SlideShare a Scribd company logo
1 of 8
Download to read offline
Project Management for Results




  Earn 35 PDUs
  and 30 CPE
  Credits!


  Complete                 April 19ā€“23, 2010 | Atlanta, GA
  Your Project
                           Featuring Project Management Methodology Speciļ¬cally
  on Time,                 Designed to Help You:
  Within                     Deļ¬ne and Plan Major Projects
  Budget                     Track and Manage Projects with Greater Accuracy
                             Deļ¬ne Project Goals and Successfully Complete Project Requirements
  and to the
                             Remain within Project Scope
  Customerā€™s                 Manage and Report Project Data and Enhance Performance
  Expectations               Master the Process of Closing and Executing Projects
                             Visualize and Plan Project Activities Using a Work Breakdown Structure



In Association with:


                       Ā®                                         www.ASMIweb.com/PMR 1
                                                                   www.ASMIweb.com/PMR
day one
                   Project Management for Results

                   April 19, 2010
                   8:30                                           1:00
                   Registration & Continental Breakfast
                                                                  Project Initiation Phase
                                                                    Implement key stakeholder techniques for
                   9:00
                                                                    the ļ¬rst customer/sponsor meetings
                   Introduction to Project Management:
                                                                    Identify and describe project requirements
                   The Latest Methodologies in                      in clear terms
                   Project Management According to
                   the PMBOKĀ®
                     Describe the differences between             Project Organization Phase
                     operations, projects and programs              Align project team requirements
                     Deļ¬ne roles, review the necessary skills       with current organizational structure
                     of project managers and identify possible      and standards
                     competency gaps                                Deļ¬ne roles and develop necessary skills to
                                                                    effectively deliver on planned objectives

                   Review the Terminology: Understand
                   Key Concepts and Terms                         Creating the Project Charter
                     Review key project management                  Review criteria to determine exactly what is
                     terminology as it relates to the PMBOKĀ®        needed in the project charter documents
                     and project management methodology             Utilize best-in-class techniques for
                     Differentiate the various roles and            executing a project charter with full
                     responsibilities of project stakeholders       sponsorā€™s approval


                                                                  4:00
                   Develop Project Management Skills              Day One Adjourns
                   for Success
                     Utilize various methods to enhance project
                     team building
                     Understand the key organizational
                     inļ¬‚uences that may affect a project


                   12:00
                   Lunch Break




          who should attend:
           Project Managers                                          Procurement Managers
           Portfolio Managers                                        Acquisition and Procurement Staff
           Program Managers                                          IT Architects
               Ā®
           PMP s                                                     IT Specialists
           Project Support Staff                                     CAPMs
           Program Analysts                                          Contract Managers


2         www.ASMIweb.com/PMR
day two
         Project Management for Results

         April 20, 2010
         8:30                                           1:00
         Registration & Continental Breakfast
                                                        Use the Work Breakdown Structure
                                                        for Effective Estimating
         9:00
                                                          Differentiate cost estimating and
         Key Techniques for Deļ¬ning                       cost budgeting
         a Project
                                                          Develop an expected value process to
           Understand and identify the components of      create a defensible contingency reserve
           a project description document
           Create and describe the purpose of a
           project priority matrix                      Develop a Preliminary Schedule
                                                          Create a network diagram and identify the
                                                          critical path
         Plan the Project Infrastructure
                                                          Identify early and late schedules and
           Determine the purpose of deļ¬ning the           produce a preliminary Gantt Chart using
           project infrastructure                         this information
           Develop quality standards based on project
           goals and contract requirements
                                                        Construct the Network Diagram
                                                          Monitor project timing and resources and
         Visualize and Plan the Project                   manage the links between them
         Activities Using a Work Breakdown                Establish then minimize realistic project
         Structure                                        duration while maintaining overall cost and
           Understand the purpose of a Work               design requirements
           Breakdown Structure (WBS)
           Create a WBS using two techniques            4:00
                                                        Day Two Adjourns

         12:00
         Lunch Break




top ļ¬ve reasons to attend:

 Successfully              Break project        Develop               Understand              Acquire the
 bring a project           work down into       project               critical factors        necessary units to
 from initiation to        meaningful tasks     performance           for reclaiming          sit for the PMPĀ®
 execution                                      measurement           troubled projects       examination
                                                and reporting
                                                standards




                                                                                       www.ASMIweb.com/PMR              3
day three
                    Project Management for Results

                    April 21, 2010
                    8:30                                            1:00
                    Registration & Continental Breakfast            Utilize and Load
                                                                    Organizational Resources
                    9:00                                              Maintain and assign people, facility and
                    Deļ¬ne Project Estimates                           equipment resources accordingly
                      Differentiate between a contingency reserve     Actively adjust loads and variable expenses
                      and a management reserve                        and understand the difference between
                      Use your WBS to provide a more accurate         generic and speciļ¬c-level resources
                      project estimate
                                                                    Create the Project Budget
                    Analyze the Network Diagram                       Identify your costs and develop your own
                      Resolve project and program problems and        project budgeting process
                      make decisions                                  Create a baseline to determine if the
                      Establish then minimize realistic project       project is on track and help chart the project
                      duration while maintaining overall cost and     and progress
                      design requirements
                                                                    Optimize the Project Plan
                    Manage Project Progress: Integrating              Develop key strategies for creating and
                    the Gantt Chart                                   optimizing the project plan
                      Graphically document, manage and                Manage project status and anticipate
                      monitor project progress to effectively         problems that can hurt project progress
                      minimize setbacks
                      Maintain project scope and take corrective    4:00
                      action to get projects back on course         Day Three Adjourns




                    12:00
                    Lunch Break




            PMPĀ® exam voucher: $600
            If you plan on taking the PMP Exam, you may purchase a voucher from The Performance
            Institute for $600. The beneļ¬ts of purchasing the voucher from the Institute are:
              No out-of-pocket expense to register for the exam
              All costs associated with PMP certiļ¬cation are included on one invoice
              Add all PMP certiļ¬cation expenses to the cost of this training




4           www.ASMIweb.com/PMR
day four
     Project Management for Results

     April 22, 2010
     8:30                                               1:00
     Registration & Continental Breakfast
                                                        Assemble the Project Team
                                                          Assess project human capital needs
     9:00
                                                          and negotiate staff assignments with
     Identify Risks                                       senior leadership
       Identify and evaluate project risk                 Lead exercises that promote overall
       Identify speciļ¬c risks by project and by work      team success
       package or activity

                                                        Understand the Project Managerā€™s
     Utilize Risk Analysis Techniques                   Role in Team Development
       Determine how risk management will be              Overcome the many challenges to being an
       executed, who will be involved and the             effective project leader
       precise techniques to use                          Strengthen your leadership skills by
       Objectively analyze the probability and            assessing, developing and advancing
       impact of each possible risk                       management capabilities


     Design a Risk Management Plan                      Report Project Status
       Create a risk management plan to ensure            Record and report project status using
       successful project execution                       different methods
       Analyze, control and mitigate risks using this     Ensure data accuracy when giving real
       effective tool                                     project status reports


     12:00                                              4:00
     Lunch Break                                        Day Four Adjourns




key methodologies covered
The project management process described in this course enables project managers
to produce project deliverables in the least amount of time, for the lowest cost and
with the highest quality. Developed from the Project Management Body of Knowledge
(PMBOKĀ®) and produced by The Project Management Institute (PMI), this course
teaches project managers to develop speciļ¬c goals, objectives and deliverables to
control the elements of projects.




                                                                                      www.ASMIweb.com/PMR         5
day ļ¬ve
                  Project Management for Results

                  April 23, 2010
                  8:30                                           1:00
                  Registration & Continental Breakfast
                                                                 Monitor and Control Project Processes
                                                                   Utilize proper measures and metrics to
                  9:00
                                                                   gauge project processes
                  Deal with Change
                                                                   Effectively report project processes and
                    Manage and communicate project change          make enhancements
                    Create a change management system to
                    avoid confusion and keep your projects
                    on track                                     Execute the Project Closeout Phase
                                                                   Name the three steps to closing out a
                                                                   project and several choices for project
                  Establish Change Management                      closeout activities
                  Control Procedures                               Conduct a project closeout review
                    Initiate a change management process
                    within your project
                    Enhance project team success through         Document Lessons Learned
                    effective change initiatives                   Document project successes and
                                                                   improvements
                                                                   Implement a system to ensure data and
                  Adjust the Scope for                             metrics for further projects
                  Schedule Changes
                    Schedule changes that can uncontrollably     4:00
                    alter the project scope                      Conference Adjourns
                    Keep your project within scope and on time
                    using best practices

                  12:00
                  Lunch Break




          sponsorship opportunities
          As a conference and training provider, The American Strategic Management Institute is an
          expert in bringing together leaders to share and discuss best practices and innovations. We
          connect decision-makers with respected solution providers.

          ASMI offers four different pre-designed sponsorship packages:
          ā€¢ Event Co-Sponsor ā€¢ Session Sponsor ā€¢ Luncheon Sponsor ā€¢ Exhibit Booth Sponsor

          For more information on sponsorships or to get started, please contact Meredith Mason at
          202-739-9707 or email her at Meredith.Mason@ASMIweb.com

6         www.ASMIweb.com/PMR
Project Management for Results

 Logistics & Registration
 Venue and Hotel:                                                     PDUs
 Project Management for Results will be hosted at The                                               PMI Registered Education Provider
 Westin Buckhead in Atlanta, GA. Continental breakfast and                                          PDU Credits: Up to 35
                                                                  Ā®                                    As a PMI Registered Education Provider (R.E.P), The
 refreshments will be provided for delegates on each day.
                                                                      Performance Institute has agreed to abide by PMI established quality assurance
                                                                      criteria. ā€œPMIā€ and the PMI logo are service and trademarks registered in the
 Conference Address:                                                  United States and other nations; ā€œPMPā€ is a certiļ¬cation mark registered in
 The Westin Buckhead Atlanta                                          the United States and other nations; ā€œPMBOKā€ and ā€œCAPMā€ are trademarks
                                                                      registered in the United States and other nations by the Project Management
 3391 Peachtree Road, NE                                              Institute, Inc., which is not afļ¬liated with The Performance Institute. Earning
 Atlanta, GA 30326                                                    PMI Credits: The Performance Institute is a Registered Education Provider of
                                                                      The Project Management Institute. All of our project management trainings,
 (404) 365-0065                                                       conferences and webinars offer credits to help you take the PMP Exam or stay
                                                                      accredited with PMI.
 A limited number of rooms have been reserved at The Westin
 Buckhead Atlanta at the prevailing rate of $169.00 until March
 19, 2010. Please call the hotel directly and reference code
                                                                      CPE Credits:
 Project Management for Results when making reservations to                        Delivery Method: Group-live
 get the discounted rate.                                                          Program Level: Basic
                                                                                   Prerequisites: None
 The Westin Buckhead Atlanta                                                       Advanced Preparation: None
 3391 Peachtree Road, NE                                              CPE Credits: 30 Credits
 Atlanta, GA 30326                                                    The American Strategic Management Institute (ASMI) is registered with the
                                                                      National Association of State Boards of Accountancy (NASBA) as a sponsor of
 (404) 365-0065                                                       continuing professional education on the National Registry of CPE Sponsors.
 http://www.starwoodhotels.com/westin/property/                       State boards of accountancy have ļ¬nal authority on the acceptance of individual
 overview/index.html?propertyID=1485                                  courses for CPE credit. Complaints regarding sponsors may be addressed to
                                                                      the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN
                                                                      37219-2417. Website: www.nasba.org.

 Tuition & Group Discounts:
 The tuition rate for attending Project Management for                Quality Assurance
 Results Week is as follows:                                          ASMI strives to provide you with the most productive and effective
  Offerings                            Rate         PDUs              educational experience possible. If after completing the course you feel
                                                                      there is some way we can improve, please write your comments on the
  Full Project Management                                             evaluation form provided upon your arrival. Should you feel dissatisļ¬ed
                                      $2199           35              with your learning experience and wish to request a credit or refund,
  for Results Week                                                    please submit it in writing no later than 10 business days after the end of
                                                                      the training to: ASMI: Corporate Headquarters; 805 15th Street NW, 3rd
 * For information on group discounts, please contact                 Floor; Washington, D.C. 20005
   Dave Yerks at 858-866-9381 or email him at
                                                                      Note: As speakers are conļ¬rmed six months before the event, some
   David.Yerks@ASMIweb.com                                            speaker changes or topic changes may occur in the program. ASMI is not
                                                                      responsible for speaker changes, but will work to ensure a comparable
                                                                      speaker is located to participate in the program.

                                                                      If for any reason ASMI decides to cancel this conference, ASMI

ā€œVery interesting                                                     accepts no responsibility for covering airfare, hotel or other costs incurred
                                                                      by registrants, including delegates, sponsors and guests.



 combination of                                                       Discounts and Payment

                                                                      ā€¢ All ā€˜Early Birdā€™ Discounts must require payment at time of registration

 system and strategy. Real                                              and before the cut-off date in order to receive any discount.
                                                                      ā€¢ Any discounts offered whether by ASMI (including team discounts) must
                                                                        also require payment at the time of registration.

 demonstration of how to.ā€                                            ā€¢ All discount offers cannot be combined with any other offer.
                                                                      ā€¢ Discounts cannot be applied retroactively

                                                                      Payment must be secured prior to the conference. If payment is not
 Teri Burks,                                                          received by the conference start date, a method of payment must
                                                                      be presented at the time of registration in order to guarantee your
 Regional Project Manager, USDA                                       participation at the event.




                                                                                                                www.ASMIweb.com/PMR                          7
Project Management for Results

    Logistics & Registration
    to register
                 Call                                    Fax this Form to                                 Visit
                 877-992-9522                            866-234-0680                                     www.ASMIweb.com/PMR



     Registration Form
            Yes! Register me for Full Project Management for Results Week
            Please call me. I am interested in a special Group Discount for my team


     Delegate Information


     Name                                                                            Title




     Organization                                                                    Dept.




     Address




     City                                                                            State                                    Zip




     Telephone                                              Fax                                         Email



     Payment Information:
       Check         Purchase Order / Training Form                                  Credit Card


     Credit Card Number                                                Expiration Date                                        Veriļ¬cation no.




     Name on Card                                                      Billing Zip



     Please make checks payable to: The Performance Institute

     CANCELLATION POLICY: ASMI will provide a full refund less a $399 administration fee for cancellations requested four weeks prior
     to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than
     two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event
     will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance
     conļ¬rmation email. Please note that cancellation is not ļ¬nal until you receive a cancellation conļ¬rmation email.

            I have read and accepted the Cancellation Policy above.

     ACKNOWLEDGED AND AGREED

     By: __________________________________________________________________________________________             Date: _______________________

                                                                                                                         Priority Code: T348-WEB



8   www.ASMIweb.com/PMR

More Related Content

What's hot

What's hot (19)

T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
Ā 
T328
T328T328
T328
Ā 
T328
T328T328
T328
Ā 
T328
T328T328
T328
Ā 
T355
T355T355
T355
Ā 
T349 Pi Web
T349 Pi WebT349 Pi Web
T349 Pi Web
Ā 
T343
T343T343
T343
Ā 
T347 P Iweb
T347 P IwebT347 P Iweb
T347 P Iweb
Ā 
T347
T347T347
T347
Ā 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
Ā 
P775
P775P775
P775
Ā 
ThinkICT -Process and Tools for PM
ThinkICT -Process and Tools for PMThinkICT -Process and Tools for PM
ThinkICT -Process and Tools for PM
Ā 
5 Ways SharePoint will Benefit your PMO
5 Ways SharePoint will Benefit your PMO5 Ways SharePoint will Benefit your PMO
5 Ways SharePoint will Benefit your PMO
Ā 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
Ā 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
Ā 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overview
Ā 
T344
T344T344
T344
Ā 
T344 Web
T344 WebT344 Web
T344 Web
Ā 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
Ā 

Viewers also liked

Viewers also liked (8)

K228
K228K228
K228
Ā 
L281
L281L281
L281
Ā 
W237
W237W237
W237
Ā 
W231
W231W231
W231
Ā 
B315
B315B315
B315
Ā 
M136
M136M136
M136
Ā 
B310 Web
B310 WebB310 Web
B310 Web
Ā 
B315
B315B315
B315
Ā 

Similar to T348 Asm Iweb (20)

T348 Asm Iweb
T348 Asm IwebT348 Asm Iweb
T348 Asm Iweb
Ā 
T348 P Iweb
T348 P IwebT348 P Iweb
T348 P Iweb
Ā 
T349
T349T349
T349
Ā 
T335 Asmiweb
T335 AsmiwebT335 Asmiweb
T335 Asmiweb
Ā 
T328
T328T328
T328
Ā 
T355
T355T355
T355
Ā 
T349
T349T349
T349
Ā 
T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
Ā 
T335 Web
T335 WebT335 Web
T335 Web
Ā 
T335 Web
T335 WebT335 Web
T335 Web
Ā 
T328
T328T328
T328
Ā 
T328
T328T328
T328
Ā 
T335asmi
T335asmiT335asmi
T335asmi
Ā 
T356
T356T356
T356
Ā 
T356 Asmi
T356 AsmiT356 Asmi
T356 Asmi
Ā 
T329
T329T329
T329
Ā 
T335
T335T335
T335
Ā 
Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1
Ā 
T329
T329T329
T329
Ā 
T326
T326T326
T326
Ā 

More from guesta433fb

More from guesta433fb (6)

W236
W236W236
W236
Ā 
B315
B315B315
B315
Ā 
K228
K228K228
K228
Ā 
P750
P750P750
P750
Ā 
W236
W236W236
W236
Ā 
V2E Business Life Cycle
V2E Business Life CycleV2E Business Life Cycle
V2E Business Life Cycle
Ā 

Recently uploaded

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
Ā 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
Ā 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
Ā 
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’anilsa9823
Ā 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
Ā 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
Ā 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
Ā 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
Ā 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
Ā 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
Ā 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...amitlee9823
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
Ā 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
Ā 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
Ā 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
Ā 

Recently uploaded (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
Ā 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Ā 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Ā 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
Ā 
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’VIP Call Girls In Saharaganj ( Lucknow  ) šŸ” 8923113531 šŸ”  Cash Payment (COD) šŸ‘’
VIP Call Girls In Saharaganj ( Lucknow ) šŸ” 8923113531 šŸ” Cash Payment (COD) šŸ‘’
Ā 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Ā 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
Ā 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
Ā 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
Ā 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
Ā 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Ā 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Ā 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
Ā 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
Ā 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Ā 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
Ā 

T348 Asm Iweb

  • 1. Project Management for Results Earn 35 PDUs and 30 CPE Credits! Complete April 19ā€“23, 2010 | Atlanta, GA Your Project Featuring Project Management Methodology Speciļ¬cally on Time, Designed to Help You: Within Deļ¬ne and Plan Major Projects Budget Track and Manage Projects with Greater Accuracy Deļ¬ne Project Goals and Successfully Complete Project Requirements and to the Remain within Project Scope Customerā€™s Manage and Report Project Data and Enhance Performance Expectations Master the Process of Closing and Executing Projects Visualize and Plan Project Activities Using a Work Breakdown Structure In Association with: Ā® www.ASMIweb.com/PMR 1 www.ASMIweb.com/PMR
  • 2. day one Project Management for Results April 19, 2010 8:30 1:00 Registration & Continental Breakfast Project Initiation Phase Implement key stakeholder techniques for 9:00 the ļ¬rst customer/sponsor meetings Introduction to Project Management: Identify and describe project requirements The Latest Methodologies in in clear terms Project Management According to the PMBOKĀ® Describe the differences between Project Organization Phase operations, projects and programs Align project team requirements Deļ¬ne roles, review the necessary skills with current organizational structure of project managers and identify possible and standards competency gaps Deļ¬ne roles and develop necessary skills to effectively deliver on planned objectives Review the Terminology: Understand Key Concepts and Terms Creating the Project Charter Review key project management Review criteria to determine exactly what is terminology as it relates to the PMBOKĀ® needed in the project charter documents and project management methodology Utilize best-in-class techniques for Differentiate the various roles and executing a project charter with full responsibilities of project stakeholders sponsorā€™s approval 4:00 Develop Project Management Skills Day One Adjourns for Success Utilize various methods to enhance project team building Understand the key organizational inļ¬‚uences that may affect a project 12:00 Lunch Break who should attend: Project Managers Procurement Managers Portfolio Managers Acquisition and Procurement Staff Program Managers IT Architects Ā® PMP s IT Specialists Project Support Staff CAPMs Program Analysts Contract Managers 2 www.ASMIweb.com/PMR
  • 3. day two Project Management for Results April 20, 2010 8:30 1:00 Registration & Continental Breakfast Use the Work Breakdown Structure for Effective Estimating 9:00 Differentiate cost estimating and Key Techniques for Deļ¬ning cost budgeting a Project Develop an expected value process to Understand and identify the components of create a defensible contingency reserve a project description document Create and describe the purpose of a project priority matrix Develop a Preliminary Schedule Create a network diagram and identify the critical path Plan the Project Infrastructure Identify early and late schedules and Determine the purpose of deļ¬ning the produce a preliminary Gantt Chart using project infrastructure this information Develop quality standards based on project goals and contract requirements Construct the Network Diagram Monitor project timing and resources and Visualize and Plan the Project manage the links between them Activities Using a Work Breakdown Establish then minimize realistic project Structure duration while maintaining overall cost and Understand the purpose of a Work design requirements Breakdown Structure (WBS) Create a WBS using two techniques 4:00 Day Two Adjourns 12:00 Lunch Break top ļ¬ve reasons to attend: Successfully Break project Develop Understand Acquire the bring a project work down into project critical factors necessary units to from initiation to meaningful tasks performance for reclaiming sit for the PMPĀ® execution measurement troubled projects examination and reporting standards www.ASMIweb.com/PMR 3
  • 4. day three Project Management for Results April 21, 2010 8:30 1:00 Registration & Continental Breakfast Utilize and Load Organizational Resources 9:00 Maintain and assign people, facility and Deļ¬ne Project Estimates equipment resources accordingly Differentiate between a contingency reserve Actively adjust loads and variable expenses and a management reserve and understand the difference between Use your WBS to provide a more accurate generic and speciļ¬c-level resources project estimate Create the Project Budget Analyze the Network Diagram Identify your costs and develop your own Resolve project and program problems and project budgeting process make decisions Create a baseline to determine if the Establish then minimize realistic project project is on track and help chart the project duration while maintaining overall cost and and progress design requirements Optimize the Project Plan Manage Project Progress: Integrating Develop key strategies for creating and the Gantt Chart optimizing the project plan Graphically document, manage and Manage project status and anticipate monitor project progress to effectively problems that can hurt project progress minimize setbacks Maintain project scope and take corrective 4:00 action to get projects back on course Day Three Adjourns 12:00 Lunch Break PMPĀ® exam voucher: $600 If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The beneļ¬ts of purchasing the voucher from the Institute are: No out-of-pocket expense to register for the exam All costs associated with PMP certiļ¬cation are included on one invoice Add all PMP certiļ¬cation expenses to the cost of this training 4 www.ASMIweb.com/PMR
  • 5. day four Project Management for Results April 22, 2010 8:30 1:00 Registration & Continental Breakfast Assemble the Project Team Assess project human capital needs 9:00 and negotiate staff assignments with Identify Risks senior leadership Identify and evaluate project risk Lead exercises that promote overall Identify speciļ¬c risks by project and by work team success package or activity Understand the Project Managerā€™s Utilize Risk Analysis Techniques Role in Team Development Determine how risk management will be Overcome the many challenges to being an executed, who will be involved and the effective project leader precise techniques to use Strengthen your leadership skills by Objectively analyze the probability and assessing, developing and advancing impact of each possible risk management capabilities Design a Risk Management Plan Report Project Status Create a risk management plan to ensure Record and report project status using successful project execution different methods Analyze, control and mitigate risks using this Ensure data accuracy when giving real effective tool project status reports 12:00 4:00 Lunch Break Day Four Adjourns key methodologies covered The project management process described in this course enables project managers to produce project deliverables in the least amount of time, for the lowest cost and with the highest quality. Developed from the Project Management Body of Knowledge (PMBOKĀ®) and produced by The Project Management Institute (PMI), this course teaches project managers to develop speciļ¬c goals, objectives and deliverables to control the elements of projects. www.ASMIweb.com/PMR 5
  • 6. day ļ¬ve Project Management for Results April 23, 2010 8:30 1:00 Registration & Continental Breakfast Monitor and Control Project Processes Utilize proper measures and metrics to 9:00 gauge project processes Deal with Change Effectively report project processes and Manage and communicate project change make enhancements Create a change management system to avoid confusion and keep your projects on track Execute the Project Closeout Phase Name the three steps to closing out a project and several choices for project Establish Change Management closeout activities Control Procedures Conduct a project closeout review Initiate a change management process within your project Enhance project team success through Document Lessons Learned effective change initiatives Document project successes and improvements Implement a system to ensure data and Adjust the Scope for metrics for further projects Schedule Changes Schedule changes that can uncontrollably 4:00 alter the project scope Conference Adjourns Keep your project within scope and on time using best practices 12:00 Lunch Break sponsorship opportunities As a conference and training provider, The American Strategic Management Institute is an expert in bringing together leaders to share and discuss best practices and innovations. We connect decision-makers with respected solution providers. ASMI offers four different pre-designed sponsorship packages: ā€¢ Event Co-Sponsor ā€¢ Session Sponsor ā€¢ Luncheon Sponsor ā€¢ Exhibit Booth Sponsor For more information on sponsorships or to get started, please contact Meredith Mason at 202-739-9707 or email her at Meredith.Mason@ASMIweb.com 6 www.ASMIweb.com/PMR
  • 7. Project Management for Results Logistics & Registration Venue and Hotel: PDUs Project Management for Results will be hosted at The PMI Registered Education Provider Westin Buckhead in Atlanta, GA. Continental breakfast and PDU Credits: Up to 35 Ā® As a PMI Registered Education Provider (R.E.P), The refreshments will be provided for delegates on each day. Performance Institute has agreed to abide by PMI established quality assurance criteria. ā€œPMIā€ and the PMI logo are service and trademarks registered in the Conference Address: United States and other nations; ā€œPMPā€ is a certiļ¬cation mark registered in The Westin Buckhead Atlanta the United States and other nations; ā€œPMBOKā€ and ā€œCAPMā€ are trademarks registered in the United States and other nations by the Project Management 3391 Peachtree Road, NE Institute, Inc., which is not afļ¬liated with The Performance Institute. Earning Atlanta, GA 30326 PMI Credits: The Performance Institute is a Registered Education Provider of The Project Management Institute. All of our project management trainings, (404) 365-0065 conferences and webinars offer credits to help you take the PMP Exam or stay accredited with PMI. A limited number of rooms have been reserved at The Westin Buckhead Atlanta at the prevailing rate of $169.00 until March 19, 2010. Please call the hotel directly and reference code CPE Credits: Project Management for Results when making reservations to Delivery Method: Group-live get the discounted rate. Program Level: Basic Prerequisites: None The Westin Buckhead Atlanta Advanced Preparation: None 3391 Peachtree Road, NE CPE Credits: 30 Credits Atlanta, GA 30326 The American Strategic Management Institute (ASMI) is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of (404) 365-0065 continuing professional education on the National Registry of CPE Sponsors. http://www.starwoodhotels.com/westin/property/ State boards of accountancy have ļ¬nal authority on the acceptance of individual overview/index.html?propertyID=1485 courses for CPE credit. Complaints regarding sponsors may be addressed to the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN 37219-2417. Website: www.nasba.org. Tuition & Group Discounts: The tuition rate for attending Project Management for Quality Assurance Results Week is as follows: ASMI strives to provide you with the most productive and effective Offerings Rate PDUs educational experience possible. If after completing the course you feel there is some way we can improve, please write your comments on the Full Project Management evaluation form provided upon your arrival. Should you feel dissatisļ¬ed $2199 35 with your learning experience and wish to request a credit or refund, for Results Week please submit it in writing no later than 10 business days after the end of the training to: ASMI: Corporate Headquarters; 805 15th Street NW, 3rd * For information on group discounts, please contact Floor; Washington, D.C. 20005 Dave Yerks at 858-866-9381 or email him at Note: As speakers are conļ¬rmed six months before the event, some David.Yerks@ASMIweb.com speaker changes or topic changes may occur in the program. ASMI is not responsible for speaker changes, but will work to ensure a comparable speaker is located to participate in the program. If for any reason ASMI decides to cancel this conference, ASMI ā€œVery interesting accepts no responsibility for covering airfare, hotel or other costs incurred by registrants, including delegates, sponsors and guests. combination of Discounts and Payment ā€¢ All ā€˜Early Birdā€™ Discounts must require payment at time of registration system and strategy. Real and before the cut-off date in order to receive any discount. ā€¢ Any discounts offered whether by ASMI (including team discounts) must also require payment at the time of registration. demonstration of how to.ā€ ā€¢ All discount offers cannot be combined with any other offer. ā€¢ Discounts cannot be applied retroactively Payment must be secured prior to the conference. If payment is not Teri Burks, received by the conference start date, a method of payment must be presented at the time of registration in order to guarantee your Regional Project Manager, USDA participation at the event. www.ASMIweb.com/PMR 7
  • 8. Project Management for Results Logistics & Registration to register Call Fax this Form to Visit 877-992-9522 866-234-0680 www.ASMIweb.com/PMR Registration Form Yes! Register me for Full Project Management for Results Week Please call me. I am interested in a special Group Discount for my team Delegate Information Name Title Organization Dept. Address City State Zip Telephone Fax Email Payment Information: Check Purchase Order / Training Form Credit Card Credit Card Number Expiration Date Veriļ¬cation no. Name on Card Billing Zip Please make checks payable to: The Performance Institute CANCELLATION POLICY: ASMI will provide a full refund less a $399 administration fee for cancellations requested four weeks prior to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance conļ¬rmation email. Please note that cancellation is not ļ¬nal until you receive a cancellation conļ¬rmation email. I have read and accepted the Cancellation Policy above. ACKNOWLEDGED AND AGREED By: __________________________________________________________________________________________ Date: _______________________ Priority Code: T348-WEB 8 www.ASMIweb.com/PMR