QUALITYASSURANCEMANUAL
QUALITY ASSURANCE MANUAL
ELECTRO INSTALL LIMITED
Mpelembe House,
Suite 509,
Broadway Road
P. O. Box 70674
Ndola.
Tel: +260 212 650949 Fax: +260 212 650949
1
Copy Number: ______________
Issue Date: ____17/06/2013_____________
Approved By:
__________________
Name: Henry Nasilele (B.Eng., MEIZ, R.Eng.)
Title: Chief Operating Officer and Consulting Engineer
`
3
1.0 INTRODUCTION..............................................................................................................................................4
2.0 Scope........................................................................................................................................................5
2.1 Policy.....................................................................................................................................................5
2.2 Objective.............................................................................................................................................5
3.0 Amendments and Revisions to the Quality Manual.....................................................................6
4.0 Organization............................................................................................................................................7
4.1 Consulting Engineer..........................................................................................................................7
4.2 Responsibilities................................................................................................................................7
5.0 DEFINITIONS .................................................................................................................................................8
6.0 Quality Program .....................................................................................................................................9
6.1 Documentation..................................................................................................................................9
6.3 Indoctrination and Training ............................................................................................................9
7.0 Procurement Document Control .....................................................................................................10
7.1 System of Procurement..................................................................................................................10
7.2 Review and Approval.......................................................................................................................10
7.3 Changes to Documents ................................................................................................................10
8.0 Instructions and Drawings .................................................................................................................11
8.1 Work Instructions ..............................................................................................................................11
8.2 Drawings ............................................................................................................................................11
9.0 Document Control ...............................................................................................................................12
9.1 Current Issues....................................................................................................................................12
9.2 Modification or Design Changes ................................................................................................12
10.0 Control of Purchased Items...................................................................................................................13
10.1 Incoming Articles.............................................................................................................................13
10.2 Inspection ..........................................................................................................................................13
10.3 Certifications.....................................................................................................................................13
10.4 Rejected Articles .............................................................................................................................13
11.0 Identification and control of Items......................................................................................................14
12.0 Inspection .............................................................................................................................................15
12.1 Stock ...................................................................................................................................................15
12.2 Final Inspection ................................................................................................................................15
12.3 Shipping Inspection ........................................................................................................................15
13.0 Control of Measuring and Test Equipment...................................................................................16
13.1 Commercial Equipment ................................................................................................................16
13.2 Special Devices ...............................................................................................................................16
13.3 Identification of Equipment..........................................................................................................16
14.0 Control of Nonconforming Articles .................................................................................................17
14.1 Dispositions ........................................................................................................................................17
14.2 Approval of Dispositions ................................................................................................................17
15.0 Corrective Action.....................................................................................................................................18
15.1 Customer Complaints ....................................................................................................................18
16.0 Quality Records...................................................................................................................................19
16.1 Retention ...........................................................................................................................................19
17. MANUFACTURING PROCESS CONTROL .................................................................................................20
18. INDICATION OF INSPECTION STATUS......................................................................................................20
Contents
`
4
Electro Install Limited was incorporated in June 2013. Prior to that, the Technical
Director, a professional Electrical Engineer, has had thirty three years’ experience of
industrial/ domestic electrical installations, after working for the mining industry at five
operating mines on the Copperbelt and Lusaka.
Additional capabilities have been added to the organization to include technical
assistance and support, installation, maintenance of products and systems, and design
of systems.
This Quality System relates to the full range of company activities.
1.0 Introduction
`
5
2.0 Scope
This manual describes Electro Install Limited Quality System Policies and Procedures. These
policies and procedures control all activities from Supplier procurement to customer shipment of
articles.
2.1 Policy
Electro Install Limited policy is to achieve sustained, profitable growth by providing
services which consistently satisfy the needs and expectations of its customers.
This level of quality is achieved through adoption of a system of procedures that
reflect the competence of the Company to existing customers, potential customers,
and independent auditing authorities.
Achievement of this policy involves all staff, who is individually responsible for the
quality of their work, resulting in a continually improving working environment for all.
This policy is provided and explained to each employee by the Technical Director or
Consulting Engineer, who are responsible for Quality Assurance of the company.
To achieve and maintain the required level of assurance the Technical Director
retains responsibility for the Quality System with routine operation controlled by the
Consulting Engineer.
2.2 Objective
The quality System described herein is mandatory for all activities performed at Electro
Install Limited to assure product conformance to the applicable drawing, catalog item
specification and/or contract requirement.
a) To maintain an effective Quality Assurance System complying with international
Standard ISO9001 (Quality Systems).
(b) To achieve and maintain a level of quality which enhances the Company's reputation
with customers.
(c) To ensure compliance with relevant statutory and safety requirements
d) To endeavor, at all times, to maximize customer satisfaction with the services provided
by Electro Install Limited.
`
6
All documentation utilized within the Company related to the management system itself, or
to the execution of individual customer contracts is controlled to ensure that it is issued to
the appropriate personnel, under the correct level of authority, is revised and reissued as
necessary, and all obsolete versions are removed from the point of use.
Such documentation typically includes:
i. Specifications, Customer Orders, Plans/ Drawings,
ii. Quality Assurance Manual/ Operating Procedures,
iii. National/ International Standards and Codes of Practice.
The Quality Assurance Manual, Procedures and Quality Plans are maintained by the
Consulting Engineer who ensures that the appropriate items, at the correct revision levels,
are issued to all who need them within the Company.
National/International Standards, Codes of Practice are maintained by the Support
Engineers who ensure that appropriate documents are available within the Company, and
are issued at the correct revision levels. External suppliers of documentation are
contacted regularly to ascertain that the documents held remain current.
The distribution of standard documents is controlled and recorded on Distribution Lists,
which also show the current issue status. The Distribution Lists are reviewed and updated
as changes occur.
All changes to documents are reviewed and approved by the person responsible for the
original issue and, where appropriate, the nature of the change is indicated on the
document. Master copies of the revised documents are retained as records of the
changes and renewed as necessary to ensure clarity.
Each contract has a File which contains all relevant information. Information is also held on
the company's computer system for ease of access and manipulation.
3.0 Amendments and Revisions to the Quality Manual
`
7
4.1 Consulting Engineer
The Consulting Engineer reports directly to the Managing Director and is delegated
authority and organizational freedom to identify and evaluate quality problems and to
initiate, recommend or provide solutions.
4.2 Responsibilities
The Consulting Engineer is responsible for:
a. Update and distribution control of the Quality Manual as.
b. Planning to meet customer's quality requirements.
c. Determining inspection points within the system.
d. Approval of quality work instructions.
e. Directing inspection activities.
f. Surveillance of procurement documents.
g. Approval of Suppliers.
h. Maintaining a listing of approved suppliers.
i. Monitoring procedures to assure compliance
j. Reviewing and maintaining Quality Records.
k. Calibration of Measuring and Test Equipment.
l. Approval of disposition of Nonconforming Articles
m. Corrective action coordination
4.0 Organization
`
8
The terms and descriptions used in this Manual are generally defined within ISO9001 - Quality
Systems.
Additional definitions apply for items not covered by the documents:
Site any location, other than the Company's established premises, where work is undertaken as part
of a formal contract.
5.0 DEFINITIONS
`
9
6.1 Documentation
The Quality Program is documented within this manual and may be supported at any point by desk
or work instructions that may be selected to increase control of a quality function. Desk or work
instructions affecting Quality shall be approved by the Consulting Engineer. This document details
the corporate quality policy and structure of the Company and references appropriate Operating
Procedures.
6.2 Planning
The Quality Program is planned to control products from the requirements of a customer order to
include procurement practices, receipt of material, and receipt inspection of supplier material,
handling and storage to the eventual shipment of an article to our customer.
6.3 Indoctrination and Training
The policy of the company is to ensure that all personnel are trained and experienced to the
extent necessary to undertake their assigned activities and responsibilities effectively. The
company generally procures and recruits employees capable of meeting the technical, skill,
experience and educational requirements of the company's activities.
All staff and senior employees are responsible for recommending the training needs of others and
for ensuring that all employees allocated specific tasks are suitably qualified and experienced to
execute those tasks. Once training needs are identified these are provided under the responsibility
of the Directors.
Full records are maintained of all training undertaken by employees.
6.0 Quality Program
`
10
7.1 System of Procurement
Procurement documents are computer generated and include appropriate technical and
quality requirements. When a customer has special requirements, such as a Certified
Material Test Report (CMTR), our program is designed to include the requirement into
our procurement documents.
7.2 Review and Approval
Procurement documents are reviewed and approved by the Project Manager, who is in
charge of the procurement function. The Consulting Engineer performs random
surveillance of procurement documents semi-annually and documents the results.
7.3 Changes to Documents
Changes to procurement documents are subject to the same level of control as in
preparation of the original document.
Such documentation typically includes:
a.) Specifications, Customer Orders, Plans/ Drawings,
b.) Quality Assurance Manual/ Operating Procedures,
c.) National/ International Standards and Codes of Practice.
The Quality Assurance Manual, Procedures and Quality Plans are maintained by the
Consulting Engineer who ensures that the appropriate items, at the correct revision levels,
are issued to all who need them within the Company.
National/ International Standards, Codes of Practice are maintained by the Support
Engineers who ensure that appropriate documents are available within the Company, and
are issued at the correct revision levels. External suppliers of documentation are
contacted regularly to ascertain that the documents held remain current.
The distribution of standard documents is controlled and recorded on Distribution Lists,
which also show the current issue status. The Distribution Lists are reviewed and updated
as changes occur.
All changes to documents are reviewed and approved by the person responsible for the
original issue and, where appropriate, the nature of the change is indicated on the
document. Master copies of the revised documents are retained as records of the changes
and renewed as necessary to ensure clarity. Each contract has a File which contains all
7.0 Procurement Document Control
`
11
relevant information. Information is also held on the company's computer system for ease
of access and manipulation.
8.1 Work Instructions
Work or desk instruction is utilized in support of this Quality Manual to improve the
control of a specific operation or evaluation, but in no circumstances shall these
documents supersede or change the requirements of this manual.
8.2 Drawings
Drawings, specifications and/or catalog criteria shall be used to control the technical
requirements of products offered to our customers.
8.0 Instructions and Drawings
`
12
9.1 Current Issues
The latest issue of drawings, specifications, catalogs, work instructions and Customer
orders will be utilized to control articles throughout the operations system.
The Company offers both standard products and specialist services to meet each
customer's needs. Standard products are displayed in a catalogue for customer
selection. Specialist service requirements differ from one customer to another (and from
one contract to another); therefore each tends to be quoted for the specific contract.
Once a proposal is accepted by the customer, or an order is placed, it is recorded and
reviewed to establish that the requirements of the order are adequately defined and
documented, any differences from the proposal are resolved, and the Company is
capable of fully satisfying the customers’ requirements.
In addition to the original order/ contract specification the customer may also request
addition/ variation work to be undertaken by the Company. In these circumstances the
work content is documented and agreed with the customer prior to execution to ensure
that no ambiguity exists.
The Company operates on a computer assisted order processing system to ensure
rapid fulfillment of customer orders.
9.2 Modification or Design Changes
Obsolete documents caused by modification or design change will be identified as such
and removed from use.
9.0 Document Control
`
13
10.1 Incoming Articles
Receipt of purchased articles is documented on a Receiving Report. The
requirements of the Purchase Order are attached to the receiving report to
provide the inspection function with complete criteria for evaluation of the receipt.
10.2 Inspection
Articles are inspected in accordance with the requirements of the receiving
documents. As a minimum, all articles are inspected for count, identification and
damage.
10.3 Certifications
Certifications and Certified Material Test Reports (CMTRs) are reviewed for
compliance and accuracy of contents as required by procurement
documents. Certified reports or other proof of Quality used as a basis for
acceptance shall be (validated by independent testing on an annual basis)
10.4 Rejected Articles
Rejected articles will be documented as nonconforming on the Receiving
Report to prevent inadvertent use or further processing. The Consulting
Engineer will approve final disposition.
10.0 Control of Purchased Items
`
14
The Original Equipment Manufacturer (OEM) articles will retain their identity through
our receipt, stocking and delivery function traceable to the procurement and receipt
documents containing acceptance status.
Suppliers of products, materials and services, where unspecified by a customer
contract, are selected on their ability to meet the company's requirements given due
consideration to the quality, statutory obligations, timescale and cost. A list of approved
suppliers and sub-contractors is maintained which is compiled on the following criteria:-
a.) Previous performance in supplying to similar specifications and
requirements.
b.) Stocking of high volume standard items conforming to a relevant British
Standard, or supplied with a statement of conformity.
c.) Compliance with an approved third party product/ quality registration
scheme.
d.) Recommendation by other similar purchasers or manufacturers of
equipment.
e.) A trial order and evaluation of performance.
All supplies and sub-contracts are subject to an authorized
Purchase Order providing full clarification of the type and extent of supply.
Should a supplier, not appearing on the Approved Suppliers List be proposed, they
will be analysed by capability and subject to acceptance on the authority of a
Director.
11.0 Identification and control of Items
`
15
12.1 Stock
Stock re-inspection will be implemented on specific articles in storage as a result of a
customer complaint or any suspected Quality problem concerning an article. Rejected
articles will be identified or segregated and disposition in accordance with control of
nonconforming material. Accepted articles will be returned to the stock location.
12.2 Final Inspection
Inspection of articles to be delivered to a customer will be accomplished prior to
packaging for identification, damage and in accordance with the shipping document.
The customer ordered requirements are included with the shipping document. Rejected
articles will be identified or segregated and disposition in accordance with control of
nonconforming material. Accepted articles will be identified on the shipping document
as accepted by stamp impression
12.3 Shipping Inspection
Inspection of the packaging will include evaluation to determine adequacy to preclude
damage during delivery and any special requirements directed by the customer order.
Customer requirements for Certifications and/or Certified Material Test Reports will be
included with the articles.
Inspection and testing is carried out on completion of installation and maintenance
activities, with results being documented. Should items not be acceptable against the
agreed contract criteria they will be repaired, replaced or identified for a subsequent
evaluation and decision. All repaired items are subject to a re-inspection to ensure
acceptability. On completion of installation and maintenance works, the customer is also
invited to check the work performed to ensure full acceptability.
12.0 Inspection
`
16
13.0 Control of Measuring and Test Equipment
13.1 Commercial Equipment
Calibration of normal commercial equipment (i.e., rulers, tape,
measures, levels, and other similar devices) is not required. It is the
responsibility of the user to report worn or damaged equipment to
management to prevent inadvertent use.
13.2 Special Devices
Calibration will be performed and maintained at prescribed intervals in
accordance with manufacturers’ recommendations. An Outside
Calibration Laboratory is contracted to supply this service. The supplier
is certified and performs calibrations traceable to recognized national
Standards.
13.3 Identification of Equipment
Each item is identified with current status of calibration and the user is
responsible to verify an item is serviceable. Items too small to be
identified are serialised, and calibration status is maintained by a
traceable record supporting a calibration recall system.
Production and measuring equipment held is maintained in good condition, and
capable of safe and effective operation within a specified tolerance of accuracy.
Test and measuring equipment is regularly inspected or calibrated to ensure that it
is capable of accurate operation, by comparison with external sources traceable
back to National Standards.
Electrostatic protection equipment is utilized when handling sensitive components
and this equipment is regularly checked to ensure that it remains fully functional.
`
17
14.1 Dispositions
All nonconforming articles are reviewed to determine disposition; the disposition is
documented on the accompanying paperwork.
Once non-conforming items have been noticed they are identified by location, associated
documents, or specific markings to prevent their inadvertent use. All non-conforming items
and customer complaints are subject to review and rectification by nominated personnel.
The type and extent of non-conformity is documented in order to establish trends and
identify possible areas for improvement.
The corrective action required to prevent recurrence is evaluated, documented, and its
effective implementation is monitored. All rectification is subsequently re-inspected to
ensure complete customer satisfaction.
All employees are encouraged to suggest improvements in methods, materials, suppliers,
and sub-contractors. The Company has established procedures for review of all activities
in order to identify and evaluate all possible improvements in methods/ materials and its
procedures.
14.2 Approval of Dispositions
A. The Consulting Engineer approves all dispositions of nonconforming articles as
follows:
1. Return to Supplier
2. Rework to Specification
3. Scrap /obsolete
B. Customer approval of the following dispositions shall be requested and required
prior to delivery of articles:
1. Use as is (waiver)
2. Repair to a Useable Condition
C. Reworked and repaired items are re-inspected and/or tested in accordance with
disposition instructions.
14.0Control of Nonconforming Articles
`
18
Conditions adverse to quality shall be promptly identified and corrected. In the case of
significant conditions adverse to Quality, the cause of the condition shall be determined and
action planned to correct and preclude repetition.
15.1 Customer Complaints
Responses to Customer complaints will be documented by letter or on forms
required by the customer. Responses will include cause of the condition, actions
taken to prevent a future occurrence and effective date.
Goods received from customers (i.e. free issue items or equipment being
serviced) are always visually inspected at the receipt stage, with any un-
declared non-conformance being immediately reported to the customer.
15.0 Corrective Action
`
19
16.1 Retention
Quality records traceable to an article or lot of articles will be stored by the
identifying part number. Quality records traceable to a Customer will be stored by
the Customer's Order Number. The retention of Quality records is a minimum of
three years or as otherwise directed by a Customer Order Requirement
Storage facilities are allocated which ensure that all stored records are
identifiable and retrievable, and the storage areas are free from damp and other
agents which could cause premature deterioration.
Where records are maintained on computer magnetic media, and these are
subject to "back-up" at regular intervals, with the "back-up" information being
stored in a protected location to ensure security from loss/ damage of active
data.
All records are retained for a minimum of 2 years.
16.0 Quality Records
`
20
.
All productive work is planned and undertaken in accordance with the company's
procedures, and any specific documents agreed for individual contracts (e.g. contract
specifications).
Work instructions are provided by the agreed contract specification and any documents
referenced therein, alternatively work is performed in accordance with nationally
accepted codes of practice (e.g. BS6701).
As goods are inspected, the status is defined by location in stores, with all non-
conforming items being placed in a reject area or marked as reject for review. The status
of work in progress is established by markings or associated documentation recording
the inspections undertaken and their acceptability.
17. Manufacturing Process Control
18. Indication of Inspection Status

Más contenido relacionado

La actualidad más candente

NDL Group - Transformer Experts
NDL Group - Transformer ExpertsNDL Group - Transformer Experts
NDL Group - Transformer Expertsdivyanshkohli
 
Practical Control Valve Sizing, Selection and Maintenance
Practical Control Valve Sizing, Selection and MaintenancePractical Control Valve Sizing, Selection and Maintenance
Practical Control Valve Sizing, Selection and MaintenanceLiving Online
 
Ascon engineers company profile pdf
Ascon engineers company profile pdfAscon engineers company profile pdf
Ascon engineers company profile pdfDhananjay Baglekar
 

La actualidad más candente (6)

NDL Group - Transformer Experts
NDL Group - Transformer ExpertsNDL Group - Transformer Experts
NDL Group - Transformer Experts
 
PQC & Testing
PQC & TestingPQC & Testing
PQC & Testing
 
Practical Control Valve Sizing, Selection and Maintenance
Practical Control Valve Sizing, Selection and MaintenancePractical Control Valve Sizing, Selection and Maintenance
Practical Control Valve Sizing, Selection and Maintenance
 
Ascon engineers company profile pdf
Ascon engineers company profile pdfAscon engineers company profile pdf
Ascon engineers company profile pdf
 
Vasu cv2017
Vasu  cv2017Vasu  cv2017
Vasu cv2017
 
prince-NOV-15
prince-NOV-15prince-NOV-15
prince-NOV-15
 

Destacado

Chiputa Mukwatu CV(2016)
Chiputa Mukwatu CV(2016)Chiputa Mukwatu CV(2016)
Chiputa Mukwatu CV(2016)chiputa mukwatu
 
CV Divine Tarla final
CV Divine Tarla finalCV Divine Tarla final
CV Divine Tarla finalDivine Tarla
 
1 selective phc interimstrategy
1 selective phc interimstrategy1 selective phc interimstrategy
1 selective phc interimstrategyglichone1
 
Specialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant EquipmentSpecialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant EquipmentPaul Neuman
 
CV-jamal Khatib-for Linkedin&RG-v12
CV-jamal Khatib-for Linkedin&RG-v12CV-jamal Khatib-for Linkedin&RG-v12
CV-jamal Khatib-for Linkedin&RG-v12Jamal Khatib
 
AHS Slides_JAMES O'KEEFE
AHS Slides_JAMES O'KEEFEAHS Slides_JAMES O'KEEFE
AHS Slides_JAMES O'KEEFEJames O'Keefe
 
V1_issue1paperSEVEN_F59
V1_issue1paperSEVEN_F59V1_issue1paperSEVEN_F59
V1_issue1paperSEVEN_F59Danish Gondal
 
depositos de cobre em sedimentos
depositos de cobre em sedimentosdepositos de cobre em sedimentos
depositos de cobre em sedimentosOvidio Duarte
 
Railways Africa March 2010
Railways Africa March 2010 Railways Africa March 2010
Railways Africa March 2010 Railways Africa
 
The university of kansas aap 16-17_guidebook_hrnc
The university of kansas  aap 16-17_guidebook_hrncThe university of kansas  aap 16-17_guidebook_hrnc
The university of kansas aap 16-17_guidebook_hrncAbhishek Bajaj
 
C R B P I Executive Summary Mapping F I N A L
C R B P I  Executive  Summary  Mapping  F I N A LC R B P I  Executive  Summary  Mapping  F I N A L
C R B P I Executive Summary Mapping F I N A LBirendra Raturi
 
CURRICULUM oscar-2
CURRICULUM oscar-2CURRICULUM oscar-2
CURRICULUM oscar-2oscar mwale
 
EMC Academic Alliance Partnering Schools
EMC Academic Alliance Partnering SchoolsEMC Academic Alliance Partnering Schools
EMC Academic Alliance Partnering SchoolsEMC
 

Destacado (20)

cv.doc11
cv.doc11cv.doc11
cv.doc11
 
Chiputa Mukwatu CV(2016)
Chiputa Mukwatu CV(2016)Chiputa Mukwatu CV(2016)
Chiputa Mukwatu CV(2016)
 
CV Divine Tarla final
CV Divine Tarla finalCV Divine Tarla final
CV Divine Tarla final
 
Daniel Nunes
Daniel Nunes Daniel Nunes
Daniel Nunes
 
1 selective phc interimstrategy
1 selective phc interimstrategy1 selective phc interimstrategy
1 selective phc interimstrategy
 
Specialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant EquipmentSpecialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant Equipment
 
CV-jamal Khatib-for Linkedin&RG-v12
CV-jamal Khatib-for Linkedin&RG-v12CV-jamal Khatib-for Linkedin&RG-v12
CV-jamal Khatib-for Linkedin&RG-v12
 
AHS Slides_JAMES O'KEEFE
AHS Slides_JAMES O'KEEFEAHS Slides_JAMES O'KEEFE
AHS Slides_JAMES O'KEEFE
 
22.05.2009, NEWSWIRE, Issue 70
22.05.2009, NEWSWIRE, Issue 7022.05.2009, NEWSWIRE, Issue 70
22.05.2009, NEWSWIRE, Issue 70
 
V1_issue1paperSEVEN_F59
V1_issue1paperSEVEN_F59V1_issue1paperSEVEN_F59
V1_issue1paperSEVEN_F59
 
depositos de cobre em sedimentos
depositos de cobre em sedimentosdepositos de cobre em sedimentos
depositos de cobre em sedimentos
 
Railways Africa March 2010
Railways Africa March 2010 Railways Africa March 2010
Railways Africa March 2010
 
THOMAS NEW CV
THOMAS NEW CVTHOMAS NEW CV
THOMAS NEW CV
 
The university of kansas aap 16-17_guidebook_hrnc
The university of kansas  aap 16-17_guidebook_hrncThe university of kansas  aap 16-17_guidebook_hrnc
The university of kansas aap 16-17_guidebook_hrnc
 
Conservation farming in zambia draft paper
Conservation farming in zambia draft paperConservation farming in zambia draft paper
Conservation farming in zambia draft paper
 
Acre 17
Acre 17Acre 17
Acre 17
 
C R B P I Executive Summary Mapping F I N A L
C R B P I  Executive  Summary  Mapping  F I N A LC R B P I  Executive  Summary  Mapping  F I N A L
C R B P I Executive Summary Mapping F I N A L
 
CURRICULUM oscar-2
CURRICULUM oscar-2CURRICULUM oscar-2
CURRICULUM oscar-2
 
EMC Academic Alliance Partnering Schools
EMC Academic Alliance Partnering SchoolsEMC Academic Alliance Partnering Schools
EMC Academic Alliance Partnering Schools
 
ABDULRAHIMS C.V.4
ABDULRAHIMS C.V.4ABDULRAHIMS C.V.4
ABDULRAHIMS C.V.4
 

Similar a Electro Install Limited's Quality Assurance Manual

SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015Eddie Ngari
 
Turnkey Electrical Contractors Mumbai, India - Sterling Electro
Turnkey Electrical Contractors Mumbai, India  - Sterling ElectroTurnkey Electrical Contractors Mumbai, India  - Sterling Electro
Turnkey Electrical Contractors Mumbai, India - Sterling ElectroSterlingElectro
 
GK Plumbing Business Profile 2016
GK Plumbing Business Profile 2016GK Plumbing Business Profile 2016
GK Plumbing Business Profile 2016Kaelo Motshotlwane
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalMd Joynal Abaden
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfbkbk37
 
Industrial training report / Summer Vacation Report / Institutional Training ...
Industrial training report / Summer Vacation Report / Institutional Training ...Industrial training report / Summer Vacation Report / Institutional Training ...
Industrial training report / Summer Vacation Report / Institutional Training ...RajaKrishnan M
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxstirlingvwriters
 
compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015nikhil jain
 
Engineering quality assurance manual
Engineering quality assurance manualEngineering quality assurance manual
Engineering quality assurance manualsimonhackett1
 
Prekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects
 
Proposal to supply, installation and testing of CCTV Camera
Proposal to supply, installation and testing of CCTV Camera Proposal to supply, installation and testing of CCTV Camera
Proposal to supply, installation and testing of CCTV Camera Denis kisina
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)Marlowe Salenga
 
Capstone Final Project
Capstone Final ProjectCapstone Final Project
Capstone Final Projectchris odle
 

Similar a Electro Install Limited's Quality Assurance Manual (20)

SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015
 
Turnkey Electrical Contractors Mumbai, India - Sterling Electro
Turnkey Electrical Contractors Mumbai, India  - Sterling ElectroTurnkey Electrical Contractors Mumbai, India  - Sterling Electro
Turnkey Electrical Contractors Mumbai, India - Sterling Electro
 
merged_document_3
merged_document_3merged_document_3
merged_document_3
 
G3E Brochure
G3E BrochureG3E Brochure
G3E Brochure
 
GK Plumbing Business Profile 2016
GK Plumbing Business Profile 2016GK Plumbing Business Profile 2016
GK Plumbing Business Profile 2016
 
GEESOL MECHANICAL PRofile
GEESOL MECHANICAL  PRofile GEESOL MECHANICAL  PRofile
GEESOL MECHANICAL PRofile
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _Proposal
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
 
Industrial training report / Summer Vacation Report / Institutional Training ...
Industrial training report / Summer Vacation Report / Institutional Training ...Industrial training report / Summer Vacation Report / Institutional Training ...
Industrial training report / Summer Vacation Report / Institutional Training ...
 
4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docx
 
Alkaiser Leading Projects.
Alkaiser Leading Projects.Alkaiser Leading Projects.
Alkaiser Leading Projects.
 
compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015
 
Engineering quality assurance manual
Engineering quality assurance manualEngineering quality assurance manual
Engineering quality assurance manual
 
Prekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilitiesPrekaro Projects - Statement of capabilities
Prekaro Projects - Statement of capabilities
 
Proposal to supply, installation and testing of CCTV Camera
Proposal to supply, installation and testing of CCTV Camera Proposal to supply, installation and testing of CCTV Camera
Proposal to supply, installation and testing of CCTV Camera
 
PROFILE
PROFILEPROFILE
PROFILE
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
Belco Electrical Brochure
Belco Electrical BrochureBelco Electrical Brochure
Belco Electrical Brochure
 
Capstone Final Project
Capstone Final ProjectCapstone Final Project
Capstone Final Project
 

Más de Henry Nasilele

Family history book of Ruth Mulela Njebele
Family history book of Ruth Mulela NjebeleFamily history book of Ruth Mulela Njebele
Family history book of Ruth Mulela NjebeleHenry Nasilele
 
The Family history book of Joshua Nasilele Sezongo
The Family history book of Joshua Nasilele SezongoThe Family history book of Joshua Nasilele Sezongo
The Family history book of Joshua Nasilele SezongoHenry Nasilele
 
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...Henry Nasilele
 
The Lusaka Strangler Files - Revisited
The Lusaka Strangler Files - RevisitedThe Lusaka Strangler Files - Revisited
The Lusaka Strangler Files - RevisitedHenry Nasilele
 
Electro Install Limited's Company Profile
Electro Install Limited's Company ProfileElectro Install Limited's Company Profile
Electro Install Limited's Company ProfileHenry Nasilele
 
Electro Install Limited Solar Power Products _20.06.2013
Electro Install Limited Solar Power Products _20.06.2013Electro Install Limited Solar Power Products _20.06.2013
Electro Install Limited Solar Power Products _20.06.2013Henry Nasilele
 
Electro Install Limited's Safety and Health Policy
Electro Install Limited's Safety and Health PolicyElectro Install Limited's Safety and Health Policy
Electro Install Limited's Safety and Health PolicyHenry Nasilele
 
Electro Install Limited's Power Point Presentation
Electro Install Limited's Power Point PresentationElectro Install Limited's Power Point Presentation
Electro Install Limited's Power Point PresentationHenry Nasilele
 
Mobritech Limited's "Easy Quote System".
Mobritech Limited's "Easy Quote System".Mobritech Limited's "Easy Quote System".
Mobritech Limited's "Easy Quote System".Henry Nasilele
 

Más de Henry Nasilele (11)

Family history book of Ruth Mulela Njebele
Family history book of Ruth Mulela NjebeleFamily history book of Ruth Mulela Njebele
Family history book of Ruth Mulela Njebele
 
The Family history book of Joshua Nasilele Sezongo
The Family history book of Joshua Nasilele SezongoThe Family history book of Joshua Nasilele Sezongo
The Family history book of Joshua Nasilele Sezongo
 
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...
Action on Natural Medicine Seminar held at St. Margaret's UCZ Church in Kitwe...
 
The Beauty of Ashes
The Beauty of AshesThe Beauty of Ashes
The Beauty of Ashes
 
Warped Minds
Warped MindsWarped Minds
Warped Minds
 
The Lusaka Strangler Files - Revisited
The Lusaka Strangler Files - RevisitedThe Lusaka Strangler Files - Revisited
The Lusaka Strangler Files - Revisited
 
Electro Install Limited's Company Profile
Electro Install Limited's Company ProfileElectro Install Limited's Company Profile
Electro Install Limited's Company Profile
 
Electro Install Limited Solar Power Products _20.06.2013
Electro Install Limited Solar Power Products _20.06.2013Electro Install Limited Solar Power Products _20.06.2013
Electro Install Limited Solar Power Products _20.06.2013
 
Electro Install Limited's Safety and Health Policy
Electro Install Limited's Safety and Health PolicyElectro Install Limited's Safety and Health Policy
Electro Install Limited's Safety and Health Policy
 
Electro Install Limited's Power Point Presentation
Electro Install Limited's Power Point PresentationElectro Install Limited's Power Point Presentation
Electro Install Limited's Power Point Presentation
 
Mobritech Limited's "Easy Quote System".
Mobritech Limited's "Easy Quote System".Mobritech Limited's "Easy Quote System".
Mobritech Limited's "Easy Quote System".
 

Último

Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 

Último (20)

Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 

Electro Install Limited's Quality Assurance Manual

  • 2. QUALITY ASSURANCE MANUAL ELECTRO INSTALL LIMITED Mpelembe House, Suite 509, Broadway Road P. O. Box 70674 Ndola. Tel: +260 212 650949 Fax: +260 212 650949 1 Copy Number: ______________ Issue Date: ____17/06/2013_____________ Approved By: __________________ Name: Henry Nasilele (B.Eng., MEIZ, R.Eng.) Title: Chief Operating Officer and Consulting Engineer
  • 3. ` 3 1.0 INTRODUCTION..............................................................................................................................................4 2.0 Scope........................................................................................................................................................5 2.1 Policy.....................................................................................................................................................5 2.2 Objective.............................................................................................................................................5 3.0 Amendments and Revisions to the Quality Manual.....................................................................6 4.0 Organization............................................................................................................................................7 4.1 Consulting Engineer..........................................................................................................................7 4.2 Responsibilities................................................................................................................................7 5.0 DEFINITIONS .................................................................................................................................................8 6.0 Quality Program .....................................................................................................................................9 6.1 Documentation..................................................................................................................................9 6.3 Indoctrination and Training ............................................................................................................9 7.0 Procurement Document Control .....................................................................................................10 7.1 System of Procurement..................................................................................................................10 7.2 Review and Approval.......................................................................................................................10 7.3 Changes to Documents ................................................................................................................10 8.0 Instructions and Drawings .................................................................................................................11 8.1 Work Instructions ..............................................................................................................................11 8.2 Drawings ............................................................................................................................................11 9.0 Document Control ...............................................................................................................................12 9.1 Current Issues....................................................................................................................................12 9.2 Modification or Design Changes ................................................................................................12 10.0 Control of Purchased Items...................................................................................................................13 10.1 Incoming Articles.............................................................................................................................13 10.2 Inspection ..........................................................................................................................................13 10.3 Certifications.....................................................................................................................................13 10.4 Rejected Articles .............................................................................................................................13 11.0 Identification and control of Items......................................................................................................14 12.0 Inspection .............................................................................................................................................15 12.1 Stock ...................................................................................................................................................15 12.2 Final Inspection ................................................................................................................................15 12.3 Shipping Inspection ........................................................................................................................15 13.0 Control of Measuring and Test Equipment...................................................................................16 13.1 Commercial Equipment ................................................................................................................16 13.2 Special Devices ...............................................................................................................................16 13.3 Identification of Equipment..........................................................................................................16 14.0 Control of Nonconforming Articles .................................................................................................17 14.1 Dispositions ........................................................................................................................................17 14.2 Approval of Dispositions ................................................................................................................17 15.0 Corrective Action.....................................................................................................................................18 15.1 Customer Complaints ....................................................................................................................18 16.0 Quality Records...................................................................................................................................19 16.1 Retention ...........................................................................................................................................19 17. MANUFACTURING PROCESS CONTROL .................................................................................................20 18. INDICATION OF INSPECTION STATUS......................................................................................................20 Contents
  • 4. ` 4 Electro Install Limited was incorporated in June 2013. Prior to that, the Technical Director, a professional Electrical Engineer, has had thirty three years’ experience of industrial/ domestic electrical installations, after working for the mining industry at five operating mines on the Copperbelt and Lusaka. Additional capabilities have been added to the organization to include technical assistance and support, installation, maintenance of products and systems, and design of systems. This Quality System relates to the full range of company activities. 1.0 Introduction
  • 5. ` 5 2.0 Scope This manual describes Electro Install Limited Quality System Policies and Procedures. These policies and procedures control all activities from Supplier procurement to customer shipment of articles. 2.1 Policy Electro Install Limited policy is to achieve sustained, profitable growth by providing services which consistently satisfy the needs and expectations of its customers. This level of quality is achieved through adoption of a system of procedures that reflect the competence of the Company to existing customers, potential customers, and independent auditing authorities. Achievement of this policy involves all staff, who is individually responsible for the quality of their work, resulting in a continually improving working environment for all. This policy is provided and explained to each employee by the Technical Director or Consulting Engineer, who are responsible for Quality Assurance of the company. To achieve and maintain the required level of assurance the Technical Director retains responsibility for the Quality System with routine operation controlled by the Consulting Engineer. 2.2 Objective The quality System described herein is mandatory for all activities performed at Electro Install Limited to assure product conformance to the applicable drawing, catalog item specification and/or contract requirement. a) To maintain an effective Quality Assurance System complying with international Standard ISO9001 (Quality Systems). (b) To achieve and maintain a level of quality which enhances the Company's reputation with customers. (c) To ensure compliance with relevant statutory and safety requirements d) To endeavor, at all times, to maximize customer satisfaction with the services provided by Electro Install Limited.
  • 6. ` 6 All documentation utilized within the Company related to the management system itself, or to the execution of individual customer contracts is controlled to ensure that it is issued to the appropriate personnel, under the correct level of authority, is revised and reissued as necessary, and all obsolete versions are removed from the point of use. Such documentation typically includes: i. Specifications, Customer Orders, Plans/ Drawings, ii. Quality Assurance Manual/ Operating Procedures, iii. National/ International Standards and Codes of Practice. The Quality Assurance Manual, Procedures and Quality Plans are maintained by the Consulting Engineer who ensures that the appropriate items, at the correct revision levels, are issued to all who need them within the Company. National/International Standards, Codes of Practice are maintained by the Support Engineers who ensure that appropriate documents are available within the Company, and are issued at the correct revision levels. External suppliers of documentation are contacted regularly to ascertain that the documents held remain current. The distribution of standard documents is controlled and recorded on Distribution Lists, which also show the current issue status. The Distribution Lists are reviewed and updated as changes occur. All changes to documents are reviewed and approved by the person responsible for the original issue and, where appropriate, the nature of the change is indicated on the document. Master copies of the revised documents are retained as records of the changes and renewed as necessary to ensure clarity. Each contract has a File which contains all relevant information. Information is also held on the company's computer system for ease of access and manipulation. 3.0 Amendments and Revisions to the Quality Manual
  • 7. ` 7 4.1 Consulting Engineer The Consulting Engineer reports directly to the Managing Director and is delegated authority and organizational freedom to identify and evaluate quality problems and to initiate, recommend or provide solutions. 4.2 Responsibilities The Consulting Engineer is responsible for: a. Update and distribution control of the Quality Manual as. b. Planning to meet customer's quality requirements. c. Determining inspection points within the system. d. Approval of quality work instructions. e. Directing inspection activities. f. Surveillance of procurement documents. g. Approval of Suppliers. h. Maintaining a listing of approved suppliers. i. Monitoring procedures to assure compliance j. Reviewing and maintaining Quality Records. k. Calibration of Measuring and Test Equipment. l. Approval of disposition of Nonconforming Articles m. Corrective action coordination 4.0 Organization
  • 8. ` 8 The terms and descriptions used in this Manual are generally defined within ISO9001 - Quality Systems. Additional definitions apply for items not covered by the documents: Site any location, other than the Company's established premises, where work is undertaken as part of a formal contract. 5.0 DEFINITIONS
  • 9. ` 9 6.1 Documentation The Quality Program is documented within this manual and may be supported at any point by desk or work instructions that may be selected to increase control of a quality function. Desk or work instructions affecting Quality shall be approved by the Consulting Engineer. This document details the corporate quality policy and structure of the Company and references appropriate Operating Procedures. 6.2 Planning The Quality Program is planned to control products from the requirements of a customer order to include procurement practices, receipt of material, and receipt inspection of supplier material, handling and storage to the eventual shipment of an article to our customer. 6.3 Indoctrination and Training The policy of the company is to ensure that all personnel are trained and experienced to the extent necessary to undertake their assigned activities and responsibilities effectively. The company generally procures and recruits employees capable of meeting the technical, skill, experience and educational requirements of the company's activities. All staff and senior employees are responsible for recommending the training needs of others and for ensuring that all employees allocated specific tasks are suitably qualified and experienced to execute those tasks. Once training needs are identified these are provided under the responsibility of the Directors. Full records are maintained of all training undertaken by employees. 6.0 Quality Program
  • 10. ` 10 7.1 System of Procurement Procurement documents are computer generated and include appropriate technical and quality requirements. When a customer has special requirements, such as a Certified Material Test Report (CMTR), our program is designed to include the requirement into our procurement documents. 7.2 Review and Approval Procurement documents are reviewed and approved by the Project Manager, who is in charge of the procurement function. The Consulting Engineer performs random surveillance of procurement documents semi-annually and documents the results. 7.3 Changes to Documents Changes to procurement documents are subject to the same level of control as in preparation of the original document. Such documentation typically includes: a.) Specifications, Customer Orders, Plans/ Drawings, b.) Quality Assurance Manual/ Operating Procedures, c.) National/ International Standards and Codes of Practice. The Quality Assurance Manual, Procedures and Quality Plans are maintained by the Consulting Engineer who ensures that the appropriate items, at the correct revision levels, are issued to all who need them within the Company. National/ International Standards, Codes of Practice are maintained by the Support Engineers who ensure that appropriate documents are available within the Company, and are issued at the correct revision levels. External suppliers of documentation are contacted regularly to ascertain that the documents held remain current. The distribution of standard documents is controlled and recorded on Distribution Lists, which also show the current issue status. The Distribution Lists are reviewed and updated as changes occur. All changes to documents are reviewed and approved by the person responsible for the original issue and, where appropriate, the nature of the change is indicated on the document. Master copies of the revised documents are retained as records of the changes and renewed as necessary to ensure clarity. Each contract has a File which contains all 7.0 Procurement Document Control
  • 11. ` 11 relevant information. Information is also held on the company's computer system for ease of access and manipulation. 8.1 Work Instructions Work or desk instruction is utilized in support of this Quality Manual to improve the control of a specific operation or evaluation, but in no circumstances shall these documents supersede or change the requirements of this manual. 8.2 Drawings Drawings, specifications and/or catalog criteria shall be used to control the technical requirements of products offered to our customers. 8.0 Instructions and Drawings
  • 12. ` 12 9.1 Current Issues The latest issue of drawings, specifications, catalogs, work instructions and Customer orders will be utilized to control articles throughout the operations system. The Company offers both standard products and specialist services to meet each customer's needs. Standard products are displayed in a catalogue for customer selection. Specialist service requirements differ from one customer to another (and from one contract to another); therefore each tends to be quoted for the specific contract. Once a proposal is accepted by the customer, or an order is placed, it is recorded and reviewed to establish that the requirements of the order are adequately defined and documented, any differences from the proposal are resolved, and the Company is capable of fully satisfying the customers’ requirements. In addition to the original order/ contract specification the customer may also request addition/ variation work to be undertaken by the Company. In these circumstances the work content is documented and agreed with the customer prior to execution to ensure that no ambiguity exists. The Company operates on a computer assisted order processing system to ensure rapid fulfillment of customer orders. 9.2 Modification or Design Changes Obsolete documents caused by modification or design change will be identified as such and removed from use. 9.0 Document Control
  • 13. ` 13 10.1 Incoming Articles Receipt of purchased articles is documented on a Receiving Report. The requirements of the Purchase Order are attached to the receiving report to provide the inspection function with complete criteria for evaluation of the receipt. 10.2 Inspection Articles are inspected in accordance with the requirements of the receiving documents. As a minimum, all articles are inspected for count, identification and damage. 10.3 Certifications Certifications and Certified Material Test Reports (CMTRs) are reviewed for compliance and accuracy of contents as required by procurement documents. Certified reports or other proof of Quality used as a basis for acceptance shall be (validated by independent testing on an annual basis) 10.4 Rejected Articles Rejected articles will be documented as nonconforming on the Receiving Report to prevent inadvertent use or further processing. The Consulting Engineer will approve final disposition. 10.0 Control of Purchased Items
  • 14. ` 14 The Original Equipment Manufacturer (OEM) articles will retain their identity through our receipt, stocking and delivery function traceable to the procurement and receipt documents containing acceptance status. Suppliers of products, materials and services, where unspecified by a customer contract, are selected on their ability to meet the company's requirements given due consideration to the quality, statutory obligations, timescale and cost. A list of approved suppliers and sub-contractors is maintained which is compiled on the following criteria:- a.) Previous performance in supplying to similar specifications and requirements. b.) Stocking of high volume standard items conforming to a relevant British Standard, or supplied with a statement of conformity. c.) Compliance with an approved third party product/ quality registration scheme. d.) Recommendation by other similar purchasers or manufacturers of equipment. e.) A trial order and evaluation of performance. All supplies and sub-contracts are subject to an authorized Purchase Order providing full clarification of the type and extent of supply. Should a supplier, not appearing on the Approved Suppliers List be proposed, they will be analysed by capability and subject to acceptance on the authority of a Director. 11.0 Identification and control of Items
  • 15. ` 15 12.1 Stock Stock re-inspection will be implemented on specific articles in storage as a result of a customer complaint or any suspected Quality problem concerning an article. Rejected articles will be identified or segregated and disposition in accordance with control of nonconforming material. Accepted articles will be returned to the stock location. 12.2 Final Inspection Inspection of articles to be delivered to a customer will be accomplished prior to packaging for identification, damage and in accordance with the shipping document. The customer ordered requirements are included with the shipping document. Rejected articles will be identified or segregated and disposition in accordance with control of nonconforming material. Accepted articles will be identified on the shipping document as accepted by stamp impression 12.3 Shipping Inspection Inspection of the packaging will include evaluation to determine adequacy to preclude damage during delivery and any special requirements directed by the customer order. Customer requirements for Certifications and/or Certified Material Test Reports will be included with the articles. Inspection and testing is carried out on completion of installation and maintenance activities, with results being documented. Should items not be acceptable against the agreed contract criteria they will be repaired, replaced or identified for a subsequent evaluation and decision. All repaired items are subject to a re-inspection to ensure acceptability. On completion of installation and maintenance works, the customer is also invited to check the work performed to ensure full acceptability. 12.0 Inspection
  • 16. ` 16 13.0 Control of Measuring and Test Equipment 13.1 Commercial Equipment Calibration of normal commercial equipment (i.e., rulers, tape, measures, levels, and other similar devices) is not required. It is the responsibility of the user to report worn or damaged equipment to management to prevent inadvertent use. 13.2 Special Devices Calibration will be performed and maintained at prescribed intervals in accordance with manufacturers’ recommendations. An Outside Calibration Laboratory is contracted to supply this service. The supplier is certified and performs calibrations traceable to recognized national Standards. 13.3 Identification of Equipment Each item is identified with current status of calibration and the user is responsible to verify an item is serviceable. Items too small to be identified are serialised, and calibration status is maintained by a traceable record supporting a calibration recall system. Production and measuring equipment held is maintained in good condition, and capable of safe and effective operation within a specified tolerance of accuracy. Test and measuring equipment is regularly inspected or calibrated to ensure that it is capable of accurate operation, by comparison with external sources traceable back to National Standards. Electrostatic protection equipment is utilized when handling sensitive components and this equipment is regularly checked to ensure that it remains fully functional.
  • 17. ` 17 14.1 Dispositions All nonconforming articles are reviewed to determine disposition; the disposition is documented on the accompanying paperwork. Once non-conforming items have been noticed they are identified by location, associated documents, or specific markings to prevent their inadvertent use. All non-conforming items and customer complaints are subject to review and rectification by nominated personnel. The type and extent of non-conformity is documented in order to establish trends and identify possible areas for improvement. The corrective action required to prevent recurrence is evaluated, documented, and its effective implementation is monitored. All rectification is subsequently re-inspected to ensure complete customer satisfaction. All employees are encouraged to suggest improvements in methods, materials, suppliers, and sub-contractors. The Company has established procedures for review of all activities in order to identify and evaluate all possible improvements in methods/ materials and its procedures. 14.2 Approval of Dispositions A. The Consulting Engineer approves all dispositions of nonconforming articles as follows: 1. Return to Supplier 2. Rework to Specification 3. Scrap /obsolete B. Customer approval of the following dispositions shall be requested and required prior to delivery of articles: 1. Use as is (waiver) 2. Repair to a Useable Condition C. Reworked and repaired items are re-inspected and/or tested in accordance with disposition instructions. 14.0Control of Nonconforming Articles
  • 18. ` 18 Conditions adverse to quality shall be promptly identified and corrected. In the case of significant conditions adverse to Quality, the cause of the condition shall be determined and action planned to correct and preclude repetition. 15.1 Customer Complaints Responses to Customer complaints will be documented by letter or on forms required by the customer. Responses will include cause of the condition, actions taken to prevent a future occurrence and effective date. Goods received from customers (i.e. free issue items or equipment being serviced) are always visually inspected at the receipt stage, with any un- declared non-conformance being immediately reported to the customer. 15.0 Corrective Action
  • 19. ` 19 16.1 Retention Quality records traceable to an article or lot of articles will be stored by the identifying part number. Quality records traceable to a Customer will be stored by the Customer's Order Number. The retention of Quality records is a minimum of three years or as otherwise directed by a Customer Order Requirement Storage facilities are allocated which ensure that all stored records are identifiable and retrievable, and the storage areas are free from damp and other agents which could cause premature deterioration. Where records are maintained on computer magnetic media, and these are subject to "back-up" at regular intervals, with the "back-up" information being stored in a protected location to ensure security from loss/ damage of active data. All records are retained for a minimum of 2 years. 16.0 Quality Records
  • 20. ` 20 . All productive work is planned and undertaken in accordance with the company's procedures, and any specific documents agreed for individual contracts (e.g. contract specifications). Work instructions are provided by the agreed contract specification and any documents referenced therein, alternatively work is performed in accordance with nationally accepted codes of practice (e.g. BS6701). As goods are inspected, the status is defined by location in stores, with all non- conforming items being placed in a reject area or marked as reject for review. The status of work in progress is established by markings or associated documentation recording the inspections undertaken and their acceptability. 17. Manufacturing Process Control 18. Indication of Inspection Status