ensure all CTR personnel on site are familiar with POB procedure and its implementation. 6.5 HSE Officer • To conduct Safety Induction of CTR employee and new comer • To ensure that POB management system is implemented • To monitor and check that all CTR personnel have attached their ID badges on specific board as required. • Liaise with TEPI Ops on regards to POB System and CPY- Passport • To ensure and maintain the POB management system is implemented accordingly • To distribute necessary PPE for CTR employee or new comer prior to them entering the site construction area • Assist HSE Coordinator to manage POB during Emergency situation. 6.6 POB Reporting • Keeps up with all personnel offshore.
  • 10. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 10 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB • Move names from helicopter and boat manifests to the current POB list with just a few clicks. No more re-typing information. • Track days offshore for all personnel. • POB lists are easily accessible online by everyone on the team in the event of an emergency. The POB list does not “sink with the ship” in the event of a catastrophe. • Easily view cabin assignments, life boat assignments and evacuation priorities. 6.7 Doctor and Paramedic • To conduct and or check employee(s) medical check up certificate 6.8 Barge master of Accommodation Work barge • To list the POB who living on the accommodation work barge and reporting to HSE Officer in daily basis everyday • To ensure that the POB Procedure is communicated to all CTR employees • To manage POB during emergency situation • To ensure all personnel on board are wearing proper Badge. 6.9 HRD Representative • To check validity of medical check up certificate • To check the mission order and competency of all CTR employees when they arriving at Shoreline Base • To coordinate with HSE Officer for Safety Induction of all new comer(s) • To coordinate with the Barge master of accommodation work barge and arrange transportation from Shoreline Base to the Accommodation work barge. 6.10 Radio Operators of CTR Shoreline base and Accommodation work barge • To monitor and record marine spreads movement (arrival and departure) from or to the work barge. • To maintain communication with marine spread (crew boat or other vessel) prior alongside at Accommodation work barge and Platform • To collect the POB from Security in charge of each Posts and report to HSE Coordinator • To provide passenger manifest prior traveling to Accommodation work barge and Platform. 6.11 Security • To check all personnel ID badge while entering on their Post. • To ensure the number of POB are met with the ID badge hanging on a board. • To collect and account the ID badge quantity and report to HSE Coordinator • Security check before embarking crew boat or surfer
  • 11. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 11 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 6.12 Project Employees • To report and register when arriving at Site construction area • To follow and implement POB management system • To use Mandatory ID badge at all times whilst on board barge or Accommodation work barge and Platform • To bring mandatory ID badge at all time while on board or Accommodation work barge and Platform.. 7. GENERAL POB CONTROL PROCEDURE 7.1 VALID MCU Medical Check up certificate of offshore personnel shall have been submitted and validated by CPY doctor. Where it is applicable, an MCU Pass badge will be released by CPY doctor for each personnel. 7.2 MANDATORY TRAINING Mandatory training: 1. Sea Survival 2. Basic First Aid 3. Basic Fire Fighting VALID SEA SURVIVAL CTR personnel and sub-contractors personnel who involved in off-shore activity shall have sea survival certificate as offshore minimum requirement. The offshore personnel data will be recorded in CTR data base. CTR will forward / report the up-date personnel record to CPY on daily basis. 7.3 HSE PASSPORT Offshore Hook Up personnel shall have valid HSE Passport which indicate that passport holder is permitted for mobilization to offshore area. The minimum requirement for get HSE Passport every personnel should have a valid medical check up and valid sea survival certificate. All HSE Passport will be recorded and register by CTR HSE Department. (refer to Appendix 3. POB System Flow Chart) 7.4 CHECK IN AT DEDICATED SHORELINE BASE Upon arrival on site (dedicated shoreline base) all CTR employees shall pass thru the CTR Site Representative in-charge for registration on passenger manifest and arrange their accommodations, safety induction, PPE and transportation to offshore.
  • 12. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 12 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 7.5 ON SHORELINE BASE All new comer and CTR employees shall report upon they arrive at shoreline base prior traveling to and/ or enter to the accommodation work barge. The CTR Shoreline Base Representative will collect the MCU certificate; CTR employees ID badges, and HSE passport for registration and keep them in shoreline base office. The CTR Shoreline Base Representative shall submit the list of CTR employees to COMPANY Shoreline Base Representative or TEPI Fields in order to get the Safety Induction. Without approval TEPI FIELDS will not allow CTR employees traveling or entering to the AWB. Before embarking to the crew boat at shoreline base jetty, CTR HSE or Security shall check the offshore badge and control the number of personal before embarking to the crew boat, he shall ensure that the number nominated passenger is not over then the allowed capacity of crew boat. . 7.6 ON ACCOMODATION WORK BARGE The CTR employee(s) who shall work or to be accommodated at the accommodation work barge shall report their arrival to the Barge master or his delegated person, and then the AWB Representative will conduct Safety Induction and delivery Magnobar Card as replacement of CTR offshore badge (on outside accomodation and near from boat landing); for temporary visit will receive visitor offshore badge and for permanent stay will receive Magnobar Card. The offshore badge of CTR personnel will be kept on the AWB Radio Operator during CTR personnel on duty in offshore. On the Magnobar Card will stated the bunk number and the life raft number and the Magnobar card will attach on destination place of the CTR personnel. 7.7 SAFETY INDUCTION After registration the HSE Officer on board will conduct safety induction and the content of safety induction will include : • Safety ruleduring transportation by boat (put on fastened your life jacket) • Procedure of POB • procedure of Emergency • Request transportation by boat • procedure of work permit • Safety Video Induction • Etc. All CTR personnel who will work at Offshore HU&C have safety induction provided by CTR HSE Personnel and All personnel attending safety induction must be recorded in a register. All personnel attending safety induction must be recorded in a register. 7.8 EMBARKING AND DISEMBARKING Personnel arriving at Balikpapan Office shall report to CTR Site Representative.
  • 13. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 13 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 7.9 POB REPORT Daily POB report shall be reported by HSE Administration and acknowledged by Barge master before submitted to CTR onshore base and CPY. 7.10 MAGNOBAR SYSTEM All personnel on board (POB) the barge shall be registered for head counting purpose by the Radio Operator who will be responsible for but not limited to the following tasks :  All personnel arriving offshore are required to sign in at the radio Room and will have Personalized Magnobar Card.  Assigning each POB with a specific life raft location for his/her mustering purpose and each life raft shall be assigned one leader and his alternate. This assignment list shall be posted on the bulletin boards located at strategic location.  Personnel crossing into platform will re-locate their Magnobar Card as movement between platform and barges. The Safety Officer at main deck shall monitor this Magnobar Card system implementation. 7.10.1MAGNOBAR LOCATION. This section details how the Individual Magnobar locations will be utilized during the hook up campaign (see Appendix 3.) • Individuals entering Platform A from the AWB will utilize the existing Magnobar station1. • Individuals existing AWB will utilize the existing Magnobar station 2. Figure 1.MagnoBar Model Plan
  • 14. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 14 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 7.11 PERSONNEL MOVEMENT 7.11.1SHORELINE BASE All CTR employees shall report their arrival to the CTR shoreline base – Balikpapan or his delegated person, and then the HRD Representative will arrange Safety Induction and delivery offshore ID badge. Prior to departing to the accommodation work barge by crew boat, the HRD personnel shall prepare the manifest of passenger. 7.11.2AWB  On arrival employees is issued with Badge indicating bunk number, and mustering station/life raft number which identified with color code.  After briefing, employees proceed to slot the badge at mustering station/life raft numberand in case of emergency they shall remove the badge and muster.  All CTR and Subcontractors employee(s) will receive T-card after they pass Safety induction at AWB.  The POB of accommodation work barge will be recorded on the logbook and it will be kept as per where they are living on board (accommodation work barge will be recorded by Camp boss and Barge Master).  Personnel on leave (departure from barge) :  All personnel will embark from barge shall report to Radio Operator  All personnel shall return their magnet bar before embarking from barge  Magnobar position can see on Appendix 3. 7.11.3PLATFORM  All CTR and Subcontractors employees who will work at PLATFORMSmodule must be passed though the boat landing by gang way (as the check point post of CTR hook up and commissioning area).  Since arriving at PLATFORMSmodule all CTR and or Subcontractors employee(s) shall report to the Security at postby filling their personal identity and the destination point on the log book then Security will change their CTRoffshore badge with PLATFORMS badge.  The Security in-charge at post will attach their CTR offshore badge at a POB board as per their destination place/work location on POB board.  In case of emergency at PLATFORMS, muster point nearer boat landing (top of jacket) can be used (see Appendix 4 & Appendix 5).
  • 15. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 15 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB 8. POB MONITORING 8.1 TOTAL PERSONS ONBOARD AT ANYTIME All personnel coming and outgoing from the barges shall be registered in the POB list and shall keep up- dated on daily basis. This POB list shall include name, personnel position, cabin no, life raft and company name as per the Personalized Magnobar System. 8.2 RESIDENTS PERSONNEL AND TEMPORARY PERSONNEL Resident personnel and temporary personnel when coming and outgoing from the barges shall be registered in the POB list and shall keep up-dated on daily basis. This POB list shall include name, personnel position, cabin no. life raft no, and company name as per the Personalized Magnobar System. 8.3 SEPARATION OF CPY, CTR, SUB-CONTRACTOR, BARGE CREW AND VISITOR Resident personnel (CPY, CTR, Sub-contractor, and Barge Crew) when coming and outgoing from the barges shall be registered in the POB lit and shall keep up-dated on daily basis. This POB list shall include name, personnel position, cabin no. life raft no, and company name as per the Personalized T- card. Visitor coming and outgoing from the barges shall be registered in the POB lit and shall keep up-dated on daily basis. This POB lit shall include name, personnel position, cabin no. life raft no, and company name as per the Personalized T-card. 8.4 PERSONNEL WHO WORKS ON PLATFORMS AND ONBOARD Personnel movement can be seen and tracking by Magnobar System which displayed on master board, remote board and also gangway crossing board.
  • 16. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 16 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 1 MAIN MUSTER BOARD
  • 17. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 17 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB
  • 18. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 18 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 2 TYPE OF MAGNOBAR CARD
  • 19. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 19 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: ON DUTY AT ACCOMODATION WORK BARGE FOR DAY SHIFT NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: OFF DUTY / LEAVE NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: ON DUTY AT PLATFORM MODULE FOR DAY SHIFT NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: VISITORS ON DUTY AT ACCOMODATION WORK BARGE FOR NIGHT SHIFT NAME– MUSTER STATION NO. – CABIN NO. – LIFE RAFT NO. COMPANY: ON DUTY AT PLATFORM MODULE FOR NIGHT SHIFT
  • 20. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 20 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 3 MAGNOBAR POSITION AT AWB & POB CONTROL
  • 21. APPENDIX 3 MAGNOBAR POSITION at AWB (Accommodation Work Barge) 12 1. Near swing rope position 2. Near gangway position 3. Near Boat Landing Legend : 3
  • 22. PERSONAL ON BOARD (POB) CONTROL RELATED WITH MAGNOBAR CARD POSITION CREW BOAT / SURFER PERSONNEL TRANSFER ACCOMODATION WORK BARGE PROCESS Manifest should be borrowed for each personnel who on go (arrival to barge) Manifest exchange with Magnobar Card by Radio Operator on AWB Every time the personnel enter or exit Platform through the gangway, personnel must place magnobar card on the muster point station available. GANGWAY BOAT LANDING-AWB If any personnel who will enter or exit Platform through the boat landing, shall first report to AWB through Radio Operator by giving manifest in exchange for magnobar card. SWING ROPE If any personnel who will enter or exit AWB through the Swing Rope, shall first report to AWB through Radio Operator by giving manifest in exchange for magnobar card.IN COMING PASSENGER
  • 23. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 21 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 4 MAGNOBAR POSITION AT BOAT LANDING
  • 24. APPENDIX 4 MAGNOBAR POSITION at BOAT LANDING (Top of Jacket) Gangway Boat Landing AWB Wellhead Platform
  • 25. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 22 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 5 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY
  • 26. APPENDIX 5 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY EvacuationEscapePOB Wellhead Platform Gangway : In case of Emergency cannot be used Boat Landing V-Shape
  • 27. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 23 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 6 POB FLOW PROCESS DURING EMERGENCY AT GANGWAY
  • 28. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 24 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB
  • 29. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 25 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB APPENDIX 7 SAMPLE of HSE PASSPORT and HANDBOOK
  • 30. Contract: PJC_SN2B & PCK7B_EPSC(1+2) COMPANY Document No PJC_SN2B&PCK7B_EPSC(1+2)_PRC_PERSONNEL ON BOARD (POB) CONTROL (OFFSHORE SCOPE) ID-SPA-ALL-2020-105232 Revision: D Status: AFC Doc type: PRC Syst. / S-Syst. : N/A Discipline: HSE Revision Date: 31 December 2013 OriginatorDocument No. : N/A Page : 26 of 26 This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY. Electronic Filename: ID-SPA-ALL-2020-105231_revB