Allocation under the
project as per PIP (Rs.
Crores)
Rs.7.55 Crore as per original
PIP
Rs. 14.04 Crore as per
Revised Cost Table 2013
Expenditure upto March
2014 (Rs. Crores) Rs. 10.43 Crore
Expenditure in the FY
2013-14 (Rs. Crores) Rs. 2.86 Crore
Likely expenditure by
May31, 2014 (Rs. Crores) Rs. 0.91 Crore
Component wise break up
Detailed Costs
Financials (Rs. In Thousands)
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total
INVESTMENT COST
COMPONENT I: Institutional Strengthening
1. I.A. Consolidation
of HP I
0.00 318.59 218.95 1883.38 1946.58 2603.82 614.13 5274.747 12860.20
2. I.B. Awareness,
Dissemination and
Knowledge Sharing
1.80 0.00 14.17 157.03 345.74 480.98 121.65 14.885 1136.26
3. I.C.
Implementation
Support
755.31 300.67 1387.41 3346.79 472.99 2298.63 2222.28
10072.21
1
20856.28
Component I 757.11 619.26 1620.53 5387.20 2765.30 5383.44 2958.06 15361.84 34852.73
Detailed Costs
Financials (Rs. In Thousands)
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total
INVESTMENT COST
COMPONENT II: Vertical Extension
1. II.A.
Hydrological
Design Aids
0 0 0 0 15.515 0 13.144 0 28.66
2. II.B. Decision
Support
Systems
0 0 29.5 287.255
2218.08
2
505.819 775.683 197.464 4013.80
3. II.C. Purpose-
Driven Studies
0 0
1947.23
2
828.577 524.819 183.982 264.175 30.939 3779.72
Component II 0 0 1976.73 1115.832 2758.41 689.801 1053.002 228.403 7822.19
Total Investment
Cost
757.109 619.26 3597.26 6503.02 5523.71 6073.23 4011.06 15590.25 42674.92
Detailed Costs
Financials (Rs. In Thousands)
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total
RECURRENT COST
COMPONENT I: Institutional Strengthening
1. I.A.
Consolidation of
HP I
275.45 252.789 337.14 149.8 116.55 56.859 43.758 54.114 1286.46
2. I.B.
Awareness,
Dissemination
and Knowledge
Sharing
0 0 0 0 0 2 0 0 2.00
3. I.C.
Implementation
Support
4510.18 4703.50 5476.69 7787.69 7468.11 9153.47 7979.144 12958.51 60037.33
Component I 4785.63 4956.29 5813.83 7937.49 7584.66 9212.33 8022.902 13012.62 61325.78
Detailed Costs
Financials (Rs. In Thousands)
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total
RECURRENT COST
COMPONENT II: Vertical Extension
1. II.A.
Hydrological
Design Aids
0 0 0 0 0 0 0 0 0.00
2. II.B. Decision
Support
Systems
2.724 0 5.472 174.662 75.683 8.638 5.086 0 272.27
3. II.C. Purpose-
Driven Studies
0 0 1.68 0 19.448 21.989 0 0 43.12
Component II 2.724 0 7.152 174.662 95.131 30.627 5.086 0 315.382
Total Recurrent
Cost
4788 4956 5821 8112 7680 9243 8028 13013 61641
Total Cost
5545 5576 9418 14615 13204 15316 12039 28603 104316(Investment +
Recurrent)
Gauging of Hydro- meteorological
stations using modern data
collection Equipments
• 54 River gauging sites
• 140 meteorological sites including
9 full climatic stations.
• Historical hydro- Meteorological data
digitized.
• GSM telemetry system has been installed in State Data
Processing Centre.
• Up gradation of existing hydro meteorological stations in
Bharathapuzha River basin with Real Time Telemetric
Systems.
Water Level
Recorder with
Telemetry
Systems– 7Nos
Rain Gauge with
Telemetry
Systems – 6 Nos
Data Processing and Analysis
Current Data Analysed in SDPC and Published in the form of Water Year
Book.
Pictorial representation
of Analysis Results of
Rainfall patterns in the
year 2011 and drought
year 2012
•
• Training programmes were implemented to handle the
latest, sophisticated technologies, software and protocols in
HIS.
• Awareness Raising Programmes to data users.
• Construction of new River gauging stations in ungauged
river basins -10Nos (7 nos completed and 3 Nos nearing
completion).
• Procured Arc GIS Software with 3D Analyst and Spatial
Analyst extensions.
• Strengthened and upgraded the infrastructure facilities of
Level II WQ Lab at Thrissur. Salinity Study Conducted for
Major Irrigation Projects.
• DSS Server with Static IP Connection and Work Stations -
3Nos.
• Procured Reference Books for Library.
Other Physical Achievements
• Construction of training center building at Thrissur –
completed.
• Construction of Regional Centre for Ground Water Building
and Lab Level II at Ernakulm.- Work is nearing Completion.
Major Basin Bharathapuzha
Basin area 6186 KM2
(4400 KM2
in Kerala)
Latitude 100
25’ to 110
15’ N
Longitude 750
50’ to 760
55’ E
Tributaries 43 Nos
Hydrological parameters (including groundwater parameters in accordance
with the latest GEC) in the basin was fine tuned using NAM & Mike Basin
1. Conjunctive Use
2. Inter basin transfer with Hydropower module- Revisit of
Kuriarkuty-Karapara Project
3. Inter Sub Basin Transfer- Silent Valley to Malampuzha
reservoir
4. Artificial Recharge Viability Analysis.
5. Water Quality module
6. Water Availability of Bharathapuzha Basin
7. Reservoir Operation
8. Irrigation module
Conjunctive Use
0
20
40
60
80
100
120
Demand Deficit
Base Scenario
(Mm3/Yr)
Demand Deficit
Optimal Scenario-
(Mm3/Yr)
Reduction in
Deficit %
Tail
Middle
Head
Scenario
User
areas
Total
Demand
(Mm3
/Yr)
SW
Abstractio
n
(Mm3
/Yr)
GW
Abstractio
n (Mm3
/Yr)
Demand
Deficit
(Mm3
/Yr)
Base
Head 19.32 19.33 0 0
Middle 32.34 7.9 6.32 18.2
Tail 20.32 5.97 5.94 8.43
Optimal
Head 19.32 9.66 9.66 0
Middle 32.34 23.45 4.89 4
Tail 20.32 9.36 5.46 5.5
The application was envisaged for providing irrigation to Kanjikode -
Kozhijampara area. The project was conceived 2 decades ago but did not
materialize due to objection from forest department. Scenarios were run for
different levels of submergence using DEM. Mike Basin was used to analyze the
amount water conveyed through tunnel and the hydropower generated.
 The unutilized capacity of Parambikulam reservoir is made use of for
supplying water to Palakkad region in the summer months.
The process of supplying the water to Contour canal in the monsoon
months and receiving back a lesser amount in summer months is
equivalent of having a new reservoir of capacity 90Mm3 up in the
Western Ghats without any cost. (Capacity of the proposed Karapara
reservoir is only 28Mm3.)
The most suitable option appears to be the 2nd scenario in which
maximum water (164.3Mm3) is transferred to Contour canal from
Karapara and Upper Kuriarkuty and getting back a stable flow of
88.6Mm3 in summer months for power and Irrigation.
The water availability at Moolathara will be doubled from 7.5 TMC (as per
PAP agreement), if the project is implemented.
 Forest submergence will be minimum in this proposal.
 The power generated will be around 15 MW from Karapara and 30MW from
Main tunnel. Power can be produced in the summer also.
 The power generated from the project will be more than 200MW if only peak
hour generation is followed.
 During heavy rainy season, the main tunnel can also be used for transferring
flood water from Chalakudy basin to Bharathapuzha basin, where flood does
not cause much damage.
Artificial Recharge Viability Analysis
A project proposal amounting to 7.5 crores was submitted before the Kerala State Ground Water
Authority which in turn has recommended to the Government for the final nod.
Inter Sub Basin Transfer
This application was to study the viability of inter sub basin water transfer during
monsoon season to rain shadow regions and there by to augment the ground
resource of the area.
Water Availability of Bharathapuzha Basin
Specific runoff in the basinRain fall distribution
0
20
40
60
80
100
120
Litres/sec/km2
Catchment Name
Sub Basin Wise Specific run off
Reservoir Operation
Simulated data of seven reservoirs in the Study Basin was integrated using DSS
(P) Software. Inflow (including dependability), Water level, Demands etc. can be
viewed and exported to MS Excel. This will help Officers involved in Water
Resources planning to take decisions on Water allocation.
1. Dam release study for meeting the domestic water supply in
Trivandrum.
2. Integrated operation of proposed reservoirs in Vamanapuram Basin.
3. Analysing the feasibility of a dam at Murinjapuzha – Manimala Basin.
4. Viability analysis of proposed Pattissery Dam in Pambar basin.
5. Feasibility of 7 check dam locations - Meenachil Basin.
6. Reconnaissance study for storage locations - Chalakudy Basin.
7. Feasibility of check dam locations in Pampar Basin .
8. Drinking water supply to Kollam City
9. Kuttanad Flood study
10.Thampanoor Flood study
• Database (access &
update)
• DSS
• MIKEBASIN
GW 1
(TSR)
SE - SW SE - GW EE-SW/Sr. HG -
GW
Chief Engineer
Hydrology
Director
Ground Water
Secretary
Water Resources
• Database (access)
• DSS
• MIKEBASIN
VPN Connectivity
• Database (access)
• DSS
LAN/VPN Connectivity
• Analysed data
• Model results
Web Server
GW Server
(TVM)
GW 2
(EKM)
SW 1 (TSR
Division)
SW Server
(TSR)
SW 2 (Under
CGNR
Division)
DSS Set-up
SW SW GW GW
LAN
DSS Project
Status of Kerala state
 Rainfall Runoff model of Bharathapuzha basin
represents characteristics of GW & SW. The trainings
and DHI support was effectively utilized by the state as
there was no change in team members in the last four
years.
 The Secretary to Govt. (Water Resources Department,
Kerala) and department Heads in Kerala are keen to
make use of this decision making tool. The applications
mentioned earlier was carried out on such directions.
 Detailed documentation on all the developed
applications is in progress.
 With projects like DSS getting good momentum, Kerala
also focuses on the extension on HP…
1. License issue for model tools
Now no network License for modelling………
2. TOT Training and Training in MIKE HYDRO
No body is trained in MIKE HYDRO (New Modelling Software). In House training
programme is needed for DSS team Members and other officials.
TOT Programme originally planned for the state was not materialized.
3. Less training in DSS(P) Software
An exhaustive training was lacking.
Comparison, Optimization, Dashboard…….. techniques
4. Modeling of other basins
Need future support to the modeling processes – NIH/DHI
5. Hardware issues
Trouble shooting in future. There is no system in place.
• Kerala State Irrigation Department
• Kerala State Ground Water Department
&
• Hard Rock Regional Centre, National
Institute of Hydrology, Belgaum
 To ascertain the existing pollution levels of Rivers,
Streams, Lakes, Ponds, Wells, Tap water and other
water bodies in Kerala
 To evolve Water Quality Index for the surface water
bodies and quality modelling for the selected river
reaches
 To develop vulnerability index for ground water
resources
 To create awareness among people about the
locations causing pollution and thereby to initiate
proper pollution control practices.
 Sampling Network Design.
 Collection and analysis of Water Samples.
 Onsite analysis of Hourly DO and BOD for selected
river Basins.
 Discharge measurement at sampling sites.
 Compilation of WQ Data.
 Preparation of Location maps in GIS.
 Data exchange to NIH for further processing and
reporting .
 Awareness dissemination & Technical Workshops.
Sample Collection network was designed covering
all River Basins of the state.
The locations selected are river gauging stations,
reservoirs, ponds, lakes, intake points of Kerala
water authority, tap water points of KWA, upstream
of major tributaries confluences, points likely to be
contaminated by pesticides and d/s of discharge
points of industries.
PHYSICAL.
CHEMICAL.
BACTERIOLOGICAL.
TRACES & PESTICIDES.
PHYSICAL PARAMETERS : Colour, Temperature,
Turbidity, Total Dissolved Solids, Electrical
Conductivity, Odour.
CHEMICAL PARAMETERS : pH, Acidity, Alkalinity,
Total Hardness, Calcium, Magnesium, Chloride,
Fluoride, Iron, Nitrate, Dissolved Oxygen, BOD, COD
Sulphate, Phosphate, Manganese.
BACTERIOLOGICAL : Total Coliform, E- Coli
TRACE METALS AND PESTICIDES : Arsenic,
Copper, Mercury, Lead, Zinc Nickel, Cadmium,
Lindane, Aldrin ,Die Aldrin, Endosulphan Alpha,
Endosulphan Beta, DDD, DDE.
WQ Labs involved in the analysis of Samples.
Level II WQ Lab established under Hydrology
Project at Thrissur.
Quality Control Labs of Kerala Water
Authority (KWA).
Central Water Research Lab of CWRDM,
Kozhikode.
Physical Achievements
 WQ Data of surface water samples of 485 stations
pertaining to various River Basins of the State have
been generated for the following seasons
Pre and Post Monsoon 2008
Pre Monsoon 2009
Pre and Post Monsoon 2010
Post Monsoon 2011
Pre Monsoon 2012
 During the season Post Monsoon 2011 and Pre
Monsoon 2012, 175 samples were collected only from
the 15 major River Basins of the state and analysed
for physico chemical parameters
 DO-BOD Monitoring of River Basins viz. Pamba,
Periyar, Muvattupuzha, Karamana, Chaliyar,
Vamanapuram, Kallada, Achenkovil, Manimala,
Meenachil, Chalakkudy, and Bharathapuzha have
been carried out on hourly basis.
 Prepared maps of various river basins showing
sampling locations in Arc GIS.
Conducted awareness raising workshops on district
level and Regional Seminar on Water Quality
Assessment and Management of Kerala State at
State Level.
 Technical workshops were organized to train the
State Government officials involved in Water quality
Analysis, Assessment and Management.
Location Map of WQ Monitoring Stations
Findings of the Study
The major water quality problem associated
with rivers of Kerala is bacteriological pollution.
The study also revealed that industrial pollution of
surface water is not much in Kerala compared to
other States of India.
 In some of the rivers viz Periyar, Muvattupuzha etc
which directly receive untreated industrial effluents,
the pollution is in an alarming rate.
 Salinity is another problem observed in the coastal
stretches
 In general the water quality deterioration is
reported to be mainly due to anthropogenic
activities.
 Large scale urbanization, indiscriminate disposal
of solid and liquid waste, changes in land-use
and agricultural practices contribute
significantly to the water quality deterioration
 Bacteriological contamination is mainly due to
poor sanitation practices
 There is an urgent need to make integrated efforts by
different Government as well as Non-Governmental
organizations in order to address issues related to large
scale contamination of fresh water resources to provide the
desired quality of water to various stake holders in Kerala.
 A regular water quality monitoring program covering the
entire State.
 Adequate and well trained technical staff is required for
carrying out the analysis utilizing advanced equipments in
the WQ laboratories.
Recommendations
 Appropriate Scientific interventions and management practices
are required to be evolved for proper disposal of solid and
liquid waste as these lead to the contamination of the available
fresh surface as well as ground water resources.
 Scientific, cost-effective and environmental friendly Mitigation
activities are to be practised.
 Establishing Web based water quality information System.
 Mass awareness programs to manage water quality and related
health problems.
 Water Quality related studies to be continued with extended
objectives and scope to address the water quality problems of
Kerala State in a Holistic Manner.
Post project plan for continuation of
HPII Activities
Proposal for next phase of Hydrology Project submitted…….
• Development of DSS (Planning) for all River Basins of
Kerala.
• Water Quality Monitoring and Modelling of Reservoirs.
• Dam Break Analysis and Flood Forecasting Study.
• Climate Change study and Hydrological Modelling.
• Real Time Data Acquisition Systems.
• Training Programmes.
• Infrastructure Development:
Thank You

Más contenido relacionado

La actualidad más candente

IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River BasinIRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River BasinIRJET Journal
 
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir Study
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir StudySyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir Study
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir StudySyQwest Inc.
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...GavanThomas
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sepindiawrm
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert ProjectIwl Pcu
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelHydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelSumant Diwakar
 
3-maharashtra presentation, Sept-18
3-maharashtra presentation, Sept-183-maharashtra presentation, Sept-18
3-maharashtra presentation, Sept-18indiawrm
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...HydrologyWebsite
 
Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015Amaljit Bharali
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Dhiraj Jhunjhunwala
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water managementhydrologyproject2
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
ChoptankModelingPresentation
ChoptankModelingPresentationChoptankModelingPresentation
ChoptankModelingPresentationRyan Jones, P.E.
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Timo Brussée
 

La actualidad más candente (20)

Smart ICT for Weather and Water
Smart ICT for Weather and WaterSmart ICT for Weather and Water
Smart ICT for Weather and Water
 
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River BasinIRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
 
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir Study
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir StudySyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir Study
SyQwest Bathy-2010 Sub Bottom Profiler used in Tarbela Reservoir Study
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert Project
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT ModelHydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
Hydrologic Assessment in a Middle Narmada Basin, India using SWAT Model
 
3-maharashtra presentation, Sept-18
3-maharashtra presentation, Sept-183-maharashtra presentation, Sept-18
3-maharashtra presentation, Sept-18
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Erosion and runoff evaluation
Erosion and runoff evaluationErosion and runoff evaluation
Erosion and runoff evaluation
 
Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
ChoptankModelingPresentation
ChoptankModelingPresentationChoptankModelingPresentation
ChoptankModelingPresentation
 
72.gis in water resources
72.gis in water resources72.gis in water resources
72.gis in water resources
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
 

Similar a Kerala sw

4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Septindiawrm
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17indiawrm
 
Assessment of Water Supply–Demand for a Watershed using WEAP Model
Assessment of Water Supply–Demand  for a Watershed using WEAP Model Assessment of Water Supply–Demand  for a Watershed using WEAP Model
Assessment of Water Supply–Demand for a Watershed using WEAP Model dipesh thakur
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...Deltares
 
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...IRJET Journal
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxINDRANIL BANERJEE
 
journal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfjournal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfnareshkotra
 
journal of applied science and engineering.pdf
journal of applied science and engineering.pdfjournal of applied science and engineering.pdf
journal of applied science and engineering.pdfnareshkotra
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)IRJET Journal
 
Iei bangalore-efficient gw-irrigation-compilation-report
Iei bangalore-efficient gw-irrigation-compilation-reportIei bangalore-efficient gw-irrigation-compilation-report
Iei bangalore-efficient gw-irrigation-compilation-reportmainadakala
 
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...IRJET Journal
 
Jaya r pudashine
Jaya r pudashineJaya r pudashine
Jaya r pudashineClimDev15
 
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYDESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYIRJET Journal
 
Pa Pa Shwe Sin Kyaw.pptx
Pa Pa Shwe Sin Kyaw.pptxPa Pa Shwe Sin Kyaw.pptx
Pa Pa Shwe Sin Kyaw.pptxAbdusalamIdiris
 

Similar a Kerala sw (20)

4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
 
Assessment of Water Supply–Demand for a Watershed using WEAP Model
Assessment of Water Supply–Demand  for a Watershed using WEAP Model Assessment of Water Supply–Demand  for a Watershed using WEAP Model
Assessment of Water Supply–Demand for a Watershed using WEAP Model
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
29 cej-2730.f
29 cej-2730.f29 cej-2730.f
29 cej-2730.f
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
 
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
 
Himachal may, 2014
Himachal  may, 2014Himachal  may, 2014
Himachal may, 2014
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
 
Swat model
Swat model Swat model
Swat model
 
journal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfjournal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdf
 
journal of applied science and engineering.pdf
journal of applied science and engineering.pdfjournal of applied science and engineering.pdf
journal of applied science and engineering.pdf
 
5 ijsrms-02617 (1)
5 ijsrms-02617 (1)5 ijsrms-02617 (1)
5 ijsrms-02617 (1)
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Iei bangalore-efficient gw-irrigation-compilation-report
Iei bangalore-efficient gw-irrigation-compilation-reportIei bangalore-efficient gw-irrigation-compilation-report
Iei bangalore-efficient gw-irrigation-compilation-report
 
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...
Hydrological Model for Estimating Volume of Inflow into the Peppara Dam Reser...
 
Jaya r pudashine
Jaya r pudashineJaya r pudashine
Jaya r pudashine
 
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYDESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
 
Pa Pa Shwe Sin Kyaw.pptx
Pa Pa Shwe Sin Kyaw.pptxPa Pa Shwe Sin Kyaw.pptx
Pa Pa Shwe Sin Kyaw.pptx
 

Más de hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Último

Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 

Último (20)

Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 

Kerala sw

  • 1.
  • 2. Allocation under the project as per PIP (Rs. Crores) Rs.7.55 Crore as per original PIP Rs. 14.04 Crore as per Revised Cost Table 2013 Expenditure upto March 2014 (Rs. Crores) Rs. 10.43 Crore Expenditure in the FY 2013-14 (Rs. Crores) Rs. 2.86 Crore Likely expenditure by May31, 2014 (Rs. Crores) Rs. 0.91 Crore
  • 3. Component wise break up Detailed Costs Financials (Rs. In Thousands) 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total INVESTMENT COST COMPONENT I: Institutional Strengthening 1. I.A. Consolidation of HP I 0.00 318.59 218.95 1883.38 1946.58 2603.82 614.13 5274.747 12860.20 2. I.B. Awareness, Dissemination and Knowledge Sharing 1.80 0.00 14.17 157.03 345.74 480.98 121.65 14.885 1136.26 3. I.C. Implementation Support 755.31 300.67 1387.41 3346.79 472.99 2298.63 2222.28 10072.21 1 20856.28 Component I 757.11 619.26 1620.53 5387.20 2765.30 5383.44 2958.06 15361.84 34852.73
  • 4. Detailed Costs Financials (Rs. In Thousands) 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total INVESTMENT COST COMPONENT II: Vertical Extension 1. II.A. Hydrological Design Aids 0 0 0 0 15.515 0 13.144 0 28.66 2. II.B. Decision Support Systems 0 0 29.5 287.255 2218.08 2 505.819 775.683 197.464 4013.80 3. II.C. Purpose- Driven Studies 0 0 1947.23 2 828.577 524.819 183.982 264.175 30.939 3779.72 Component II 0 0 1976.73 1115.832 2758.41 689.801 1053.002 228.403 7822.19 Total Investment Cost 757.109 619.26 3597.26 6503.02 5523.71 6073.23 4011.06 15590.25 42674.92
  • 5. Detailed Costs Financials (Rs. In Thousands) 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total RECURRENT COST COMPONENT I: Institutional Strengthening 1. I.A. Consolidation of HP I 275.45 252.789 337.14 149.8 116.55 56.859 43.758 54.114 1286.46 2. I.B. Awareness, Dissemination and Knowledge Sharing 0 0 0 0 0 2 0 0 2.00 3. I.C. Implementation Support 4510.18 4703.50 5476.69 7787.69 7468.11 9153.47 7979.144 12958.51 60037.33 Component I 4785.63 4956.29 5813.83 7937.49 7584.66 9212.33 8022.902 13012.62 61325.78
  • 6. Detailed Costs Financials (Rs. In Thousands) 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total RECURRENT COST COMPONENT II: Vertical Extension 1. II.A. Hydrological Design Aids 0 0 0 0 0 0 0 0 0.00 2. II.B. Decision Support Systems 2.724 0 5.472 174.662 75.683 8.638 5.086 0 272.27 3. II.C. Purpose- Driven Studies 0 0 1.68 0 19.448 21.989 0 0 43.12 Component II 2.724 0 7.152 174.662 95.131 30.627 5.086 0 315.382 Total Recurrent Cost 4788 4956 5821 8112 7680 9243 8028 13013 61641 Total Cost 5545 5576 9418 14615 13204 15316 12039 28603 104316(Investment + Recurrent)
  • 7. Gauging of Hydro- meteorological stations using modern data collection Equipments • 54 River gauging sites • 140 meteorological sites including 9 full climatic stations. • Historical hydro- Meteorological data digitized.
  • 8. • GSM telemetry system has been installed in State Data Processing Centre. • Up gradation of existing hydro meteorological stations in Bharathapuzha River basin with Real Time Telemetric Systems. Water Level Recorder with Telemetry Systems– 7Nos Rain Gauge with Telemetry Systems – 6 Nos
  • 9. Data Processing and Analysis Current Data Analysed in SDPC and Published in the form of Water Year Book. Pictorial representation of Analysis Results of Rainfall patterns in the year 2011 and drought year 2012
  • 10.
  • 11. • Training programmes were implemented to handle the latest, sophisticated technologies, software and protocols in HIS. • Awareness Raising Programmes to data users. • Construction of new River gauging stations in ungauged river basins -10Nos (7 nos completed and 3 Nos nearing completion). • Procured Arc GIS Software with 3D Analyst and Spatial Analyst extensions. • Strengthened and upgraded the infrastructure facilities of Level II WQ Lab at Thrissur. Salinity Study Conducted for Major Irrigation Projects. • DSS Server with Static IP Connection and Work Stations - 3Nos. • Procured Reference Books for Library. Other Physical Achievements
  • 12. • Construction of training center building at Thrissur – completed.
  • 13. • Construction of Regional Centre for Ground Water Building and Lab Level II at Ernakulm.- Work is nearing Completion.
  • 14.
  • 15. Major Basin Bharathapuzha Basin area 6186 KM2 (4400 KM2 in Kerala) Latitude 100 25’ to 110 15’ N Longitude 750 50’ to 760 55’ E Tributaries 43 Nos
  • 16. Hydrological parameters (including groundwater parameters in accordance with the latest GEC) in the basin was fine tuned using NAM & Mike Basin
  • 17. 1. Conjunctive Use 2. Inter basin transfer with Hydropower module- Revisit of Kuriarkuty-Karapara Project 3. Inter Sub Basin Transfer- Silent Valley to Malampuzha reservoir 4. Artificial Recharge Viability Analysis. 5. Water Quality module 6. Water Availability of Bharathapuzha Basin 7. Reservoir Operation 8. Irrigation module
  • 18. Conjunctive Use 0 20 40 60 80 100 120 Demand Deficit Base Scenario (Mm3/Yr) Demand Deficit Optimal Scenario- (Mm3/Yr) Reduction in Deficit % Tail Middle Head Scenario User areas Total Demand (Mm3 /Yr) SW Abstractio n (Mm3 /Yr) GW Abstractio n (Mm3 /Yr) Demand Deficit (Mm3 /Yr) Base Head 19.32 19.33 0 0 Middle 32.34 7.9 6.32 18.2 Tail 20.32 5.97 5.94 8.43 Optimal Head 19.32 9.66 9.66 0 Middle 32.34 23.45 4.89 4 Tail 20.32 9.36 5.46 5.5
  • 19. The application was envisaged for providing irrigation to Kanjikode - Kozhijampara area. The project was conceived 2 decades ago but did not materialize due to objection from forest department. Scenarios were run for different levels of submergence using DEM. Mike Basin was used to analyze the amount water conveyed through tunnel and the hydropower generated.
  • 20.  The unutilized capacity of Parambikulam reservoir is made use of for supplying water to Palakkad region in the summer months. The process of supplying the water to Contour canal in the monsoon months and receiving back a lesser amount in summer months is equivalent of having a new reservoir of capacity 90Mm3 up in the Western Ghats without any cost. (Capacity of the proposed Karapara reservoir is only 28Mm3.) The most suitable option appears to be the 2nd scenario in which maximum water (164.3Mm3) is transferred to Contour canal from Karapara and Upper Kuriarkuty and getting back a stable flow of 88.6Mm3 in summer months for power and Irrigation. The water availability at Moolathara will be doubled from 7.5 TMC (as per PAP agreement), if the project is implemented.
  • 21.  Forest submergence will be minimum in this proposal.  The power generated will be around 15 MW from Karapara and 30MW from Main tunnel. Power can be produced in the summer also.  The power generated from the project will be more than 200MW if only peak hour generation is followed.  During heavy rainy season, the main tunnel can also be used for transferring flood water from Chalakudy basin to Bharathapuzha basin, where flood does not cause much damage.
  • 22. Artificial Recharge Viability Analysis A project proposal amounting to 7.5 crores was submitted before the Kerala State Ground Water Authority which in turn has recommended to the Government for the final nod.
  • 23. Inter Sub Basin Transfer This application was to study the viability of inter sub basin water transfer during monsoon season to rain shadow regions and there by to augment the ground resource of the area.
  • 24. Water Availability of Bharathapuzha Basin Specific runoff in the basinRain fall distribution 0 20 40 60 80 100 120 Litres/sec/km2 Catchment Name Sub Basin Wise Specific run off
  • 25. Reservoir Operation Simulated data of seven reservoirs in the Study Basin was integrated using DSS (P) Software. Inflow (including dependability), Water level, Demands etc. can be viewed and exported to MS Excel. This will help Officers involved in Water Resources planning to take decisions on Water allocation.
  • 26. 1. Dam release study for meeting the domestic water supply in Trivandrum. 2. Integrated operation of proposed reservoirs in Vamanapuram Basin. 3. Analysing the feasibility of a dam at Murinjapuzha – Manimala Basin. 4. Viability analysis of proposed Pattissery Dam in Pambar basin. 5. Feasibility of 7 check dam locations - Meenachil Basin. 6. Reconnaissance study for storage locations - Chalakudy Basin. 7. Feasibility of check dam locations in Pampar Basin . 8. Drinking water supply to Kollam City 9. Kuttanad Flood study 10.Thampanoor Flood study
  • 27. • Database (access & update) • DSS • MIKEBASIN GW 1 (TSR) SE - SW SE - GW EE-SW/Sr. HG - GW Chief Engineer Hydrology Director Ground Water Secretary Water Resources • Database (access) • DSS • MIKEBASIN VPN Connectivity • Database (access) • DSS LAN/VPN Connectivity • Analysed data • Model results Web Server GW Server (TVM) GW 2 (EKM) SW 1 (TSR Division) SW Server (TSR) SW 2 (Under CGNR Division) DSS Set-up SW SW GW GW LAN
  • 28. DSS Project Status of Kerala state
  • 29.  Rainfall Runoff model of Bharathapuzha basin represents characteristics of GW & SW. The trainings and DHI support was effectively utilized by the state as there was no change in team members in the last four years.  The Secretary to Govt. (Water Resources Department, Kerala) and department Heads in Kerala are keen to make use of this decision making tool. The applications mentioned earlier was carried out on such directions.  Detailed documentation on all the developed applications is in progress.  With projects like DSS getting good momentum, Kerala also focuses on the extension on HP…
  • 30. 1. License issue for model tools Now no network License for modelling……… 2. TOT Training and Training in MIKE HYDRO No body is trained in MIKE HYDRO (New Modelling Software). In House training programme is needed for DSS team Members and other officials. TOT Programme originally planned for the state was not materialized. 3. Less training in DSS(P) Software An exhaustive training was lacking. Comparison, Optimization, Dashboard…….. techniques 4. Modeling of other basins Need future support to the modeling processes – NIH/DHI 5. Hardware issues Trouble shooting in future. There is no system in place.
  • 31.
  • 32. • Kerala State Irrigation Department • Kerala State Ground Water Department & • Hard Rock Regional Centre, National Institute of Hydrology, Belgaum
  • 33.  To ascertain the existing pollution levels of Rivers, Streams, Lakes, Ponds, Wells, Tap water and other water bodies in Kerala  To evolve Water Quality Index for the surface water bodies and quality modelling for the selected river reaches  To develop vulnerability index for ground water resources  To create awareness among people about the locations causing pollution and thereby to initiate proper pollution control practices.
  • 34.  Sampling Network Design.  Collection and analysis of Water Samples.  Onsite analysis of Hourly DO and BOD for selected river Basins.  Discharge measurement at sampling sites.  Compilation of WQ Data.  Preparation of Location maps in GIS.  Data exchange to NIH for further processing and reporting .  Awareness dissemination & Technical Workshops.
  • 35. Sample Collection network was designed covering all River Basins of the state. The locations selected are river gauging stations, reservoirs, ponds, lakes, intake points of Kerala water authority, tap water points of KWA, upstream of major tributaries confluences, points likely to be contaminated by pesticides and d/s of discharge points of industries.
  • 37. PHYSICAL PARAMETERS : Colour, Temperature, Turbidity, Total Dissolved Solids, Electrical Conductivity, Odour. CHEMICAL PARAMETERS : pH, Acidity, Alkalinity, Total Hardness, Calcium, Magnesium, Chloride, Fluoride, Iron, Nitrate, Dissolved Oxygen, BOD, COD Sulphate, Phosphate, Manganese. BACTERIOLOGICAL : Total Coliform, E- Coli TRACE METALS AND PESTICIDES : Arsenic, Copper, Mercury, Lead, Zinc Nickel, Cadmium, Lindane, Aldrin ,Die Aldrin, Endosulphan Alpha, Endosulphan Beta, DDD, DDE.
  • 38. WQ Labs involved in the analysis of Samples. Level II WQ Lab established under Hydrology Project at Thrissur. Quality Control Labs of Kerala Water Authority (KWA). Central Water Research Lab of CWRDM, Kozhikode.
  • 39. Physical Achievements  WQ Data of surface water samples of 485 stations pertaining to various River Basins of the State have been generated for the following seasons Pre and Post Monsoon 2008 Pre Monsoon 2009 Pre and Post Monsoon 2010 Post Monsoon 2011 Pre Monsoon 2012  During the season Post Monsoon 2011 and Pre Monsoon 2012, 175 samples were collected only from the 15 major River Basins of the state and analysed for physico chemical parameters
  • 40.  DO-BOD Monitoring of River Basins viz. Pamba, Periyar, Muvattupuzha, Karamana, Chaliyar, Vamanapuram, Kallada, Achenkovil, Manimala, Meenachil, Chalakkudy, and Bharathapuzha have been carried out on hourly basis.  Prepared maps of various river basins showing sampling locations in Arc GIS. Conducted awareness raising workshops on district level and Regional Seminar on Water Quality Assessment and Management of Kerala State at State Level.  Technical workshops were organized to train the State Government officials involved in Water quality Analysis, Assessment and Management.
  • 41. Location Map of WQ Monitoring Stations
  • 42.
  • 43.
  • 44.
  • 45. Findings of the Study The major water quality problem associated with rivers of Kerala is bacteriological pollution. The study also revealed that industrial pollution of surface water is not much in Kerala compared to other States of India.  In some of the rivers viz Periyar, Muvattupuzha etc which directly receive untreated industrial effluents, the pollution is in an alarming rate.  Salinity is another problem observed in the coastal stretches
  • 46.  In general the water quality deterioration is reported to be mainly due to anthropogenic activities.  Large scale urbanization, indiscriminate disposal of solid and liquid waste, changes in land-use and agricultural practices contribute significantly to the water quality deterioration  Bacteriological contamination is mainly due to poor sanitation practices
  • 47.  There is an urgent need to make integrated efforts by different Government as well as Non-Governmental organizations in order to address issues related to large scale contamination of fresh water resources to provide the desired quality of water to various stake holders in Kerala.  A regular water quality monitoring program covering the entire State.  Adequate and well trained technical staff is required for carrying out the analysis utilizing advanced equipments in the WQ laboratories. Recommendations
  • 48.  Appropriate Scientific interventions and management practices are required to be evolved for proper disposal of solid and liquid waste as these lead to the contamination of the available fresh surface as well as ground water resources.  Scientific, cost-effective and environmental friendly Mitigation activities are to be practised.  Establishing Web based water quality information System.  Mass awareness programs to manage water quality and related health problems.  Water Quality related studies to be continued with extended objectives and scope to address the water quality problems of Kerala State in a Holistic Manner.
  • 49. Post project plan for continuation of HPII Activities
  • 50. Proposal for next phase of Hydrology Project submitted……. • Development of DSS (Planning) for all River Basins of Kerala. • Water Quality Monitoring and Modelling of Reservoirs. • Dam Break Analysis and Flood Forecasting Study. • Climate Change study and Hydrological Modelling. • Real Time Data Acquisition Systems. • Training Programmes. • Infrastructure Development: