NET ZERO ENERGY BUILDING (NZEB)
Presented By: Abdur Rasheed, Abu Huraira & Mohd Khalid Raza
• amount of energy used is equal to amount of renewable energy created on
the site
• reduce carbon emissions & reduce dependence on fossil fuels
• Buildings that produce a surplus of energy over the year are called “Energy
Surplus Buildings”
• During the last 20 years more than 200 reputable projects claiming net zero
energy balance have been realized all over the world.
• NZEB buildings consequently contribute less overall greenhouse gas to the
atmosphere than similar non-ZNE buildings. They do at times consume non-
renewable energy and produce greenhouse gases, but at other times reduce
energy consumption and greenhouse gas production elsewhere by the same
amount. Traditional buildings consume 40% of the total fossil fuel energy in all
over the world and are significant contributors of greenhouse gases.
Net Zero Energy Building
For the discussion of ZEB definitions literature can be divided into a number of main important
topics
1. Energy focus
Total energy demand in the building is a sum of thermal and electricity demand; however,
many studies focus only on one demand neglecting the other. This issue is raised by Able,
(1994): “Many low-energy building projects seem to have been based on the idea 'decrease
heat supply at any cost'. In some cases, this has resulted in 'zero-energy buildings' which, it is
true, do not need any heat supply but do, instead, indirectly need electricity, e.g., to operate
the heat pump included in the system.”
2 . Energy Supply system
The scientific publications focus either on off-grid ZEBs or on-grid ZEB. The main difference
between those two approaches is that, the off-grid ZEB does not have any connection to the
energy infrastructure, thus it does not purchase energy from any external sources, and the
boundaries for the balance calculations are within the building. The on-grid ZEB, in the
literature also named “net zero” or “grid connected”, is the energy producing building
connected to one or more energy infrastructures; electricity grid, district heating and cooling
system, gas pipe network, biomass and bio fuels distribution networks. Therefore, it is has a
possibility for both buying and selling energy from/to the utility grid. This division is also well
noticeable in the ZEB definitions.
3. Renewable energy options
• In a ZEB, it is necessary to define the supply-side of the renewable energy sources.
• There are two options: on-site supply or off-site supply.
• Within the on-site supply authors distinguish building footprint and building site.
• Within the off-site supply the building either uses RES available off-site to produce
energy on-site, or purchase off-site RES.
Total Energy consumption diagram
NZEB CONCEPTS
• Net Zero Site Energy
• Net Zero Source Energy
• Net Zero Energy Costs
• Net Zero Energy Emissions
WHY NZEB
• Reduces Energy Consumption
• Reduces Green House Gases (Carbon Emissions) & Global Warming
• Reduces Dependence on Fossil Fuels
• Reduces Ozone Depletion
• Reduces Climate Change
• Protects Our Environment for Future Generations
Strat
Energy demand
Load demand
Air flow
simulation
Colling load
Renewable
sources
identification
Economical and
environmental
benefits
Maintenance
Reneweable
resources
Climate analysis
Methodology
Process of construction
Design Methodology
• Construction & lab experiments are
costly
• Computer Simulations are
convenient & quick
• Very low cost
• EnergyPlus and TRNSYS 16.0 are used
• EnergyPlus models hourly energy
consumption
• TRNSYS is widely applied for both
energy efficiency and renewable
energy analyses
• EnergyPlus simulations are used for
building envelope design
• TRANSYS is used for building systems
and renewable energy systems
design
Weather Data Analysis
Primary step
•Wind frequency profile
ZERO ENERGY STRATEGIES & COMPONENTS
Case Study: The Indira Paryavaran Bhavan.
• India’s first net zero energy building
• solar passive design and energy-efficient building materials.
• earthquake-resistant structure with a total plinth area of 31,488 sq. m.
• More than 50 per cent area outside the building is a soft area with plantation and
grass.
• The building has a robotic parking system in the basement that can accommodate 330
cars.
• Thin-client networking system has been provided instead of conventional desktop
computers to minimise energy consumption.
• Design allows for 75% of natural daylight to be utilised to reduce energy consumption.
• Installed capacity of 930 kW peak power, the building has the largest rooftop solar
system among multi-storied buildings in India.
• Union environment minister Prakash Javadekar showcased the building to United
Nations secretary general Ban Ki-moon on 13/1/15
• Total energy savings of about 40 per cent through the adoption of energy efficient
chilled beam system of air-conditioning
• Air-conditioning is done by convection currents rather than airflow through air handling
units, and chilled water is circulated right up to the diffuser points unlike the
conventional systems.
• UPVC windows with hermetically sealed double glass. Calcium Silicate ceiling tiles with
high recyclable content and grass paver blocks on pavements and roads, renewable
bamboo jute for door-frame, fly ash bricks
• Reduction in water consumption has been achieved by use of low-discharge water
fixtures, recycling of waste water through sewage treatment plant, use of plants with
low water demand in landscaping, use of geothermal cooling for HVAC system,
rainwater harvesting and use of curing compounds during construction.
• Preservation of maximum possible number of trees standing over the site
• Solar Passive Architecture with proper orientation and shading of
Fenestrations
• Appropriate building envelope design with envelope insulation to reduce
heat intake
• Use of permanent, durable and local materials such as sand stone on
exterior face, low heat transmission glass and reflective roofing
• Priority for pedestrians in the front, with vehicular access on the sides of
the building
• Reduction of conventional lighting load by ensuring 75% day-light use
• Natural ventilation due to stack effect
• The building is designed in such a way that there is free ventilation across
the entire building
Architectural design of the building is primarily based on
following concepts
• Utilization of High Efficiency Solar Panels to achieve Net Zero criteria
• Energy efficient T-5 and LED fixtures
• Innovative chilled beam system for cooling
• Pre-cooling of fresh air from exhaust using heat recovery wheel in order to
reduce load on chiller plant
• Water cooled chillers
• Double skin air handling units with variable frequency drives
• Geo thermal heat exchange technology used for heat rejection from Air-
conditioning system
• Innovative energy saving regenerative lifts which have been installed for the first
time in government institutional building
Energy Conservation Measures:
Conclusion
•With the advancement in renewable technology, Net Zero Energy Buildings
are the future.
•Many governments have framed Zero Energy building laws.
•Few governments are also providing subsidies to individuals and
organizations for creating Zero Energy Buildings.
•The goal of zero energy buildings would not be fulfilled till the time all the
people don’t understand their responsibility and contribute towards reducing
energy consumption.
• Solar and Wind energy will be the major contributor of renewable energy for
ZEB’s owing to their widespread availability.
• Biogas can also be used for our energy needs but its only constraint is that it
needs huge quantity of waste and it is also not feasible everywhere.
• Geothermal energy is an upcoming form of energy having great potential to
generate electricity but a lot of research still has to be done to tap into its full
potential.
THANKS

More Related Content

What's hot

Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSamanth kumar
 
Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingKetulKhatri
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Buildingshiva prakash
 
Energy efficiency building code
Energy  efficiency building codeEnergy  efficiency building code
Energy efficiency building codeJhanvi Desai
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India Satya Rachakonda
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case studyInu shakya
 
Zero Energy Building - A Case Study
Zero Energy Building - A Case StudyZero Energy Building - A Case Study
Zero Energy Building - A Case StudySonali117356
 
Net zero or nearly zero energy buildings
Net zero or nearly zero energy buildings Net zero or nearly zero energy buildings
Net zero or nearly zero energy buildings badekarbhavana
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy BuildingsJeffrey Funk
 
Zero energy buildings seminar
Zero energy buildings seminarZero energy buildings seminar
Zero energy buildings seminarSharan Raj
 

What's hot (20)

IGBC
IGBCIGBC
IGBC
 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
 
Case study
Case studyCase study
Case study
 
Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green Building
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
Energy efficiency building code
Energy  efficiency building codeEnergy  efficiency building code
Energy efficiency building code
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
Zero energy building
Zero energy buildingZero energy building
Zero energy building
 
ITC Green Centre Gurgaon
ITC Green Centre GurgaonITC Green Centre Gurgaon
ITC Green Centre Gurgaon
 
Energy Efficient and sustainable Buildings
Energy Efficient  and sustainable BuildingsEnergy Efficient  and sustainable Buildings
Energy Efficient and sustainable Buildings
 
Embodied energy
Embodied energyEmbodied energy
Embodied energy
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
 
Zero Energy Building - A Case Study
Zero Energy Building - A Case StudyZero Energy Building - A Case Study
Zero Energy Building - A Case Study
 
Net zero or nearly zero energy buildings
Net zero or nearly zero energy buildings Net zero or nearly zero energy buildings
Net zero or nearly zero energy buildings
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy Buildings
 
Zero energy buildings seminar
Zero energy buildings seminarZero energy buildings seminar
Zero energy buildings seminar
 
Leed
Leed Leed
Leed
 

Similar to Net zero energy building

Information about zero energy building and green buiding
Information about zero energy building and green buidingInformation about zero energy building and green buiding
Information about zero energy building and green buidingNikhil NG
 
Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)niruma
 
Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)niruma
 
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptx
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptxRenewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptx
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptxArunachelamN1
 
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Loay Ghazaleh MBA, BSc Civil Eng.
 
Green buildings and Renewable energy
Green buildings and Renewable energyGreen buildings and Renewable energy
Green buildings and Renewable energyron55456545
 
eea desktop case study.pdf
eea desktop case study.pdfeea desktop case study.pdf
eea desktop case study.pdfDarshanReddy49
 
Green bldgs 19 12 16
Green bldgs 19 12 16Green bldgs 19 12 16
Green bldgs 19 12 16Usha Batra
 
USE OF NET ZERO ENERGY BUILDING (NZEB.pptx
USE OF NET ZERO ENERGY BUILDING (NZEB.pptxUSE OF NET ZERO ENERGY BUILDING (NZEB.pptx
USE OF NET ZERO ENERGY BUILDING (NZEB.pptxVortexBolthe
 
Green Money For Green Building
Green Money For Green BuildingGreen Money For Green Building
Green Money For Green BuildingKrishan Kapil
 
Energy system for buildings. It has how to build buildings efficiently by sav...
Energy system for buildings. It has how to build buildings efficiently by sav...Energy system for buildings. It has how to build buildings efficiently by sav...
Energy system for buildings. It has how to build buildings efficiently by sav...krishna4644
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
1. Control systems.pptx
1. Control systems.pptx1. Control systems.pptx
1. Control systems.pptxUgyenWangmo8
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slidesSWITCHOntario
 
Highlights of the Kuwait HVAC&R Conference 2017
Highlights of the Kuwait HVAC&R Conference 2017Highlights of the Kuwait HVAC&R Conference 2017
Highlights of the Kuwait HVAC&R Conference 2017Swati Warang
 
Zero energy building
Zero energy buildingZero energy building
Zero energy buildingANIL SINGH
 

Similar to Net zero energy building (20)

Technical seminar on net zero energy building
Technical seminar on net zero energy buildingTechnical seminar on net zero energy building
Technical seminar on net zero energy building
 
Information about zero energy building and green buiding
Information about zero energy building and green buidingInformation about zero energy building and green buiding
Information about zero energy building and green buiding
 
Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)
 
Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)Net zero energy building (ppt-2016)
Net zero energy building (ppt-2016)
 
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptx
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptxRenewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptx
Renewable_Energy_Applications_for_Existing_Buildings_1645617467641.pptx
 
Power saving
Power savingPower saving
Power saving
 
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
 
Zero Energy Building
Zero Energy BuildingZero Energy Building
Zero Energy Building
 
Clean energy technology
Clean energy technologyClean energy technology
Clean energy technology
 
Green buildings and Renewable energy
Green buildings and Renewable energyGreen buildings and Renewable energy
Green buildings and Renewable energy
 
eea desktop case study.pdf
eea desktop case study.pdfeea desktop case study.pdf
eea desktop case study.pdf
 
Green bldgs 19 12 16
Green bldgs 19 12 16Green bldgs 19 12 16
Green bldgs 19 12 16
 
USE OF NET ZERO ENERGY BUILDING (NZEB.pptx
USE OF NET ZERO ENERGY BUILDING (NZEB.pptxUSE OF NET ZERO ENERGY BUILDING (NZEB.pptx
USE OF NET ZERO ENERGY BUILDING (NZEB.pptx
 
Green Money For Green Building
Green Money For Green BuildingGreen Money For Green Building
Green Money For Green Building
 
Energy system for buildings. It has how to build buildings efficiently by sav...
Energy system for buildings. It has how to build buildings efficiently by sav...Energy system for buildings. It has how to build buildings efficiently by sav...
Energy system for buildings. It has how to build buildings efficiently by sav...
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
1. Control systems.pptx
1. Control systems.pptx1. Control systems.pptx
1. Control systems.pptx
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slides
 
Highlights of the Kuwait HVAC&R Conference 2017
Highlights of the Kuwait HVAC&R Conference 2017Highlights of the Kuwait HVAC&R Conference 2017
Highlights of the Kuwait HVAC&R Conference 2017
 
Zero energy building
Zero energy buildingZero energy building
Zero energy building
 

More from Hamzah Meraj, Faculty of Architecture, Jamia Millia Islamia, New delhi

More from Hamzah Meraj, Faculty of Architecture, Jamia Millia Islamia, New delhi (20)

Ophthalmology hospital
Ophthalmology hospital Ophthalmology hospital
Ophthalmology hospital
 
Housing Policies-BJP/UPA/STATE -Tushar bansal
Housing Policies-BJP/UPA/STATE -Tushar bansalHousing Policies-BJP/UPA/STATE -Tushar bansal
Housing Policies-BJP/UPA/STATE -Tushar bansal
 
Housing Policies-BJP/UPA/STATE -Shobha suraj
Housing Policies-BJP/UPA/STATE -Shobha surajHousing Policies-BJP/UPA/STATE -Shobha suraj
Housing Policies-BJP/UPA/STATE -Shobha suraj
 
Housing Policies-BJP/UPA/STATE
Housing Policies-BJP/UPA/STATE Housing Policies-BJP/UPA/STATE
Housing Policies-BJP/UPA/STATE
 
Housing Policies-BJP/UPA/STATE
Housing Policies-BJP/UPA/STATE Housing Policies-BJP/UPA/STATE
Housing Policies-BJP/UPA/STATE
 
Housing Policies- Lalit kumar
Housing Policies- Lalit kumarHousing Policies- Lalit kumar
Housing Policies- Lalit kumar
 
National Policies and programs on Habitat- Lakshay mittal
National Policies and programs on Habitat- Lakshay mittalNational Policies and programs on Habitat- Lakshay mittal
National Policies and programs on Habitat- Lakshay mittal
 
national Housing Policies- Kadambani singh
national Housing Policies- Kadambani singhnational Housing Policies- Kadambani singh
national Housing Policies- Kadambani singh
 
National Housing Policies- Jyoti arora
National Housing Policies- Jyoti aroraNational Housing Policies- Jyoti arora
National Housing Policies- Jyoti arora
 
Housing Policies- Janbaz ali
Housing Policies- Janbaz aliHousing Policies- Janbaz ali
Housing Policies- Janbaz ali
 
housing policies -Bushra fatima
housing policies -Bushra fatimahousing policies -Bushra fatima
housing policies -Bushra fatima
 
housing decisions, policies and yojnas by BJP-Batul zainab
housing decisions, policies and yojnas by BJP-Batul zainabhousing decisions, policies and yojnas by BJP-Batul zainab
housing decisions, policies and yojnas by BJP-Batul zainab
 
SAMAJWADI AWAS YOJNA - Anubhav singh
SAMAJWADI AWAS YOJNA - Anubhav singhSAMAJWADI AWAS YOJNA - Anubhav singh
SAMAJWADI AWAS YOJNA - Anubhav singh
 
National Policies and programmes on habitat- Apoorva singh
National Policies and programmes on habitat- Apoorva singhNational Policies and programmes on habitat- Apoorva singh
National Policies and programmes on habitat- Apoorva singh
 
Digital green architecture - Phare Tower
Digital green architecture  - Phare TowerDigital green architecture  - Phare Tower
Digital green architecture - Phare Tower
 
Up state housing policy-02
Up state housing policy-02Up state housing policy-02
Up state housing policy-02
 
Housing policies BJP & UPA
Housing policies BJP & UPAHousing policies BJP & UPA
Housing policies BJP & UPA
 
Up state hosuing policies-01
Up state hosuing policies-01Up state hosuing policies-01
Up state hosuing policies-01
 
Positive impact of human activities
Positive impact of human activities Positive impact of human activities
Positive impact of human activities
 
Low embodied energy
Low embodied energyLow embodied energy
Low embodied energy
 

Recently uploaded

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 

Recently uploaded (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Net zero energy building

  • 1. NET ZERO ENERGY BUILDING (NZEB) Presented By: Abdur Rasheed, Abu Huraira & Mohd Khalid Raza
  • 2. • amount of energy used is equal to amount of renewable energy created on the site • reduce carbon emissions & reduce dependence on fossil fuels • Buildings that produce a surplus of energy over the year are called “Energy Surplus Buildings” • During the last 20 years more than 200 reputable projects claiming net zero energy balance have been realized all over the world. • NZEB buildings consequently contribute less overall greenhouse gas to the atmosphere than similar non-ZNE buildings. They do at times consume non- renewable energy and produce greenhouse gases, but at other times reduce energy consumption and greenhouse gas production elsewhere by the same amount. Traditional buildings consume 40% of the total fossil fuel energy in all over the world and are significant contributors of greenhouse gases. Net Zero Energy Building
  • 3. For the discussion of ZEB definitions literature can be divided into a number of main important topics 1. Energy focus Total energy demand in the building is a sum of thermal and electricity demand; however, many studies focus only on one demand neglecting the other. This issue is raised by Able, (1994): “Many low-energy building projects seem to have been based on the idea 'decrease heat supply at any cost'. In some cases, this has resulted in 'zero-energy buildings' which, it is true, do not need any heat supply but do, instead, indirectly need electricity, e.g., to operate the heat pump included in the system.” 2 . Energy Supply system The scientific publications focus either on off-grid ZEBs or on-grid ZEB. The main difference between those two approaches is that, the off-grid ZEB does not have any connection to the energy infrastructure, thus it does not purchase energy from any external sources, and the boundaries for the balance calculations are within the building. The on-grid ZEB, in the literature also named “net zero” or “grid connected”, is the energy producing building connected to one or more energy infrastructures; electricity grid, district heating and cooling system, gas pipe network, biomass and bio fuels distribution networks. Therefore, it is has a possibility for both buying and selling energy from/to the utility grid. This division is also well noticeable in the ZEB definitions.
  • 4. 3. Renewable energy options • In a ZEB, it is necessary to define the supply-side of the renewable energy sources. • There are two options: on-site supply or off-site supply. • Within the on-site supply authors distinguish building footprint and building site. • Within the off-site supply the building either uses RES available off-site to produce energy on-site, or purchase off-site RES.
  • 6. NZEB CONCEPTS • Net Zero Site Energy • Net Zero Source Energy • Net Zero Energy Costs • Net Zero Energy Emissions
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. WHY NZEB • Reduces Energy Consumption • Reduces Green House Gases (Carbon Emissions) & Global Warming • Reduces Dependence on Fossil Fuels • Reduces Ozone Depletion • Reduces Climate Change • Protects Our Environment for Future Generations
  • 13. Strat Energy demand Load demand Air flow simulation Colling load Renewable sources identification Economical and environmental benefits Maintenance Reneweable resources Climate analysis Methodology
  • 15. Design Methodology • Construction & lab experiments are costly • Computer Simulations are convenient & quick • Very low cost • EnergyPlus and TRNSYS 16.0 are used • EnergyPlus models hourly energy consumption • TRNSYS is widely applied for both energy efficiency and renewable energy analyses • EnergyPlus simulations are used for building envelope design • TRANSYS is used for building systems and renewable energy systems design Weather Data Analysis Primary step •Wind frequency profile
  • 16. ZERO ENERGY STRATEGIES & COMPONENTS
  • 17.
  • 18. Case Study: The Indira Paryavaran Bhavan. • India’s first net zero energy building • solar passive design and energy-efficient building materials. • earthquake-resistant structure with a total plinth area of 31,488 sq. m. • More than 50 per cent area outside the building is a soft area with plantation and grass.
  • 19. • The building has a robotic parking system in the basement that can accommodate 330 cars. • Thin-client networking system has been provided instead of conventional desktop computers to minimise energy consumption. • Design allows for 75% of natural daylight to be utilised to reduce energy consumption. • Installed capacity of 930 kW peak power, the building has the largest rooftop solar system among multi-storied buildings in India. • Union environment minister Prakash Javadekar showcased the building to United Nations secretary general Ban Ki-moon on 13/1/15 • Total energy savings of about 40 per cent through the adoption of energy efficient chilled beam system of air-conditioning • Air-conditioning is done by convection currents rather than airflow through air handling units, and chilled water is circulated right up to the diffuser points unlike the conventional systems. • UPVC windows with hermetically sealed double glass. Calcium Silicate ceiling tiles with high recyclable content and grass paver blocks on pavements and roads, renewable bamboo jute for door-frame, fly ash bricks • Reduction in water consumption has been achieved by use of low-discharge water fixtures, recycling of waste water through sewage treatment plant, use of plants with low water demand in landscaping, use of geothermal cooling for HVAC system, rainwater harvesting and use of curing compounds during construction.
  • 20. • Preservation of maximum possible number of trees standing over the site • Solar Passive Architecture with proper orientation and shading of Fenestrations • Appropriate building envelope design with envelope insulation to reduce heat intake • Use of permanent, durable and local materials such as sand stone on exterior face, low heat transmission glass and reflective roofing • Priority for pedestrians in the front, with vehicular access on the sides of the building • Reduction of conventional lighting load by ensuring 75% day-light use • Natural ventilation due to stack effect • The building is designed in such a way that there is free ventilation across the entire building Architectural design of the building is primarily based on following concepts
  • 21. • Utilization of High Efficiency Solar Panels to achieve Net Zero criteria • Energy efficient T-5 and LED fixtures • Innovative chilled beam system for cooling • Pre-cooling of fresh air from exhaust using heat recovery wheel in order to reduce load on chiller plant • Water cooled chillers • Double skin air handling units with variable frequency drives • Geo thermal heat exchange technology used for heat rejection from Air- conditioning system • Innovative energy saving regenerative lifts which have been installed for the first time in government institutional building Energy Conservation Measures:
  • 22. Conclusion •With the advancement in renewable technology, Net Zero Energy Buildings are the future. •Many governments have framed Zero Energy building laws. •Few governments are also providing subsidies to individuals and organizations for creating Zero Energy Buildings. •The goal of zero energy buildings would not be fulfilled till the time all the people don’t understand their responsibility and contribute towards reducing energy consumption. • Solar and Wind energy will be the major contributor of renewable energy for ZEB’s owing to their widespread availability. • Biogas can also be used for our energy needs but its only constraint is that it needs huge quantity of waste and it is also not feasible everywhere. • Geothermal energy is an upcoming form of energy having great potential to generate electricity but a lot of research still has to be done to tap into its full potential.