Project Breathalyzer


      Asking and answering the
      “breathalyzer” test
      questions every week
      keeps the project team,
      management, and
      participants focused on
      outcomes rather than effort

                               1
If the PM can’t answer these
                     questions, then the project should be
                     scheduled for immediate review


 Do you have a current, credible activity network supported by
  a WBS?
 Do you have a current, credible schedule and budget?
 Do you know what deliverables you are accountable for?
 Can you list the top ten risks?
 Do you know your schedule compression percentage?
 What is the estimated size of your deliverables? How were
  these derived?
 Do you know the percentage of external dependencies that
  are not under your control?
 Does your staff have sufficient expertise in the project
  domain?
 Have you identified adequate staff to allocate to scheduled
  tasks at the proper time?
                                                              2/11
Do we have a current and credible
                         activity network supported by a Work
                         Breakdown Structure?

 Have the critical path items been identified?
 What explicit provisions have been made for work that isn’t in the
    Work Breakdown Structure?
   Does the activity network clearly organize, define, and graphically
    display the work to be accomplished?
   Does the top–level activity network graphically define the project
    from start to finish, including all the dependencies?
   Does the lowest–level WBS show work packages with measurable
    tasks and short duration?
   Are project objectives fully supported by the lower–level objectives?
   Does each task on the network have a well–defined deliverable?
   Is each work package under budget control (expressed in labor
    hours, dollars, other numerical units)?

                                                                        3/11
Do we have a current, credible
                         schedule and budget for the identified
                         work?

 Is the schedule based on a project/activity network supported with a
    WBS?
   Is the schedule based on realistic historical, quantitative performance
    estimates?
   Does the schedule provide time for holidays, vacation, sick days,
    etc.?
   Does the schedule allow for all the necessary quality assurance
    activities?
   Does the schedule account for resource overlap?
   Is the schedule for the next three to six months as detailed as
    possible?
   Is the schedule consistently updated at all levels in the Gantt, PERT,
    and Critical Path views?
   Is the budget clearly based on the schedule and required resources
    over time?
   Can the schedule and budget be performed?
                                                                        4/11
Do you know what capabilities you
                        are responsible for delivering?


 Are the system’s operational requirements clearly specified?
 Are definitions of what the system must do to support the delivery of
    the solution clearly specified?
   Are system interfaces clearly specified and, of appropriate,
    prototyped?
   Is the selection of the capabilities’ architecture traceable to the
    organization operational characteristics?
   Are descriptions of the organizations environment and relationships
    of the capabilities to the business unit functional processes clearly
    specified?
   Are specific new capabilities explicitly defined?
   Are specific acceptance and delivery requirements explicitly defined?
   Are user requirements agreed to by joint teams of provider and users
    at both corporate and business unit tiers?
   Are system requirements traceable through the capabilities design?
                                                                       5/11
Can we list the current top ten project
                         risks?


 Has a Risk Management role been assigned to your project?
 Are risks determined through established processes for risk
    identification, assessment, and mitigation?
   Is there a “database” that includes all non–negligible risks in terms of
    probability, earliest expected visible symptom, estimated and actual
    schedule, and cost effects?
   Are all project personnel encouraged to become risk identifiers?
   Are correction plans written, followed up, and reported?
   Is the “database” of top–ten risk list updated regularly?
   Are transfers of all deliverables to operational status controlled?
   Are user requirements reasonably stable?
   Do you know the risks that are changing over time?


                                                                          6/11
Do we know the percentage of
                        schedule compression for each
                        capability?

 Has the schedule been constructed bottom up from quantitative
    estimates and not by predetermined dates?
   Has the schedule been modified when major modifications in the
    proposed capabilities have taken place?
   Have staff and contractors received training in the principle domain
    area and applications?
   Have detailed task–level and process level design specifications
    been created for maximum parallel rollout effort?
   Does the project avoid extreme dependence on specific individuals?
   Are people working abnormal hours?
   Do you know the historical schedule compression percentage on
    similar projects, and the results of those projects?
   Is any part of the schedule compression based on the use of new
    technologies?
   Has the percentage of application functionality been decreased in
    proportion to the percentage of schedule compression?
                                                                      7/11
Do we know the estimated cost and
                        effort of the capability deliverables?


 Has project scope been clearly established?
 Where measurements from previous projects used as a basis of size
    estimates?
   Were complexity measures or functional measures used as a basis
    for estimates?
   Are the subject matter experts who do the estimating experienced in
    the domain area?
   Were estimates of project size corroborated by an estimate
    verification tool?
   Are estimates regularly updated to reflect software development
    realities?




                                                                      8/11
Do we know the percentage of
                         services deliverables that are not
                         under our control?

 Has each external customer for the services deliverables been
    identified?
   Have critical dependencies of each external customer’s services
    deliverables been documented?
   Has each external services deliverables been ranked based on
    potential project impact?
   Have procedures been established to monitor external customer’s
    services deliverables until the risk is eliminated or substantially
    reduced?
   Have agreements with the external customer business units been
    reached and documented?




                                                                          9/11
Does our staff have sufficient
                         expertise in the project domains?


 Do we know what the user needs, wants, and expects?
 Does the staffing plan include a list of the key expertise areas and
    estimated number of personnel needed?
   Do most of the project staff have experience with the specific type of
    capability being developed?
   Are the developers able to proceed without undue requests for
    additional time and cost to help resolve technical problems?
   Do the developers understand their project role and are they
    committed to its success?
   Are the developers knowledgeable in domain engineering – the
    process of choosing the best model for the project and using it
    throughout design, code, and test?
   Is there a domain area expert assigned to each domain?

                                                                         10/11
Have we identified adequate staff to
                          allocate to the scheduled tasks at the
                          right time?

 Do we have sufficient staff to support the tasks identified in the
    activity network?
   Is the staffing plan based on historical data of level of effort or staff
    months on similar projects?
   Do we have adequate staffing for the current tasks and all the tasks
    scheduled to occur in the next two months?
   Have alternative staff buildup approaches been planned?
   Does the staff buildup rate match the rate at which the project
    leaders identify unsolved problems?
   Is there sufficient range and coverage of skills in the project?
   Is there adequate time allocated for staff vacations, sick leave,
    training, and education?
   Are staffing plans regularly updated to reflect reality?

                                                                           11/11

Más contenido relacionado

La actualidad más candente

Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hrPm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hrLoren Schwappach
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies Capterra
 
Software project management
Software project managementSoftware project management
Software project managementR A Akerkar
 
Overview of project planning
Overview of project planningOverview of project planning
Overview of project planningnidhu_raji88
 
Program management audit checklist
Program management audit checklistProgram management audit checklist
Program management audit checklistBob Prieto
 
Software Project Management Slide
Software Project Management SlideSoftware Project Management Slide
Software Project Management SlideTing Yin
 
Software Project Planning III
Software Project Planning IIISoftware Project Planning III
Software Project Planning IIIGagan Deep
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning IIGagan Deep
 
Applying the checklist manifesto for project management success
Applying the checklist manifesto for project management successApplying the checklist manifesto for project management success
Applying the checklist manifesto for project management successGlen Alleman
 
Software project management
Software project managementSoftware project management
Software project managementPAWAN KUMAR
 
From WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleFrom WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleGlen Alleman
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project ManagementDeepak Kumar
 

La actualidad más candente (20)

Governance
GovernanceGovernance
Governance
 
Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hrPm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
 
Software project management
Software project managementSoftware project management
Software project management
 
Overview of project planning
Overview of project planningOverview of project planning
Overview of project planning
 
software project management
software project managementsoftware project management
software project management
 
Loubert s resume2016 pmn
Loubert s resume2016 pmnLoubert s resume2016 pmn
Loubert s resume2016 pmn
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Program management audit checklist
Program management audit checklistProgram management audit checklist
Program management audit checklist
 
Software Project Management Slide
Software Project Management SlideSoftware Project Management Slide
Software Project Management Slide
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
 
Project Management !!!
Project Management !!! Project Management !!!
Project Management !!!
 
Software Project Planning III
Software Project Planning IIISoftware Project Planning III
Software Project Planning III
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning II
 
Applying the checklist manifesto for project management success
Applying the checklist manifesto for project management successApplying the checklist manifesto for project management success
Applying the checklist manifesto for project management success
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Software Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. MohiteSoftware Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. Mohite
 
Software project management
Software project managementSoftware project management
Software project management
 
From WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleFrom WBS to Integrated Master Schedule
From WBS to Integrated Master Schedule
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 

Similar a Project breathalyzer

Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzerGlen Alleman
 
Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzerGlen Alleman
 
Project success assessment
Project success assessmentProject success assessment
Project success assessmentGlen Alleman
 
Project management issues and their solution
Project management issues and their solutionProject management issues and their solution
Project management issues and their solutionOrangescrum
 
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docx
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docxPROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docx
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docxbriancrawford30935
 
MIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfMIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfEsteban340583
 
How to manage project deadlines in 2021
How to manage project deadlines in 2021How to manage project deadlines in 2021
How to manage project deadlines in 2021Orangescrum
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management PlanOrangescrum
 
Day 1 - 3PM Revision
Day 1 - 3PM RevisionDay 1 - 3PM Revision
Day 1 - 3PM RevisionJeffrey Cheah
 
Strategies for successful engineering management
Strategies for successful engineering managementStrategies for successful engineering management
Strategies for successful engineering managementCarla Fair-Wright
 
There are two discussions here that need to be responded to thorough.docx
There are two discussions here that need to be responded to thorough.docxThere are two discussions here that need to be responded to thorough.docx
There are two discussions here that need to be responded to thorough.docxcroftsshanon
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation ChecklistAnand Subramaniam
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoringYb Yar
 
Primavara
PrimavaraPrimavara
Primavaradanabl
 
Software Project Requirement and Team Requirement Model
Software Project Requirement and  Team Requirement  Model  Software Project Requirement and  Team Requirement  Model
Software Project Requirement and Team Requirement Model SRMGPC Lucknow
 

Similar a Project breathalyzer (20)

Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
 
Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
 
Project success assessment
Project success assessmentProject success assessment
Project success assessment
 
Project management issues and their solution
Project management issues and their solutionProject management issues and their solution
Project management issues and their solution
 
Project Planning Checklist
Project Planning ChecklistProject Planning Checklist
Project Planning Checklist
 
Resume g anand_kumar
Resume g anand_kumarResume g anand_kumar
Resume g anand_kumar
 
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docx
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docxPROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docx
PROJECT MANAGEMENT PLANS1PROJECT MANAGEMENT PLANS .docx
 
MIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdfMIlestoneDrivenAgileExecution.pdf
MIlestoneDrivenAgileExecution.pdf
 
How to manage project deadlines in 2021
How to manage project deadlines in 2021How to manage project deadlines in 2021
How to manage project deadlines in 2021
 
Rajesh unni krishna resume
Rajesh unni krishna resumeRajesh unni krishna resume
Rajesh unni krishna resume
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management Plan
 
Day 1 - 3PM Revision
Day 1 - 3PM RevisionDay 1 - 3PM Revision
Day 1 - 3PM Revision
 
Strategies for successful engineering management
Strategies for successful engineering managementStrategies for successful engineering management
Strategies for successful engineering management
 
Deb Mohney Resume
Deb Mohney ResumeDeb Mohney Resume
Deb Mohney Resume
 
There are two discussions here that need to be responded to thorough.docx
There are two discussions here that need to be responded to thorough.docxThere are two discussions here that need to be responded to thorough.docx
There are two discussions here that need to be responded to thorough.docx
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoring
 
Primavara
PrimavaraPrimavara
Primavara
 
Saikat Mazumder_PMP
Saikat Mazumder_PMPSaikat Mazumder_PMP
Saikat Mazumder_PMP
 
Software Project Requirement and Team Requirement Model
Software Project Requirement and  Team Requirement  Model  Software Project Requirement and  Team Requirement  Model
Software Project Requirement and Team Requirement Model
 

Más de Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 

Más de Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 

Último

Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...DianaGray10
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 

Último (20)

20230104 - machine vision
20230104 - machine vision20230104 - machine vision
20230104 - machine vision
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 

Project breathalyzer

  • 1. Project Breathalyzer Asking and answering the “breathalyzer” test questions every week keeps the project team, management, and participants focused on outcomes rather than effort 1
  • 2. If the PM can’t answer these questions, then the project should be scheduled for immediate review  Do you have a current, credible activity network supported by a WBS?  Do you have a current, credible schedule and budget?  Do you know what deliverables you are accountable for?  Can you list the top ten risks?  Do you know your schedule compression percentage?  What is the estimated size of your deliverables? How were these derived?  Do you know the percentage of external dependencies that are not under your control?  Does your staff have sufficient expertise in the project domain?  Have you identified adequate staff to allocate to scheduled tasks at the proper time? 2/11
  • 3. Do we have a current and credible activity network supported by a Work Breakdown Structure?  Have the critical path items been identified?  What explicit provisions have been made for work that isn’t in the Work Breakdown Structure?  Does the activity network clearly organize, define, and graphically display the work to be accomplished?  Does the top–level activity network graphically define the project from start to finish, including all the dependencies?  Does the lowest–level WBS show work packages with measurable tasks and short duration?  Are project objectives fully supported by the lower–level objectives?  Does each task on the network have a well–defined deliverable?  Is each work package under budget control (expressed in labor hours, dollars, other numerical units)? 3/11
  • 4. Do we have a current, credible schedule and budget for the identified work?  Is the schedule based on a project/activity network supported with a WBS?  Is the schedule based on realistic historical, quantitative performance estimates?  Does the schedule provide time for holidays, vacation, sick days, etc.?  Does the schedule allow for all the necessary quality assurance activities?  Does the schedule account for resource overlap?  Is the schedule for the next three to six months as detailed as possible?  Is the schedule consistently updated at all levels in the Gantt, PERT, and Critical Path views?  Is the budget clearly based on the schedule and required resources over time?  Can the schedule and budget be performed? 4/11
  • 5. Do you know what capabilities you are responsible for delivering?  Are the system’s operational requirements clearly specified?  Are definitions of what the system must do to support the delivery of the solution clearly specified?  Are system interfaces clearly specified and, of appropriate, prototyped?  Is the selection of the capabilities’ architecture traceable to the organization operational characteristics?  Are descriptions of the organizations environment and relationships of the capabilities to the business unit functional processes clearly specified?  Are specific new capabilities explicitly defined?  Are specific acceptance and delivery requirements explicitly defined?  Are user requirements agreed to by joint teams of provider and users at both corporate and business unit tiers?  Are system requirements traceable through the capabilities design? 5/11
  • 6. Can we list the current top ten project risks?  Has a Risk Management role been assigned to your project?  Are risks determined through established processes for risk identification, assessment, and mitigation?  Is there a “database” that includes all non–negligible risks in terms of probability, earliest expected visible symptom, estimated and actual schedule, and cost effects?  Are all project personnel encouraged to become risk identifiers?  Are correction plans written, followed up, and reported?  Is the “database” of top–ten risk list updated regularly?  Are transfers of all deliverables to operational status controlled?  Are user requirements reasonably stable?  Do you know the risks that are changing over time? 6/11
  • 7. Do we know the percentage of schedule compression for each capability?  Has the schedule been constructed bottom up from quantitative estimates and not by predetermined dates?  Has the schedule been modified when major modifications in the proposed capabilities have taken place?  Have staff and contractors received training in the principle domain area and applications?  Have detailed task–level and process level design specifications been created for maximum parallel rollout effort?  Does the project avoid extreme dependence on specific individuals?  Are people working abnormal hours?  Do you know the historical schedule compression percentage on similar projects, and the results of those projects?  Is any part of the schedule compression based on the use of new technologies?  Has the percentage of application functionality been decreased in proportion to the percentage of schedule compression? 7/11
  • 8. Do we know the estimated cost and effort of the capability deliverables?  Has project scope been clearly established?  Where measurements from previous projects used as a basis of size estimates?  Were complexity measures or functional measures used as a basis for estimates?  Are the subject matter experts who do the estimating experienced in the domain area?  Were estimates of project size corroborated by an estimate verification tool?  Are estimates regularly updated to reflect software development realities? 8/11
  • 9. Do we know the percentage of services deliverables that are not under our control?  Has each external customer for the services deliverables been identified?  Have critical dependencies of each external customer’s services deliverables been documented?  Has each external services deliverables been ranked based on potential project impact?  Have procedures been established to monitor external customer’s services deliverables until the risk is eliminated or substantially reduced?  Have agreements with the external customer business units been reached and documented? 9/11
  • 10. Does our staff have sufficient expertise in the project domains?  Do we know what the user needs, wants, and expects?  Does the staffing plan include a list of the key expertise areas and estimated number of personnel needed?  Do most of the project staff have experience with the specific type of capability being developed?  Are the developers able to proceed without undue requests for additional time and cost to help resolve technical problems?  Do the developers understand their project role and are they committed to its success?  Are the developers knowledgeable in domain engineering – the process of choosing the best model for the project and using it throughout design, code, and test?  Is there a domain area expert assigned to each domain? 10/11
  • 11. Have we identified adequate staff to allocate to the scheduled tasks at the right time?  Do we have sufficient staff to support the tasks identified in the activity network?  Is the staffing plan based on historical data of level of effort or staff months on similar projects?  Do we have adequate staffing for the current tasks and all the tasks scheduled to occur in the next two months?  Have alternative staff buildup approaches been planned?  Does the staff buildup rate match the rate at which the project leaders identify unsolved problems?  Is there sufficient range and coverage of skills in the project?  Is there adequate time allocated for staff vacations, sick leave, training, and education?  Are staffing plans regularly updated to reflect reality? 11/11