Change Management Plan
Project Name:




Project Management Improvement,
Phase 3


Example
Disclaimer: This example is based on the Project Management Improvement project, but is not
necessarily an actual case for that project.




Prepared By: Person A
Title: Project Management Improvement, Phase 3
Version No: 1.0
Document Change Control
The following is the document control for revisions to this document.
 Version      Date of
                           Author(s)                    Brief Description of Change
 Number       Issue
 1.0          12/1/06      Person A                     Initial plan




Definition
The following are definitions of terms, abbreviations and acronyms used in this document.

 Term                    Definition
 DoIT                    Division of Information Technology
 PMA                     Project Management Advisor




3.3.4 Example – Change Management Plan, v2.0                                                Page i
Table Of Contents


1. PROJECT CONSTRAINTS .............................................................................. 1

2. CHANGE MANAGEMENT GUIDELINES AND PURVIEW. ............................. 1

3. ESTIMATE OF CHANGE VOLUME ................................................................. 1

4. ROLES AND RESPONSIBILITIES ................................................................... 1

5. THE CHANGE MANAGEMENT PROCESS ..................................................... 2

6. TOOLS ............................................................................................................. 3




3.3.4 Example –Change Management Plan v2.0                                                                     Page ii
1. Project constraints
We acknowledge the following project constraints:

    •   Fixed budget set at $73,360
    •   Scope is firm for completion of basic framework components, otherwise constrained by
        cost.
    •   Phase 3 deadline is flexible, provided project is completed by 6/30/07
    •   Quality is important, but reviews will be constrained to meet budget constraints.


2. Change management guidelines and purview.
The following items will be subject to change management.

Primary deliverables
    •   Framework components
    •   Project Management Advisor (PMA) components

Secondary deliverables
    •   Budget
    •   Schedule
    •   Scope

The project team has latitude to interpret requirements in the following areas:
   • Specific framework content
   • Task assignments
   • Quality review specifics




3. Estimate of change volume
The budgetary impact of change in this project is expected to fall within the range of $250 to
$500. We assume the number of change requests will be roughly 5. We estimate change
evaluation and management to require 10-15 hours.


4. Roles and responsibilities

The project manager will serve as change manager and lead change evaluator.
Responsibilities include:
   • receive and log change requests
   • perform the timely and adequate evaluation of changes in terms of their impacts on
        project deliverables and constraints
   • outline options and recommend courses of action and priorities for changes
   • track and facilitate timely decisions on changes
   • incorporate changes into the appropriate project documents



3.3.4 Example –Change Management Plan v2.0                                                 Page 1
•   communicate changes to the project team and others as the communication plan below
        dictates

The change requestor, who is any key stakeholder, may submit project change requests
following the submittal process indicated below.

The project sponsors will serve as change evaluators and change decision makers .
Responsibilities include:
   • evaluate options and recommended courses of action for these changes
   • approve or reject changes


5. The change management process
For each change the following process will be followed. Note that logging occurs at various
points in the process, e.g. after evaluation and after the decision, not shown in this diagram.




5.1 Submittal and Logging: Change requests will be submitted using the change request form
referenced below. A change resulting from a realized risk or issue will be documented through a
change request form. The change manager will scan risks and issues for likely changes every
month.

5.2 Evaluation: The lead change evaluator will evaluate all change request.

Unless otherwise noted, change requests will be evaluated within 15 days of submission.

5.3 Decision: Unless otherwise noted, changes will be approved, rejected, or parked within 15
days of submission to the change decision maker. The decision maker may also request further
evaluation.

5.4 Integration: The change manager will update project documentation for significant changes
only. A running summary of changes will be posted to the project change log within My
Webspace.




3.3.4 Example –Change Management Plan v2.0                                                   Page 2
5.5 Communication: The project team will be notified of changes as they are approved at the
next project team meeting. Other stakeholders will be notified of changes in the monthly project
status report.

6. Tools

Change request form
See attached change request template.


Change log
See attached change log template.




3.3.4 Example –Change Management Plan v2.0                                                Page 3

Más contenido relacionado

La actualidad más candente

Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangePeter Quintana
 
Effective Project Change Management
Effective Project Change ManagementEffective Project Change Management
Effective Project Change ManagementBrandon Olson
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management pptSourabh Kumar
 
Managing Change in the Coast Guard and other complex organizations
Managing Change in the Coast Guard and other complex organizationsManaging Change in the Coast Guard and other complex organizations
Managing Change in the Coast Guard and other complex organizationsPeter Stinson
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and CommunicationsEnamul Haque
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick GuideMaven
 
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftAppendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftmandy stuart
 
Show me the value: Enabling BCM Program Success through Lean thinking
Show me the value: Enabling BCM Program Success through Lean thinkingShow me the value: Enabling BCM Program Success through Lean thinking
Show me the value: Enabling BCM Program Success through Lean thinkingMilen Kutev
 
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementRisk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementCarolineKealey
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosettidrosetti
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Kanamanapalli 2010 (2)
Kanamanapalli 2010 (2)Kanamanapalli 2010 (2)
Kanamanapalli 2010 (2)Referendo Org
 
Benefits Management in Health and Care part 1: Identify and map target benefits
Benefits Management in Health and Care part 1: Identify and map target benefitsBenefits Management in Health and Care part 1: Identify and map target benefits
Benefits Management in Health and Care part 1: Identify and map target benefitsAssociation for Project Management
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project managementim8home85
 

La actualidad más candente (20)

Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
 
Effective Project Change Management
Effective Project Change ManagementEffective Project Change Management
Effective Project Change Management
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management ppt
 
project management change
project management changeproject management change
project management change
 
Managing Change in the Coast Guard and other complex organizations
Managing Change in the Coast Guard and other complex organizationsManaging Change in the Coast Guard and other complex organizations
Managing Change in the Coast Guard and other complex organizations
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and Communications
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick Guide
 
Change Management Series:
Change Management Series: Change Management Series:
Change Management Series:
 
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftAppendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
 
Show me the value: Enabling BCM Program Success through Lean thinking
Show me the value: Enabling BCM Program Success through Lean thinkingShow me the value: Enabling BCM Program Success through Lean thinking
Show me the value: Enabling BCM Program Success through Lean thinking
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementRisk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Project governance
Project governanceProject governance
Project governance
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosetti
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Kanamanapalli 2010 (2)
Kanamanapalli 2010 (2)Kanamanapalli 2010 (2)
Kanamanapalli 2010 (2)
 
Benefits Management in Health and Care part 1: Identify and map target benefits
Benefits Management in Health and Care part 1: Identify and map target benefitsBenefits Management in Health and Care part 1: Identify and map target benefits
Benefits Management in Health and Care part 1: Identify and map target benefits
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project management
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 

Destacado

The Seven Step Change Management Plan
The Seven Step Change Management PlanThe Seven Step Change Management Plan
The Seven Step Change Management PlanCaroline Siemers
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy pptsonips
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT SlidesYodhia Antariksa
 
Strategy execution ebook why most ideas fail pdf
Strategy execution ebook  why most ideas fail pdfStrategy execution ebook  why most ideas fail pdf
Strategy execution ebook why most ideas fail pdfJeroen De Flander
 
Strategic Plan & Change Management
Strategic Plan & Change ManagementStrategic Plan & Change Management
Strategic Plan & Change ManagementTriune Global
 
Organizational change & development
Organizational change & developmentOrganizational change & development
Organizational change & developmentvanyasingla1
 
Organization change mgmt models
Organization change mgmt modelsOrganization change mgmt models
Organization change mgmt modelsMaysoun Mohamed
 
Organizational Change and Development
Organizational Change and DevelopmentOrganizational Change and Development
Organizational Change and DevelopmentRajat Gupta
 
141212 brochure change management for hp
141212 brochure change management for hp141212 brochure change management for hp
141212 brochure change management for hpchange-factory
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Changejohnnyg14
 
Org change communications strategy & tips
Org change communications strategy & tipsOrg change communications strategy & tips
Org change communications strategy & tipsLsteblay
 
Change Management Models- a comparison
Change Management Models- a comparisonChange Management Models- a comparison
Change Management Models- a comparisonPeopleWiz Consulting
 
Msn 560 organizational change plan
Msn 560 organizational change planMsn 560 organizational change plan
Msn 560 organizational change planJahmela Pech
 
Software Project Management (lecture 4)
Software Project Management (lecture 4)Software Project Management (lecture 4)
Software Project Management (lecture 4)Syed Muhammad Hammad
 
8 Step Process For Leading Change
8 Step Process For Leading Change8 Step Process For Leading Change
8 Step Process For Leading ChangeJazzbi Etheridge
 
Communication management plan template
Communication management plan templateCommunication management plan template
Communication management plan templateAbu Mooky Abu Mooky
 
Change management in mergers and acquisitions
Change management in mergers and acquisitionsChange management in mergers and acquisitions
Change management in mergers and acquisitionsMarilise Smit
 

Destacado (20)

The Seven Step Change Management Plan
The Seven Step Change Management PlanThe Seven Step Change Management Plan
The Seven Step Change Management Plan
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
 
Change Management
Change Management  Change Management
Change Management
 
Strategy execution ebook why most ideas fail pdf
Strategy execution ebook  why most ideas fail pdfStrategy execution ebook  why most ideas fail pdf
Strategy execution ebook why most ideas fail pdf
 
Strategic Plan & Change Management
Strategic Plan & Change ManagementStrategic Plan & Change Management
Strategic Plan & Change Management
 
Organizational change & development
Organizational change & developmentOrganizational change & development
Organizational change & development
 
Organization change mgmt models
Organization change mgmt modelsOrganization change mgmt models
Organization change mgmt models
 
Organizational Change and Development
Organizational Change and DevelopmentOrganizational Change and Development
Organizational Change and Development
 
141212 brochure change management for hp
141212 brochure change management for hp141212 brochure change management for hp
141212 brochure change management for hp
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Change
 
Change management
Change managementChange management
Change management
 
Org change communications strategy & tips
Org change communications strategy & tipsOrg change communications strategy & tips
Org change communications strategy & tips
 
Change Management Models- a comparison
Change Management Models- a comparisonChange Management Models- a comparison
Change Management Models- a comparison
 
Msn 560 organizational change plan
Msn 560 organizational change planMsn 560 organizational change plan
Msn 560 organizational change plan
 
Software Project Management (lecture 4)
Software Project Management (lecture 4)Software Project Management (lecture 4)
Software Project Management (lecture 4)
 
8 Step Process For Leading Change
8 Step Process For Leading Change8 Step Process For Leading Change
8 Step Process For Leading Change
 
Communication management plan template
Communication management plan templateCommunication management plan template
Communication management plan template
 
Sample management plan
Sample management planSample management plan
Sample management plan
 
Change management in mergers and acquisitions
Change management in mergers and acquisitionsChange management in mergers and acquisitions
Change management in mergers and acquisitions
 

Similar a Change Management Plan v1.0

Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan templateVivek Srivastava
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0Aditya Pandey
 
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxcravennichole326
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing managementDhamo daran
 
Department of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docxDepartment of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docxsalmonpybus
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTAlessandro Rinaldi
 
Change%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelinesChange%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelinesruwani.ars
 
Control is the last element of your project. Add a summary about som.docx
Control is the last element of your project. Add a summary about som.docxControl is the last element of your project. Add a summary about som.docx
Control is the last element of your project. Add a summary about som.docxdickonsondorris
 
PSO_Project_Closeout.ppt
PSO_Project_Closeout.pptPSO_Project_Closeout.ppt
PSO_Project_Closeout.pptDucAnhLe56
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management ProjectMary Stevenson
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control processPM Majik
 
SPM PPT.pptx
SPM PPT.pptxSPM PPT.pptx
SPM PPT.pptxabhikde11
 
Metro station documentation
Metro station documentationMetro station documentation
Metro station documentationfarouq umar
 
Project management plan_template
Project management plan_templateProject management plan_template
Project management plan_templateRaquel Shirazi
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxgalerussel59292
 

Similar a Change Management Plan v1.0 (20)

Project change management plan template
Project change management plan templateProject change management plan template
Project change management plan template
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
 
Change management process 17.01.15
Change management process 17.01.15Change management process 17.01.15
Change management process 17.01.15
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Department of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docxDepartment of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docx
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Change%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelinesChange%20control%20plan%20preparation%20guidelines
Change%20control%20plan%20preparation%20guidelines
 
How the change control process affects project quality
How the change control process affects project qualityHow the change control process affects project quality
How the change control process affects project quality
 
Control is the last element of your project. Add a summary about som.docx
Control is the last element of your project. Add a summary about som.docxControl is the last element of your project. Add a summary about som.docx
Control is the last element of your project. Add a summary about som.docx
 
PSO_Project_Closeout.ppt
PSO_Project_Closeout.pptPSO_Project_Closeout.ppt
PSO_Project_Closeout.ppt
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
Communication 1
Communication 1Communication 1
Communication 1
 
Project Mgt
Project MgtProject Mgt
Project Mgt
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
 
SPM PPT.pptx
SPM PPT.pptxSPM PPT.pptx
SPM PPT.pptx
 
Metro station documentation
Metro station documentationMetro station documentation
Metro station documentation
 
Project management plan_template
Project management plan_templateProject management plan_template
Project management plan_template
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docx
 

Más de haroldtaylor1113

Design Coordinates Incorporated
Design Coordinates IncorporatedDesign Coordinates Incorporated
Design Coordinates Incorporatedharoldtaylor1113
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Managementharoldtaylor1113
 
Case Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in LagunaCase Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in Lagunaharoldtaylor1113
 
Case Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite ProvinceCase Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite Provinceharoldtaylor1113
 
Case Study No. 8-Managing Floods in Metro Manila
Case  Study No. 8-Managing Floods in Metro ManilaCase  Study No. 8-Managing Floods in Metro Manila
Case Study No. 8-Managing Floods in Metro Manilaharoldtaylor1113
 
Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067haroldtaylor1113
 
Case Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the PhilippinesCase Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the Philippinesharoldtaylor1113
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippinesharoldtaylor1113
 
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan CityCase Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan Cityharoldtaylor1113
 
Case Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in AquacultureCase Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in Aquacultureharoldtaylor1113
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...haroldtaylor1113
 
Case Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, CaviteCase Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, Caviteharoldtaylor1113
 
Case Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of SuccessCase Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of Successharoldtaylor1113
 
Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen  Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen haroldtaylor1113
 
Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine haroldtaylor1113
 
Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection haroldtaylor1113
 
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...haroldtaylor1113
 
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...haroldtaylor1113
 
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...haroldtaylor1113
 
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...haroldtaylor1113
 

Más de haroldtaylor1113 (20)

Design Coordinates Incorporated
Design Coordinates IncorporatedDesign Coordinates Incorporated
Design Coordinates Incorporated
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
 
Case Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in LagunaCase Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in Laguna
 
Case Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite ProvinceCase Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite Province
 
Case Study No. 8-Managing Floods in Metro Manila
Case  Study No. 8-Managing Floods in Metro ManilaCase  Study No. 8-Managing Floods in Metro Manila
Case Study No. 8-Managing Floods in Metro Manila
 
Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067
 
Case Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the PhilippinesCase Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the Philippines
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippines
 
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan CityCase Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
 
Case Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in AquacultureCase Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in Aquaculture
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
 
Case Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, CaviteCase Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, Cavite
 
Case Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of SuccessCase Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of Success
 
Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen  Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen
 
Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine
 
Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection
 
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
 
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
 
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
 
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
 

Último

Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Lviv Startup Club
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
Exploring Elite Translation Services in Your Vicinity
Exploring Elite Translation Services in Your VicinityExploring Elite Translation Services in Your Vicinity
Exploring Elite Translation Services in Your VicinityThe Spanish Group
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Lviv Startup Club
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIBGregory DeShields
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi Bazaar
 

Último (20)

Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
Exploring Elite Translation Services in Your Vicinity
Exploring Elite Translation Services in Your VicinityExploring Elite Translation Services in Your Vicinity
Exploring Elite Translation Services in Your Vicinity
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIB
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptx
 

Change Management Plan v1.0

  • 1. Change Management Plan Project Name: Project Management Improvement, Phase 3 Example Disclaimer: This example is based on the Project Management Improvement project, but is not necessarily an actual case for that project. Prepared By: Person A Title: Project Management Improvement, Phase 3 Version No: 1.0
  • 2. Document Change Control The following is the document control for revisions to this document. Version Date of Author(s) Brief Description of Change Number Issue 1.0 12/1/06 Person A Initial plan Definition The following are definitions of terms, abbreviations and acronyms used in this document. Term Definition DoIT Division of Information Technology PMA Project Management Advisor 3.3.4 Example – Change Management Plan, v2.0 Page i
  • 3. Table Of Contents 1. PROJECT CONSTRAINTS .............................................................................. 1 2. CHANGE MANAGEMENT GUIDELINES AND PURVIEW. ............................. 1 3. ESTIMATE OF CHANGE VOLUME ................................................................. 1 4. ROLES AND RESPONSIBILITIES ................................................................... 1 5. THE CHANGE MANAGEMENT PROCESS ..................................................... 2 6. TOOLS ............................................................................................................. 3 3.3.4 Example –Change Management Plan v2.0 Page ii
  • 4. 1. Project constraints We acknowledge the following project constraints: • Fixed budget set at $73,360 • Scope is firm for completion of basic framework components, otherwise constrained by cost. • Phase 3 deadline is flexible, provided project is completed by 6/30/07 • Quality is important, but reviews will be constrained to meet budget constraints. 2. Change management guidelines and purview. The following items will be subject to change management. Primary deliverables • Framework components • Project Management Advisor (PMA) components Secondary deliverables • Budget • Schedule • Scope The project team has latitude to interpret requirements in the following areas: • Specific framework content • Task assignments • Quality review specifics 3. Estimate of change volume The budgetary impact of change in this project is expected to fall within the range of $250 to $500. We assume the number of change requests will be roughly 5. We estimate change evaluation and management to require 10-15 hours. 4. Roles and responsibilities The project manager will serve as change manager and lead change evaluator. Responsibilities include: • receive and log change requests • perform the timely and adequate evaluation of changes in terms of their impacts on project deliverables and constraints • outline options and recommend courses of action and priorities for changes • track and facilitate timely decisions on changes • incorporate changes into the appropriate project documents 3.3.4 Example –Change Management Plan v2.0 Page 1
  • 5. communicate changes to the project team and others as the communication plan below dictates The change requestor, who is any key stakeholder, may submit project change requests following the submittal process indicated below. The project sponsors will serve as change evaluators and change decision makers . Responsibilities include: • evaluate options and recommended courses of action for these changes • approve or reject changes 5. The change management process For each change the following process will be followed. Note that logging occurs at various points in the process, e.g. after evaluation and after the decision, not shown in this diagram. 5.1 Submittal and Logging: Change requests will be submitted using the change request form referenced below. A change resulting from a realized risk or issue will be documented through a change request form. The change manager will scan risks and issues for likely changes every month. 5.2 Evaluation: The lead change evaluator will evaluate all change request. Unless otherwise noted, change requests will be evaluated within 15 days of submission. 5.3 Decision: Unless otherwise noted, changes will be approved, rejected, or parked within 15 days of submission to the change decision maker. The decision maker may also request further evaluation. 5.4 Integration: The change manager will update project documentation for significant changes only. A running summary of changes will be posted to the project change log within My Webspace. 3.3.4 Example –Change Management Plan v2.0 Page 2
  • 6. 5.5 Communication: The project team will be notified of changes as they are approved at the next project team meeting. Other stakeholders will be notified of changes in the monthly project status report. 6. Tools Change request form See attached change request template. Change log See attached change log template. 3.3.4 Example –Change Management Plan v2.0 Page 3