SlideShare a Scribd company logo
1 of 5
Download to read offline
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR
ANANTAPUR - 515002 (A.P.) INDIA
EXAMINATION BRANCH
B Tech II Year I Semester (R07) Supplementary Examinations - May 2013 Results
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
ASHOK KUMAR G07F61A0206
R7210206 ELECTRICAL MACHINES ‐ I 10 AB 10 F 0
R7210203 PULSE & DIGITAL CIRCUITS 9 31 40 P 4
R7210201 MATHEMATICS ‐ III 14 AB 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0
R7210208 ELECTRICAL CIRCUITS AND SIMULATION LAB 17 39 56 P 2
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 15 32 47 P 4
BHANUPRAVEENREDDY AVULA07F61A0209
R7210203 PULSE & DIGITAL CIRCUITS 7 AB 7 F 0
R7210206 ELECTRICAL MACHINES ‐ I ‐1 AB 0 F 0
CHIRANJEEVI KOTAPATI07F61A0218
R7210201 MATHEMATICS ‐ III 3 20 23 F 0
R7210206 ELECTRICAL MACHINES ‐ I 5 14 19 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 14 28 F 0
ELAGANURU DHANANJAYULU07F61A0219
R7210201 MATHEMATICS ‐ III 8 AB 8 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 29 40 P 4
S GOPINATH07F61A0223
R7210203 PULSE & DIGITAL CIRCUITS 3 AB 3 F 0
R7210206 ELECTRICAL MACHINES ‐ I 3 AB 3 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 4 AB 4 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 AB 7 F 0
R7210201 MATHEMATICS ‐ III 2 AB 2 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
GOWTHAMKUMAR P07F61A0226
R7210206 ELECTRICAL MACHINES ‐ I 8 AB 8 F 0
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 8 AB 8 F 0
MAHESH BABU S07F61A0256
R7210205 ELECTROMAGNETIC FIELDS 9 8 17 F 0
R7210206 ELECTRICAL MACHINES ‐ I 8 9 17 F 0
Page 1 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210203 PULSE & DIGITAL CIRCUITS 5 13 18 F 0
V R MAHESH07F61A0258
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 12 28 40 P 4
R7210205 ELECTROMAGNETIC FIELDS 6 4 10 F 0
NARESH KEERTHIPATI07F61A0268
R7210201 MATHEMATICS ‐ III 8 AB 8 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
R7210206 ELECTRICAL MACHINES ‐ I 8 18 26 F 0
R7210203 PULSE & DIGITAL CIRCUITS 4 5 9 F 0
NAVAKANTH G S07F61A0271
R7210205 ELECTROMAGNETIC FIELDS 5 3 8 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 13 20 F 0
R7210201 MATHEMATICS ‐ III 1 2 3 F 0
R7210206 ELECTRICAL MACHINES ‐ I 5 4 9 F 0
NAVEEN KUMAR G07F61A0272
R7210204 SWITCHING THEORY & LOGIC DESIGN 9 7 16 F 0
R7210206 ELECTRICAL MACHINES ‐ I 3 37 40 P 4
R7210205 ELECTROMAGNETIC FIELDS 3 25 28 F 0
R7210203 PULSE & DIGITAL CIRCUITS 4 28 32 F 0
NANDIPATI RAVITEJA07F61A0285
R7210203 PULSE & DIGITAL CIRCUITS 7 0 7 F 0
R7210205 ELECTROMAGNETIC FIELDS 6 AB 6 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 1 8 F 0
REDDYBHASKAR D07F61A0286
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210203 PULSE & DIGITAL CIRCUITS 10 4 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 7 12 F 0
S SAMEER07F61A0292
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
R7210206 ELECTRICAL MACHINES ‐ I 7 AB 7 F 0
SANDEEP KUMAR B07F61A0293
R7210201 MATHEMATICS ‐ III 6 AB 6 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 10 AB 10 F 0
GANGAPATNAM SIVAKUMAR07F61A02A1
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
R7210201 MATHEMATICS ‐ III 4 AB 4 F 0
S SUNIL KUMAR07F61A02A7
Page 2 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210201 MATHEMATICS ‐ III 5 9 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 11 29 40 P 4
SURESH N07F61A02A8
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 20 31 F 0
R7210203 PULSE & DIGITAL CIRCUITS 2 14 16 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 13 7 20 F 0
R7210205 ELECTROMAGNETIC FIELDS 6 12 18 F 0
R7210206 ELECTRICAL MACHINES ‐ I 4 3 7 F 0
R7210201 MATHEMATICS ‐ III 3 AB 3 F 0
G VEENADHARI07F61A02B8
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
RAGHAVARAJU BHANU07F61A0304
R7210304 MECHANICS OF SOLIDS 7 17 24 F 0
V TEJESH07F61A0328
R7210302 OBJECT ORIENTED PROGRAMMING 10 35 45 P 4
R7210304 MECHANICS OF SOLIDS 2 16 18 F 0
MUTHYALA KUMAR07F61A0444
R7210201 MATHEMATICS ‐ III 9 1 10 F 0
M MOHAN KRISHNA07F61A0456
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 6 8 14 F 0
V NAVEEN07F61A0578
R7210501 PROBABILITY & STATISTICS 10 16 26 F 0
R7210505 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 11 30 41 P 4
R7210506 UNIX & SHELL PROGRAMMING 3 AB 3 F 0
KARAVATI RAVI07F61A0597
R7210506 UNIX & SHELL PROGRAMMING 4 36 40 P 4
P ROOPESH KUMAR07F61A05A1
R7210501 PROBABILITY & STATISTICS 8 AB 8 F 0
N SHANMUKHA SREENIVAS07F61A05A7
R7210506 UNIX & SHELL PROGRAMMING 7 AB 7 F 0
SRIHARI SARAKOLLU07F61A05B2
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE ‐1 AB 0 F 0
SRIPATHI K07F61A05B5
R7210501 PROBABILITY & STATISTICS 6 AB 6 F 0
R7210503 ADVANCED DATA STRUCTURES 9 3 12 F 0
P M PREETHI07F61A1220
R7210501 PROBABILITY & STATISTICS 8 5 13 F 0
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 9 5 14 F 0
KANALA SIVASANKAR08F61A0148
Page 3 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210101 MATHEMATICS ‐ II 13 AB 13 F 0
NOOKALA TEJESWAR08F61A0155
R7210101 MATHEMATICS ‐ II 12 14 26 F 0
R7210106 FLUID MECHANICS 17 14 31 F 0
R7210105 SURVEYING 17 28 45 P 4
P S V PRASAD08F61A0242
R7210201 MATHEMATICS ‐ III 15 AB 15 F 0
R7210205 ELECTROMAGNETIC FIELDS 13 38 51 P 4
C VINODHKUMAR08F61A0272
R7210204 SWITCHING THEORY & LOGIC DESIGN 15 AB 15 F 0
R7210201 MATHEMATICS ‐ III 17 AB 17 F 0
R7210206 ELECTRICAL MACHINES ‐ I 13 AB 13 F 0
K VISHNU08F61A0273
R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
R7210206 ELECTRICAL MACHINES ‐ I 11 AB 11 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 AB 14 F 0
R7210201 MATHEMATICS ‐ III 13 0 13 F 0
LAKAKULA BHARATHDEEP08F61A0304
R7210301 PRODUCTION TECHNOLOGY 9 AB 9 F 0
R7210102 ELECTRICAL & ELECTRONICS ENGINEERING 11 AB 11 F 0
V CHANDRA SEKHAR08F61A0422
R7210201 MATHEMATICS ‐ III 13 AB 13 F 0
R7210406 ELECTRONIC CIRCUIT ANALYSIS 17 AB 17 F 0
R7210405 ELECTRICAL TECHNOLOGY 19 AB 19 F 0
KOTAPATI HARISH08F61A0436
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210406 ELECTRONIC CIRCUIT ANALYSIS 11 AB 11 F 0
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 AB 12 F 0
R7210404 SIGNALS & SYSTEMS 13 AB 13 F 0
PALAKALA RAGHAVENDRA08F61A0486
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 20 32 F 0
K RANGANATHAN08F61A0586
R7210504 DIGITAL LOGIC DESIGN 14 30 44 P 4
R7210501 PROBABILITY & STATISTICS 7 14 21 F 0
R7210503 ADVANCED DATA STRUCTURES 10 32 42 P 4
M REDDY SEKHAR08F61A0588
R7210501 PROBABILITY & STATISTICS 9 2 11 F 0
SAMPATHI S HEMANTH KUMAR08F61A1212
Page 4 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 12 AB 12 F 0
M RADHA SWAMY08F65A0207
R7210206 ELECTRICAL MACHINES ‐ I 7 33 40 P 4
R7210204 SWITCHING THEORY & LOGIC DESIGN 8 AB 8 F 0
R7210203 PULSE & DIGITAL CIRCUITS 5 16 21 F 0
R7210205 ELECTROMAGNETIC FIELDS 4 4 8 F 0
R7210201 MATHEMATICS ‐ III 3 AB 3 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 16 23 F 0
MANOJ KUMAR V09F65A0103
R7210103 STRENGTH OF MATERIALS ‐ I 10 AB 10 F 0
R7210101 MATHEMATICS ‐ II 10 AB 10 F 0
B VINOD KUMAR09F65A0412
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 10 17 27 F 0
R7210201 MATHEMATICS ‐ III 14 3 17 F 0
R7210404 SIGNALS & SYSTEMS 8 10 18 F 0
Page 5 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013

More Related Content

What's hot

B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012
VARIGONDA GOPI
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
P.G.GOPI NATH
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012
VARIGONDA GOPI
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
P.G.GOPI NATH
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 results
VARIGONDA GOPI
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013
P.G.GOPI NATH
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 results
VARIGONDA GOPI
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013
P.G.GOPI NATH
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdf
P.G.GOPI NATH
 
I B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam resultsI B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam results
VARIGONDA GOPI
 
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
P.G.GOPI NATH
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
P.G.GOPI NATH
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 Results
VARIGONDA GOPI
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
P.G.GOPI NATH
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
P.G.GOPI NATH
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 results
VARIGONDA GOPI
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
VARIGONDA GOPI
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 results
VARIGONDA GOPI
 
Iii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 resultsIii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 results
AB Madhu Mohana Raju
 

What's hot (20)

4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 results
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 results
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdf
 
I B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam resultsI B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam results
 
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 Results
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 results
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 results
 
Iii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 resultsIii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 results
 

Viewers also liked

I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012
P.G.GOPI NATH
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013
P.G.GOPI NATH
 
III B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLEIII B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLE
P.G.GOPI NATH
 
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
P.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
P.G.GOPI NATH
 
IV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULTIV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULT
P.G.GOPI NATH
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...
P.G.GOPI NATH
 
III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012
P.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
P.G.GOPI NATH
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
P.G.GOPI NATH
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
P.G.GOPI NATH
 
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
P.G.GOPI NATH
 
III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULT
P.G.GOPI NATH
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
P.G.GOPI NATH
 
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
P.G.GOPI NATH
 
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
P.G.GOPI NATH
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
P.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
P.G.GOPI NATH
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLE
P.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
P.G.GOPI NATH
 

Viewers also liked (20)

I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013
 
III B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLEIII B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLE
 
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
 
IV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULTIV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULT
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...
 
III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
 
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
 
III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULT
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
 
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
 
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLE
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
 

Similar to II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013

B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013
prasadmvreddy
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
Karthik Kumar
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013
prasadmvreddy
 
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
P.G.GOPI NATH
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 results
Karthik Kumar
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012
Karthik Kumar
 
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
P.G.GOPI NATH
 
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
P.G.GOPI NATH
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012
Karthik Kumar
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
VARIGONDA GOPI
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012
Karthik Kumar
 
Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012
SISTKEXAMSECTION
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012
Karthik Kumar
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)
Karthik Kumar
 
I b tech results.pdf
I b tech results.pdfI b tech results.pdf
I b tech results.pdf
Karthik Kumar
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 results
Karthik Kumar
 

Similar to II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013 (20)

B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013
 
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
 
2 1 R09 supply
2 1  R09  supply2 1  R09  supply
2 1 R09 supply
 
2 1 R09 supply(2)
2 1 R09  supply(2)2 1 R09  supply(2)
2 1 R09 supply(2)
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 results
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012
 
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
 
3 u 3-1 reg r09
3 u  3-1 reg r093 u  3-1 reg r09
3 u 3-1 reg r09
 
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012
 
Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)
 
4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
I b tech results.pdf
I b tech results.pdfI b tech results.pdf
I b tech results.pdf
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 results
 

More from P.G.GOPI NATH

Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...
P.G.GOPI NATH
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE.
P.G.GOPI NATH
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple results
P.G.GOPI NATH
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013
P.G.GOPI NATH
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
P.G.GOPI NATH
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
P.G.GOPI NATH
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
P.G.GOPI NATH
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACH
P.G.GOPI NATH
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013
P.G.GOPI NATH
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013
P.G.GOPI NATH
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAY
P.G.GOPI NATH
 

More from P.G.GOPI NATH (12)

Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE.
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple results
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013
 
F6 32 r05s
F6 32 r05sF6 32 r05s
F6 32 r05s
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACH
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAY
 

Recently uploaded

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013

  • 1. JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR ANANTAPUR - 515002 (A.P.) INDIA EXAMINATION BRANCH B Tech II Year I Semester (R07) Supplementary Examinations - May 2013 Results SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS ASHOK KUMAR G07F61A0206 R7210206 ELECTRICAL MACHINES ‐ I 10 AB 10 F 0 R7210203 PULSE & DIGITAL CIRCUITS 9 31 40 P 4 R7210201 MATHEMATICS ‐ III 14 AB 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0 R7210208 ELECTRICAL CIRCUITS AND SIMULATION LAB 17 39 56 P 2 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 15 32 47 P 4 BHANUPRAVEENREDDY AVULA07F61A0209 R7210203 PULSE & DIGITAL CIRCUITS 7 AB 7 F 0 R7210206 ELECTRICAL MACHINES ‐ I ‐1 AB 0 F 0 CHIRANJEEVI KOTAPATI07F61A0218 R7210201 MATHEMATICS ‐ III 3 20 23 F 0 R7210206 ELECTRICAL MACHINES ‐ I 5 14 19 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 14 28 F 0 ELAGANURU DHANANJAYULU07F61A0219 R7210201 MATHEMATICS ‐ III 8 AB 8 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 29 40 P 4 S GOPINATH07F61A0223 R7210203 PULSE & DIGITAL CIRCUITS 3 AB 3 F 0 R7210206 ELECTRICAL MACHINES ‐ I 3 AB 3 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 4 AB 4 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 AB 7 F 0 R7210201 MATHEMATICS ‐ III 2 AB 2 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 GOWTHAMKUMAR P07F61A0226 R7210206 ELECTRICAL MACHINES ‐ I 8 AB 8 F 0 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 8 AB 8 F 0 MAHESH BABU S07F61A0256 R7210205 ELECTROMAGNETIC FIELDS 9 8 17 F 0 R7210206 ELECTRICAL MACHINES ‐ I 8 9 17 F 0 Page 1 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 2. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210203 PULSE & DIGITAL CIRCUITS 5 13 18 F 0 V R MAHESH07F61A0258 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 12 28 40 P 4 R7210205 ELECTROMAGNETIC FIELDS 6 4 10 F 0 NARESH KEERTHIPATI07F61A0268 R7210201 MATHEMATICS ‐ III 8 AB 8 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 R7210206 ELECTRICAL MACHINES ‐ I 8 18 26 F 0 R7210203 PULSE & DIGITAL CIRCUITS 4 5 9 F 0 NAVAKANTH G S07F61A0271 R7210205 ELECTROMAGNETIC FIELDS 5 3 8 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 13 20 F 0 R7210201 MATHEMATICS ‐ III 1 2 3 F 0 R7210206 ELECTRICAL MACHINES ‐ I 5 4 9 F 0 NAVEEN KUMAR G07F61A0272 R7210204 SWITCHING THEORY & LOGIC DESIGN 9 7 16 F 0 R7210206 ELECTRICAL MACHINES ‐ I 3 37 40 P 4 R7210205 ELECTROMAGNETIC FIELDS 3 25 28 F 0 R7210203 PULSE & DIGITAL CIRCUITS 4 28 32 F 0 NANDIPATI RAVITEJA07F61A0285 R7210203 PULSE & DIGITAL CIRCUITS 7 0 7 F 0 R7210205 ELECTROMAGNETIC FIELDS 6 AB 6 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 1 8 F 0 REDDYBHASKAR D07F61A0286 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210203 PULSE & DIGITAL CIRCUITS 10 4 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 7 12 F 0 S SAMEER07F61A0292 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 R7210206 ELECTRICAL MACHINES ‐ I 7 AB 7 F 0 SANDEEP KUMAR B07F61A0293 R7210201 MATHEMATICS ‐ III 6 AB 6 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 10 AB 10 F 0 GANGAPATNAM SIVAKUMAR07F61A02A1 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 R7210201 MATHEMATICS ‐ III 4 AB 4 F 0 S SUNIL KUMAR07F61A02A7 Page 2 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 3. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210201 MATHEMATICS ‐ III 5 9 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 11 29 40 P 4 SURESH N07F61A02A8 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 20 31 F 0 R7210203 PULSE & DIGITAL CIRCUITS 2 14 16 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 13 7 20 F 0 R7210205 ELECTROMAGNETIC FIELDS 6 12 18 F 0 R7210206 ELECTRICAL MACHINES ‐ I 4 3 7 F 0 R7210201 MATHEMATICS ‐ III 3 AB 3 F 0 G VEENADHARI07F61A02B8 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 RAGHAVARAJU BHANU07F61A0304 R7210304 MECHANICS OF SOLIDS 7 17 24 F 0 V TEJESH07F61A0328 R7210302 OBJECT ORIENTED PROGRAMMING 10 35 45 P 4 R7210304 MECHANICS OF SOLIDS 2 16 18 F 0 MUTHYALA KUMAR07F61A0444 R7210201 MATHEMATICS ‐ III 9 1 10 F 0 M MOHAN KRISHNA07F61A0456 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 6 8 14 F 0 V NAVEEN07F61A0578 R7210501 PROBABILITY & STATISTICS 10 16 26 F 0 R7210505 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 11 30 41 P 4 R7210506 UNIX & SHELL PROGRAMMING 3 AB 3 F 0 KARAVATI RAVI07F61A0597 R7210506 UNIX & SHELL PROGRAMMING 4 36 40 P 4 P ROOPESH KUMAR07F61A05A1 R7210501 PROBABILITY & STATISTICS 8 AB 8 F 0 N SHANMUKHA SREENIVAS07F61A05A7 R7210506 UNIX & SHELL PROGRAMMING 7 AB 7 F 0 SRIHARI SARAKOLLU07F61A05B2 R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE ‐1 AB 0 F 0 SRIPATHI K07F61A05B5 R7210501 PROBABILITY & STATISTICS 6 AB 6 F 0 R7210503 ADVANCED DATA STRUCTURES 9 3 12 F 0 P M PREETHI07F61A1220 R7210501 PROBABILITY & STATISTICS 8 5 13 F 0 R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 9 5 14 F 0 KANALA SIVASANKAR08F61A0148 Page 3 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 4. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210101 MATHEMATICS ‐ II 13 AB 13 F 0 NOOKALA TEJESWAR08F61A0155 R7210101 MATHEMATICS ‐ II 12 14 26 F 0 R7210106 FLUID MECHANICS 17 14 31 F 0 R7210105 SURVEYING 17 28 45 P 4 P S V PRASAD08F61A0242 R7210201 MATHEMATICS ‐ III 15 AB 15 F 0 R7210205 ELECTROMAGNETIC FIELDS 13 38 51 P 4 C VINODHKUMAR08F61A0272 R7210204 SWITCHING THEORY & LOGIC DESIGN 15 AB 15 F 0 R7210201 MATHEMATICS ‐ III 17 AB 17 F 0 R7210206 ELECTRICAL MACHINES ‐ I 13 AB 13 F 0 K VISHNU08F61A0273 R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 R7210206 ELECTRICAL MACHINES ‐ I 11 AB 11 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 AB 14 F 0 R7210201 MATHEMATICS ‐ III 13 0 13 F 0 LAKAKULA BHARATHDEEP08F61A0304 R7210301 PRODUCTION TECHNOLOGY 9 AB 9 F 0 R7210102 ELECTRICAL & ELECTRONICS ENGINEERING 11 AB 11 F 0 V CHANDRA SEKHAR08F61A0422 R7210201 MATHEMATICS ‐ III 13 AB 13 F 0 R7210406 ELECTRONIC CIRCUIT ANALYSIS 17 AB 17 F 0 R7210405 ELECTRICAL TECHNOLOGY 19 AB 19 F 0 KOTAPATI HARISH08F61A0436 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210406 ELECTRONIC CIRCUIT ANALYSIS 11 AB 11 F 0 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 AB 12 F 0 R7210404 SIGNALS & SYSTEMS 13 AB 13 F 0 PALAKALA RAGHAVENDRA08F61A0486 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 20 32 F 0 K RANGANATHAN08F61A0586 R7210504 DIGITAL LOGIC DESIGN 14 30 44 P 4 R7210501 PROBABILITY & STATISTICS 7 14 21 F 0 R7210503 ADVANCED DATA STRUCTURES 10 32 42 P 4 M REDDY SEKHAR08F61A0588 R7210501 PROBABILITY & STATISTICS 9 2 11 F 0 SAMPATHI S HEMANTH KUMAR08F61A1212 Page 4 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 5. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 12 AB 12 F 0 M RADHA SWAMY08F65A0207 R7210206 ELECTRICAL MACHINES ‐ I 7 33 40 P 4 R7210204 SWITCHING THEORY & LOGIC DESIGN 8 AB 8 F 0 R7210203 PULSE & DIGITAL CIRCUITS 5 16 21 F 0 R7210205 ELECTROMAGNETIC FIELDS 4 4 8 F 0 R7210201 MATHEMATICS ‐ III 3 AB 3 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 16 23 F 0 MANOJ KUMAR V09F65A0103 R7210103 STRENGTH OF MATERIALS ‐ I 10 AB 10 F 0 R7210101 MATHEMATICS ‐ II 10 AB 10 F 0 B VINOD KUMAR09F65A0412 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 10 17 27 F 0 R7210201 MATHEMATICS ‐ III 14 3 17 F 0 R7210404 SIGNALS & SYSTEMS 8 10 18 F 0 Page 5 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013