Software Quality:

        Software satisfies quality only when it meets to Customer Requirement / Customer
Satisfaction / Customer Expectations. Meets Customer Requirement refers to proper output
& Customer Expectations refers to extra characteristics, good interface, speed, privacy,
security, easy to operate, good functionality.
Non-technical reasons: Cost of product & Time to market


Software Quality Assurance:

        SQA are the Concepts to be followed by company to develop the software. An SQA
team is responsible for Monitoring & Measuring the strength of developing processes.


Software Project:

        A set of problems assigned by the client, who can be solved by the software people
through the process of software Engineer called Software project. In short, the problem, the
people, the process called project. Software related problem is solved by software engineers
through software engineer process is software project.


Software Development Life Cycle / Life Cycle Development:

        Stages involved in software project development

   1)   Information gathering; Customer requirement
   2)   Analysis; Customer requirement v/s Solutions
   3)   Design; Dividing the project into modules & coupling them
   4)   Coding; Physical construction of project
   5)   Testing
   6)   Maintenance


Information gathering stage:

        In this stage, Business Analyst studies the requirement of the client /customer and
they prepare Business Requirement Specification (BRS) documents.




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    1
gcrindia@gmail.com



Analysis:

        In this stage, Sr. Analyst prepares Software Requirement Specification (S/w RS)
document with respect to corresponding BRS document. This document consists of two
sub-documents System Requirement Specification (SRS) & Functional Requirement
Specification (FRS). SRS contain details about software & hardware requirement. FRS
contains details about the functionality to be used in project.


Designing:

        In designing phase, Designers creates two documents High Level Document (HLD)
& Low Level Document (LLD). HLD consists of main modules of the project from root to
leaf and multiple LLD’s. LLD consists of sub-modules of main module along with Data
flow diagrams, ER-Diagrams, etc., are prepared by technical support people or designers
called Internal designers.

   •    Black box tester should have knowledge of customer requirement
   •    Black box testing tests BRS & SRS
   •    Testing external interfacing is Black box testing
   •    Testing internal interfacing is White box testing
   •    White box testing is done w.r.t design documents

Testing:
                                     V MODEL TESTING
            Development                                           Testing

                                                                    Assesment development plan
                                                                    Prepare Test plan
       Information                                                  Requirement phase testing


                                                             Design phase testing
                                                             Programme phase testing
   Design & Coding

                                                       Functional system testing
                                                       User acceptance testing
       Install Build                                   Test documentation


                                                       Port testing
       Maintenance                                     Test Software changes
                                                       Test efficiency




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    2
gcrindia@gmail.com



* Test plan is developed based on Development plan

Formula for test efficiency: DRE = A / A + B
DRE = Defect Removal Efficiency
A -> Bugs found at the testing side
B -> Bugs found at the client side
DRE= 0.8 – 0.9 good
      0.7 – 0.8 requires improvement
      < 0.7 poor


Refinement Form of V-Model




    BRS / URS/ CRS                                              User Acceptance Test



            S/w RS                                          Black box Testing



                     HLD’s                           Integration Testing



                             LLD’s               Unit Testing



                                       Coding



       From the above refinement form of V-Model, small & medium scale organizations
are maintaining separate testing team for Functional & System testing stage.


1) Reviews during Analysis

       In general, Software development process starts with Information Gathering &
Analysis. In this stage Business Analyst category people are preparing BRS & S/w RS




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                  3
gcrindia@gmail.com



documents and after completion documents preparation, they conduct reviews on the
documents for completeness & correctness. This review focuses on below factors:

       1)   Are they complete
       2)   Are they met with right requirements of client / customer
       3)   Are they achievable w.r.t technology
       4)   Are they reasonable w.r.t time & cost
       5)   Are they testable


2) Reviews during Design

         After completion of Analysis phase & their reviews, our Project-level designers will
start logical design of application in terms of External & Internal design (HLD’s & LLD’s).
In this stage, they conduct reviews for completeness & correctness of designed documents.
This review focuses on below factors:

       1)   Are they understandable
       2)   Are they met with right requirements of client / customer
       3)   Are they complete
       4)   Are they follow able
       5)   Does they handle errors


3) During Unit Testing

        After completeness of Design & their reviews, software programmers will starts
coding the logical design to physical construction of software. During these coding stage
programmers is conducting Unit Testing through a set of White box testing techniques, Unit
Testing also known as Module / Component / Program / Micro testing


White box Testing:

       There are three possible White box testing techniques
1) Execution Testing
       Basic path coverage – Execution of all possible blocks in a program
       Loops coverage – Termination of loop statements
       Programmer technique coverage – less no of memory cycles & CPU cycles
2) Operation Testing – Running the application on Customer expected platforms




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      4
gcrindia@gmail.com




3) Mutation Testing
       Mutation means that a change program. White box testers are performing the change
in the program to estimate test coverage on that program. Mutation testing can decide
whether the test coverage is correct or wrong

4) Integration Testing
        After completion of dependent modules of development & testing, Programmers
combine them to form a System. In this Integration, they are conducting Integration testing
on the compiled modules w.r.t HLD.

       There are three approaches to conduct Integration testing

a) Top-Down Approach



                                         Mai


                                               Stub



                            Sub 1                     Sub 2



                                  Top-Down Approach

       In this approach, testing is conducted on Main module without conducting testing to
some of sub-modules. From the above diagram, a Stub is a temporary program instead of
under constructive sub-module, it is known as called program.




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    5
gcrindia@gmail.com




   b)   Bottom-Up Approach


                                            Main


                                           Driver


                                            Sub 1


                                            Sub 2

                                 Bottom-Up Approach

      In this approach, testing is conducted on sub-modules without conducting testing on
main modules. From the above diagram, a Driver is a temporary program instead of main
module, it is known as calling program.

c) Sandwich or Hybrid Approach


                                           Main


                                           Driver


                                   Sub 1

                                                     Stub
                             Sub 2


                                                              Sub 3

                            Sandwich / Hybrid Approach

      In this approach, testing is conducted taking both Top-Down & Bottom
Approaches.




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                 6
gcrindia@gmail.com




* Build: A finally integrated all modules set *.exe form file is called build.

4) Functional & System testing (* imp)

        After completion of final integration of modules as a system, Testing Engineers are
planning to conduct Functional & System testing through Black box testing techniques,
these techniques classified into four categories.

        1)   Usability Testing
        2)   Functional Testing
        3)   Performance Testing
        4)   Security Testing

From Above 1 & 2 are Core level and 3 & 4 are Advance level

       During Usability testing, Testing team validates User-Friendliness of screens.
       During Functional testing, TT validates the correctness of customer requirements
       During Performance testing, TT estimates speed of processing
       During Security testing, Testing team validates privacy to User operations


1) Usability Testing

        In general, TT starts with test execution with Usability testing. During test, Testing
team validates User-Friendliness of screens of build. During Usability testing, TT applies two
types of sub-test:

a) User Interface Test

     Easy of use (Understandable screens)
     Look & Feel (Attractiveness & Pleasantness)
     Speed in Interface (Less no of event to complete a test, easy short navigation)

b) Manual Support Test

     Context sensitiveness of user manuals
     Manual support test are conducted at the end of all testing & before release

2) Functional Testing

        The major part of Black box testing is Functional testing, during this test, Testing
team1 concentrates on “meet customer requirements”. This Functional Testing is classified
into below sub-test.




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      7
gcrindia@gmail.com




a) Functional / Requirement Testing

       During this test, Test Engineers validates correctness of every functionality in terms
of below coverage’s.

       Behavioral coverage (changes in object properties)
       Input domain coverage (size & type of every input & output object)
       Error handling coverage (preventing negative navigations)
       Calculations coverage (correctness of output)
       Back-end coverage (impact of Front-end operation on back-end tables contents)
       Service levels coverage (order of functionalities)

b) Input Domain Testing

        It is a part of Functionality testing; Test Engineers are maintaining special structures
to define size & type of input object

c) Recovery Testing

       It is also known as Reliability testing. During this test, Testing team validates
whether the application is changing from abnormal state to normal state or not.

d) Compatibility Testing

        It is also known as Portability testing. During this test, Testing team validates
whether application build run on customer expected platforms or not. During this test,
Testing Engineers are finding Backward compatibility at maximum.
     Forward compatibility -> application is ready to run but Operating system is not
      supporting.
     Backward compatibility -> Operating system is supporting but the application has
      some internal coding problems to run on Operating system

e) Configuration Testing

        It is also known as Hardware compatibility testing. During this test, Testing team
validates whether application build supports different technology Hardware devices or not.

f) Inter-Systems Testing

        During this test, Testing team validates whether application build co-existence with
other existing software’s or not and also test whether any Dead lock situation occurs or not.




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                        8
gcrindia@gmail.com




g) Installation Testing

       During this test, Testing team validates whether application build along with
supported software’s into customers site like configured systems. During this test, Testing
team observes below factors.
    Setup program execution to start installation
    Easy Interface
    Amount of disk occupied after installation

h) Parallel / Comparative Testing

       During this test, Testing team compares application build with competitive products
in market.

i) Sanitation / Garbage Testing

      During this test, Testing team tries to find extra features in application build w.r.t
customer requirements.

* Defects
        During this test, Testing team reports defects to developers in terms of below
categories

   1. Mismatches between expected & actual
   2. Missing functionality
   3. Extra functionality w.r.t customer requirement

* Manual v/s Automation
        A Tester conducts any test on application build without using any testing tool is
called Manual testing, if any testing tool is used then it is called Automation testing
        In common testing process, Testing Engineers are using test Automation w.r.t test
impact & criticality. Impact -> test repetition & Criticality -> complex to apply test
manually. Due to these two reasons testing people are using test Automation.

j) Re-testing

        The re-execution of a test with multiple test data to validate a function, e.g. To
validate multiplication, Test Engineers use different combinations of input in terms of min,
max, -ve, +ve, zero, int, float, etc.




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                     9
gcrindia@gmail.com




k) Regression Testing

        The re-execution of test on modified build to ensure bug fixing work & occurrence
of any side effects, Test Engineers conducts this test using Automation
l) Error, Defect & Bug
        A mistake in code is Error, due to errors in coding, Test Engineers are getting
mismatches in application build are defects, if the defects are accepted by developers to be
solves then it is Bug.




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    10
gcrindia@gmail.com




                              Testing Documents

                                      Test Policy


                                     Test Strategy


                                   Test Methodology


                                        Test Plan


                                       Test Cases


                                     Test Procedure


                                       Test Script


                                      Defect Report


                               Final Test Summary Report


       Above Figure, shows the various levels of documents prepared at project testing.
Test Policy is documented by Quality Control. Test Strategy & Test Methodology are
documented by Quality Analyst or Project Manager. Test Plan, Test Cases, Test Procedure,
Test Script & Defect Report are documented by Quality Assurance Engineers or Test
Engineers.

        Test Policy & Test Strategy are Company Level Documents. Test Methodology, Test
Plan, Test Cases, Test Procedure, Test Script, Defect Report & Final Test Summary Report
are Project Level Documents.




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                11
gcrindia@gmail.com




1) TEST POLICY:
      This document developed by Quality Control people (Management). In this
document Quality Control defines “Testing Objective”.

                             Test Policy Document

                             Address of the Company

Test Definition          :   Verification & Validation

Testing Process          :   Proper planning before starts testing

Testing Standards        :   One defect per 250 lines of code or 10 FP (Functional points)

Testing Measurements :       QAM, TTM, PCM


                                                                                *******
                                                                                 (C.E.O)

QAM: Quality Assurance Measurements, how much quality is expected

TTM: Testing Team Measurements, how much testing is over & is yet to complete

PCM: Process Capability Measurements, depends on old project to the upcoming projects.


2) TEST STRATEGY:
      This is a Company level document & developed by Quality Analyst or Project
Manager Category people, it defines “Testing Approach”.

Components:

   a) Scope & Objective: Definition & purpose of testing in organization
   b) Business Issue: Budget control for testing
   c) Test Approach: Mapping between development stages & Testing Issue.
   d) Test Deliverables: Required testing documents to be prepared
   e) Roles & Responsibilities: Names of the job in testing team & their responsibilities
   f) Communication & Status reporting: Required negotiation between testing team &
      developing team during test execution
   g) Automation & Testing Tools: Purpose of automation & possibilities to go to test
      automation



        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                 12
gcrindia@gmail.com



   h)    Testing Measurements & Metrics: QAM, TTM, PCM
   i)    Risks & Mitigation: Possible problems will come in testing & solutions to overcome
   j)    Change & Configuration Management: To handle change request during testing
   k)    Training Plan: Required training sessions to testing team before start testing process

Testing Issues:

   1.    Authorization: Whether user is valid or not to connect to application
   2.    Access Control: Whether a valid user have permission to use specific service
   3.    Audit Trail: Maintains metadata about user operation in our application
   4.    Continuity of Processing: Inter-process communication
   5.    Correctness: Meet customer requirement in terms of functionality
   6.    Coupling: Co-existence with other existence software to share resources
   7.    Ease of Use: User Friendliness of the screens
   8.    Ease of Operator:            Installation, Un-installations, Dumping, Uploading,
         Downloading, etc.,
   9.    File Integrity: Creation of backup
   10.   Reliability: Recover from abnormal state
   11.   Performance: Speed of processing
   12.   Portable: Run on different platforms
   13.   Service levels: Order of functionalities
   14.   Maintainable: Whether our application build is long term serviceable to our
         customer
   15.   Methodology: Whether our tester are following standards or not during testing

   3) TEST METHODOLOGY:

         It is project level document. Methodology provides required testing approach to be
         followed for current project. In this level Quality Analyst select possible approach
         for corresponding project testing.




          Test             Test             Test              Test                 Test
        Initiation       Planning         Designing         Execution             Closure



                                                              Test
                                                            Reporting




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      13
gcrindia@gmail.com



Pet Process:
        Process involves experts, tools & techniques. It is a refinement form of V-Model. It
defines mapping between development & Testing stages. From this model, Organizations
are maintaining separate team for Functional & System testing & remaining stages of testing
done by development people. This model is developed in HCL & recognized by QA Forum
of INDIA.




                            TESTING PROCESS




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                     14
gcrindia@gmail.com

               Information Gathering (Business Requirement Specifications)


                      Analysis (Software Requirement Specification)




     Design                                                      Test Initiation


     Coding                                                Test Planning & Training


Unit & Integration                                                   Test Design


                                                         Test Cases Selection & Closure




                                     Level – 0
          Sanity / Smoke / Tester Acceptance Test / Build Verification Test


                                   Test Automation


                      Create Test Suits / Test Batches / Test Sets


 Defect fixing                          Level – 1
 & Resolving                Select a batch & starts execution


  Developers              If Mismatch, then suspend the batch


                                       Otherwise




     G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                       15
gcrindia@gmail.com


                                          Test Closure



                                             Level – 3
           Final Regression / Releasing Testing / Pre-Acceptance / Post-Mortem testing


                                    User Acceptance Testing


                                            Sign Off



4) TEST PLANNING:

       After finalization of possible test for current project, Test Lead category people
concentration on test plan document preparation to define work allocation in terms of What,
Who, When & How to test. To prepare test plan document, test plan order follows below
approach;


     Development
      document                     Team Formation
                                   Identify Tactical Risks               System Test Plan
                                   Prepare Test Plan
   Test Responsible
                                   Review Test Plan
        Matrix


1] Team Formation:

         In general, Test planning process starts with testing team formation. To define a
testing team, test plan author depends on below factors;

           1. Availability of testers
           2. Test duration
           3. Availability of test environment resource

2] Identify Tactical Risk:

           After Testing team formation Plan author analysis possible & mitigation (ad hoc
testing)




           G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                   16
gcrindia@gmail.com



# Risk 1: Lack of knowledge of Test Engineer on that domain
# Soln 1: Extra training to Test Engineers

# Risk 2: Lack of Resource
# Risk 3: Lack of budget {less no of time}
# Soln 3: Increase Team size

# Risk 4: Lack of Test data
# Soln 4: Conduct test on past experience basis i.e., ad hoc testing or contact client for data

# Risk 5: Lack of developer process rigor
# Soln 5: Report to Test Lead for further communication between test & development PM

# Risk 6: Delay of modified build delivery
# Soln 6: Extra hours of work is needed

# Risk 7: Lack of communication in between Test Engineer - > Test team and
          Test team - > Development team

3] PREPARE TEST PLAN:

       After completion of testing team formation & Risk analysis, Test plan author
concentrate on Test Plan Document in IEEE format.

01) Test Plan ID: Unique No or Name e.g. STP-ATM
02) Introduction: About Project description
03) Test Items: Modules / Functions / Services / Features / etc.
04) Features to be tested: Responsible Modules for Test design (preparing test cases for
                            added modules)
05) Features not to be tested: Which feature is not to be tested and Why? (Due to test
                                cases available for the old modules, so for these modules no
                                need to be tested / no test case

Above (3), (4) & (5) decides which module to be tested – > What to test?

06) Approach: List of selected testing techniques to be applied on above specified
                modules in reference to the TRM(Test Responsible Matrix).
07) Feature pass or fail criteria: When a feature is pass or fail description
                                   (Environment is good) (After testing conclusion)
08) Suspension criteria: Possible abnormal situations rose during above features testing
                           (Environment is not good) (During testing conclusion)
09) Test Environment: Required software & Hardware to be tested on above features
10) Test Deliverables: Required testing document to be prepared (during testing, the type




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      17
gcrindia@gmail.com



                      of documents are prepared by tester)
11) Testing Task: Necessary tasks to do before start every feature testing

Above (6) to (11) specifies -> How to test?

12) Staff & Training: Names of selected Test Engineers & training requirements to them
13) Responsibilities: Work allocation to every member in the team (dependable modules
                      are given to single Test Engineer)
14) Schedule: Dates & Times of testing modules
Above (4) specifies -> When to test?

15) List & Mitigation: Possible testing level risks & solution to overcome them
16) Approvals: Signatures of Test plan authors & Project Manager / Quality Analyst

4) Review Test Plan:

      After completion of plan document preparation, Test plan author conducts a review
of completion & correctness. In this review, Plan author follows below coverage analysis

    BRS based coverage (What to test? Review)
    Risks based coverage (When & Who to test? Review)
    TRM based coverage (How to test? Review)

5) TEST DESIGNING:

         After completion of Test Planning & required training to testing team,
corresponding testing team members will start preparing the list of test cases for their
responsible modules. There are three types of test cases design methods to cover core level
testing (Usability & Functionality testing).

       a) Business Logic based test case design (S/w RS)
       b) Input Domain based test case design (E-R diagrams / Data Models)
       c) User Interface based test case design (MS-Windows rules)

a) Business Logic based Test Case design (S/w RS)
       In general, Test Engineers are preparing a set of Test Cases depends on Use Cases in
(S/w RS). Every Use Case describes a functionality in terms of inputs, process & output,
depends on this Use Cases Test Engineers are preparing Test Cases to validate the
functionality




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                   18
gcrindia@gmail.com




              BRS

                                                                        Test
              Use Cases &                                               Cases
               Functional
                 Cases



                    HLD’s


                              LLD’s
                                                   Coding
                                                    *.exe



       From the above model, Test Engineers are preparing Test Cases depends on
corresponding Use Cases & every test case defines a test condition to be applied.

         To prepare test cases, Test Engineers studies Use Cases in below approach:

Steps:

1) Collect Use Cases of our responsible module
2) Select a Use Case & their dependencies from the list
2.1) Identify entry condition (Base state)
2.2) Identify input required (Test data)
2.3) Identify exit condition (End state)
2.4) Identify output & outcome (Expected)
2.5) Identify normal flow (Navigation)
2.6) Identify alternative flows & exceptions
3) Write Test Cases depends on above information
4) Review Test Cases for the completeness & correctness
5) Goto step (2) until completion of all Use Cases completion

Use Case I:

        A login process allows user id & password to validate users. During these validations,
login process allows user id in alpha-numeric from 4 to 16 characters long & password in
alphabets in lowercase from 4 to 8 characters long.



         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    19
gcrindia@gmail.com



Case study:
Test Case 1) Successful entry of user id
                  BVA (Size)

        min       ->    4 chars    =>       pass
        min-1     ->    3 chars    =>       fail
        min+1     ->    5 chars    =>       pass
        max-1     ->    15 chars   =>       pass
        max+1     ->    17 chars   =>       fail
        max       ->    16 chars   =>       pass

                          ECP

                  Valid       Invalid

                  a-z       special chars
                 A-Z        blank
                 0-9


Test Case Format:

          During Test design Test Engineers are writing list of Test Cases in IEEE format.
01)   Test Case ID: Unique no or name
02)   Test Case Name: Name of test condition to be tested
03)   Feature to be tested: Module / Function / Feature
04)   Test suit ID: Batch ID, in which this case is member
05)   Priority: Importance of Test Case {Low, Med, High}

              P0 -> Basic functionality
              P1 -> General functionality (I/P domain, Error handling, Compatibility etc,)
              P2 -> Cosmetic testing (UIT)

06)   Test Environment: Required Software & Hardware to execute
07)   Test afford (person / hr): Time to execute this Test Case e.g. 20 minutes
08)   Test duration: Date & Time
09)   Test Setup: Required testing task to do before starts case execution (pre-requisites)
10)   Test Procedure: Step by step procedure to execute Test Case




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                        20
gcrindia@gmail.com



         Test Procedure Format:
               1)   Step No:
               2)   Action:                         -> Test Design
               3)   Input required:
               4)   Expected:

               5) Actual:
               6) Result:                           -> Test Execution
               7) Comments:
11) Test Case passes or fails criteria: When this case is pass or fail
Note: Test Engineers follows list of Test Cases along with step by step procedures only

Example 1:
Prepare Test Procedure for below test cases “Successful file save operation in Notepad “.

Step    Action                                Input                Expected
No                                            Required
1       Open Notepad                                               Empty Editor
2       Fill with text                                             Save Icon enabled
3       Click Save Icon or click File                              Save Dialog box appears with
        menu                                                       Default file name
        Option & select save option
4       Enter File name & Click Save  Unique                       Focus to Notepad & File
                                      File name                    name
                                                                   Appears in title bar of
                                                                   Notepad

Note: For more examples refer to notes

b) Input Domain based Test Case design (E-R diagrams / Data Models)

        In general, Test Engineers are preparing maximum Test Cases depends on Use Cases
or functional requirements in S/wRS. These functional specifications provide functional
descriptions with input, output & process, but they are not responsible to provide
information about size & type of input objects. To correct this type of information, Test
Engineers study Data model of responsible modules E-R diagram. During Data model
study, Test Engineer follows below approach: Steps:

1)   Collect Data model of responsible modules
2)   Study every input attribute in terms of size, type & constraint
3)   Identify critical attributes in the test, which is participated in manipulation & retrivals
4)   Identify non-critical attributes such as input & output type




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                            21
gcrindia@gmail.com




                 A/C No:
                                                                          Critical
                 A/C Name:

                 Balance:
                                                                             Non-Critical
                 Address:

5) Prepare BVA & ECP for every input object

                                        ECP         BVA(Size / Range)
                Input Attribute     Valid Invalid Minimum Maximum
                Xxxx                xxxx xxxx     xxxx        xxxx
                “                   “     “       “           “
                “                   “     “       “           “
                “                   “     “       “           “
                                    DATA MATRIX
Note: In general, Test Engineers are preparing step by step procedure based Test Cases for
functionality testing. Test Engineers prepare valid / invalid table based Test Cases for input
domain of object testing {Data Matrix }
Note: For examples refer to notes


c) User Interface based test case design (MS-Windows rules)
        To conduct Usability Testing, Test Engineers are preparing list of Test Cases
depends on our organization User Interface standards or conventions, Global User Interface
rules & interest of customer site people.
Example: Test Cases
1)   Spelling check
2)   Graphics check (Screen level Align, Font style, Color, Size & Microsoft six rules)
3)   Meaning of error messages
4)   Accuracy of data displayed
5)   Accuracy of data in the database are result of user inputs, if developer restrict the data in
     database level by rounding / truncating then the developer must also restrict the data in

   front-end as well
6) Accuracy of data in the database as the result of external factors. Ex. File attachments
7) Meaningful help messages (Manual support testing)




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                         22
gcrindia@gmail.com




Review Test Cases:
        After completion of all possible Test Cases preparation for responsible modules,
Testing team concentrates on review of Test Cases for completeness & correctness. In this
review, Testing team applies coverage analysis.
Test Case Review

1)   BR based coverage
2)   Use Cases based coverage
3)   Data model based coverage
4)   User Interface based coverage
5)   TRM based coverage
       At the end of this review, Test Lead prepare Requirement Traceability Matrix or
Requirement Validation Matrix (RTM / RVM)

Business Requirement Source (Use Cases, Data model) Test Cases
       xxxx                        xxxx               xxxx
                                                      xxxx
                                                      xxxx

                                      xxxx                 xxxx
                                                           xxxx

                                      xxxx                 xxxx
                                                           xxxx
                                                           xxxx

         xxxx                         xxxx                 xxxx
                                                           xxxx

                                      xxxx                 xxxx
                                                           xxxx
                                                           xxxx


       From RTM / RVM model, it defines mapping between customer requirement &
prepared Test Cases to validate the requirement.

6) TEST EXECUTION:
       After completion of Test Cases selections & their review, Testing team concentrate
on Build release from development side & Test execution on that build.




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                               23
gcrindia@gmail.com



a) Test Execution Levels or Phases:
      See figure in next page for clear understandability of this levels

b) Test Execution Levels v/s Test Cases:

       Level – 0 -> P0 Test Cases
       Level – 1 -> All P0, P1 & P2 Test Cases as batches
       Level – 2 -> Selected P0, P1, & P2 w.r.t modification
       Level – 3 -> Selected P0, P1, & P2 w.r.t critical areas in the master build


                             A) Test Execution Levels or Phases:

                       Initial Build
                       Stable Build                                  Level – 0
                                                                Sanity / Smoke / ….

       Defect          Defect Report
                                                                     Level – 1
       Fixing                                                      Comprehensive

                       Modified build                                Level – 2
      Defect
     Resolving                                                       Regression


                                                                     Level – 3
                                                                  Final Regression

c) Build Version Control:
       In general, Testing Engineers are receiving build from development in below model




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                24
gcrindia@gmail.com



                                 Build
   Server
                                                        FTP (file transport
                                                        Protocol)             Testing Environment

Testers




        During Test execution Test Engineer are receiving modified build from software. To
distinguish old & new builds, development team maintains unique version in system, which
is understandable to Tester / Testing team. For this version controlling developers are using
version control tools (Visual Source Safe)

d) Level – 0 (Sanity / Test Acceptance / Build verification test):
         After receiving initial build, Testing Engineers concentrate on basic functionality of
that build to estimate stability for complete testing. In this Sanity testing, Testing Engineers
tries to execute all P0 Test Cases to cover basis functionality. If functionality is not working /
functionality missing, Testing team rejects that build. If Tester decided stability then they
concentrate on Test execution of all Test Cases to detect defects.


          During this Sanity testing, Testing Engineer observes below factors on that build




          G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                            25
gcrindia@gmail.com



               1)   Understandable
               2)   Operatable
               3)   Observable
               4)   Consistency
               5)   Controllable
               6)   Simplicity
               7)   Maintainable
               8)   Automation
      From the above “8” testable issues, Sanity test is also known as Testability testing /
OCT angle testing.

e) Test Automation:
        If test automation is possible than Testing team concentrate on Test script creation
using corresponding testing tools. Every Test script consists of navigation statement along
with required check points.
                                         Stable Build

                                       Test Automation
                                     (Select Automation)

                         (All P0 & Carefully selected P1 Test Cases)

f) Level – 1 (Comprehensive testing)
       After completion of Sanity testing & possible test automation, Testing team
concentrates on test batches formation with depended Test Cases. Test batches are also
known as Test suits / sets. During these Test batches execution, Test Engineers prepare test
log document, this document consist of three types of entries.

       1) Passed (Expected = Actual)
       2) Failed (Any one Expected != Actual, Any one Expected variants from Actual)
       3) Blocked (Corresponding parent functionality failed)


                                                        Pass
                      Skip


  In queue                       In Progress                     Fail             Closed


                    Blocked                         Partial
                                                   Pass / Fail



       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      26
gcrindia@gmail.com




g) Level – 2 (Regression testing)

        During Comprehensive test execution, Test Engineers are reporting mismatches as
defects to developers. After receiving modified build from developers, Test Engineers
concentrate on Regression testing to ensure bug-fixing work & occurrences of side effects.


                                   Resolved Bug Severity




                       Low                Medium                 High


Case I:
         If development team resolve bugs severity which is high, Test Engineers re-execute
all P0, P1 & carefully selected P2 Test Cases on modified build
Case II:
           Bugs severity is medium, then all P0, carefully selected P1 & some of P2 Test Cases

Case III:
        Bugs severity is low, then some P0, P1 & P2
Case IV:
        If development team released modified build due to sudden changes in project
requirement then Test Engineers re-execute all P0, P1 & carefully selected P2 Test Cases w.r.t
that requirement modification.
h) Level – 3 (Final Regression / Pre-Acceptance testing)




           G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                  27
gcrindia@gmail.com




                                    Gather Regression
                                      Requirement


                Test Reporting                            Effort Estimation



                     Final Regression                Plan Regression


7) TEST REPORTING:


                       Level - 0


                       Level - 1
                                                   Test Reporting

                       Level - 2


                       Level - 3


       During comprehensive testing, Test Engineer are reporting mismatches as defects to
developers through IEEE format.

   1)    Defect ID: Unique No or Name
   2)    Description: Summary of the defect
   3)    Feature: Module / Function / Service , in these module TE found the defect
   4)    Test Case Name: Corresponding failing test condition
   5)    Reproducible (Yes / No): Yes -> Every time defect appears during test execution
                                     No -> Rarely defect appears
   6)    If Yes, attach test procedure:
   7)    If No, attach snapshot & strong reasons:
   8)    Status: New / Reopen
   9)    Severity: Seriousness of defect w.r.t functionality (high / medium / low)
   10)   Priority: Importance of the defect w.r.t customers (high / medium / low)
   11)   Reported bug: Name of Test Engineer
   12)   Reported on: Date of submission
   13)   Assign to: Name of the responsible person in development team -> PM
   14)   Build Version ID: In which build, Test Engineer fount the defect




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                28
gcrindia@gmail.com



   15)   Suggested fix (Optional): Tester tries to produce suggestion to solve this defect
   16)   Fixed by: PM or Team Lead
   17)   Resolved by: Developer name
   18)   Resolved on: Date of solving                                   By Developers
   19)   Resolution type: check out in next page
   20)   Approved by: Signature of Project Manager (PM)

Defect Age: The time gap between “reported on” & “resolved on”
Defect submission process:



           Quality                                                     Project Mgr
           Analyst                         Test Mgr


                                                                        Team Lead
                                           Test Lead
                 If high defect
                   is rejected
                                                                        Developer
                                           Test Eng


Defect Status Cycle:
         New     Open / rejected / deferred     close     reopen

         Deferred => Accepted but not interested to resolve in this version
Defect Resolution:

        After receiving defect report from Testers, developers review the defect & they send
resolution type to Tester as a reply

   1)    Duplicate, rejected due to the defect is same as previously reported defect
   2)    Enhancement, rejected due to the defect is related future requirement of customer
   3)    H/w limitation, rejected due to the defect raised w.r.t limitation of H/w devices
   4)    S/w limitations, rejected due to the defect raised w.r.t limitation of S/w Techno
   5)    Not applicable, rejected due to the defect has no proper meaning
   6)    Functions as designed, rejected due to coding is correct w.r.t to designed doc’s
   7)    Need more information, not (accepted / rejected) but developers requires extra
         information to understand the defect
   8)    Not reproducible, not (accepted / rejected) but developers require correct
         procedure to reproduce the defect




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                      29
gcrindia@gmail.com



   9)    No plan to fix it, not (accepted / rejected) but developers want extra time to fix
   10)   Fixed, developers accepted to resolve
   11)   Fixed indirectly, accepted but not interested to resolve in this version (default)
   12)   User misunderstanding, need extra negotiation between testing & development
         team.

Types of defects:
01) User Interface bugs (low severity):
       1) Spelling mistakes (high priority)
       2) Improper alignment (low priority)
02) Boundary related bugs (medium severity)
       1) Doesn’t allows valid type (high priority)
       2) Allows invalid type also (low priority)
03) Error handling bugs (medium severity)
       1) Doesn’t providing error message window (high priority)
       2) Improper meaning of error message (low priority)
04) Calculations bugs (high severity)
       1) Final output is wrong (low priority)
       2) Dependent results are wrong (high priority)
05) Race condition bugs (high severity)
       1) Dead lock (high priority)
       2) Improper order of services (low priority)
06) Load conditions bugs (high severity)
       1) Doesn’t allow multiple users to access / operate (high priority)
       2) Doesn’t allow customers accepted load (low priority)
07) Hardware bugs (high severity)
       1) Doesn’t handle device (high priority)
       2) Wrong output from device (low priority)
08) ID control bugs (medium severity)
       1) Logo missing, wrong logo, Version No mistake, Copyright window missing,
          Developers Name missing, Tester Name missing
09) Version control bugs (medium severity)
       1) Differences between two consecutive build versions
10) Source bugs (medium severity)
       1) Mistake in help documents – Manual support

8) TEST CLOSURE:
        After completion of all possible test cycle execution, Test Lead conducts a review to
estimate the completeness & correctness of testing. In this review, Test Lead follows below
factors with Test Engineers




         G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                   30
gcrindia@gmail.com



1) Coverage Analysis

       a)   BR based coverage
       b)   Use Cases based coverage
       c)   Data model based coverage
       d)   User Interface based coverage
       e)   TRM based coverage

2) Bug density
       a)   Module A has 20% percentile bugs found
       b)   Module B has 20% percentile bugs found
       c)   Module C has 40% percentile bugs found
       d)   Module D has 20% percentile bugs found

3) Analysis of deferred bugs

       Whether deferred bugs are deferrable or not
       At the end of this review, Testing team concentrate on high bug density modules or
all modules if time is available.
9) User Acceptance Testing (UAT)
       Organization management concentrate on UAT to collect feedback, there are two
approaches to conduct testing.
                               1. Alpha (α) test
                               2. Beta (β) test

10) Sign Off

       After completion of User Acceptance testing & their modifications, Test Lead
concentrates on final test summary report creation. It is a part of Software Release Node (S/
w RN). This final test summary report consist of below documents

       1)   Test Strategy / Methodology (TRM)
       2)   System Test Plan
       3)   Requirement Traceability Matrix (RTM)
       4)   Automated Test Scripts
       5)   Bugs Summary Reports

The below, has to be in horizontal direction

       •    Bug Description
       •    Feature
       •    Found By




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                     31
gcrindia@gmail.com



       •   Status (closed / deferred)
       •   Comments

               CASE STUDY ON A PROJECT TESTING PROCESS

The “ X ” is a client/server product. It is running in single computer with windows 2000
as OS this product provides a facility to search matched records in existing database. w.r.t
has given search keys.

                                            Local host



                                client        DSN        DB


                                         Windows 2000




        This product maintains a default administrator to create new users and every valid
user search data in database.

Activity flow diagram: -




                                         Login


                        Admin               Admin             Invalid
                                            (Or)                 user
                                            Valid user


       New                              Search                 Re-login
       user                             records


                                           Search keys


                                  Existing DB



       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    32
gcrindia@gmail.com




FUNCTIONAL POINTS: -

   Login is taking user id and password
   User id and password allows alphabets in lower case from 4 to 8 characters long.
   New user id’s created by administrators only
   New user creation windows allows unique user id and password with create and
    cancel buttons
   “Search records” opened for valid users only
   “Search records window” maintains below search keys
           Customer id: 6 digits number (collected from design document
           First name: one character in upper or lower
           Last name: one to eight characters in lower case characters
           Date of birth: ddmmyy in numeric
           Age: “from” and “to” in numeric

   Search records windows allows below combination of fields to search records.

      → Last name
      → Last with first name
      → Last name with first name and d-o-b
      → Last name with first name and age
      → Customer id only

   “Search records” window consists of “start search” and “stop search” buttons.
   Allows last name as full or partial
   Allows customer id as full or partial with * or wild card

                             Customer id

                            2 8 6 * ------
                            286*-----


   Refresh search records window using Alt+ctrl
   Display matched records in a pop-up window with ok button after search
    completion.
   Returns message like “too many matches to display when matched records >1000

  Test methodology:- (by PM)

  Testing stage                   System testing
  Testing Factors
  Authorization                   √



      G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                33
gcrindia@gmail.com



Access Control                    √
Audit trail                       ×
Continuity to                     √
Correctness                       √
Coupling                          ×
Data integrity                    √
Ease of use                       √
Ease of operate                   √
Reliability                       √
Fortable                          ×
Performance                       ×
Service levels                    √
Maintainable                      √
Methodology                       √
Note: Test responsibility matrix for IIXI (11 by 1)

    “X” product is maintaining metadata so
   it is not sharing resources of other application
   This application went to run on windows 2000
   It is a stand alone application (at time one user can operate)
    So need net to test load and stress testing)

    System test plan by test lead:-

1. Test plan ID: STP_X
2. Introduction: “X” is a product and it provides a facility to connect to existing data
   base and search matching records to retrieve.
3. Test items → user creation
              → Login by user
                → Search records
4. Features to be tested: → user creation
                           → Login by user
                           → Search records
5. Features not to be tested:-
6. Approach: To apply PM selected 1 factors from TRM, below black box testing
   techniques are suitable to follow depends on test lead.
                   → User interface testing
                   → Manual support testing
                   → Functionality testing
                   → i/p domain testing
                   → Recovery testing
                   → Sanitation testing




    G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    34
gcrindia@gmail.com



                  → Installation testing
                  → Security testing
                  → Complaints testing

7. Entry criteria: -
   → Are the necessary documents available?
   → Is the “X” product is ready for release from developers?
   → Is the supporting database available to search required records?
   → Is the test environment ready?

8. Suspension criteria:
   → Data base disconnect may require suspension of testing
   → Suspension of testing is mandatory when searching records process went to
   infinite.
   → Admin is failed to new user creation, a decision can be mad to continue testing
   on “searching records” module using admin or other existing valid users.

9. Exit Criteria: -
   → Ensure that the “X” product provides the required services
   → Ensure that all test documents has been completed up to date.
   →All high severity bugs resolved.




10. Test deliverables:-
                   Test cases
                   Test procedures                 Test Engg..
                   Automated Test scripts
                   Test log
                   Defect Report

11. Test environment:-
    → Client pc or local host
    → OS: Win2000
    → DB server: ORACLE/ SQL SERVER/ MS-ACCESS
    → Connectivity: DSN/ Thin Drivers
12. Testing Tasks:-
    → Availability of admin with password
    → Database consists of records
    → Valid users are able to database to search records
13. Staff and Training needs:-
    Test Engg.. / QA Engg: Kurugonda Srinaiah



   G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                 35
gcrindia@gmail.com




   14. Responsibilities:
   Document / Report               Responsibility                             Effort

   1. Tst cases with procedures        K.Srinaiah                    12 hours

       Defect Report                   K Srinaiah                    every day during
Testing

      Test completion reports          Test Lead with             At the end of the
Testing
                                       K Srinaiah



   15. Schedule:
        Task                            Effort             Start date               
          End date

   Test design             12 hours                     28-12-2005
          29-12-2005
   Implement test and        4 hours                    29-12-2005
          29-12-2005
   Review
   Execute test            24 hours                     30-12-2005
          01-01-2006
   Evaluate test             8 hours                    02-01-2006
          02-01-2006


   16. Risks and mitigations:-
   1. Lack of documentation:
       → Contact business analyst
       → Ad-hoc testing
       → Contact customer site people if possible

   2. Lack of time
      → Over-time



   3. Delays and delivery:
      → Over time



       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                     36
gcrindia@gmail.com




   4. Lack of development process reggur:
      → Contact test lead to motivate developers
      → Over time to complete task is right time

   17. APPROVALS: -

   Test case 1:
      Signature of PM and signature of test lead.

   Test case 2: Successful entry of user id


       BVA (size)

       Min = 4 chars → pass
       Max = 8 chars→ pass
       Min-1 =3 chars → fail
       Min +1 = 5 chars → pass
       Max –1 = 7 chars → pass
       Max +1 = 9 chars → fail
Test case 3: successful entry of password

       BVA (size)

Min = 4 chars → pass
Max = 8 chars → pass
Min –1 = 3 chars → fail
Min +1 = 5 chars → pass
Max + = 7 chars → pass
Max = 9 chars → fail


Test case 4: successful login operation

       User id                      Password             Criteria

Admin                                valid                 pass
Admin                                invalid               fail
Other valid                          valid                 pass
Other valid                          invalid               fail
Other invalid                        invalid               fail
Blank                                value                 fail



       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                   37
gcrindia@gmail.com



Valid                                  blank                                 fail




Test case 5:    Successful selection of new user creation option

Test case 6:    Un successful selection of this option due to current user is not admin.

Test case 7     successful entry of user id in create user window

Note: (like as Test case2)

Test case 8:   Successful entry of userid in create user window

Note: (-----------test case 3)

Test case9: Successful creation of new user by admin

Test case10: unsuccessful new user creation due to given user id is not unique.

Test case 11: successful closing of new user creation window using cancel
               (After enter user id and offer enter passes)

Test case 12: Successful selection of search records option

Test case 13: successful entry of customer id

BVA (size)                                              ECP (TYPE)

Min = max = 6                                           valid             invalid
                                                        --------------------------
                                                        0 – 9 a-z, A-Z, special characters
                                                                 Expect * , blank space
                                                                 Start with *
                                                                  Exp: 123 √, *23Х,
1*23X

Test case 14: successful entry of first name

        Min = max = 1 → pass                             Ecp
                                               ---------------------------
                        o √ fail               valid  invalid




        G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                     38
gcrindia@gmail.com



                                               ----------------------------
                                               a- z      o-9,
                                               A-Z       special characters

Test case 15: successful entry of last name:
       Min = 1 and max = 8 → pass                      ----------------
                                                       valid  invalid
                                                       -----------------
                                                       a- z     A-Z, o-9,
                                                                Special characters

Test case 16: successful entry of DOB

BVA (range)

                                                         Ecp (type)
Day: min → 01                                          -----------------
     min → 31                                          valid      invalid
                                                       -----------------
                                                       0- 9 a-z, A-Z
Month: min → 01                                                 special characters
      max→ 12

Year: min → 00
      max→ 99

Case 17: success entry of age from

                                                                Ecp(type)
        min → 01                                       -----------------
        max→ 22                                        valid  invalid
                                                       -----------------
                                                       0- 9      a-z, A-Z
                                                                 Special characters
Test case 18: successful entry of age to

Note: like as above

Test case 19: successful display of matched records with full last name and all other
fields are
              Blank

Test case 20: successful display of matched records with full last name and first name




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                    39
gcrindia@gmail.com




Test case21: successful display of matched records with full last name first name and dob

Test case22: successful display of matched records with full last name first name age

Test case 23: on successful search operation due to invalid combination of filled fields.

Test case 24: unsuccessful search operation due to invalid Dob

Test case 25: unsuccessful search operation due to age from greater than age ‘To’

Test case26: successful display of records with search key as partial last name and other
fields
           as blank

Test case 27:successful display of records with search key a partial last name and first
name

Test case 28: successful display of records with search key as partial last name, first name
and
              Dob

Test case 29: successful display of records with search key as partial last name, first name

Test case 30: successful display of records with search key as customer id

Test case 31: successful display of records with search key as partial customer id with *
as
              wild card

Test case 32: Unsuccessful display of records due to no matching records in database
w.r.to
              given search keys

Test case 33: unsuccessful display of records due to “too many” records to display when
no
              of matched records greater than 1000

Test case 34 : successful refresh search window with Alt +Ctrl

Test case 35: Successful termination of search operation when click “stop search” button.

Test case 36: successful closing of records window through click o.k after searching.




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                       40
gcrindia@gmail.com



Test case 37: spelling check in every screen

Test case 38: Graphics check in every screen
              Ex: (alignment, font, size, label, graphical, colour, etc)
                                                                           Usability
                                                                           Testing
Test case39: Accuracy of data displayed
               Ex:Dob         ddmmyy


Test case 40: Meaninful help messages and error messages




       G.C.Reddy, QTP Trainer, Hyderabad (9247837478)                                  41

Más contenido relacionado

La actualidad más candente

Nitesh...........testing resume (1)
Nitesh...........testing resume (1)Nitesh...........testing resume (1)
Nitesh...........testing resume (1)9036858358
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notesdkns0906
 
Anjali gupta resume
Anjali gupta resumeAnjali gupta resume
Anjali gupta resumeANJALI GUPTA
 
Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)Deepa Keshav
 
Prasanna_Software Testing Engineer resume
Prasanna_Software Testing Engineer resumePrasanna_Software Testing Engineer resume
Prasanna_Software Testing Engineer resumePrasanna Hegde
 
shweta resume software manual tester
shweta resume software manual testershweta resume software manual tester
shweta resume software manual testershweta kubde
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-timeSunil Pandey
 
Resume For Software Test Engineer
Resume For Software Test Engineer Resume For Software Test Engineer
Resume For Software Test Engineer Akram Khan
 
Bhavana Singh_Manual Testing Resume
Bhavana Singh_Manual Testing ResumeBhavana Singh_Manual Testing Resume
Bhavana Singh_Manual Testing ResumeBhavana Singh
 
RESUME_NEHA _SELENIUM
RESUME_NEHA _SELENIUMRESUME_NEHA _SELENIUM
RESUME_NEHA _SELENIUMNeha Samal
 
Vishwanath Resume_Manual Testing
Vishwanath Resume_Manual TestingVishwanath Resume_Manual Testing
Vishwanath Resume_Manual Testingvishwanath95
 

La actualidad más candente (20)

Nitesh...........testing resume (1)
Nitesh...........testing resume (1)Nitesh...........testing resume (1)
Nitesh...........testing resume (1)
 
TESTING
TESTINGTESTING
TESTING
 
selenium resume
selenium resumeselenium resume
selenium resume
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notes
 
Anjali gupta resume
Anjali gupta resumeAnjali gupta resume
Anjali gupta resume
 
Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)
 
Prasanna_Software Testing Engineer resume
Prasanna_Software Testing Engineer resumePrasanna_Software Testing Engineer resume
Prasanna_Software Testing Engineer resume
 
FRESHER TESTING
FRESHER TESTINGFRESHER TESTING
FRESHER TESTING
 
shweta resume software manual tester
shweta resume software manual testershweta resume software manual tester
shweta resume software manual tester
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-time
 
Resume For Software Test Engineer
Resume For Software Test Engineer Resume For Software Test Engineer
Resume For Software Test Engineer
 
Bhavana Singh_Manual Testing Resume
Bhavana Singh_Manual Testing ResumeBhavana Singh_Manual Testing Resume
Bhavana Singh_Manual Testing Resume
 
priti_resume
priti_resumepriti_resume
priti_resume
 
RESUME_NEHA _SELENIUM
RESUME_NEHA _SELENIUMRESUME_NEHA _SELENIUM
RESUME_NEHA _SELENIUM
 
Fresher testing cv
Fresher testing cvFresher testing cv
Fresher testing cv
 
Indhu G_M&AT
Indhu G_M&ATIndhu G_M&AT
Indhu G_M&AT
 
Manual testing ppt
Manual testing pptManual testing ppt
Manual testing ppt
 
Resume_Arundhati Ghosh
Resume_Arundhati GhoshResume_Arundhati Ghosh
Resume_Arundhati Ghosh
 
Vishwanath Resume_Manual Testing
Vishwanath Resume_Manual TestingVishwanath Resume_Manual Testing
Vishwanath Resume_Manual Testing
 
Shoaib Kamal Resume
Shoaib Kamal ResumeShoaib Kamal Resume
Shoaib Kamal Resume
 

Similar a Manual Testing

Manual testing by reddy
Manual testing by reddyManual testing by reddy
Manual testing by reddyKrishna Gurjar
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing conceptssatyatwrmca
 
Bridge Process Model
Bridge Process ModelBridge Process Model
Bridge Process ModelStephen Raj
 
Testing material (1).docx
Testing material (1).docxTesting material (1).docx
Testing material (1).docxKVamshiKrishna5
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notesguest208aa1
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdfKhushal Chate
 
Software Development Life Cycle-SDLC
Software Development Life Cycle-SDLCSoftware Development Life Cycle-SDLC
Software Development Life Cycle-SDLCAdeel Rasheed
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-pptatish90
 
Testing documents
Testing documentsTesting documents
Testing documentsHari Tiru
 
Essence of waterfall_model
Essence of waterfall_modelEssence of waterfall_model
Essence of waterfall_modelwanda31
 
Software Testing Tutorials - MindScripts Technologies, Pune
Software Testing Tutorials - MindScripts Technologies, PuneSoftware Testing Tutorials - MindScripts Technologies, Pune
Software Testing Tutorials - MindScripts Technologies, Punesanjayjadhav8789
 
Continuous Integration for z using Test Data Management and Application D...
Continuous  Integration for z  using  Test Data Management  and Application D...Continuous  Integration for z  using  Test Data Management  and Application D...
Continuous Integration for z using Test Data Management and Application D...DevOps for Enterprise Systems
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )eshtiyak
 

Similar a Manual Testing (20)

Manual testing by reddy
Manual testing by reddyManual testing by reddy
Manual testing by reddy
 
Manual testing
Manual testingManual testing
Manual testing
 
Testing tools
Testing toolsTesting tools
Testing tools
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing concepts
 
2
22
2
 
2
22
2
 
Bridge Process Model
Bridge Process ModelBridge Process Model
Bridge Process Model
 
Testing material (1).docx
Testing material (1).docxTesting material (1).docx
Testing material (1).docx
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notes
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdf
 
Software_Testing.pptx
Software_Testing.pptxSoftware_Testing.pptx
Software_Testing.pptx
 
Software Development Life Cycle-SDLC
Software Development Life Cycle-SDLCSoftware Development Life Cycle-SDLC
Software Development Life Cycle-SDLC
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-ppt
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Testing documents
Testing documentsTesting documents
Testing documents
 
Essence of waterfall_model
Essence of waterfall_modelEssence of waterfall_model
Essence of waterfall_model
 
Software Testing Tutorials - MindScripts Technologies, Pune
Software Testing Tutorials - MindScripts Technologies, PuneSoftware Testing Tutorials - MindScripts Technologies, Pune
Software Testing Tutorials - MindScripts Technologies, Pune
 
Continuous Integration for z using Test Data Management and Application D...
Continuous  Integration for z  using  Test Data Management  and Application D...Continuous  Integration for z  using  Test Data Management  and Application D...
Continuous Integration for z using Test Data Management and Application D...
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 

Más de G.C Reddy

Qtp training in hyderabad
Qtp training in hyderabadQtp training in hyderabad
Qtp training in hyderabadG.C Reddy
 
New features in qtp11
New features in qtp11New features in qtp11
New features in qtp11G.C Reddy
 
QTP Training
QTP TrainingQTP Training
QTP TrainingG.C Reddy
 
Software+struc+doc
Software+struc+docSoftware+struc+doc
Software+struc+docG.C Reddy
 
Qtp (advanced)
Qtp (advanced)Qtp (advanced)
Qtp (advanced)G.C Reddy
 
Qtp (basics to advanced)
Qtp (basics to advanced)Qtp (basics to advanced)
Qtp (basics to advanced)G.C Reddy
 
Qtp commands
Qtp commandsQtp commands
Qtp commandsG.C Reddy
 
Object Repository
Object RepositoryObject Repository
Object RepositoryG.C Reddy
 
Advanced Qtp
Advanced QtpAdvanced Qtp
Advanced QtpG.C Reddy
 
Advanced Qtp Book
Advanced Qtp BookAdvanced Qtp Book
Advanced Qtp BookG.C Reddy
 
QTP 10 00 Guide
QTP 10 00 GuideQTP 10 00 Guide
QTP 10 00 GuideG.C Reddy
 
File System Operations
File System OperationsFile System Operations
File System OperationsG.C Reddy
 
Web Dictionary
Web DictionaryWeb Dictionary
Web DictionaryG.C Reddy
 

Más de G.C Reddy (20)

Qtp training in hyderabad
Qtp training in hyderabadQtp training in hyderabad
Qtp training in hyderabad
 
Qtp test
Qtp testQtp test
Qtp test
 
Html
HtmlHtml
Html
 
Functions
FunctionsFunctions
Functions
 
New features in qtp11
New features in qtp11New features in qtp11
New features in qtp11
 
QTP Training
QTP TrainingQTP Training
QTP Training
 
Software+struc+doc
Software+struc+docSoftware+struc+doc
Software+struc+doc
 
Qtp (advanced)
Qtp (advanced)Qtp (advanced)
Qtp (advanced)
 
Qtp (basics to advanced)
Qtp (basics to advanced)Qtp (basics to advanced)
Qtp (basics to advanced)
 
Qtp commands
Qtp commandsQtp commands
Qtp commands
 
Object Repository
Object RepositoryObject Repository
Object Repository
 
Advanced Qtp
Advanced QtpAdvanced Qtp
Advanced Qtp
 
Advanced Qtp Book
Advanced Qtp BookAdvanced Qtp Book
Advanced Qtp Book
 
QTP 10 00 Guide
QTP 10 00 GuideQTP 10 00 Guide
QTP 10 00 Guide
 
Qtp Scripts
Qtp ScriptsQtp Scripts
Qtp Scripts
 
File System Operations
File System OperationsFile System Operations
File System Operations
 
Qtp Faq
Qtp FaqQtp Faq
Qtp Faq
 
Qtp Summary
Qtp SummaryQtp Summary
Qtp Summary
 
Qtp Scripts
Qtp ScriptsQtp Scripts
Qtp Scripts
 
Web Dictionary
Web DictionaryWeb Dictionary
Web Dictionary
 

Último

UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesMd Hossain Ali
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Brian Pichman
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxUdaiappa Ramachandran
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 

Último (20)

UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptx
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 

Manual Testing

  • 1. gcrindia@gmail.com Manual Testing Software Quality: Software satisfies quality only when it meets to Customer Requirement / Customer Satisfaction / Customer Expectations. Meets Customer Requirement refers to proper output & Customer Expectations refers to extra characteristics, good interface, speed, privacy, security, easy to operate, good functionality. Non-technical reasons: Cost of product & Time to market Software Quality Assurance: SQA are the Concepts to be followed by company to develop the software. An SQA team is responsible for Monitoring & Measuring the strength of developing processes. Software Project: A set of problems assigned by the client, who can be solved by the software people through the process of software Engineer called Software project. In short, the problem, the people, the process called project. Software related problem is solved by software engineers through software engineer process is software project. Software Development Life Cycle / Life Cycle Development: Stages involved in software project development 1) Information gathering; Customer requirement 2) Analysis; Customer requirement v/s Solutions 3) Design; Dividing the project into modules & coupling them 4) Coding; Physical construction of project 5) Testing 6) Maintenance Information gathering stage: In this stage, Business Analyst studies the requirement of the client /customer and they prepare Business Requirement Specification (BRS) documents. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 1
  • 2. gcrindia@gmail.com Analysis: In this stage, Sr. Analyst prepares Software Requirement Specification (S/w RS) document with respect to corresponding BRS document. This document consists of two sub-documents System Requirement Specification (SRS) & Functional Requirement Specification (FRS). SRS contain details about software & hardware requirement. FRS contains details about the functionality to be used in project. Designing: In designing phase, Designers creates two documents High Level Document (HLD) & Low Level Document (LLD). HLD consists of main modules of the project from root to leaf and multiple LLD’s. LLD consists of sub-modules of main module along with Data flow diagrams, ER-Diagrams, etc., are prepared by technical support people or designers called Internal designers. • Black box tester should have knowledge of customer requirement • Black box testing tests BRS & SRS • Testing external interfacing is Black box testing • Testing internal interfacing is White box testing • White box testing is done w.r.t design documents Testing: V MODEL TESTING Development Testing Assesment development plan Prepare Test plan Information Requirement phase testing Design phase testing Programme phase testing Design & Coding Functional system testing User acceptance testing Install Build Test documentation Port testing Maintenance Test Software changes Test efficiency G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 2
  • 3. gcrindia@gmail.com * Test plan is developed based on Development plan Formula for test efficiency: DRE = A / A + B DRE = Defect Removal Efficiency A -> Bugs found at the testing side B -> Bugs found at the client side DRE= 0.8 – 0.9 good 0.7 – 0.8 requires improvement < 0.7 poor Refinement Form of V-Model BRS / URS/ CRS User Acceptance Test S/w RS Black box Testing HLD’s Integration Testing LLD’s Unit Testing Coding From the above refinement form of V-Model, small & medium scale organizations are maintaining separate testing team for Functional & System testing stage. 1) Reviews during Analysis In general, Software development process starts with Information Gathering & Analysis. In this stage Business Analyst category people are preparing BRS & S/w RS G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 3
  • 4. gcrindia@gmail.com documents and after completion documents preparation, they conduct reviews on the documents for completeness & correctness. This review focuses on below factors: 1) Are they complete 2) Are they met with right requirements of client / customer 3) Are they achievable w.r.t technology 4) Are they reasonable w.r.t time & cost 5) Are they testable 2) Reviews during Design After completion of Analysis phase & their reviews, our Project-level designers will start logical design of application in terms of External & Internal design (HLD’s & LLD’s). In this stage, they conduct reviews for completeness & correctness of designed documents. This review focuses on below factors: 1) Are they understandable 2) Are they met with right requirements of client / customer 3) Are they complete 4) Are they follow able 5) Does they handle errors 3) During Unit Testing After completeness of Design & their reviews, software programmers will starts coding the logical design to physical construction of software. During these coding stage programmers is conducting Unit Testing through a set of White box testing techniques, Unit Testing also known as Module / Component / Program / Micro testing White box Testing: There are three possible White box testing techniques 1) Execution Testing Basic path coverage – Execution of all possible blocks in a program Loops coverage – Termination of loop statements Programmer technique coverage – less no of memory cycles & CPU cycles 2) Operation Testing – Running the application on Customer expected platforms G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 4
  • 5. gcrindia@gmail.com 3) Mutation Testing Mutation means that a change program. White box testers are performing the change in the program to estimate test coverage on that program. Mutation testing can decide whether the test coverage is correct or wrong 4) Integration Testing After completion of dependent modules of development & testing, Programmers combine them to form a System. In this Integration, they are conducting Integration testing on the compiled modules w.r.t HLD. There are three approaches to conduct Integration testing a) Top-Down Approach Mai Stub Sub 1 Sub 2 Top-Down Approach In this approach, testing is conducted on Main module without conducting testing to some of sub-modules. From the above diagram, a Stub is a temporary program instead of under constructive sub-module, it is known as called program. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 5
  • 6. gcrindia@gmail.com b) Bottom-Up Approach Main Driver Sub 1 Sub 2 Bottom-Up Approach In this approach, testing is conducted on sub-modules without conducting testing on main modules. From the above diagram, a Driver is a temporary program instead of main module, it is known as calling program. c) Sandwich or Hybrid Approach Main Driver Sub 1 Stub Sub 2 Sub 3 Sandwich / Hybrid Approach In this approach, testing is conducted taking both Top-Down & Bottom Approaches. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 6
  • 7. gcrindia@gmail.com * Build: A finally integrated all modules set *.exe form file is called build. 4) Functional & System testing (* imp) After completion of final integration of modules as a system, Testing Engineers are planning to conduct Functional & System testing through Black box testing techniques, these techniques classified into four categories. 1) Usability Testing 2) Functional Testing 3) Performance Testing 4) Security Testing From Above 1 & 2 are Core level and 3 & 4 are Advance level  During Usability testing, Testing team validates User-Friendliness of screens.  During Functional testing, TT validates the correctness of customer requirements  During Performance testing, TT estimates speed of processing  During Security testing, Testing team validates privacy to User operations 1) Usability Testing In general, TT starts with test execution with Usability testing. During test, Testing team validates User-Friendliness of screens of build. During Usability testing, TT applies two types of sub-test: a) User Interface Test  Easy of use (Understandable screens)  Look & Feel (Attractiveness & Pleasantness)  Speed in Interface (Less no of event to complete a test, easy short navigation) b) Manual Support Test  Context sensitiveness of user manuals  Manual support test are conducted at the end of all testing & before release 2) Functional Testing The major part of Black box testing is Functional testing, during this test, Testing team1 concentrates on “meet customer requirements”. This Functional Testing is classified into below sub-test. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 7
  • 8. gcrindia@gmail.com a) Functional / Requirement Testing During this test, Test Engineers validates correctness of every functionality in terms of below coverage’s.  Behavioral coverage (changes in object properties)  Input domain coverage (size & type of every input & output object)  Error handling coverage (preventing negative navigations)  Calculations coverage (correctness of output)  Back-end coverage (impact of Front-end operation on back-end tables contents)  Service levels coverage (order of functionalities) b) Input Domain Testing It is a part of Functionality testing; Test Engineers are maintaining special structures to define size & type of input object c) Recovery Testing It is also known as Reliability testing. During this test, Testing team validates whether the application is changing from abnormal state to normal state or not. d) Compatibility Testing It is also known as Portability testing. During this test, Testing team validates whether application build run on customer expected platforms or not. During this test, Testing Engineers are finding Backward compatibility at maximum.  Forward compatibility -> application is ready to run but Operating system is not supporting.  Backward compatibility -> Operating system is supporting but the application has some internal coding problems to run on Operating system e) Configuration Testing It is also known as Hardware compatibility testing. During this test, Testing team validates whether application build supports different technology Hardware devices or not. f) Inter-Systems Testing During this test, Testing team validates whether application build co-existence with other existing software’s or not and also test whether any Dead lock situation occurs or not. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 8
  • 9. gcrindia@gmail.com g) Installation Testing During this test, Testing team validates whether application build along with supported software’s into customers site like configured systems. During this test, Testing team observes below factors.  Setup program execution to start installation  Easy Interface  Amount of disk occupied after installation h) Parallel / Comparative Testing During this test, Testing team compares application build with competitive products in market. i) Sanitation / Garbage Testing During this test, Testing team tries to find extra features in application build w.r.t customer requirements. * Defects During this test, Testing team reports defects to developers in terms of below categories 1. Mismatches between expected & actual 2. Missing functionality 3. Extra functionality w.r.t customer requirement * Manual v/s Automation A Tester conducts any test on application build without using any testing tool is called Manual testing, if any testing tool is used then it is called Automation testing In common testing process, Testing Engineers are using test Automation w.r.t test impact & criticality. Impact -> test repetition & Criticality -> complex to apply test manually. Due to these two reasons testing people are using test Automation. j) Re-testing The re-execution of a test with multiple test data to validate a function, e.g. To validate multiplication, Test Engineers use different combinations of input in terms of min, max, -ve, +ve, zero, int, float, etc. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 9
  • 10. gcrindia@gmail.com k) Regression Testing The re-execution of test on modified build to ensure bug fixing work & occurrence of any side effects, Test Engineers conducts this test using Automation l) Error, Defect & Bug A mistake in code is Error, due to errors in coding, Test Engineers are getting mismatches in application build are defects, if the defects are accepted by developers to be solves then it is Bug. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 10
  • 11. gcrindia@gmail.com Testing Documents Test Policy Test Strategy Test Methodology Test Plan Test Cases Test Procedure Test Script Defect Report Final Test Summary Report Above Figure, shows the various levels of documents prepared at project testing. Test Policy is documented by Quality Control. Test Strategy & Test Methodology are documented by Quality Analyst or Project Manager. Test Plan, Test Cases, Test Procedure, Test Script & Defect Report are documented by Quality Assurance Engineers or Test Engineers. Test Policy & Test Strategy are Company Level Documents. Test Methodology, Test Plan, Test Cases, Test Procedure, Test Script, Defect Report & Final Test Summary Report are Project Level Documents. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 11
  • 12. gcrindia@gmail.com 1) TEST POLICY: This document developed by Quality Control people (Management). In this document Quality Control defines “Testing Objective”. Test Policy Document Address of the Company Test Definition : Verification & Validation Testing Process : Proper planning before starts testing Testing Standards : One defect per 250 lines of code or 10 FP (Functional points) Testing Measurements : QAM, TTM, PCM ******* (C.E.O) QAM: Quality Assurance Measurements, how much quality is expected TTM: Testing Team Measurements, how much testing is over & is yet to complete PCM: Process Capability Measurements, depends on old project to the upcoming projects. 2) TEST STRATEGY: This is a Company level document & developed by Quality Analyst or Project Manager Category people, it defines “Testing Approach”. Components: a) Scope & Objective: Definition & purpose of testing in organization b) Business Issue: Budget control for testing c) Test Approach: Mapping between development stages & Testing Issue. d) Test Deliverables: Required testing documents to be prepared e) Roles & Responsibilities: Names of the job in testing team & their responsibilities f) Communication & Status reporting: Required negotiation between testing team & developing team during test execution g) Automation & Testing Tools: Purpose of automation & possibilities to go to test automation G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 12
  • 13. gcrindia@gmail.com h) Testing Measurements & Metrics: QAM, TTM, PCM i) Risks & Mitigation: Possible problems will come in testing & solutions to overcome j) Change & Configuration Management: To handle change request during testing k) Training Plan: Required training sessions to testing team before start testing process Testing Issues: 1. Authorization: Whether user is valid or not to connect to application 2. Access Control: Whether a valid user have permission to use specific service 3. Audit Trail: Maintains metadata about user operation in our application 4. Continuity of Processing: Inter-process communication 5. Correctness: Meet customer requirement in terms of functionality 6. Coupling: Co-existence with other existence software to share resources 7. Ease of Use: User Friendliness of the screens 8. Ease of Operator: Installation, Un-installations, Dumping, Uploading, Downloading, etc., 9. File Integrity: Creation of backup 10. Reliability: Recover from abnormal state 11. Performance: Speed of processing 12. Portable: Run on different platforms 13. Service levels: Order of functionalities 14. Maintainable: Whether our application build is long term serviceable to our customer 15. Methodology: Whether our tester are following standards or not during testing 3) TEST METHODOLOGY: It is project level document. Methodology provides required testing approach to be followed for current project. In this level Quality Analyst select possible approach for corresponding project testing. Test Test Test Test Test Initiation Planning Designing Execution Closure Test Reporting G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 13
  • 14. gcrindia@gmail.com Pet Process: Process involves experts, tools & techniques. It is a refinement form of V-Model. It defines mapping between development & Testing stages. From this model, Organizations are maintaining separate team for Functional & System testing & remaining stages of testing done by development people. This model is developed in HCL & recognized by QA Forum of INDIA. TESTING PROCESS G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 14
  • 15. gcrindia@gmail.com Information Gathering (Business Requirement Specifications) Analysis (Software Requirement Specification) Design Test Initiation Coding Test Planning & Training Unit & Integration Test Design Test Cases Selection & Closure Level – 0 Sanity / Smoke / Tester Acceptance Test / Build Verification Test Test Automation Create Test Suits / Test Batches / Test Sets Defect fixing Level – 1 & Resolving Select a batch & starts execution Developers If Mismatch, then suspend the batch Otherwise G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 15
  • 16. gcrindia@gmail.com Test Closure Level – 3 Final Regression / Releasing Testing / Pre-Acceptance / Post-Mortem testing User Acceptance Testing Sign Off 4) TEST PLANNING: After finalization of possible test for current project, Test Lead category people concentration on test plan document preparation to define work allocation in terms of What, Who, When & How to test. To prepare test plan document, test plan order follows below approach; Development document Team Formation Identify Tactical Risks System Test Plan Prepare Test Plan Test Responsible Review Test Plan Matrix 1] Team Formation: In general, Test planning process starts with testing team formation. To define a testing team, test plan author depends on below factors; 1. Availability of testers 2. Test duration 3. Availability of test environment resource 2] Identify Tactical Risk: After Testing team formation Plan author analysis possible & mitigation (ad hoc testing) G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 16
  • 17. gcrindia@gmail.com # Risk 1: Lack of knowledge of Test Engineer on that domain # Soln 1: Extra training to Test Engineers # Risk 2: Lack of Resource # Risk 3: Lack of budget {less no of time} # Soln 3: Increase Team size # Risk 4: Lack of Test data # Soln 4: Conduct test on past experience basis i.e., ad hoc testing or contact client for data # Risk 5: Lack of developer process rigor # Soln 5: Report to Test Lead for further communication between test & development PM # Risk 6: Delay of modified build delivery # Soln 6: Extra hours of work is needed # Risk 7: Lack of communication in between Test Engineer - > Test team and Test team - > Development team 3] PREPARE TEST PLAN: After completion of testing team formation & Risk analysis, Test plan author concentrate on Test Plan Document in IEEE format. 01) Test Plan ID: Unique No or Name e.g. STP-ATM 02) Introduction: About Project description 03) Test Items: Modules / Functions / Services / Features / etc. 04) Features to be tested: Responsible Modules for Test design (preparing test cases for added modules) 05) Features not to be tested: Which feature is not to be tested and Why? (Due to test cases available for the old modules, so for these modules no need to be tested / no test case Above (3), (4) & (5) decides which module to be tested – > What to test? 06) Approach: List of selected testing techniques to be applied on above specified modules in reference to the TRM(Test Responsible Matrix). 07) Feature pass or fail criteria: When a feature is pass or fail description (Environment is good) (After testing conclusion) 08) Suspension criteria: Possible abnormal situations rose during above features testing (Environment is not good) (During testing conclusion) 09) Test Environment: Required software & Hardware to be tested on above features 10) Test Deliverables: Required testing document to be prepared (during testing, the type G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 17
  • 18. gcrindia@gmail.com of documents are prepared by tester) 11) Testing Task: Necessary tasks to do before start every feature testing Above (6) to (11) specifies -> How to test? 12) Staff & Training: Names of selected Test Engineers & training requirements to them 13) Responsibilities: Work allocation to every member in the team (dependable modules are given to single Test Engineer) 14) Schedule: Dates & Times of testing modules Above (4) specifies -> When to test? 15) List & Mitigation: Possible testing level risks & solution to overcome them 16) Approvals: Signatures of Test plan authors & Project Manager / Quality Analyst 4) Review Test Plan: After completion of plan document preparation, Test plan author conducts a review of completion & correctness. In this review, Plan author follows below coverage analysis  BRS based coverage (What to test? Review)  Risks based coverage (When & Who to test? Review)  TRM based coverage (How to test? Review) 5) TEST DESIGNING: After completion of Test Planning & required training to testing team, corresponding testing team members will start preparing the list of test cases for their responsible modules. There are three types of test cases design methods to cover core level testing (Usability & Functionality testing). a) Business Logic based test case design (S/w RS) b) Input Domain based test case design (E-R diagrams / Data Models) c) User Interface based test case design (MS-Windows rules) a) Business Logic based Test Case design (S/w RS) In general, Test Engineers are preparing a set of Test Cases depends on Use Cases in (S/w RS). Every Use Case describes a functionality in terms of inputs, process & output, depends on this Use Cases Test Engineers are preparing Test Cases to validate the functionality G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 18
  • 19. gcrindia@gmail.com BRS Test Use Cases & Cases Functional Cases HLD’s LLD’s Coding *.exe From the above model, Test Engineers are preparing Test Cases depends on corresponding Use Cases & every test case defines a test condition to be applied. To prepare test cases, Test Engineers studies Use Cases in below approach: Steps: 1) Collect Use Cases of our responsible module 2) Select a Use Case & their dependencies from the list 2.1) Identify entry condition (Base state) 2.2) Identify input required (Test data) 2.3) Identify exit condition (End state) 2.4) Identify output & outcome (Expected) 2.5) Identify normal flow (Navigation) 2.6) Identify alternative flows & exceptions 3) Write Test Cases depends on above information 4) Review Test Cases for the completeness & correctness 5) Goto step (2) until completion of all Use Cases completion Use Case I: A login process allows user id & password to validate users. During these validations, login process allows user id in alpha-numeric from 4 to 16 characters long & password in alphabets in lowercase from 4 to 8 characters long. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 19
  • 20. gcrindia@gmail.com Case study: Test Case 1) Successful entry of user id BVA (Size) min -> 4 chars => pass min-1 -> 3 chars => fail min+1 -> 5 chars => pass max-1 -> 15 chars => pass max+1 -> 17 chars => fail max -> 16 chars => pass ECP Valid Invalid a-z special chars A-Z blank 0-9 Test Case Format: During Test design Test Engineers are writing list of Test Cases in IEEE format. 01) Test Case ID: Unique no or name 02) Test Case Name: Name of test condition to be tested 03) Feature to be tested: Module / Function / Feature 04) Test suit ID: Batch ID, in which this case is member 05) Priority: Importance of Test Case {Low, Med, High} P0 -> Basic functionality P1 -> General functionality (I/P domain, Error handling, Compatibility etc,) P2 -> Cosmetic testing (UIT) 06) Test Environment: Required Software & Hardware to execute 07) Test afford (person / hr): Time to execute this Test Case e.g. 20 minutes 08) Test duration: Date & Time 09) Test Setup: Required testing task to do before starts case execution (pre-requisites) 10) Test Procedure: Step by step procedure to execute Test Case G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 20
  • 21. gcrindia@gmail.com Test Procedure Format: 1) Step No: 2) Action: -> Test Design 3) Input required: 4) Expected: 5) Actual: 6) Result: -> Test Execution 7) Comments: 11) Test Case passes or fails criteria: When this case is pass or fail Note: Test Engineers follows list of Test Cases along with step by step procedures only Example 1: Prepare Test Procedure for below test cases “Successful file save operation in Notepad “. Step Action Input Expected No Required 1 Open Notepad Empty Editor 2 Fill with text Save Icon enabled 3 Click Save Icon or click File Save Dialog box appears with menu Default file name Option & select save option 4 Enter File name & Click Save Unique Focus to Notepad & File File name name Appears in title bar of Notepad Note: For more examples refer to notes b) Input Domain based Test Case design (E-R diagrams / Data Models) In general, Test Engineers are preparing maximum Test Cases depends on Use Cases or functional requirements in S/wRS. These functional specifications provide functional descriptions with input, output & process, but they are not responsible to provide information about size & type of input objects. To correct this type of information, Test Engineers study Data model of responsible modules E-R diagram. During Data model study, Test Engineer follows below approach: Steps: 1) Collect Data model of responsible modules 2) Study every input attribute in terms of size, type & constraint 3) Identify critical attributes in the test, which is participated in manipulation & retrivals 4) Identify non-critical attributes such as input & output type G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 21
  • 22. gcrindia@gmail.com A/C No: Critical A/C Name: Balance: Non-Critical Address: 5) Prepare BVA & ECP for every input object ECP BVA(Size / Range) Input Attribute Valid Invalid Minimum Maximum Xxxx xxxx xxxx xxxx xxxx “ “ “ “ “ “ “ “ “ “ “ “ “ “ “ DATA MATRIX Note: In general, Test Engineers are preparing step by step procedure based Test Cases for functionality testing. Test Engineers prepare valid / invalid table based Test Cases for input domain of object testing {Data Matrix } Note: For examples refer to notes c) User Interface based test case design (MS-Windows rules) To conduct Usability Testing, Test Engineers are preparing list of Test Cases depends on our organization User Interface standards or conventions, Global User Interface rules & interest of customer site people. Example: Test Cases 1) Spelling check 2) Graphics check (Screen level Align, Font style, Color, Size & Microsoft six rules) 3) Meaning of error messages 4) Accuracy of data displayed 5) Accuracy of data in the database are result of user inputs, if developer restrict the data in database level by rounding / truncating then the developer must also restrict the data in front-end as well 6) Accuracy of data in the database as the result of external factors. Ex. File attachments 7) Meaningful help messages (Manual support testing) G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 22
  • 23. gcrindia@gmail.com Review Test Cases: After completion of all possible Test Cases preparation for responsible modules, Testing team concentrates on review of Test Cases for completeness & correctness. In this review, Testing team applies coverage analysis. Test Case Review 1) BR based coverage 2) Use Cases based coverage 3) Data model based coverage 4) User Interface based coverage 5) TRM based coverage At the end of this review, Test Lead prepare Requirement Traceability Matrix or Requirement Validation Matrix (RTM / RVM) Business Requirement Source (Use Cases, Data model) Test Cases xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx From RTM / RVM model, it defines mapping between customer requirement & prepared Test Cases to validate the requirement. 6) TEST EXECUTION: After completion of Test Cases selections & their review, Testing team concentrate on Build release from development side & Test execution on that build. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 23
  • 24. gcrindia@gmail.com a) Test Execution Levels or Phases: See figure in next page for clear understandability of this levels b) Test Execution Levels v/s Test Cases: Level – 0 -> P0 Test Cases Level – 1 -> All P0, P1 & P2 Test Cases as batches Level – 2 -> Selected P0, P1, & P2 w.r.t modification Level – 3 -> Selected P0, P1, & P2 w.r.t critical areas in the master build A) Test Execution Levels or Phases: Initial Build Stable Build Level – 0 Sanity / Smoke / …. Defect Defect Report Level – 1 Fixing Comprehensive Modified build Level – 2 Defect Resolving Regression Level – 3 Final Regression c) Build Version Control: In general, Testing Engineers are receiving build from development in below model G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 24
  • 25. gcrindia@gmail.com Build Server FTP (file transport Protocol) Testing Environment Testers During Test execution Test Engineer are receiving modified build from software. To distinguish old & new builds, development team maintains unique version in system, which is understandable to Tester / Testing team. For this version controlling developers are using version control tools (Visual Source Safe) d) Level – 0 (Sanity / Test Acceptance / Build verification test): After receiving initial build, Testing Engineers concentrate on basic functionality of that build to estimate stability for complete testing. In this Sanity testing, Testing Engineers tries to execute all P0 Test Cases to cover basis functionality. If functionality is not working / functionality missing, Testing team rejects that build. If Tester decided stability then they concentrate on Test execution of all Test Cases to detect defects. During this Sanity testing, Testing Engineer observes below factors on that build G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 25
  • 26. gcrindia@gmail.com 1) Understandable 2) Operatable 3) Observable 4) Consistency 5) Controllable 6) Simplicity 7) Maintainable 8) Automation From the above “8” testable issues, Sanity test is also known as Testability testing / OCT angle testing. e) Test Automation: If test automation is possible than Testing team concentrate on Test script creation using corresponding testing tools. Every Test script consists of navigation statement along with required check points. Stable Build Test Automation (Select Automation) (All P0 & Carefully selected P1 Test Cases) f) Level – 1 (Comprehensive testing) After completion of Sanity testing & possible test automation, Testing team concentrates on test batches formation with depended Test Cases. Test batches are also known as Test suits / sets. During these Test batches execution, Test Engineers prepare test log document, this document consist of three types of entries. 1) Passed (Expected = Actual) 2) Failed (Any one Expected != Actual, Any one Expected variants from Actual) 3) Blocked (Corresponding parent functionality failed) Pass Skip In queue In Progress Fail Closed Blocked Partial Pass / Fail G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 26
  • 27. gcrindia@gmail.com g) Level – 2 (Regression testing) During Comprehensive test execution, Test Engineers are reporting mismatches as defects to developers. After receiving modified build from developers, Test Engineers concentrate on Regression testing to ensure bug-fixing work & occurrences of side effects. Resolved Bug Severity Low Medium High Case I: If development team resolve bugs severity which is high, Test Engineers re-execute all P0, P1 & carefully selected P2 Test Cases on modified build Case II: Bugs severity is medium, then all P0, carefully selected P1 & some of P2 Test Cases Case III: Bugs severity is low, then some P0, P1 & P2 Case IV: If development team released modified build due to sudden changes in project requirement then Test Engineers re-execute all P0, P1 & carefully selected P2 Test Cases w.r.t that requirement modification. h) Level – 3 (Final Regression / Pre-Acceptance testing) G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 27
  • 28. gcrindia@gmail.com Gather Regression Requirement Test Reporting Effort Estimation Final Regression Plan Regression 7) TEST REPORTING: Level - 0 Level - 1 Test Reporting Level - 2 Level - 3 During comprehensive testing, Test Engineer are reporting mismatches as defects to developers through IEEE format. 1) Defect ID: Unique No or Name 2) Description: Summary of the defect 3) Feature: Module / Function / Service , in these module TE found the defect 4) Test Case Name: Corresponding failing test condition 5) Reproducible (Yes / No): Yes -> Every time defect appears during test execution No -> Rarely defect appears 6) If Yes, attach test procedure: 7) If No, attach snapshot & strong reasons: 8) Status: New / Reopen 9) Severity: Seriousness of defect w.r.t functionality (high / medium / low) 10) Priority: Importance of the defect w.r.t customers (high / medium / low) 11) Reported bug: Name of Test Engineer 12) Reported on: Date of submission 13) Assign to: Name of the responsible person in development team -> PM 14) Build Version ID: In which build, Test Engineer fount the defect G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 28
  • 29. gcrindia@gmail.com 15) Suggested fix (Optional): Tester tries to produce suggestion to solve this defect 16) Fixed by: PM or Team Lead 17) Resolved by: Developer name 18) Resolved on: Date of solving By Developers 19) Resolution type: check out in next page 20) Approved by: Signature of Project Manager (PM) Defect Age: The time gap between “reported on” & “resolved on” Defect submission process: Quality Project Mgr Analyst Test Mgr Team Lead Test Lead If high defect is rejected Developer Test Eng Defect Status Cycle: New Open / rejected / deferred close reopen Deferred => Accepted but not interested to resolve in this version Defect Resolution: After receiving defect report from Testers, developers review the defect & they send resolution type to Tester as a reply 1) Duplicate, rejected due to the defect is same as previously reported defect 2) Enhancement, rejected due to the defect is related future requirement of customer 3) H/w limitation, rejected due to the defect raised w.r.t limitation of H/w devices 4) S/w limitations, rejected due to the defect raised w.r.t limitation of S/w Techno 5) Not applicable, rejected due to the defect has no proper meaning 6) Functions as designed, rejected due to coding is correct w.r.t to designed doc’s 7) Need more information, not (accepted / rejected) but developers requires extra information to understand the defect 8) Not reproducible, not (accepted / rejected) but developers require correct procedure to reproduce the defect G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 29
  • 30. gcrindia@gmail.com 9) No plan to fix it, not (accepted / rejected) but developers want extra time to fix 10) Fixed, developers accepted to resolve 11) Fixed indirectly, accepted but not interested to resolve in this version (default) 12) User misunderstanding, need extra negotiation between testing & development team. Types of defects: 01) User Interface bugs (low severity): 1) Spelling mistakes (high priority) 2) Improper alignment (low priority) 02) Boundary related bugs (medium severity) 1) Doesn’t allows valid type (high priority) 2) Allows invalid type also (low priority) 03) Error handling bugs (medium severity) 1) Doesn’t providing error message window (high priority) 2) Improper meaning of error message (low priority) 04) Calculations bugs (high severity) 1) Final output is wrong (low priority) 2) Dependent results are wrong (high priority) 05) Race condition bugs (high severity) 1) Dead lock (high priority) 2) Improper order of services (low priority) 06) Load conditions bugs (high severity) 1) Doesn’t allow multiple users to access / operate (high priority) 2) Doesn’t allow customers accepted load (low priority) 07) Hardware bugs (high severity) 1) Doesn’t handle device (high priority) 2) Wrong output from device (low priority) 08) ID control bugs (medium severity) 1) Logo missing, wrong logo, Version No mistake, Copyright window missing, Developers Name missing, Tester Name missing 09) Version control bugs (medium severity) 1) Differences between two consecutive build versions 10) Source bugs (medium severity) 1) Mistake in help documents – Manual support 8) TEST CLOSURE: After completion of all possible test cycle execution, Test Lead conducts a review to estimate the completeness & correctness of testing. In this review, Test Lead follows below factors with Test Engineers G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 30
  • 31. gcrindia@gmail.com 1) Coverage Analysis a) BR based coverage b) Use Cases based coverage c) Data model based coverage d) User Interface based coverage e) TRM based coverage 2) Bug density a) Module A has 20% percentile bugs found b) Module B has 20% percentile bugs found c) Module C has 40% percentile bugs found d) Module D has 20% percentile bugs found 3) Analysis of deferred bugs Whether deferred bugs are deferrable or not At the end of this review, Testing team concentrate on high bug density modules or all modules if time is available. 9) User Acceptance Testing (UAT) Organization management concentrate on UAT to collect feedback, there are two approaches to conduct testing. 1. Alpha (α) test 2. Beta (β) test 10) Sign Off After completion of User Acceptance testing & their modifications, Test Lead concentrates on final test summary report creation. It is a part of Software Release Node (S/ w RN). This final test summary report consist of below documents 1) Test Strategy / Methodology (TRM) 2) System Test Plan 3) Requirement Traceability Matrix (RTM) 4) Automated Test Scripts 5) Bugs Summary Reports The below, has to be in horizontal direction • Bug Description • Feature • Found By G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 31
  • 32. gcrindia@gmail.com • Status (closed / deferred) • Comments CASE STUDY ON A PROJECT TESTING PROCESS The “ X ” is a client/server product. It is running in single computer with windows 2000 as OS this product provides a facility to search matched records in existing database. w.r.t has given search keys. Local host client DSN DB Windows 2000 This product maintains a default administrator to create new users and every valid user search data in database. Activity flow diagram: - Login Admin Admin Invalid (Or) user Valid user New Search Re-login user records Search keys Existing DB G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 32
  • 33. gcrindia@gmail.com FUNCTIONAL POINTS: -  Login is taking user id and password  User id and password allows alphabets in lower case from 4 to 8 characters long.  New user id’s created by administrators only  New user creation windows allows unique user id and password with create and cancel buttons  “Search records” opened for valid users only  “Search records window” maintains below search keys Customer id: 6 digits number (collected from design document First name: one character in upper or lower Last name: one to eight characters in lower case characters Date of birth: ddmmyy in numeric Age: “from” and “to” in numeric  Search records windows allows below combination of fields to search records. → Last name → Last with first name → Last name with first name and d-o-b → Last name with first name and age → Customer id only  “Search records” window consists of “start search” and “stop search” buttons.  Allows last name as full or partial  Allows customer id as full or partial with * or wild card Customer id 2 8 6 * ------ 286*-----  Refresh search records window using Alt+ctrl  Display matched records in a pop-up window with ok button after search completion.  Returns message like “too many matches to display when matched records >1000 Test methodology:- (by PM) Testing stage System testing Testing Factors Authorization √ G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 33
  • 34. gcrindia@gmail.com Access Control √ Audit trail × Continuity to √ Correctness √ Coupling × Data integrity √ Ease of use √ Ease of operate √ Reliability √ Fortable × Performance × Service levels √ Maintainable √ Methodology √ Note: Test responsibility matrix for IIXI (11 by 1)  “X” product is maintaining metadata so  it is not sharing resources of other application  This application went to run on windows 2000  It is a stand alone application (at time one user can operate) So need net to test load and stress testing) System test plan by test lead:- 1. Test plan ID: STP_X 2. Introduction: “X” is a product and it provides a facility to connect to existing data base and search matching records to retrieve. 3. Test items → user creation → Login by user → Search records 4. Features to be tested: → user creation → Login by user → Search records 5. Features not to be tested:- 6. Approach: To apply PM selected 1 factors from TRM, below black box testing techniques are suitable to follow depends on test lead. → User interface testing → Manual support testing → Functionality testing → i/p domain testing → Recovery testing → Sanitation testing G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 34
  • 35. gcrindia@gmail.com → Installation testing → Security testing → Complaints testing 7. Entry criteria: - → Are the necessary documents available? → Is the “X” product is ready for release from developers? → Is the supporting database available to search required records? → Is the test environment ready? 8. Suspension criteria: → Data base disconnect may require suspension of testing → Suspension of testing is mandatory when searching records process went to infinite. → Admin is failed to new user creation, a decision can be mad to continue testing on “searching records” module using admin or other existing valid users. 9. Exit Criteria: - → Ensure that the “X” product provides the required services → Ensure that all test documents has been completed up to date. →All high severity bugs resolved. 10. Test deliverables:- Test cases Test procedures Test Engg.. Automated Test scripts Test log Defect Report 11. Test environment:- → Client pc or local host → OS: Win2000 → DB server: ORACLE/ SQL SERVER/ MS-ACCESS → Connectivity: DSN/ Thin Drivers 12. Testing Tasks:- → Availability of admin with password → Database consists of records → Valid users are able to database to search records 13. Staff and Training needs:- Test Engg.. / QA Engg: Kurugonda Srinaiah G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 35
  • 36. gcrindia@gmail.com 14. Responsibilities: Document / Report  Responsibility  Effort 1. Tst cases with procedures K.Srinaiah 12 hours Defect Report K Srinaiah every day during Testing Test completion reports Test Lead with At the end of the Testing K Srinaiah 15. Schedule: Task  Effort  Start date  End date Test design 12 hours 28-12-2005 29-12-2005 Implement test and 4 hours 29-12-2005 29-12-2005 Review Execute test 24 hours 30-12-2005 01-01-2006 Evaluate test 8 hours 02-01-2006 02-01-2006 16. Risks and mitigations:- 1. Lack of documentation: → Contact business analyst → Ad-hoc testing → Contact customer site people if possible 2. Lack of time → Over-time 3. Delays and delivery: → Over time G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 36
  • 37. gcrindia@gmail.com 4. Lack of development process reggur: → Contact test lead to motivate developers → Over time to complete task is right time 17. APPROVALS: - Test case 1: Signature of PM and signature of test lead. Test case 2: Successful entry of user id BVA (size) Min = 4 chars → pass Max = 8 chars→ pass Min-1 =3 chars → fail Min +1 = 5 chars → pass Max –1 = 7 chars → pass Max +1 = 9 chars → fail Test case 3: successful entry of password BVA (size) Min = 4 chars → pass Max = 8 chars → pass Min –1 = 3 chars → fail Min +1 = 5 chars → pass Max + = 7 chars → pass Max = 9 chars → fail Test case 4: successful login operation User id  Password  Criteria Admin valid pass Admin invalid fail Other valid valid pass Other valid invalid fail Other invalid invalid fail Blank value fail G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 37
  • 38. gcrindia@gmail.com Valid blank fail Test case 5: Successful selection of new user creation option Test case 6: Un successful selection of this option due to current user is not admin. Test case 7 successful entry of user id in create user window Note: (like as Test case2) Test case 8: Successful entry of userid in create user window Note: (-----------test case 3) Test case9: Successful creation of new user by admin Test case10: unsuccessful new user creation due to given user id is not unique. Test case 11: successful closing of new user creation window using cancel (After enter user id and offer enter passes) Test case 12: Successful selection of search records option Test case 13: successful entry of customer id BVA (size) ECP (TYPE) Min = max = 6 valid invalid -------------------------- 0 – 9 a-z, A-Z, special characters Expect * , blank space Start with *  Exp: 123 √, *23Х, 1*23X Test case 14: successful entry of first name Min = max = 1 → pass Ecp --------------------------- o √ fail valid  invalid G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 38
  • 39. gcrindia@gmail.com ---------------------------- a- z o-9, A-Z special characters Test case 15: successful entry of last name: Min = 1 and max = 8 → pass ---------------- valid  invalid ----------------- a- z A-Z, o-9, Special characters Test case 16: successful entry of DOB BVA (range) Ecp (type) Day: min → 01 ----------------- min → 31 valid invalid ----------------- 0- 9 a-z, A-Z Month: min → 01 special characters max→ 12 Year: min → 00 max→ 99 Case 17: success entry of age from Ecp(type) min → 01 ----------------- max→ 22 valid  invalid ----------------- 0- 9 a-z, A-Z Special characters Test case 18: successful entry of age to Note: like as above Test case 19: successful display of matched records with full last name and all other fields are Blank Test case 20: successful display of matched records with full last name and first name G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 39
  • 40. gcrindia@gmail.com Test case21: successful display of matched records with full last name first name and dob Test case22: successful display of matched records with full last name first name age Test case 23: on successful search operation due to invalid combination of filled fields. Test case 24: unsuccessful search operation due to invalid Dob Test case 25: unsuccessful search operation due to age from greater than age ‘To’ Test case26: successful display of records with search key as partial last name and other fields as blank Test case 27:successful display of records with search key a partial last name and first name Test case 28: successful display of records with search key as partial last name, first name and Dob Test case 29: successful display of records with search key as partial last name, first name Test case 30: successful display of records with search key as customer id Test case 31: successful display of records with search key as partial customer id with * as wild card Test case 32: Unsuccessful display of records due to no matching records in database w.r.to given search keys Test case 33: unsuccessful display of records due to “too many” records to display when no of matched records greater than 1000 Test case 34 : successful refresh search window with Alt +Ctrl Test case 35: Successful termination of search operation when click “stop search” button. Test case 36: successful closing of records window through click o.k after searching. G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 40
  • 41. gcrindia@gmail.com Test case 37: spelling check in every screen Test case 38: Graphics check in every screen Ex: (alignment, font, size, label, graphical, colour, etc) Usability Testing Test case39: Accuracy of data displayed Ex:Dob ddmmyy Test case 40: Meaninful help messages and error messages G.C.Reddy, QTP Trainer, Hyderabad (9247837478) 41