SlideShare una empresa de Scribd logo
1 de 11
Descargar para leer sin conexión
Hendawy ragab Mohammed
00966556024484
Hendawy.1981@gmail.com
Seeking employment in a creative solutions company to build my career, looking for challenge position that gives me the
opportunity to utilize my educational background and experiences of life to achieve the highest goals, Depending on my
high skills, quick learning and problem solving.
A flexible, self-motivating with good communication skills and the ability to work under pressure. Committed to quality in
all individual or team oriented tasks with strong sense responsibility, team leader and player, mature, dynamic, hard work
and responsible
Jan 2015 up to date CONSULTANT OFFICE
Employer Saudi consolidated engineering co – ksa-hail
Position SENIOR ENGINEER
Project description obstetrics/gynecology & pediatric hospital-200 beds
Hail hospital-ksa (over100 million us$)
The project consists of
1- General layout (150.000m2)
Includes roads, walk way, parking area, sewage & storm lines, lighting, fence
landscaping, etc.
2- Main hospital building :the total built up area is 64500m2 at six floors( basement-
ground-4floors)
3- Utilities area :-consists of
A- Technical service building: total built up area is 2615 m2 in two floors (basement-
ground).
B- Chiller yard: total area is 750m2.
C- Under ground water tank with RO plant, LPG tank, STP plant.
D- Sceco room
E- Service building.
F- Medical store
G- Female flats: two buildings total built up area for one floor is 700m2, three floors
(ground-1st
@2nd).
H- Mosque: total area is 540m2.
I- Guard rooms: 4 guard rooms, total area for each room is 30m2..
OBJECTIVE
PROFILE
EMPLOYMENT HISTORY
Jan 2012 to Jan 2015 CONSULTANT OFFICE
Employer zuhair Fayez partnership – ksa-hail
POSITION SENIOR ENGINEER
Project description university hospital – hail.
(66000 square meter total built up area. This area divided to 38 parts. Each part about
1400m2
The structure system for substructure is isolated footing and raft foundation
The structure system for all roofs are flat slab and paneled beams
The project designed to serve about 550 beds
THE PROJECT CONSISTS OF 5 ZONES
ZONE 1: six parts .each one ground floor only.
ZONE 2: eight parts each one consists of (ground floor - first floor).
Zone 3: thirteen parts only each one consists of (ground floor – first floor).
ZONE 4 ten parts only each one consists of (basement floor- ground floor-
5 typical floor-roofs).
ZONE 5:- two parts only each part consists of (basement floor- ground floor-
5 typical floor-roofs).
Chiller yard – water tank- electric rooms –service room- boiler rooms-tunnel
Main contractor nahdate Elemaar Company
Client ministry of high educational
Contract value 32877100.0SR first stage up to 600MILIONS SR (total value)
Duration 3 years
Principal duties
 Following up and managing all structural submittal (shop drawings, materials, technical submittals,
method statements,…etc) as per project program plan
 Monitoring and review all civil works all over the project
 Attending the technical and progress meeting with client and contractor
 Resolving technical problems and NCRs when and where required.
AUGUST 2010 to December 2011 project manger
Employer biout Makah company- Makah
Project description project ( medad 2- medad 3) each one consists of (bedroom, water tank, ground floor,3typical
floor
. Penthouses) each project area about 1300m2 and serve about 190 pilgrims
Client medad Makah (nageb abd allatif alesay)
Project consultant bin jobair office
Contract value 7millions SR
DURATION 12 Months
Principal duties
 Following up of various construction & finishing activities for residential buildings (medad 2-medad 3).
 Structural engineering issues & Material take-off
 Prepare the invoices for contractors
 Monitoring the work progress according to approved time schedule.
 Coordinating between different prates sharing in the project.
 preparing tender and contract documents, including bills of quantities with the architect and/or the client;
April, 2008 to July, 2010 SITE ENGINEER
Employer SOLIMAN ABD ALAZIZ ALRAJHI COMPANY.
PROJECT The Project Classified As High Project Which Contains Villas & Buildings & Mosques &
Marketing Center And Schools.
Area: 600,000 M2- 435 Villas “8 Types”- 96 Residential Building “18 Types”- One Shopping Center
And Hotel - One Girl’s School & One Boy’s School- Marketing & Sales Building- 4 Mosques -
Commercial Areas- Green Areas..
There are a lot Of Services Such As:-Sewer System Network- Communication Networks -Road Networks
-Green Areas -Water Supply- Electric Networks-Parking Places.
PROJECT DESCRIPTION
Client alrajhi for contracting
Project manager alrajhi development
Consultant Civil alsaloom office
Designer cote office
Project value about 2 milliard SR.
Principal duties
 Following up of civil and finishing works; building no (b4-b5-b6-b7) each consists of bedroom-plaza-6 typical
floors. Average area of floor about 1200m2
 Following up of civil and finishing works ;building no(b9)each consists of bedroom-plaza-6 typical floors-
Average area of typical floor 900m2
 Following up of civil and finishing works; building no (b1-b2) each consists of bedroom-plaza-6 typical
floors. Average area of typical floor 2500
sep, 2006 to December, 2007 SITE ENGINEER
Employer bin shujaa establishment
Project asphalt – pavement-lighting for (alkhorma- zalm- turba) cities
Client albaladeia
Project manager and consultant buladiea
Contract value about 5millions SR
Principal duties
 Following up the road preparation
 Following up testing materials such as sieve analysis-sand cone-modified proctor.
December, 2004 to August, 2006 SITE ENGINEER
Employer concrete company
Project typical hospital at almansoura city
Project description Client wady AlNil Company
Consultant wady AlNil Company
Project value 2 million Egyptian liver
Principal duties
 Following up the civil works of building (scheduled time)
 Following up the wet works (block works ,plaster, flooring(ceramic, marble and granite),Toilet water proofing,
Roof water and heat proofing,……………..etc
Language skills
Arabic Native
English V.good (written & spoken)
Computer skills
MS Office
Primavera P3
MS project
Auto CAD
Sap2000
 B.Sc. civil engineering in 2004 almansoura university (5 years) in 2004
 Project grade excellent(the economic use of high strength concrete at residential buildings)
 Professional certification in Primavera P3 (44 hours) in 2006.
D.O.B Sep 6th, 1981
P.O.B Mansoura, Egypt
Marital status Married
Visa Status Employment visa
SKILLS
EDUCATIONAL PROFESSIONAL
PERSONAL DATA
‫ﺑﺣﺎﺋل‬ ‫اﻟﺗﻌﻠﯾﻣﻰ‬ ‫اﻟﻣﺳﺗﺷﻔﻰ‬ ‫ﺑﺑرﯾدة‬ ‫اﻟراﺟﺣﻰ‬ ‫ﻣﺷروع‬
‫ﺑﺑرﯾدة‬ ‫اﻟراﺟﺣﻰ‬ ‫ﻣﺷروع‬ ‫ﻣﻛﺔ‬ ‫ﻣداد‬ ‫ﻣﺷروع‬

Más contenido relacionado

La actualidad más candente

أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osmanGomaa Khamis
 
Resume-Ted Murphy 2015
Resume-Ted Murphy 2015Resume-Ted Murphy 2015
Resume-Ted Murphy 2015Ted Murphy
 
Curriculum vita1
Curriculum vita1Curriculum vita1
Curriculum vita1ibrahim222
 
HASSAN TALEB works CV 111
HASSAN TALEB works CV 111HASSAN TALEB works CV 111
HASSAN TALEB works CV 111Hassan Taleb
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014Louise Herbst
 
LinkedIn Project Manager and Superintendent Resume
LinkedIn Project Manager  and Superintendent ResumeLinkedIn Project Manager  and Superintendent Resume
LinkedIn Project Manager and Superintendent ResumeShawn Koch
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)ALI ALLAM
 

La actualidad más candente (18)

أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
 
Resume-Ted Murphy 2015
Resume-Ted Murphy 2015Resume-Ted Murphy 2015
Resume-Ted Murphy 2015
 
Curriculum vita1
Curriculum vita1Curriculum vita1
Curriculum vita1
 
HASSAN TALEB works CV 111
HASSAN TALEB works CV 111HASSAN TALEB works CV 111
HASSAN TALEB works CV 111
 
Tarek C.V
Tarek C.VTarek C.V
Tarek C.V
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
mohammed soliman 4-2014
mohammed soliman 4-2014mohammed soliman 4-2014
mohammed soliman 4-2014
 
Abdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwiAbdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwi
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
Mehdi abaeian rev3
Mehdi abaeian rev3Mehdi abaeian rev3
Mehdi abaeian rev3
 
ARC-HU_C.V-2014 en
ARC-HU_C.V-2014 enARC-HU_C.V-2014 en
ARC-HU_C.V-2014 en
 
CV OF MR. PRAKASH
CV OF MR. PRAKASHCV OF MR. PRAKASH
CV OF MR. PRAKASH
 
LinkedIn Project Manager and Superintendent Resume
LinkedIn Project Manager  and Superintendent ResumeLinkedIn Project Manager  and Superintendent Resume
LinkedIn Project Manager and Superintendent Resume
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)
 
hosam cv english 1
hosam cv english 1hosam cv english 1
hosam cv english 1
 

Destacado

Message in a bottle - Experience it learn about it and use it for mapping you...
Message in a bottle - Experience it learn about it and use it for mapping you...Message in a bottle - Experience it learn about it and use it for mapping you...
Message in a bottle - Experience it learn about it and use it for mapping you...Alexandra Lederer
 
GRASP Local Chapters Development Strategy - 10 pasi
GRASP Local Chapters Development Strategy - 10 pasiGRASP Local Chapters Development Strategy - 10 pasi
GRASP Local Chapters Development Strategy - 10 pasiiustiniftime
 
From Dot-com-y to Altmami
From Dot-com-y to AltmamiFrom Dot-com-y to Altmami
From Dot-com-y to Altmamigattygirl
 
กิจกรรมการทดลอง
กิจกรรมการทดลองกิจกรรมการทดลอง
กิจกรรมการทดลองtangkwa2
 
Web quest
Web questWeb quest
Web questLUYEDIC
 
News feb 8 14
News feb 8 14News feb 8 14
News feb 8 14nuthorn
 
Web quest
Web questWeb quest
Web questLUYEDIC
 
สวนผึ้งราชบุรี
สวนผึ้งราชบุรีสวนผึ้งราชบุรี
สวนผึ้งราชบุรีkunan0012
 
News June 8-14
News June 8-14 News June 8-14
News June 8-14 nuthorn
 
Herramientas web 2.0
Herramientas web 2.0 Herramientas web 2.0
Herramientas web 2.0 Magdalyla
 
URI 101 Mentor Portfolio
URI 101 Mentor PortfolioURI 101 Mentor Portfolio
URI 101 Mentor Portfoliokvelez89
 

Destacado (17)

Message in a bottle - Experience it learn about it and use it for mapping you...
Message in a bottle - Experience it learn about it and use it for mapping you...Message in a bottle - Experience it learn about it and use it for mapping you...
Message in a bottle - Experience it learn about it and use it for mapping you...
 
GRASP Local Chapters Development Strategy - 10 pasi
GRASP Local Chapters Development Strategy - 10 pasiGRASP Local Chapters Development Strategy - 10 pasi
GRASP Local Chapters Development Strategy - 10 pasi
 
From Dot-com-y to Altmami
From Dot-com-y to AltmamiFrom Dot-com-y to Altmami
From Dot-com-y to Altmami
 
Bliss
BlissBliss
Bliss
 
High Range Pressure Switches MD Series
High Range Pressure Switches MD SeriesHigh Range Pressure Switches MD Series
High Range Pressure Switches MD Series
 
กิจกรรมการทดลอง
กิจกรรมการทดลองกิจกรรมการทดลอง
กิจกรรมการทดลอง
 
Diapositivas
DiapositivasDiapositivas
Diapositivas
 
Lesson1 a
Lesson1 aLesson1 a
Lesson1 a
 
Web quest
Web questWeb quest
Web quest
 
News feb 8 14
News feb 8 14News feb 8 14
News feb 8 14
 
Web quest
Web questWeb quest
Web quest
 
สวนผึ้งราชบุรี
สวนผึ้งราชบุรีสวนผึ้งราชบุรี
สวนผึ้งราชบุรี
 
News June 8-14
News June 8-14 News June 8-14
News June 8-14
 
Herramientas web 2.0
Herramientas web 2.0 Herramientas web 2.0
Herramientas web 2.0
 
Ski
SkiSki
Ski
 
Women trends
Women trendsWomen trends
Women trends
 
URI 101 Mentor Portfolio
URI 101 Mentor PortfolioURI 101 Mentor Portfolio
URI 101 Mentor Portfolio
 

Similar a Hendawy ragab Mohammed Seeking Creative Solutions Role

Similar a Hendawy ragab Mohammed Seeking Creative Solutions Role (20)

Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015
 
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016
 
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
 
CV
CVCV
CV
 
Marwans CV. updated
Marwans CV. updatedMarwans CV. updated
Marwans CV. updated
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Mohamed Hussein-CV
Mohamed Hussein-CVMohamed Hussein-CV
Mohamed Hussein-CV
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
Senior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administratorSenior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administrator
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
C.V. small size
C.V. small sizeC.V. small size
C.V. small size
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
Sayed CV
Sayed CVSayed CV
Sayed CV
 
Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016
 

Último

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Último (20)

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

Hendawy ragab Mohammed Seeking Creative Solutions Role

  • 1. Hendawy ragab Mohammed 00966556024484 Hendawy.1981@gmail.com Seeking employment in a creative solutions company to build my career, looking for challenge position that gives me the opportunity to utilize my educational background and experiences of life to achieve the highest goals, Depending on my high skills, quick learning and problem solving. A flexible, self-motivating with good communication skills and the ability to work under pressure. Committed to quality in all individual or team oriented tasks with strong sense responsibility, team leader and player, mature, dynamic, hard work and responsible Jan 2015 up to date CONSULTANT OFFICE Employer Saudi consolidated engineering co – ksa-hail Position SENIOR ENGINEER Project description obstetrics/gynecology & pediatric hospital-200 beds Hail hospital-ksa (over100 million us$) The project consists of 1- General layout (150.000m2) Includes roads, walk way, parking area, sewage & storm lines, lighting, fence landscaping, etc. 2- Main hospital building :the total built up area is 64500m2 at six floors( basement- ground-4floors) 3- Utilities area :-consists of A- Technical service building: total built up area is 2615 m2 in two floors (basement- ground). B- Chiller yard: total area is 750m2. C- Under ground water tank with RO plant, LPG tank, STP plant. D- Sceco room E- Service building. F- Medical store G- Female flats: two buildings total built up area for one floor is 700m2, three floors (ground-1st @2nd). H- Mosque: total area is 540m2. I- Guard rooms: 4 guard rooms, total area for each room is 30m2.. OBJECTIVE PROFILE EMPLOYMENT HISTORY
  • 2. Jan 2012 to Jan 2015 CONSULTANT OFFICE Employer zuhair Fayez partnership – ksa-hail POSITION SENIOR ENGINEER Project description university hospital – hail. (66000 square meter total built up area. This area divided to 38 parts. Each part about 1400m2 The structure system for substructure is isolated footing and raft foundation The structure system for all roofs are flat slab and paneled beams The project designed to serve about 550 beds THE PROJECT CONSISTS OF 5 ZONES ZONE 1: six parts .each one ground floor only. ZONE 2: eight parts each one consists of (ground floor - first floor). Zone 3: thirteen parts only each one consists of (ground floor – first floor). ZONE 4 ten parts only each one consists of (basement floor- ground floor- 5 typical floor-roofs). ZONE 5:- two parts only each part consists of (basement floor- ground floor- 5 typical floor-roofs). Chiller yard – water tank- electric rooms –service room- boiler rooms-tunnel Main contractor nahdate Elemaar Company Client ministry of high educational Contract value 32877100.0SR first stage up to 600MILIONS SR (total value) Duration 3 years Principal duties  Following up and managing all structural submittal (shop drawings, materials, technical submittals, method statements,…etc) as per project program plan  Monitoring and review all civil works all over the project  Attending the technical and progress meeting with client and contractor  Resolving technical problems and NCRs when and where required.
  • 3. AUGUST 2010 to December 2011 project manger Employer biout Makah company- Makah Project description project ( medad 2- medad 3) each one consists of (bedroom, water tank, ground floor,3typical floor . Penthouses) each project area about 1300m2 and serve about 190 pilgrims Client medad Makah (nageb abd allatif alesay) Project consultant bin jobair office Contract value 7millions SR DURATION 12 Months Principal duties  Following up of various construction & finishing activities for residential buildings (medad 2-medad 3).  Structural engineering issues & Material take-off  Prepare the invoices for contractors  Monitoring the work progress according to approved time schedule.  Coordinating between different prates sharing in the project.  preparing tender and contract documents, including bills of quantities with the architect and/or the client; April, 2008 to July, 2010 SITE ENGINEER Employer SOLIMAN ABD ALAZIZ ALRAJHI COMPANY. PROJECT The Project Classified As High Project Which Contains Villas & Buildings & Mosques & Marketing Center And Schools. Area: 600,000 M2- 435 Villas “8 Types”- 96 Residential Building “18 Types”- One Shopping Center And Hotel - One Girl’s School & One Boy’s School- Marketing & Sales Building- 4 Mosques - Commercial Areas- Green Areas.. There are a lot Of Services Such As:-Sewer System Network- Communication Networks -Road Networks -Green Areas -Water Supply- Electric Networks-Parking Places. PROJECT DESCRIPTION Client alrajhi for contracting Project manager alrajhi development Consultant Civil alsaloom office Designer cote office Project value about 2 milliard SR. Principal duties  Following up of civil and finishing works; building no (b4-b5-b6-b7) each consists of bedroom-plaza-6 typical floors. Average area of floor about 1200m2  Following up of civil and finishing works ;building no(b9)each consists of bedroom-plaza-6 typical floors- Average area of typical floor 900m2  Following up of civil and finishing works; building no (b1-b2) each consists of bedroom-plaza-6 typical floors. Average area of typical floor 2500
  • 4. sep, 2006 to December, 2007 SITE ENGINEER Employer bin shujaa establishment Project asphalt – pavement-lighting for (alkhorma- zalm- turba) cities Client albaladeia Project manager and consultant buladiea Contract value about 5millions SR Principal duties  Following up the road preparation  Following up testing materials such as sieve analysis-sand cone-modified proctor. December, 2004 to August, 2006 SITE ENGINEER Employer concrete company Project typical hospital at almansoura city Project description Client wady AlNil Company Consultant wady AlNil Company Project value 2 million Egyptian liver Principal duties  Following up the civil works of building (scheduled time)  Following up the wet works (block works ,plaster, flooring(ceramic, marble and granite),Toilet water proofing, Roof water and heat proofing,……………..etc Language skills Arabic Native English V.good (written & spoken) Computer skills MS Office Primavera P3 MS project Auto CAD Sap2000  B.Sc. civil engineering in 2004 almansoura university (5 years) in 2004  Project grade excellent(the economic use of high strength concrete at residential buildings)  Professional certification in Primavera P3 (44 hours) in 2006. D.O.B Sep 6th, 1981 P.O.B Mansoura, Egypt Marital status Married Visa Status Employment visa SKILLS EDUCATIONAL PROFESSIONAL PERSONAL DATA
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. ‫ﺑﺣﺎﺋل‬ ‫اﻟﺗﻌﻠﯾﻣﻰ‬ ‫اﻟﻣﺳﺗﺷﻔﻰ‬ ‫ﺑﺑرﯾدة‬ ‫اﻟراﺟﺣﻰ‬ ‫ﻣﺷروع‬ ‫ﺑﺑرﯾدة‬ ‫اﻟراﺟﺣﻰ‬ ‫ﻣﺷروع‬ ‫ﻣﻛﺔ‬ ‫ﻣداد‬ ‫ﻣﺷروع‬