Summary of report
• The entrance to Church Square and Scunthorpe High Street is tired and over engineered. Here we see
a dominance of guard rails and crash barriers which do little to enhance the pedestrian experience of the
area. It is time for the main routes into and out of the town centre to benefit from a sustained
programme of works to improve the pedestrian experience in the town centre.
• Creating a greener route with the introduction of trees and climbing plants, would allow for a more
pleasant pedestrian experience and help to reduce the levels of PM10’s in the town centre.
• A lighting scheme would also allow for increased footfall at night, thereby increasing trade for the many
businesses in Scunthorpe.
• There are a number of documents that have been produced over the years dealing with Scunthorpe
Town Centre – these need to be refined and focused on current objectives.
• Current guidance carries little / no weight in the planning process, with documents giving a series of
‘recommendations’ rather than specifying policy requirements.
• Current best practice would suggest an approach which sets out specific policy requirements.
• The Scunthorpe Urban Public Realm Guidance (SUPRDG) and the Scunthorpe Development
Framework (SDF) are important starting points for developing a new strategy.
• Note: Further information can be found in the accompanying Reshaping Urban Spaces paper to this
report on the economic benefits of investing in the public realm.
The current situation
There are a number of documents that have been created dealing with Scunthorpe Town Centre (STC),
originally this started with the Scunthorpe Development Framework (SDF) which was created as part of the
Renaissance Towns initiative funded by Yorkshire Forward, the Regional Development Agency at the time.
Following on from the SDF a Urban Public Realm Guide was produced, along with a Public Art Strategy for
STC. In late 2009 the council in partnership with Yorkshire Forward employed Taylor Young to develop a
masterplan for the town centre – this was however an abortive work, which was not taken forward.
Currently, there is no specific policy requirement in terms of the public realm or the built environment for
Scunthorpe. It is noted that the current documents, merely suggests a series of ‘recommendations’ or ‘ideas’
rather than setting out in clear policy terms what is required of developers. For instance the only
recommendations taken from the SDF were the Lincolnshire Lakes. However the recommendations made
make some clear and important points, which have not been taken forward, proposals such as Percent for Art
and a Public Art Strategy which were in included in the SUPRDG are still relevant, whilst the proposals
outlined in the SDF for the town centre are still relevant, although they may not meet the council’s/public’s
current aspirations.
One of the key recommendations of the guidance contained within the SUPRDG is the selection of a palette
of materials that are simple and help to co-ordinate the public realm (including street furniture, lighting etc.), to
date this has not been pursued, whilst recommendations for wayfinding etc. as outlined in the SDF were not
explored further.
It should also be noted that the SUPRDG and SDF are guidance. It would for instance carry no weight in the
event of a planning appeal whereby the council considered it to be contrary to the recommendations
contained within it.
Scunthorpe Delivery FrameworkOct 13
3
Added Value of Good Design in a Challenging Economic Climate
In a report commissioned by the North West Regional Development Agency (RENEW NorthWest) about the
economic benefits of good design a series of questions were asked of various market experts such as letting
agents for commercial schemes. The importance of good design was highlighted in the responses received
overall; the majority of respondents (68%) believed that good design was either very important or
important. In terms of the impact of good design, more than 74% of agents that responded stated that good
design adds economic value in terms of increased rents and capital values, the same response was
given in relation to occupancy and take-up rates in that 74% of the agents contacted stated that good
design would be a determining factor in attracting companies to an area. Finally in relation to the
overall market attractiveness of an area 71% of the agents contacted stated that good design is very
important in order for the market to be considered attractive, whilst 48% of the agents contacted stated
that good design would be a very important factor in attracting funding or investment to an area.
The role of Public Art
The Public Art Appendix contained within the SUPRDG could essentially be established as a separate
Supplementary Planning Document, with some revisions to the text to make it more relevant to the current
circumstances of today. On the whole, it is perfectly relevant for what is needed in Scunthorpe and North
Lincolnshire.
The existing public art appendix explains the benefits that public art can bring to the town centre and the
wider region of North Lincolnshire therefore it should be supported.
The proposal
It is considered that on the whole, the existing SUPRDG and SDF documents retain some salient points that
should be taken forward in any revised document. The Streetscape document that has been produced as
part of the MA in Urban Design that I completed in 2010, is in essence an innovation from the original
guidance, in that it does specify a palette of materials, that subject to public consultation could be revised and
implemented as planning policy (subject to the agreement with Highways and Neighbourhood Services).
The streetscape document needs to be refined however. Principally, because the document was created
with little participation in its creation. The key to any transformational agenda for the town centre is public /
political “buy-in”, without their support any proposal is likely to fail. Moreover the costs involved mean that it
is important that there is a concerted campaign – to political leaders at least of the economic gains to be
considered by implementing a programme of public realm works.
Additionally, work needs to be done in order to ascertain the level of works the council would be prepared to
accept in the town centre itself and within the Church Square area of Scunthorpe (referred to as the
Scunthorpe Key Development Area – SKDA), in the form of a Urban Design Framework (UDF). Further work
could also be undertaken to widen the scope of the document to make into what could be referred to as the
Scunthorpe Delivery Framework, a document that would condense, and focus on what the council’s priorities
are for the town centre, in relation to the public realm, built environment, shop front design, business support
etc.
To get to this point a programme has been set out below:
The Programme of Works
1. Take members and senior officers to inspiring places such as Sheffield and Manchester City
Centre’s. Whilst not on a comparable scale in terms of cost and size etc. It is important to consider the
issues raised that places such as Sheffield and Manchester went through to get to where they are today.
For instance in Sheffield’s case, they wanted to re-invigorate the retail and office offering in the city
centre to make it comparable with Manchester and Leeds. Find out what lessons can be learned from
these two exemplar cities.
On a more comparable level, but further afield, it may be worthwhile visiting the towns of Darlington,
Cleveland and Workington, Cumbria. These towns are both of a comparable size to Scunthorpe with
Scunthorpe Delivery FrameworkOct 13
4
Workington being slightly smaller in population and Darlington being larger. However, again it should be
noted that the processes that these towns went through in order to re-invigorate the respective town
centres – for instance in Workington this was public art led, with various pieces of public art installed in
the town centre, the majority of which were interactive such as the Hub. More information can be found
within the attached public realm briefing paper.
2. Prepare an engagement strategy that uses design to engage widely with people across the
authority. It is important that design is used creatively, the purpose of the engagement strategy is to re-
invigorate people’s attention on the town centre. If the engagement strategy does not effectively engage
with the public then it is likely that there will be a element of resentment that they are not participating in
the design and thus will not take ownership of any proposals or look after them, from there;
3. Hold visioning workshops with the public a la the Crucible type event that was held under the
Yorkshire Forward/ SDF days. These visioning workshops could be held in one the empty shopping
units in the Foundry or the Parishes. The visioning workshops need to engage with the public in line with
the approved engagement strategy. Methods such as charettes could be utilised, asking people which
bit of Scunthorpe is their favourite/least favourite, engage creatively with children in schools by asking
them to draw what they would like to see in the town centre/what they think of it. Lastly as part of a
online / written consultation exercise it would useful to utilise the Placecheck method
(www.placecheck.info) - asking 3 simple questions - What Do You Like? What Do You Not Like? and
What Do You Think Needs To Be Improved? The opinions expressed could be collated and then fed into
the review process below:
4. Review the natural and built assets of the Town Centre and map what needs to change and what
should stay the same; The format of this could be like a Townscape Heritage Assessment, using the
feedback gained from the visioning exercises. Looking at the existing buildings in the town centre, what
could be realistically retained/demolished/modified? Analyse how the town centre has developed since
the 1920’s and see whether or not it is possible to re-establish old streets that have been lost, should the
town centre be shrunk in size? etc.
5. Develop a vision for the Town Centre - there would need to be a review of the existing documents
that deal with the Town Centre, for instance in the past 10 years there has been the SSDF, SUPRDG,
and the aborted Town Centre Masterplan. All of these documents had something important to say and
should not be discarded without first seeing what is relevant to the councils/public aspirations for the
town centre, see what can be taken forward as part of the new vision. Does the council for instance
believe that the creation of a ‘cultural’ quarter is no longer viable and a ‘civic; quarter is more appropriate
in Church Square;
6. Do design based workshops to map and draw our proposals with stakeholders and test if they
will meet our design aspirations – this will involve workshops with members, stakeholders and the
public in order to test the proposals;
7. Articulate the vision into a physical plan for the future - ;
Scunthorpe Delivery FrameworkOct 13
5
8. Develop the plan into a well designed document so that it is easy to read - along the lines of the
Streetscape guide that I produced as part of the MA. Other successful examples to look at are the
Sheffield City Centre Masterplan 2008, Sheffield Urban Design Compendium, Lincolnshire County
Council – Every Street Matters and the Havant Town Centre Urban Design Framework. All of the
documents mentioned work at a different scale, from the citywide in Sheffield to a town centre such as
the Havant UDF, this should give a thorough understanding of what is required in any document dealing
with Scunthorpe Town Centre;
9. As part of the document, design criteria/policies should be prepared to ensure that developers
etc. understand the principles and vision for the town centre - i.e. a Urban Design Framework.
Project timetable
Subject to consultation with service heads, members and the public a project timetable would be drawn up
detailing timescales for delivery.

Más contenido relacionado

Similar a Scunthorpe Delivery Framework (SDF) Paper

Adopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanAdopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanStonnington
 
Mammoth Lakes Downtown Revitalization Action Plan 2.0
Mammoth Lakes Downtown Revitalization Action Plan 2.0Mammoth Lakes Downtown Revitalization Action Plan 2.0
Mammoth Lakes Downtown Revitalization Action Plan 2.0Darin Dinsmore
 
Critical Appraisal Report
Critical Appraisal ReportCritical Appraisal Report
Critical Appraisal ReportYiting Zhou
 
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coversmart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coverAnu Devi, DPhil
 
Public-private partnerships and urban regeneration in the Cape Town Central C...
Public-private partnerships and urban regeneration in the Cape Town Central C...Public-private partnerships and urban regeneration in the Cape Town Central C...
Public-private partnerships and urban regeneration in the Cape Town Central C...Cape Town Partnership
 
Activity Centers Strategy - Council draft mins report 20-07-15
Activity Centers Strategy - Council draft mins report 20-07-15Activity Centers Strategy - Council draft mins report 20-07-15
Activity Centers Strategy - Council draft mins report 20-07-15Stonnington
 
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City CharterGoldenGateParkPreservationAlliance
 
Terms of reference for a workshop on south-south cooperation
Terms of reference for a workshop on south-south cooperationTerms of reference for a workshop on south-south cooperation
Terms of reference for a workshop on south-south cooperationDr Lendy Spires
 
value-capture-roadmap-as-web
value-capture-roadmap-as-webvalue-capture-roadmap-as-web
value-capture-roadmap-as-webAlexia Lidas
 
La design guidelines ppd 619 team 6 paper with appendix
La design guidelines ppd 619 team 6 paper with appendixLa design guidelines ppd 619 team 6 paper with appendix
La design guidelines ppd 619 team 6 paper with appendixSmart Growth
 
Urban Inclusion : Designing Participation
Urban Inclusion : Designing ParticipationUrban Inclusion : Designing Participation
Urban Inclusion : Designing ParticipationShreya Mahajan
 
Steve Pharoah November Online Version 2015
Steve Pharoah November Online Version 2015Steve Pharoah November Online Version 2015
Steve Pharoah November Online Version 2015Steve Pharoah
 
NW annual review A4 landscape_6_1_15
NW annual review A4 landscape_6_1_15NW annual review A4 landscape_6_1_15
NW annual review A4 landscape_6_1_15Andrew Ruffler
 
Municipal Development Strategy Process
Municipal Development Strategy ProcessMunicipal Development Strategy Process
Municipal Development Strategy Processrabia belhorma
 
High Point's SoSi District Design and Development Plan
High Point's SoSi District Design and Development PlanHigh Point's SoSi District Design and Development Plan
High Point's SoSi District Design and Development Plantriadsustain
 

Similar a Scunthorpe Delivery Framework (SDF) Paper (20)

Adopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure PlanAdopted Glenferrie Road and High Street Structure Plan
Adopted Glenferrie Road and High Street Structure Plan
 
Mammoth Lakes Downtown Revitalization Action Plan 2.0
Mammoth Lakes Downtown Revitalization Action Plan 2.0Mammoth Lakes Downtown Revitalization Action Plan 2.0
Mammoth Lakes Downtown Revitalization Action Plan 2.0
 
Critical Appraisal Report
Critical Appraisal ReportCritical Appraisal Report
Critical Appraisal Report
 
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coversmart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
 
Public-private partnerships and urban regeneration in the Cape Town Central C...
Public-private partnerships and urban regeneration in the Cape Town Central C...Public-private partnerships and urban regeneration in the Cape Town Central C...
Public-private partnerships and urban regeneration in the Cape Town Central C...
 
Activity Centers Strategy - Council draft mins report 20-07-15
Activity Centers Strategy - Council draft mins report 20-07-15Activity Centers Strategy - Council draft mins report 20-07-15
Activity Centers Strategy - Council draft mins report 20-07-15
 
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
 
Terms of reference for a workshop on south-south cooperation
Terms of reference for a workshop on south-south cooperationTerms of reference for a workshop on south-south cooperation
Terms of reference for a workshop on south-south cooperation
 
value-capture-roadmap-as-web
value-capture-roadmap-as-webvalue-capture-roadmap-as-web
value-capture-roadmap-as-web
 
La design guidelines ppd 619 team 6 paper with appendix
La design guidelines ppd 619 team 6 paper with appendixLa design guidelines ppd 619 team 6 paper with appendix
La design guidelines ppd 619 team 6 paper with appendix
 
Urban Inclusion : Designing Participation
Urban Inclusion : Designing ParticipationUrban Inclusion : Designing Participation
Urban Inclusion : Designing Participation
 
1597341822.4244.pdf
1597341822.4244.pdf1597341822.4244.pdf
1597341822.4244.pdf
 
Steve Pharoah November Online Version 2015
Steve Pharoah November Online Version 2015Steve Pharoah November Online Version 2015
Steve Pharoah November Online Version 2015
 
LS na China
LS na ChinaLS na China
LS na China
 
LS na China
LS na ChinaLS na China
LS na China
 
Benefits Highlight Report
Benefits Highlight ReportBenefits Highlight Report
Benefits Highlight Report
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_ArikanGIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
 
NW annual review A4 landscape_6_1_15
NW annual review A4 landscape_6_1_15NW annual review A4 landscape_6_1_15
NW annual review A4 landscape_6_1_15
 
Municipal Development Strategy Process
Municipal Development Strategy ProcessMunicipal Development Strategy Process
Municipal Development Strategy Process
 
High Point's SoSi District Design and Development Plan
High Point's SoSi District Design and Development PlanHigh Point's SoSi District Design and Development Plan
High Point's SoSi District Design and Development Plan
 

Más de Graeme Moore

Good design the fundamentals
Good design   the fundamentalsGood design   the fundamentals
Good design the fundamentalsGraeme Moore
 
Urban Design - An Introduction
Urban Design - An IntroductionUrban Design - An Introduction
Urban Design - An IntroductionGraeme Moore
 
Scunthorpe Town Centre (Public realm & built form improvements)
Scunthorpe Town Centre (Public realm & built form improvements)Scunthorpe Town Centre (Public realm & built form improvements)
Scunthorpe Town Centre (Public realm & built form improvements)Graeme Moore
 
ScunthorpeTown Centre 3D Model (Original Built Form)
ScunthorpeTown Centre 3D Model (Original Built Form)ScunthorpeTown Centre 3D Model (Original Built Form)
ScunthorpeTown Centre 3D Model (Original Built Form)Graeme Moore
 
North Lincolnshire Residential Design Guide
North Lincolnshire Residential Design GuideNorth Lincolnshire Residential Design Guide
North Lincolnshire Residential Design GuideGraeme Moore
 
Church Square Development Brief
Church Square Development BriefChurch Square Development Brief
Church Square Development BriefGraeme Moore
 
North Lincolnshire Urban Design Guide
North Lincolnshire Urban Design GuideNorth Lincolnshire Urban Design Guide
North Lincolnshire Urban Design GuideGraeme Moore
 

Más de Graeme Moore (7)

Good design the fundamentals
Good design   the fundamentalsGood design   the fundamentals
Good design the fundamentals
 
Urban Design - An Introduction
Urban Design - An IntroductionUrban Design - An Introduction
Urban Design - An Introduction
 
Scunthorpe Town Centre (Public realm & built form improvements)
Scunthorpe Town Centre (Public realm & built form improvements)Scunthorpe Town Centre (Public realm & built form improvements)
Scunthorpe Town Centre (Public realm & built form improvements)
 
ScunthorpeTown Centre 3D Model (Original Built Form)
ScunthorpeTown Centre 3D Model (Original Built Form)ScunthorpeTown Centre 3D Model (Original Built Form)
ScunthorpeTown Centre 3D Model (Original Built Form)
 
North Lincolnshire Residential Design Guide
North Lincolnshire Residential Design GuideNorth Lincolnshire Residential Design Guide
North Lincolnshire Residential Design Guide
 
Church Square Development Brief
Church Square Development BriefChurch Square Development Brief
Church Square Development Brief
 
North Lincolnshire Urban Design Guide
North Lincolnshire Urban Design GuideNorth Lincolnshire Urban Design Guide
North Lincolnshire Urban Design Guide
 

Último

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 

Scunthorpe Delivery Framework (SDF) Paper

  • 1. Scunthorpe Delivery Framework Improving the offering of the town centre A critique of the current guidance in place and the opportunities to improve upon it to ensure that Scunthorpe is able to thrive in a competitive economy 13/10/2011
  • 2. Scunthorpe Delivery FrameworkOct 13 2 Scunthorpe Delivery Framework – Improving the offering of the town centre Summary of report • The entrance to Church Square and Scunthorpe High Street is tired and over engineered. Here we see a dominance of guard rails and crash barriers which do little to enhance the pedestrian experience of the area. It is time for the main routes into and out of the town centre to benefit from a sustained programme of works to improve the pedestrian experience in the town centre. • Creating a greener route with the introduction of trees and climbing plants, would allow for a more pleasant pedestrian experience and help to reduce the levels of PM10’s in the town centre. • A lighting scheme would also allow for increased footfall at night, thereby increasing trade for the many businesses in Scunthorpe. • There are a number of documents that have been produced over the years dealing with Scunthorpe Town Centre – these need to be refined and focused on current objectives. • Current guidance carries little / no weight in the planning process, with documents giving a series of ‘recommendations’ rather than specifying policy requirements. • Current best practice would suggest an approach which sets out specific policy requirements. • The Scunthorpe Urban Public Realm Guidance (SUPRDG) and the Scunthorpe Development Framework (SDF) are important starting points for developing a new strategy. • Note: Further information can be found in the accompanying Reshaping Urban Spaces paper to this report on the economic benefits of investing in the public realm. The current situation There are a number of documents that have been created dealing with Scunthorpe Town Centre (STC), originally this started with the Scunthorpe Development Framework (SDF) which was created as part of the Renaissance Towns initiative funded by Yorkshire Forward, the Regional Development Agency at the time. Following on from the SDF a Urban Public Realm Guide was produced, along with a Public Art Strategy for STC. In late 2009 the council in partnership with Yorkshire Forward employed Taylor Young to develop a masterplan for the town centre – this was however an abortive work, which was not taken forward. Currently, there is no specific policy requirement in terms of the public realm or the built environment for Scunthorpe. It is noted that the current documents, merely suggests a series of ‘recommendations’ or ‘ideas’ rather than setting out in clear policy terms what is required of developers. For instance the only recommendations taken from the SDF were the Lincolnshire Lakes. However the recommendations made make some clear and important points, which have not been taken forward, proposals such as Percent for Art and a Public Art Strategy which were in included in the SUPRDG are still relevant, whilst the proposals outlined in the SDF for the town centre are still relevant, although they may not meet the council’s/public’s current aspirations. One of the key recommendations of the guidance contained within the SUPRDG is the selection of a palette of materials that are simple and help to co-ordinate the public realm (including street furniture, lighting etc.), to date this has not been pursued, whilst recommendations for wayfinding etc. as outlined in the SDF were not explored further. It should also be noted that the SUPRDG and SDF are guidance. It would for instance carry no weight in the event of a planning appeal whereby the council considered it to be contrary to the recommendations contained within it.
  • 3. Scunthorpe Delivery FrameworkOct 13 3 Added Value of Good Design in a Challenging Economic Climate In a report commissioned by the North West Regional Development Agency (RENEW NorthWest) about the economic benefits of good design a series of questions were asked of various market experts such as letting agents for commercial schemes. The importance of good design was highlighted in the responses received overall; the majority of respondents (68%) believed that good design was either very important or important. In terms of the impact of good design, more than 74% of agents that responded stated that good design adds economic value in terms of increased rents and capital values, the same response was given in relation to occupancy and take-up rates in that 74% of the agents contacted stated that good design would be a determining factor in attracting companies to an area. Finally in relation to the overall market attractiveness of an area 71% of the agents contacted stated that good design is very important in order for the market to be considered attractive, whilst 48% of the agents contacted stated that good design would be a very important factor in attracting funding or investment to an area. The role of Public Art The Public Art Appendix contained within the SUPRDG could essentially be established as a separate Supplementary Planning Document, with some revisions to the text to make it more relevant to the current circumstances of today. On the whole, it is perfectly relevant for what is needed in Scunthorpe and North Lincolnshire. The existing public art appendix explains the benefits that public art can bring to the town centre and the wider region of North Lincolnshire therefore it should be supported. The proposal It is considered that on the whole, the existing SUPRDG and SDF documents retain some salient points that should be taken forward in any revised document. The Streetscape document that has been produced as part of the MA in Urban Design that I completed in 2010, is in essence an innovation from the original guidance, in that it does specify a palette of materials, that subject to public consultation could be revised and implemented as planning policy (subject to the agreement with Highways and Neighbourhood Services). The streetscape document needs to be refined however. Principally, because the document was created with little participation in its creation. The key to any transformational agenda for the town centre is public / political “buy-in”, without their support any proposal is likely to fail. Moreover the costs involved mean that it is important that there is a concerted campaign – to political leaders at least of the economic gains to be considered by implementing a programme of public realm works. Additionally, work needs to be done in order to ascertain the level of works the council would be prepared to accept in the town centre itself and within the Church Square area of Scunthorpe (referred to as the Scunthorpe Key Development Area – SKDA), in the form of a Urban Design Framework (UDF). Further work could also be undertaken to widen the scope of the document to make into what could be referred to as the Scunthorpe Delivery Framework, a document that would condense, and focus on what the council’s priorities are for the town centre, in relation to the public realm, built environment, shop front design, business support etc. To get to this point a programme has been set out below: The Programme of Works 1. Take members and senior officers to inspiring places such as Sheffield and Manchester City Centre’s. Whilst not on a comparable scale in terms of cost and size etc. It is important to consider the issues raised that places such as Sheffield and Manchester went through to get to where they are today. For instance in Sheffield’s case, they wanted to re-invigorate the retail and office offering in the city centre to make it comparable with Manchester and Leeds. Find out what lessons can be learned from these two exemplar cities. On a more comparable level, but further afield, it may be worthwhile visiting the towns of Darlington, Cleveland and Workington, Cumbria. These towns are both of a comparable size to Scunthorpe with
  • 4. Scunthorpe Delivery FrameworkOct 13 4 Workington being slightly smaller in population and Darlington being larger. However, again it should be noted that the processes that these towns went through in order to re-invigorate the respective town centres – for instance in Workington this was public art led, with various pieces of public art installed in the town centre, the majority of which were interactive such as the Hub. More information can be found within the attached public realm briefing paper. 2. Prepare an engagement strategy that uses design to engage widely with people across the authority. It is important that design is used creatively, the purpose of the engagement strategy is to re- invigorate people’s attention on the town centre. If the engagement strategy does not effectively engage with the public then it is likely that there will be a element of resentment that they are not participating in the design and thus will not take ownership of any proposals or look after them, from there; 3. Hold visioning workshops with the public a la the Crucible type event that was held under the Yorkshire Forward/ SDF days. These visioning workshops could be held in one the empty shopping units in the Foundry or the Parishes. The visioning workshops need to engage with the public in line with the approved engagement strategy. Methods such as charettes could be utilised, asking people which bit of Scunthorpe is their favourite/least favourite, engage creatively with children in schools by asking them to draw what they would like to see in the town centre/what they think of it. Lastly as part of a online / written consultation exercise it would useful to utilise the Placecheck method (www.placecheck.info) - asking 3 simple questions - What Do You Like? What Do You Not Like? and What Do You Think Needs To Be Improved? The opinions expressed could be collated and then fed into the review process below: 4. Review the natural and built assets of the Town Centre and map what needs to change and what should stay the same; The format of this could be like a Townscape Heritage Assessment, using the feedback gained from the visioning exercises. Looking at the existing buildings in the town centre, what could be realistically retained/demolished/modified? Analyse how the town centre has developed since the 1920’s and see whether or not it is possible to re-establish old streets that have been lost, should the town centre be shrunk in size? etc. 5. Develop a vision for the Town Centre - there would need to be a review of the existing documents that deal with the Town Centre, for instance in the past 10 years there has been the SSDF, SUPRDG, and the aborted Town Centre Masterplan. All of these documents had something important to say and should not be discarded without first seeing what is relevant to the councils/public aspirations for the town centre, see what can be taken forward as part of the new vision. Does the council for instance believe that the creation of a ‘cultural’ quarter is no longer viable and a ‘civic; quarter is more appropriate in Church Square; 6. Do design based workshops to map and draw our proposals with stakeholders and test if they will meet our design aspirations – this will involve workshops with members, stakeholders and the public in order to test the proposals; 7. Articulate the vision into a physical plan for the future - ;
  • 5. Scunthorpe Delivery FrameworkOct 13 5 8. Develop the plan into a well designed document so that it is easy to read - along the lines of the Streetscape guide that I produced as part of the MA. Other successful examples to look at are the Sheffield City Centre Masterplan 2008, Sheffield Urban Design Compendium, Lincolnshire County Council – Every Street Matters and the Havant Town Centre Urban Design Framework. All of the documents mentioned work at a different scale, from the citywide in Sheffield to a town centre such as the Havant UDF, this should give a thorough understanding of what is required in any document dealing with Scunthorpe Town Centre; 9. As part of the document, design criteria/policies should be prepared to ensure that developers etc. understand the principles and vision for the town centre - i.e. a Urban Design Framework. Project timetable Subject to consultation with service heads, members and the public a project timetable would be drawn up detailing timescales for delivery.