Contributed substantial content to this document, edited, and proofread prior to presentation to City of Alameda to obtain funding for city feasibility studies. Written with support from Rails to Trails Conservancy.
1. E C R E AT
R
IO
C O N O M I C R E V I TA L I
I C AT ION • E Z AT
N •T
I ON
UTIF
BEA
N•
AN IO
R S P O RTAT
IMAGINE A TRAIL AC ROSS
N O RT H A L A M E DA F RO M A L A M E DA
P O I N T TO T H E M I L L E R - S W E E N E Y
( F R U I T VA L E ) B R I D G E .
...A TRAIL T H AT C E L E B R AT E S
T H E H I S TO RY O F A L A M E DA A N D
THE ALAMEDA BELT LINE RAILROAD.
. . . A T R A I L T H AT P RO V I D E S
BETTER BICYCLE AND PEDESTRIAN
AC C E S S TO T H E P A R K S T R E E T
AND WEBSTER STREET BUSINESS
DISTRICTS.
YOU C AN DO MORE THAN IMAGINE
T H I S T R A I L , YO U C A N H E L P
MAKE IT HAPPEN!
CROSS ALAMEDA TRAIL
V I S I O N
RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION • 1
2. INTRODUCTION
Alameda has a unique opportunity to convert the former Alameda Belt Line Railroad
alignment to a multiple-use trail across most of the main island.
In 2001, members of Alameda Open Space approached Rails-to-Trails Conservancy (RTC) to learn about convert-
ing the abandoned Alameda Belt Line Railroad alignment into a multiple-use trail across the island of Alameda.
Since then, RTC has been working with individuals, community-based organizations and the City of Alameda to
explore the potential of the proposed “Cross Alameda Trail.“ Early in 2004, individuals and advocacy groups in
Alameda formed the Cross Alameda Trail Steering Committee (CATSC) to plan and promote the trail with RTC.
The two organizations have begun to invite public participation in developing the trail. The City of Alameda
Department of Public Works has offered valuable technical support during this process, and has secured funding
to conduct a trail feasibility study.
The trail will begin at the corner of Main Street and Ralph M. Appezzato Parkway where it will connect with the
existing Main Street Greenway. It will travel east along the former Alameda Belt Line Railroad alignment and
other facilities until it reaches the Miller-Sweeney (“Fruitvale”) bridge.
Converting an unused railroad alignment to a trail is a complex process. This vision document has been compiled
by the California field office of Rails-to-Trails Conservancy in cooperation with the Cross Alameda Trail Steering
Committee. This document, based upon feedback received through community workshops and surveys, is one of
many steps toward completing this trail that will benefit
Alameda’s residents, businesses and visitors.
CROSS ALAMEDA TRAIL
VISION DOCUMENT STEERING COMMITTEE
The purpose of this vision document is to: The Cross Alameda Trail Steering Committee
(CATSC) consists of individuals and community
✤ Provide a broad overview of the proposed Cross
groups that support the development of a multi-use
Alameda Trail.
trail to bring recreation, transportation and quality
✤ Describe some of the anticipated benefits of the trail. of life benefits to the City of Alameda. Steering
✤ Provide a package Alameda residents and decision- Committee members include:
makers can use for community outreach and to Debra Arbuckle, ALAMEDA OPEN SPACE
describe the trail to potential funding agencies. Lucy Gigli, President, BIKE ALAMEDA
✤ Provide information and community input to the city John Knox White, BIKE ALAMEDA
to help guide its Cross Alameda Trail feasibility Helena Lengel, Biologist
study.
Audrey Lord-Hausman, Co-Founder
PEDESTRIAN FRIENDLY ALAMEDA
Melanie Mintz, RAILS-TO-TRAILS CONSERVANCY
Jon Spangler, Freelance Writer/Editor
Jean Sweeney, Founder, ALAMEDA OPEN SPACE
The city’s Department of Public Works provides
technical assistance to the Steering Committee.
Rails-to-Trails Conservancy facilitates the effort with
organizational and logistical support. The role and
composition of the CATSC is expected to expand
and change as the Cross Alameda Trail project
moves forward.
Left: Constitution Way to Sherman Street — walkers on the proposed
trail. Front Cover: Main Street to Webster Street — photo simulation of
the proposed trail by PGADesign, and (inset) current conditions on
the proposed trail.
2 • RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION
3. RAIL-TRAILS ECONOMIC BENEFITS
In 1916, the world’s most extensive rail transportation Cities and towns across the United States have
network stretched across the United States, with cities learned that converting former rail
and small towns connected by ribbons of steel. In that corridors to trails is economically
“The trail will be
year, the railroad system peaked with more than sound. Rail-trails bring tourism-
great for businesses in
270,000 miles of track winding across every state. related opportunities and
both the Park Street and
Due to changes in development and transportation bolster property values. In a
Webster Street commercial
patterns, economics, and politics, railroads have since national survey, recent home
districts, and our organization is
stopped utilizing more than 150,000 miles of track. buyers ranked proximity to a
very happy to support it,”
Rails-to-Trails Conservancy was formed in 1986 to trail second in importance out
— Robb Ratto, Executive Director
preserve this integral part of our nation’s heritage. By of 18 possible neighborhood of the Park Street Business
converting unused rail into multi-use trails, the corridors amenities when shopping for a Association.
continue to play a vital role in communities across the new home.2 The nearby Lafayette-
United States. Moraga trail is estimated to contribute
Today, the thriving rail-trail movement has created $1.2 million in economic activity per year.
hundreds of public trails for running, walking, bicycling, The Cross Alameda Trail would bring people and
skating and other purposes. There are approximately increase business activity in both of Alameda’s
12,600 miles of rail-trail across the United States, and historical business districts and Alameda Point.
285 miles in California alone. Converted rail-trails
have many benefits: TRANSPORTATION BENEFITS
✤ Rail-trails have gentle grades and minimal road Rail-trails can help make an urban or regional multi-
intersections, making them perfect for seniors, modal transportation system seamless.
families and people with disabilities. Many jurisdictions across the country
“Few factors
✤ Rail-trails act as linear greenways through urban incorporate rail-trails into their
contribute so much to
areas, providing much-needed open space and transit plans, to get people safely
successful aging as regular
new recreational opportunities. and efficiently to and from physical activity, and it’s
transit stops and hubs. Rail-trails
✤ Rail-trails promote sustainable land use and help never too late to start.”
tend to be flat and direct, and
revive historic business districts. often connect residential and
— Tommy G. Thompson,
Secretary, U.S. Department
✤ Rail-trails are independent community amenities business districts. Many people of Health and Human
that enhance existing recreational resources by find rail-trails convenient as a Services
linking neighborhoods and schools to parks, primary means of getting safely to and
waterfronts, recreational centers and other from work, school, shopping areas and other
facilities. destinations. With Alameda’s flat topography and
mild weather, the Cross Alameda Trail would provide
HEALTH BENEFITS an ideal place for people to walk and ride for both
recreation and transportation.
Trails and greenways create opportunities for healthy
recreation and transportation by providing people of
all ages with attractive, safe, accessible and low- or
no- cost places to bike, walk, hike, jog or skate.
Numerous national studies have shown RAILS-WITH-TRAILS
that creating neighborhood places
for physical activity is effective The Alameda Belt Line Railroad alignment is valuable as a
in getting people to exercise trail and also offers a potential route for rapid transit. The
more. Studies estimate that Cross Alameda Trail can be compatible with many poten-
creating or improving access tial transit options, such as an adjoining bus rapid transit,
to such places can result in a light-rail, or ultra-light rail line. Multiple-use trails along
25 percent increase in the active railroads, called “rails-with-trails,” are expanding in
number of persons who number, and the CATSC supports this concept in Alameda.
exercise at least three times
a week!1
RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION • 3
5. IMPROVING BICYCLING AND TRAIL GUIDE AND SURVEY DEVELOPED
WALKING IN ALAMEDA
To publicize the Cross Alameda Trail, present the trail’s possibili-
The City of Alameda has recently taken steps to make ties and challenges, and solicit public comments, a survey and
bicycling and walking safer and more convenient. descriptive trail guide were made available in English, Chinese
Among other projects, the city has built the Bay Farm and Spanish. Fifty trail surveys were returned in time to be in-
Island Bike Bridge, enhanced crosswalks, and cluded in this document. The CATSC will continue to distribute
installed bicycle-sensitive loop detectors. surveys. The final results will be submitted to the city for consider-
Policies in the 1990 General Plan and 1999 Bicycle ation in its trail feasibility study, which is due to be completed in
Master Plan call for additional off-street paths to link December 2004.
popular work and leisure destinations with residential Below is a sample of the survey responses thus far.
neighborhoods. Many of the components of the Cross
What elements make a place feel like a “trail” to you?
Alameda Trail are included in the General Plan. (See
Landscaping/Trees/Plants; No Vehicles/Traffic; Nature/Wildlife
text box, back cover.) The upcoming Transportation
Viewing; Wide Pathways; Smooth, Paved Trails; Peaceful/Quiet;
Master Plan will include both an updated Bicycle Plan
Dirt Trails; Benches/Bathrooms/Water; Safe; Connectivity
and a Pedestrian Plan. The Cross Alameda Trail is a
top priority for Pedestrian Friendly Alameda. If a trail existed between Alameda Point and the Fruitvale Bridge,
how would you use it?
COMMUNITY OUTREACH Recreation/Exercise (43%); Commuting to Errands (33%);
Commuting to Work (14%); Commuting to School (2%); Other
In the spring of 2004, the CATSC began to publicize
(8%) (including scenic tours, with visitors, dog walking)
the proposed trail and seek public input. Steering
Committee members attended meetings of community Using this trail, what would be your primary destinations?
organizations, such as HomeBASE and the League of Buena Vista Street, Lafayette Street, Webster Street and Park
Women Voters of Alameda. The CATSC is continuing Street business districts; local marinas; Fruitvale BART; Marina
to schedule meetings and distribute fliers and surveys Village; Ferry Terminal; Alameda Point; Northern Waterfront;
throughout the city. College of Alameda; Transit Hub at Atlantic and Webster;
Independence Plaza; Senior Center; to visit friends
More than 30 interested citizens attended a June 2,
Community Workshop about the trail. And to If sufficient improvements are made, what is the likelihood you
celebrate National Trails Day on June 5, more than would choose to ride or walk instead of drive?
30 people joined trail proponents to walk, bicycle, High (59%); Medium (23 %); Low (18%)
and discuss the proposed route. At both events, If the trail is built, what mode of travel do you expect to utilize most
participants were universally enthusiastic about the often?
trail concept. With this completed vision document in Bicycling (46%); Walking (39%); Running/Jogging (10%); Other
hand, CATSC will continue to work with the city staff, (rollerblading, surrey-riding etc.) (5%)
its boards and commissions, while meeting with
community groups and individuals to plan, design and Suggested names for the trail include: Alameda Belt Line Historic
Rail Trail, Cross Alameda Rail Trail, Island City Rail Trail and
implement the trail. Groups that have expressed
interest in learning more about the trail include: the Alameda Bike-Pedestrian Trail.
Alameda Point Advisory Committee, West Alameda
Business Association, Rotary
Club, Kiwanis Club, College of
Alameda, and the Park Street
Business Association.
Right: Completing surveys at the
June 2, 2004 community workshop
at Coffee for Thought, Alameda.
Far right: Cross Alameda Trail
Steering Committee members discuss
the trail at a community workshop at
the Bay Area School of Enterprise
(BASE), February 24, 2004.
RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION • 5
8. CONNECTIVITY THE BAY TRAIL: The Bay Trail is a planned recreational
The proposed Cross Alameda Trail will connect non- corridor that will eventually encircle San Francisco
motorized travelers (cyclists, wheelchair users, joggers, and San Pablo bays with a continuous, 400-mile
walkers, parents with strollers, inline skaters and network of bicycle and hiking trails. It will connect the
others) to a variety of local and regional resources in shorelines of all nine Bay Area counties, link 47 cities,
and around Alameda. The trail will provide access to: and cross the major toll bridges in the region.
✤ The historic Park Street and Webster Street In Alameda, it encircles Bay Farm Island and is
business districts. envisioned to also encircle much of the main island.
Several segments already exist, such as the Grand
✤ Residential neighborhoods. Marina and Marina Village paths on the island’s
✤ Schools (College of Alameda, Woodstock northern shoreline. The Cross Alameda Trail will serve
Elementary, Chipman Middle, Island High as the connecting corridor between these segments
School) and day care facilities. and serve as Alameda’s north shore portion of the
Bay Trail.
✤ Parks (Littlejohn Park, Thompson Field, McKinley
Park, Main Street Greenway). TRANSIT CONNECTIONS: The trail will provide a safe
and convenient route for non-motorized travelers
✤ Senior housing (Elders Inn, Independence Plaza).
between Alameda’s residential neighborhoods and
✤ Marinas. transit access points. When completed, the trail will
✤ Alameda Point. link to bus stops on several AC Transit District routes
(local lines 50, 51, 63, 19, and Transbay lines W, O,
The trail also will link people to bridges, local and OX). The trail will improve access for bicyclists and
Transbay bus routes, and BART, and provide connec- walkers to the Fruitvale and 12th Street BART stations,
tions to the entire region as a section of the Bay Trail. as well as the Alameda-Oakland Ferry terminal.
Many island residents do not have access to motor
vehicles and depend on public transit, walking or
bicycling for transportation. With the trail in place,
residents of all income levels will find it easier to
commute to work, go shopping or attend schools
without the need to drive a car.
Walkers along the proposed trail,
National Trails Day, June 5, 2004
8 • RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION
9. TRAIL ALIGNMENT ✤ Create separate pathway for cyclists and
The proposed Cross Alameda Trail, utilizing the pedestrians.
Alameda Belt Line alignment wherever feasible, will ✤ Develop supportive business/visitor center (or
provide a convenient, attractive and dedicated route bikestation) adjacent to greenway.
for pedestrians and cyclists to travel across northern
Alameda. ➋ WEBSTER STREET TO CONSTITUTION WAY:
At Webster Street and Atlantic Avenue, the Cross
As much as possible, the trail should be an off-street
Alameda Trail crosses one of Alameda’s busiest
path, separated from automobile traffic. In some
intersections. From this intersection, trail users could
places this will be relatively easy to accomplish, and
access the historic Webster Street commercial district,
in others, it will require more creativity to place the
nearby Marina Village businesses, or board a bus
trail off the street. In some locations, the trail may
headed for Alameda Point, Oakland, San Francisco,
consist of wide sidewalks or on-street bike lanes. This
or BART.
is a common practice with urban rail-trails.
SUGGESTIONS/COMMENTS
For ease of description, the proposed trail was divided
into five logical segments. The city’s feasibility study, ✤ Create dedicated bicycle lane separated from
to be completed in December 2004, will describe the traffic and coordinate bike lane traffic signals
segments and their respective technical characteristics with pedestrian and vehicular signals.
in more detail and include trail cross-sections. ✤ Install bright lighting.
Survey respondents’ comments and suggested improve- ✤ Widen path (sidewalk) where possible to allow
ments follow the descriptions of each segment below. for passing.
✤ Install in-pavement flashing crosswalk lights.
➊ MAIN STREET TO WEBSTER STREET: The trail’s ✤ Make visually interesting for walkers.
proposed western terminus is at Main Street and ✤ Reroute trail through parking lot or quieter area.
Ralph M. Appezzato Parkway (formerly Atlantic ✤ Add secure bike racks at Marina Village and for
Avenue), adjacent to the former Alameda Naval Air those using buses to travel off of the island.
Station (ANAS) on Alameda Point. At Main Street,
the trail will connect with the Main Street Greenway.
This segment of trail will utilize the currently vacant
➌ CONSTITUTION WAY TO SHERMAN STREET: The
trail will enter the former Alameda Belt Line rail yard
and unimproved former Alameda Belt Line property.
at the southeast corner of Atlantic and Constitution.
This part of the trail will serve the growing population This 22-acre parcel is one of the largest remaining
of Alameda Point where the former base is being open spaces in Alameda, and would provide the most
redeveloped for commercial and residential uses. “natural” experience for trail users.
The trail will provide an excellent recreation and The status (price and future zoning) of this Alameda
transportation resource to residents of Alameda’s Belt Line property is still unresolved, and it may either
West End, and offer cyclists and walkers from other be preserved as open space or partially developed
parts of Alameda and the region easy access to the for housing. The CATSC recommends that a trail and
attractions of Alameda Point. linear park be included in any future plans.
SUGGESTIONS/COMMENTS Existing on-street bike lanes on Atlantic Avenue
✤ Acquire easement or right-of-way. provide an alternate commute route for cyclists.
✤ Install crossing lights at elementary school.
SUGGESTIONS/COMMENTS
✤ Increase pedestrian crossing time at Webster
✤ Ideal area for multi-use path and park.
Street, reduce wait time. (Add “Scramble”
crosswalk.) ✤ Separate bicyclists and pedestrians.
✤ Construct pedestrian overpass at Webster Street. ✤ Add landscaping.
✤ Add landscaping and pedestrian furniture, such ✤ Install bright lights for safety.
as benches, water fountains, interesting lights. ✤ Develop like Main Street Greenway.
✤ Add landscape barrier to protect from traffic ✤ Install bike lockers for adjacent businesses.
noise and smog. ✤ Encourage businesses to adopt sections.
RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION • 9
10. ➍ SHERMAN STREET TO GRAND STREET: The TRAIL FEATURES & AMENITIES:
railroad right-of-way traverses the former Del Monte Several design elements that were mentioned in
warehouse property. Clement Street will be extended surveys and community workshops can add visual
through this area and also serve as a truck route. The and functional continuity to the trail. These include:
property is currently under redevelopment.
✤ Landscaping
SUGGESTIONS/COMMENTS ✤ Interpretive Signage
✤ A Class I facility should be established as part of ✤ Other Signs (wayfinding, courtesy, regulatory)
the redevelopment of the property. ✤ Pedestrian-scale furniture (benches, water
✤ Create multi-use path through this area. fountains)
✤ Add lighting, furniture, etc. ✤ Bike racks and staging areas
✤ Promote use of new businesses by trail users. ✤ Bike stations (adjacent to transit)
➎ GRAND STREET TO MILLER-SWEENEY OPPORTUNITIES & CONSTRAINTS
(“FRUITVALE”) BRIDGE: From Grand Street to the Several timely opportunities now exist that encourage
Fruitvale Bridge, the old railroad line travels down the the development of the Cross Alameda Trail and that
center of Clement Street to Tilden Way. The land use require action before they are lost. Several significant
is primarily industrial and marine along the waterfront, constraints must also be addressed.
with some residences on the south side of Clement
Street. A long-term goal in this section is to construct a OPPORTUNITIES
continuous waterfront path. Clement Street is wide ✤ Undeveloped Alameda Belt Line rail yard and the
enough to add on-street bike lanes. Pedestrians may linear parcel along Atlantic Avenue between
opt to utilize scenic Eagle or Buena Vista Avenues for Main and Webster streets.
direct access to the Park Street commercial district. ✤ Redevelopment efforts along the Northern
SUGGESTIONS/COMMENTS Waterfront, including the Del Monte warehouse
✤ Remove rails. and Bridgeside Center and the extension of
Clement Street to Atlantic Avenue at Sherman.
✤ Bike lane should use Clement to Oak streets,
Oak Street to Blanding Avenue, Blanding Avenue ✤ Upcoming bicycle and pedestrian plans.
to Tilden Way. ✤ Webster Street Renaissance Project.
✤ Mark trail (plastic inserts or landscaping) and
give bikes, walkers, scooters, etc. safety margin CONSTRAINTS
from cars and trucks. ✤ Litigation over Alameda Belt Line Railroad
✤ Develop waterfront route. property.
✤ Install bike lockers on Park Street. ✤ Unresolved zoning status of the former rail yard.
✤ Landscape Clement Street. ✤ Existing and future development encroaching on
✤ Install bike/pedestrian-activated signals at Park the potential trail alignment.
Street and Blanding Avenue.
TIMELINE
10 • RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION
11. FUNDING OPPORTUNITIES Below is a list of potential trail funding sources3
Though support for the potential trail is strong, a chief Bicycle Transportation Account (BTA): Caltrans’ competi-
concern of Alameda residents and elected officials is tive BTA program provides approximately $7 million a
the potential cost of implementation. Fortunately, year (up to $1.8 million/project) to projects that
numerous regional, state and federal funding sources improve safety and convenience for bicycle commuters.
are available to acquire, plan and construct trails and
Measure B/ACTIA: In November 2000, Alameda
greenways.
County voters approved Measure B, reauthorizing the
Since the early 1990s, with the passage of federal one-half cent sales tax to be used for transportation
transportation bills (ISTEA, TEA-21, and its pending improvements. Passage of this measure established
successor) the number of programs — and the funding the Alameda County Transportation Improvement
available through them — for implementing trails and Authority (ACTIA) to administer the sales tax. Five
greenways have continually grown. percent of the net revenue collected by Measure B is
The proven public health, transportation, recreation dedicated to bicycle and pedestrian projects.
and economic benefits of a trail will soon outweigh Regional Bike and Pedestrian Program: This Metro-
the initial costs. Successfully funded trail campaigns politan Transportation Commission Program was
have followed these strategies: created in 2004 to fund the construction of the
✤ Pursue a variety of funding sources. Trail-planning Regional Bicycle Network and regionally significant
and implementation require multi-faceted funding pedestrian projects. The Commission committed
strategies. Divide the trail into segments based on $200 million in Phase One of “Transportation 2030”
available and appropriate funding sources as to support the program over a 25-year period.
well as feasibility. Safe Routes to Schools (SR2S): The SR2S program
✤ Complete a Trail Master Plan and related provides funds to projects that help children walk and
environmental studies. bicycle to school more safely. The program reimburses
up to 90 percent of project costs, up to $450,000.
✤ Recruit local and state officials to champion the
trail. Familiarize them with the trail via special Transportation Development Act (TDA), Article 3: TDA
visits and request letters of support from them for provides that one-quarter cent of retail sales tax is
every grant application. returned to the county of origin. Article 3 stipulates
that 2 percent of these funds can be used to fund
✤ Remain flexible. Temporary gaps in a trail are local bicycle and pedestrian facilities. The funds are
acceptable. In the short term, avoid problematic distributed to cities based upon population.
areas. Gaps in trails can make very compelling
grant candidates. Transportation for Livable Communities (TLC): The Bay
Area’s Metropolitan Transportation Commission (MTC)
✤ Work with Planning and Building and Develop- offers the TLC program. It provides incentives for cities
ment Services departments to get trail improve- within the region to improve the range of transportation
ments completed as part of adjacent development choices by pedestrian, transit and/or bicycle facilities.
projects. The TLC program offers up to $75,000 in planning
funds and up to $3 million in capital funds for new
facilities and projects.
RAILS-TO-TRAILS CONSERVANCY CROSS ALAMEDA VISION • 11
12. SUGGESTED NEXT STEPS
1999 Bike Master Plan
By working together effectively, trail proponents, commu- Project #6: Northern Bikeway Corridor and
nity groups and local agencies can successfully convert Park/Fruitvale Bridges Bicycle Access
the Alameda Belt Line to a multi-use trail. Three crucial “…The plan recommends that the selected
components of successful trail projects include: corridor improvements consist of possibly
utilizing portions of the old Alameda Belt Line
✤ A clear and realistic plan of action that details the railroad right-of-way for a new pathway, new
benefits of the project and addresses physical bike lanes where feasible, restriping the street if
constraints and other challenges, including capital traffic conditions permit, bicycle access improve-
ments to the Park Street Bridge via Blanding
funding.
Avenue…”
✤ Strong, widespread community support for the trail.
1990 General Plan
✤ Local, regional, state and federal agency support. Policy 6.1.h
“Develop a continuous greenway, east of Main
Following are some suggested steps to develop the trail: Street north of Atlantic Avenue, and along the
Complete the feasibility study currently being conducted general alignment of the railroad right-of-way
by the City, including intersection treatment options, compat- between Webster Street and Sherman Street,
provided that the greenway design on each
ibility with a potential transit corridor, property ownership parcel allows for connection throughout the
details, and capital cost estimates. length of the greenway.”
Develop a phasing plan. Right-of-way issues widely differ
along the Cross Alameda Trail. A feasibility-based phasing ENDNOTES
plan will accelerate trail acquisition and construction. 1
Guide to Community Preventive Services, Community
Negotiate with the railroad. Negotiate to acquire part or Guide Branch, Centers for Disease Control and Prevention,
December 26, 2002, www.communityguide.org
all of the right-of-way still owned by ABL, especially the
2
uncontested sections. Attempt to secure an easement, Consumers’ Survey on Smart Choices for Home Buyers,
released in April, 2002 by the National Association of
make a partial purchase, or settle pending legal proceed- Realtors (NAR) and the National Association of Home
ings. Continue litigation if required. Builders (NAHB).
3
Establish working partnerships between members of the Matching funds are often required for 11.5 to 20 percent
of total project costs. Matching funds can often come from
public, city staff and elected officials to maintain the trail other local, regional, state or federal funds but cannot
as a priority. usually come from the same source (i.e. federal transporta-
tion funds cannot match federal transportation funds).
Monitor developments affecting the proposed trail and
capitalize on opportunities for implementation.
Rails-to-Trails Conservancy wishes to thank:
Develop a “friends of the trail” group consisting of trail
The City of Alameda Department of Public Works for
supporters and volunteers. assisting with this project.
Adopt a City Council resolution strongly supporting the The San Francisco Foundation for supporting the
trail. This will indicate clear political support for the trail opening of our California field office in 1996, and
specifically for supporting this project.
which is important for grant applications.
The members of the Cross Alameda Trail Steering
Develop political champions. Having vocal, effective Committee and especially Linda Hudson Writing for
political champions has proven to be a critical component editing support.
of successful trail campaigns throughout California. Produced by Rails-to-Trails Conservancy, 2004.
Include the trail in all relevant plans. Complete an
inventory of all city, county and regional plans in which
the project should be identified and integrated. For more information, please visit
www.railtrails.org/CA/
Complete a Cross Alameda Trail Master Plan for the entire crossalamedatrail
trail alignment. Completing a master plan that includes or contact Melanie Mintz
specific design details and environmental clearance is key Rails-to-Trails Conservancy
to acquiring construction funding. 26 O’Farrell Street, Suite 400
San Francisco, California 94108
Investigate potential trail extensions, including other unused Tel: 415-397-2220
railroad corridors that connect to the proposed trail. www.railtrails.org/CA