SlideShare una empresa de Scribd logo
1 de 11
Descargar para leer sin conexión
International Journal of Advanced Research in Engineering and Technology IN ENGINEERING
INTERNATIONAL JOURNAL OF ADVANCED RESEARCH (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME
AND TECHNOLOGY (IJARET)

ISSN 0976 - 6480 (Print)
ISSN 0976 - 6499 (Online)
Volume 4, Issue 7, November - December 2013, pp. 109-119
© IAEME: www.iaeme.com/ijaret.asp
Journal Impact Factor (2013): 5.8376 (Calculated by GISI)
www.jifactor.com

IJARET
©IAEME

DEMAND BASED OPTIMAL PERFORMANCE OF A HYDROELECTRIC
POWER PLANT
Shambhu Ratan Awasthi1, Vishnu Prasad2, Saroj Rangnekar3
1

Department of Energy, Maulana Azad National Institute of Technology, Bhopal, India
2
Department of Civil Engineering, Maulana Azad National Institute of Technology,
Bhopal, India
3
Department of Energy, Maulana Azad National Institute of Technology, Bhopal, India

ABSTRACT
Climate change is emerging as one of the greatest challenges of 21st century for which fossil
fuels are mainly responsible which emit green house gases. In order to meet this challenge, it is
necessary to adopt alternative sources of energy and make optimum use of natural resources,
predominantly water. The paper presents a concept for regulating the release of water so as to
achieve optimal performance of the units in a of hydro power plant while meeting the load demand.
Present work considers all the hydraulic and electrical losses in a hydro power plant and meets the
load demand with minimum quantity of water. The concept is applied to an operational 8x125 MW
Indira Sagar hydroelectric power plant in India and conservation of water is computed in three cases
viz. near rated head, below rated head and above rated head.
Keywords: Optimal Performance, Head Loss in Starts/Stops, Hydro Power Plant, Tail Race Level,
Turbine Efficiency, Water Conservation.
1. INTRODUCTION
In order to mitigate the challenges imposed by the climate change, it is necessary to minimize
dependency of power on fossil fuels and make optimum use of natural resources in a sustainable
manner. The reduction in per capita availability of water necessitates meticulous attention on water
management. In view of this, efficient operation of hydro power plants is drawing more attention of
the researchers in the 21st century.
Variation in turbine efficiency play an important role in the optimum generation scheduling.
Polynomial functions of 2nd and 4th degree are used to model the efficiency of turbine-generator.
109
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Difference in efficiency obtained from these two models is found to be negligible[1]. In generation
scheduling of hydro power plants, it is observed that all the hydraulic and electrical losses are not
considered [2, 3]. The concept of start-up and shut-down for hydro power plants is presented from
cost considerations due to wear and tear caused by start-ups and shut-downs [4, 5]. The start-up and
shut-down processes are phased out and loss of water is modeled mathematically [6]. Strategic
planning for enhanced generation with same quantity of water is presented [7] which is achieved by
optimal operation of large hydroelectric power plants [7].
This paper presents a concept of running the optimum number of units at maximum turbine
efficiency to meet the load demand in a short term scheduling of 24-hours so that water required is
minimised. The concept is demonstrated by applying to an operational 8x125 MW hydroelectric
power plant under three conditions, namely, near rated head, below rated head and above rated head.
2. PROBLEM FORMULATION
In this work, the load demand is met by optimizing the quantity of water used. This is
achieved by optimum selection of turbine units and their operation at maximum efficiency.
2.1 Objective function

(1)
subject to constraints :

(2)
m ≤ n
2.2 Bounds

(3)

Reservoir level
Turbine discharge
Unit output
Head

: MDDL ≥ Hlh ≤ FRL
: Qmin < Q
< Qmax
: Pgmin < Pgeach < Pgmax
: Hmin < Hnet < Hmax

3. COMPUTATION OF PARAMETERS
3.1 Turbine output
It is computed in kW as:
Pt

= 9.8*Q*Hnet*Et

(3)

3.2 Turbine efficiency
In a Francis turbine, variation in efficiency with output is large as shown in Fig. 1 and plays
an important role in optimum generation scheduling. Turbine efficiency is read from hill curves of a
prototype.

110
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Fig. 1. Variation in turbine efficiency with output at rated head

3.3 Electrical losses in transfer of power from generator to switchyard are computed as the
difference between generated power and dispatched power
3.4 Turbine output is obtained from generator efficiency curve
3.5 Head water level is read from the level measuring instrument
3.6 Hydraulic losses in water conductor system are directly proportional to the square of discharge.
It is calculated as equivalent head loss to obtain net head
3.7 Start–up/Shut down : Water required till loading of the units during start-up and then during
shut-down do not contribute in generation of power. This loss of water is taken into account
using empirical formulae given below :
3.7.1 Loss of Water in each Start-up
(4)
In case of Indira Sagar Project, it works out to be 5700 m3
3.7.2 Loss of water in each shut-down
(5)
In case of a Indira Sagar Project, it works out to be 7000 m

3

4. COMPUTATION OF OPTIMUM PERFORMANCE
The computation is carried out in three stages:
Stage-I : computation of initial net head
For a given load demand, compute gross head, plant discharge, maximum turbine efficiency. Obtain
net head by subtracting head loss from gross head.
111
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Stage-II : Computation of final net head
Compute plant discharge, tail water level, head loss and net head iteratively to obtain final value of net
head. Compute number of units to operate.
Stage-III : Optimization and optimality check
The development of computer program is shown in the form of a flow chart in Fig. 2.

Fig. 2. Flow – chart for computation of optimal performance
112
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

5.

APPLICATION TO A HYDROELECTRIC POWER PLANT

The concept is applied to a 8x125 MW Indira Sagar hydroelectric power plant situated in the
state of Madhya Pradesh in India. Relevant project data are given in Table 1.
Table 1: Relevant Data of Indira Sagar Project
Description
Data
Reservoir gross storage
12.22 Billion m3
capacity
Reservoir area at FRL
913 km2
Rated head
60 m
Turbine output
125 MW + 10% overload
Rated discharge
229.5 cumecs
The optimisation is carried out for 24-h in different seasons of a year for different head
conditions. The optimisation is applicable when number of units in operation are two or more. Water
requirement on a typical day under following two situations are computed :
(i) on the basis of ‘Daily Report’ of Indira Sagar Project
(ii) as per the proposed methodology for same generation by operating turbines at maximum
efficiency
Above two water requirements are compared to obtain water conservation.
Case-I : Operation at above rated head
Following data on a typical day in November is taken from ‘Daily Report’.
Energy generated
= 6.7183 MU
Energy dispatched
= 6.6982 MU
Energy transfer efficiency
= 0.997%
Average reservoir elevation
Average plant discharge
Cumulative volume of water released in 24 h

= 259.855 m
= 498.25 cumecs
= 43.0488 million m3

No. of start-ups
No. of shut-downs
Water loss in start-ups
Water loss in shut-downs
Water utilized in generation

=10
=9
= 10 x 5700 = 57,000 m3
= 9 x 7000 = 63,000 m3
= 43.0488 – 0.12 = 42.9288 million m3

The units are operated in different time periods as per ‘Load Dispatch Schedule’. As a
general practice, units are equally loaded without any consideration of turbine efficiency. For each
head there is a maximum turbine efficiency. Tail water elevation, net head and plant discharge are
computed while operating the turbines at maximum efficiencies as given in Table 2. Duration of
operation is computed for total quantity of water i.e. 42.9288 million m3. For example, duration of
operation of 2 units is calculated as 25.17 hr (42928800 x 3600/473.72).
113
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Table 2 : Plant Discharge and Duration of Operation
Units in Tail water Net head Maximum
Plant
Duration of
operation level (m)
(m)
turbine
discharge
operation
(No.)
efficiency
(cumecs)
(hr)
2
194.163
64.621
0.94991
473.72
25.17
3
194.499
64.287
0.95004
710.11
16.79
4
194.838
63.949
0.95015
946.19
12.60
5
195.181
63.608
0.95026
1181.96
10.09
6
195.520
63.271
0.95036
1417.45
8.41
7
195.854
62.937
0.95044
1652.66
7.22
8
196.190
62.603
0.95052
1887.59
6.32
As per the optimization methodology i.e. by operating the units at maximum turbine
efficiency, duration of operation for same generation is obtained. For example, to generate 6.7183
MU of energy, 2 units will operate for 24.43 hr (6.7183 MWh/275 MW) as given in Table 3.
Table 3 : Water Conservation in Power Generation of 6.7183 MU
Units in Output of Total output Duration of Total water Total water
of units
operation
required
conserved,
operation each unit
(No.)
(MW)
(MW)
(hr)
(million m3) (million m3)
2
137.50
275.00
24.43
41.6630
1.2658
3
137.50
412.50
16.29
41.6355
1.2933
4
137.50
550.00
12.22
41.6081
1.3207
5
137.50
687.50
9.77
41.5807
1.3481
6
137.01
822.06
8.17
41.7029
1.2259
7
136.21
953.49
7.05
41.9208
1.0080
8
135.41
1083.32
6.20
42.1418
0.7870
Upto 5 units, power output of each unit at maximum turbine efficiency is more than
permissible maximum output limit of 137.5 MW. Hence, it is desirable to maximize generation by
operating the units at their maximum output limits irrespective of turbine efficiency. In the present
case, as per Table 3, the load demand will be met by operating 3 units at maximum output limit of
137.5 MW which will result in water conservation of 3.01%. For different number of units in
operation, water conservation from 1.83% to 3.14% will be achieved for same generation as shown
in Fig. 3.

Fig. 3. Variation in water conservation above rated head
114
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

It is observed from Fig. 3 that there is a rising trend in water conservation upto 5 units when
each of them operate at their maximum output limit of 137.5 MW though at sub-optimal turbine
efficiencies. When 6th unit onwards are added, they operate below maximum output limit but at
maximum turbine efficiency. Effect of reduction in net head caused by rise in tail race level is
visible with the addition 6th unit onwards, resulting in reduced water conservation.
Case-II : Operation near to rated head
Following data on a typical day in the month of February is taken from ‘Daily Report’.
Energy generated
= 2.15 MU
Energy dispatched
= 2.1251 MU
Energy transfer efficiency
= 0.98842%
Average reservoir elevation
= 255.375 m
Average plant discharge
= 168.98 cumecs
Cumulative volume of water released in 24-hr = 14.599872, say 14.6 million m3
No. of start-ups
No. of shut-downs
Water loss in start-ups
Water loss in shut downs
Water utilized in generation

= 6
= 6
= 6 x 5700 = 34200 m3
= 6 x 7000 = 42000 m3
= 14.6 – 0.0762 = 14.5238 million m3

Tail water elevation, net head and plant discharge are computed while operating the turbines at
maximum efficiencies. Duration of operation for total quantity of water i.e. 14.5238 million m3 is
computed on the basis of plant discharges given in Table 4.
Table 4 : Plant Discharge and Duration of Operation
Net head
Maximum
Plant
Duration of
Units in Tail water
turbine
discharge
operation
operation level (m)
(m)
efficiency
(cumecs)
(hr)
(No.)
1

193.835

60.487

0.95079

235.06

17.16

2

194.171

60.326

0.95080

470.01

8.58

3

194.513

59.985

0.95080

704.60

5.73

4

194.838

59.661

0.95079

938.96

4.30

5

195.172

59.328

0.95078

1173.04

6

195.507

58.995

0.95075

1406.87

3.44
2.87

7

195.837

58.666

0.95072

1640.46

2.46

8

196.170

58.334

0.95068

1873.80

2.15

It is observed from Table 4 that net head available is near rated head of 60 m. Power output,
duration of operation and water conservation are computed at maximum turbine efficiency as given
in Table 5.

115
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Table 5 : Water Conservation in Power Generation of 2.15 MU
Units in Output of Total output Duration of Total water Total water
operation each unit
of units
operation
required
conserved
(No.)
(MW)
(MW)
(hr)
(million m3) (million m3)
1
130.17
130.17
16.517
13.9768
0.5470
2
129.99
259.98
8.270
13.9929
0.5309
3
129.18
387.54
5.548
14.0724
0.4514
4
128.41
513.63
4.186
14.1494
0.3744
5
127.62
638.08
3.369
14.2291
0.2947
6
126.82
760.94
2.825
14.3102
0.2136
7
126.04
882.29
2.437
14.3911
0.1327
8
125.25
1002.01
2.146
14.4741
0.0497
It is observed from Table 5 that generation required is so small that it is met by operating
only 1 unit at maximum turbine efficiency which results in water conservation of 3.77% as shown in
Fig. 4. As the number of units are increased, there is decrease in conservation of water.

Fig. 4. Variation in water conservation near rated head
Case-III : Operation below rated head conditions
Following data on a typical day in the month of May is taken from ‘Daily Report’.
Energy generated
= 4.976 MU
Energy dispatched
= 4.8709 MU
Energy transfer efficiency
= 0.97888%
Average reservoir elevation
Average plant discharge
Cumulative volume of water released in 24 h

= 248.72 m
= 446 cumecs
= 38.5344 million m3

No. of start-ups
No. of shut-downs
Water loss in start-ups
Water loss in shut-downs
Total water loss in start-ups and shut-downs
Water utilized in generation

=6
=5
= 6 x 5700 = 34200 m3
= 5 x 7000 = 35000 m3
= 69200 m3 = 0.0692 million m3
= 38.5344 – 0.0692 = 38.4652 million m3
116
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Tail water elevation, net head and plant discharge are computed while operating the turbines
at maximum efficiencies. Duration of operation for the total quantity of water i.e. 38.4652 million
m3 is computed on the basis of plant discharges given in Table 6.
Table 6 : Plant Discharge and Duration of Operation
Units in Tail water Net head Maximum
Plant
Duration of
(m)
operation
operation level (m)
discharge
turbine
(cumecs)
(hr)
(No.)
efficiency
2

194.162

53.528

0.94902

464.94

22.98

3

194.495

53.197

0.94884

697.06

15.33

4

194.823

52.871

0.94866

928.96

11.50

5

195.152

52.544

0.94847

1160.63

9.21

6

195.483

52.216

0.94827

1392.07

7.68

7

195.812

51.890

0.94808

1623.29

6.57

8

196.140

51.567

0.94787

1854.29

5.76

Power output and duration of operation are computed at maximum turbine efficiency. Water
conservation achieved is given in Table 7.
Table 7 : Water Conservation in Actual Power Generation of 4.976 MU
Duration of Total water Total water
Units in Output of
Total
operation each unit output of
operation
required,
conserved,
(MW) units (MW)
(million m3) (million m3)
(No.)
(hr)
2

113.84

227.68

21.86

36.5907

1.8745

3

113.05

339.15

14.67

36.8203

1.6449

4

112.28

449.10

11.08

37.0475

1.4177

5

111.50

557.50

8.93

37.2924

1.1728

6

110.71

664.28

7.49

37.5425

0.9227

7

109.94

769.55

6.47

37.8577

0.6075

8

109.16

873.30

5.70

38.0254

0.4398

It is seen from Table 7 that unit output decreases with the increase in number of units. It is
due to reduction in net head with increase in plant discharge. Hence, it is most advantageous to
operate minimum number of units. In this case, operation of 2 units as above will meet the load
demand efficiently with water conservation of 4.87%. Variation in water conservation from 1.14%
to 4.87% with number of units in operation is shown in Fig. 7.

117
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

Fig. 5. Variation in water conservation below rated head
6. CONCLUSION
The concept of demand based optimal generation of a hydroelectric power plant is developed
on the basis of operation of turbines at maximum efficiency and applied to a multi-unit hydroelectric
power plant. It is found that variation in water conservation varies with the head and number of units
to be operated. Maximum upto 4.87% saving in water is achieved when head is below the rated
head. Towards the end of summer season, water level in reservoir is low and hence conservation of
water becomes crucial. It is also found that in all the cases, saving in water is maximum with lesser
number of units in operation.
Using above information, the utilities may coordinate with river control authorities and Load
Dispatch Centre for operation of the units at maximum turbine efficiencies. In summer when
scarcity of water is more and demand of electricity is increased, the role of water management
becomes critical to ensure its optimum utilization. The operation of turbines at maximum efficiency
minimizes vibrations and cavitation which reduces wear-tear and in-turn maintenance cost.
7. ACKNOWLEDGEMENT
The authors gratefully acknowledge Dr. Appu Kuttan K. K., Director, Maulana Azad
National Institute of Technology, Bhopal, India for his encouragement in carrying out research work.
The authors are thankful to NHDC Ltd. for cooperation and sharing of data on Indira Sagar
Hydroelectric Project.
NOMENCLATURE
Et
Etmax
FRL
Hlh
Hmax
Hmin
Hnet
LD
MDDL

efficiency of turbine
max. turbine efficiency
Full Reservoir Level (m)
Elevation of reservoir (m)
maximum head limit (m)
minimum head limit (m)
net head (m)
load demand (MW)
Minimum Draw Down Level
118
International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 –
6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME

m
n
Pgeach
Pgmax
Pgmin
Pi
Pt
POL
PTLi
Q
Qi
Qmax
Qmin
Qrated
ti
T1
T2
T3
T4
Vstart_los
Vstop_los

no. of units in operation
no. of units in power plant
output of each generator (MW)
unit maximum output limit (MW)
unit minimum output limit (MW)
output of ith unit (MW)
output of turbine (MW)
part/over load (MW)
power transfer loss
discharge (cumecs)
discharge of ith turbine (cumecs)
maximum discharge limit of a turbine (cumecs)
minimum discharge limit of a turbine (cumecs)
minimum discharge limit of a turbine (cumecs)
time of operation of ith turbine (s)
time to achieve 90% of rated speed from standstill (30 s)
time to reach synchronous speed and synchronizing (60 s)
time to load the unit after synchronizing (30 s)
stopping time (60 s)
loss of water in one start-up (m3)
loss of water in one shut-down (m3)

REFERENCES
[1]

A.L. Diniz, P.P.I. Esteves, and C. Sagastizábal, A mathematical model for the
efficiency curves of hydroelectric units, IEEE PES General Meeting, Tampa, FL, 2007, 1-7.
[2] A. Mahor, and S. Rangnekar, Short term optimal generation scheduling of Narmada cascaded
hydro electric system,” Hydro Nepal, 7, 2010, 71-80.
[3] J.P.S. Catalão, S.J.P.S. Mariano, V.M.F. Mendes, and L.A.F.M. Ferreira, Scheduling of headSensitive cascaded hydro systems: A nonlinear approach, IEEE Transactions on Power
Systems, 24(1), 2009, 337-346.
[4] C. Li, E. Hsu, A.J. Svoboda, C. Tseng, and R.B. Johnson, Hydro unit commitment in hydrothermal optimization, IEEE Transactions on Power Systems, 12(2), 1997, 764-769.
[5] O. Nilsson, and D. Sjelvgren, Variable splitting applied to modeling of start-up costs in short
term hydro generation scheduling,” IEEE Transactions Power Systems, 12(2), 1997, 770-775.
[6] O. Nilsson, and D. Sjelvgren, Hydro unit start-up costs and their impact on the short term
scheduling strategies of Swedish Power Producers, IEEE Transactions Power Systems, 12(1),
1997, 38-44.
[7] S.R. Awasthi, V. Prasad, and S. Rangnekar, Operational strategies to increase generation of
large hydroelectric power plants, Water and Energy International Journal of CBIP, 70(8),
2013, 7-11.
[8] Bilal Abdullah Nasir, “Design of High Efficiency Pelton Turbine for Micro-Hydropower
Plant”, International Journal of Electrical Engineering & Technology (IJEET), Volume 4,
Issue 1, 2013, pp. 171 - 183, ISSN Print : 0976-6545, ISSN Online: 0976-6553,
[9] Deepika Yadav, R. Naresh and V. Sharma, “Fixed Head Short Term Hydro Thermal
Generation Scheduling Using Real Variable Genetic Algorithm”, International Journal of
Electrical Engineering & Technology (IJEET), Volume 3, Issue 2, 2012, pp. 430 - 443, ISSN
Print : 0976-6545, ISSN Online: 0976-6553.
119

Más contenido relacionado

La actualidad más candente

MOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMDO_Lab
 
OM_MAO_2012_Jun
OM_MAO_2012_JunOM_MAO_2012_Jun
OM_MAO_2012_JunMDO_Lab
 
Exergy analysis and igcc plant technology to improve the efficiency and to re...
Exergy analysis and igcc plant technology to improve the efficiency and to re...Exergy analysis and igcc plant technology to improve the efficiency and to re...
Exergy analysis and igcc plant technology to improve the efficiency and to re...eSAT Publishing House
 
The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...IJECEIAES
 
Selection of prime mover for combined cooling, heating, and power systems bas...
Selection of prime mover for combined cooling, heating, and power systems bas...Selection of prime mover for combined cooling, heating, and power systems bas...
Selection of prime mover for combined cooling, heating, and power systems bas...Kibria K. Roman, PE, EMIT, LEED GA
 
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...IrisPublishers
 
Fuzzy Logic Pitch Control of Variable Speed Wind Turbine
Fuzzy Logic Pitch Control of Variable Speed Wind TurbineFuzzy Logic Pitch Control of Variable Speed Wind Turbine
Fuzzy Logic Pitch Control of Variable Speed Wind TurbineIRJET Journal
 
Assessment of wind resource and
Assessment of wind resource andAssessment of wind resource and
Assessment of wind resource andijcsa
 
MOWF_SchiTech_2015_Weiyang
MOWF_SchiTech_2015_WeiyangMOWF_SchiTech_2015_Weiyang
MOWF_SchiTech_2015_WeiyangMDO_Lab
 
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...Weiyang Tong
 
Frequency regulation of deregulated power system
Frequency regulation of deregulated power systemFrequency regulation of deregulated power system
Frequency regulation of deregulated power systemeSAT Publishing House
 
Frequency regulation of deregulated power system having grc integrated with r...
Frequency regulation of deregulated power system having grc integrated with r...Frequency regulation of deregulated power system having grc integrated with r...
Frequency regulation of deregulated power system having grc integrated with r...eSAT Journals
 
Numerical simulation of Hybrid Generation System: a case study
Numerical simulation of Hybrid Generation System: a case studyNumerical simulation of Hybrid Generation System: a case study
Numerical simulation of Hybrid Generation System: a case studyIRJET Journal
 
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationImpact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationWeiyang Tong
 

La actualidad más candente (18)

MOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_Weiyang
 
30120140505006
3012014050500630120140505006
30120140505006
 
OM_MAO_2012_Jun
OM_MAO_2012_JunOM_MAO_2012_Jun
OM_MAO_2012_Jun
 
Exergy analysis and igcc plant technology to improve the efficiency and to re...
Exergy analysis and igcc plant technology to improve the efficiency and to re...Exergy analysis and igcc plant technology to improve the efficiency and to re...
Exergy analysis and igcc plant technology to improve the efficiency and to re...
 
The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...
 
Selection of prime mover for combined cooling, heating, and power systems bas...
Selection of prime mover for combined cooling, heating, and power systems bas...Selection of prime mover for combined cooling, heating, and power systems bas...
Selection of prime mover for combined cooling, heating, and power systems bas...
 
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...
Iris Publishers- Journal of Engineering Sciences | Performance and Design Opt...
 
Fuzzy Logic Pitch Control of Variable Speed Wind Turbine
Fuzzy Logic Pitch Control of Variable Speed Wind TurbineFuzzy Logic Pitch Control of Variable Speed Wind Turbine
Fuzzy Logic Pitch Control of Variable Speed Wind Turbine
 
Assessment of wind resource and
Assessment of wind resource andAssessment of wind resource and
Assessment of wind resource and
 
MOWF_SchiTech_2015_Weiyang
MOWF_SchiTech_2015_WeiyangMOWF_SchiTech_2015_Weiyang
MOWF_SchiTech_2015_Weiyang
 
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...
A Consolidated Visualization of Wind Farm Energy Production Potential and Opt...
 
WFO_MAO_2010_Souma
WFO_MAO_2010_SoumaWFO_MAO_2010_Souma
WFO_MAO_2010_Souma
 
Frequency regulation of deregulated power system
Frequency regulation of deregulated power systemFrequency regulation of deregulated power system
Frequency regulation of deregulated power system
 
Frequency regulation of deregulated power system having grc integrated with r...
Frequency regulation of deregulated power system having grc integrated with r...Frequency regulation of deregulated power system having grc integrated with r...
Frequency regulation of deregulated power system having grc integrated with r...
 
B44080512
B44080512B44080512
B44080512
 
Numerical simulation of Hybrid Generation System: a case study
Numerical simulation of Hybrid Generation System: a case studyNumerical simulation of Hybrid Generation System: a case study
Numerical simulation of Hybrid Generation System: a case study
 
F046013443
F046013443F046013443
F046013443
 
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationImpact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
 

Destacado (15)

50120130406019 2
50120130406019 250120130406019 2
50120130406019 2
 
What Companies Consider When Choosing an Advertising Agency
What Companies Consider When Choosing an Advertising AgencyWhat Companies Consider When Choosing an Advertising Agency
What Companies Consider When Choosing an Advertising Agency
 
50120130405019
5012013040501950120130405019
50120130405019
 
40120130405014
4012013040501440120130405014
40120130405014
 
50120130405015
5012013040501550120130405015
50120130405015
 
30120130405030
3012013040503030120130405030
30120130405030
 
Darba tiesības: fakti un skaitļi
Darba tiesības: fakti un skaitļiDarba tiesības: fakti un skaitļi
Darba tiesības: fakti un skaitļi
 
Final design project
Final design projectFinal design project
Final design project
 
ISUZU D-MAX HI LANDER CAB4 3.0 Ddi VGS Turbo AT ปี 2009
ISUZU D-MAX HI LANDER CAB4 3.0 Ddi VGS Turbo AT ปี 2009ISUZU D-MAX HI LANDER CAB4 3.0 Ddi VGS Turbo AT ปี 2009
ISUZU D-MAX HI LANDER CAB4 3.0 Ddi VGS Turbo AT ปี 2009
 
TOYOTA FORTUNER 3.0 [V] AT 4WD ปี 2008
TOYOTA FORTUNER 3.0 [V] AT 4WD ปี 2008TOYOTA FORTUNER 3.0 [V] AT 4WD ปี 2008
TOYOTA FORTUNER 3.0 [V] AT 4WD ปี 2008
 
Chema madoz
Chema madozChema madoz
Chema madoz
 
05.Intro to business in Asia
05.Intro to business in Asia05.Intro to business in Asia
05.Intro to business in Asia
 
06.Becoming a Confident trainer
06.Becoming a Confident trainer06.Becoming a Confident trainer
06.Becoming a Confident trainer
 
Classroom Management Strategies
Classroom Management StrategiesClassroom Management Strategies
Classroom Management Strategies
 
TOYOTA YARIS 1.5 [E] AT ปี 2008
TOYOTA YARIS 1.5 [E] AT ปี 2008TOYOTA YARIS 1.5 [E] AT ปี 2008
TOYOTA YARIS 1.5 [E] AT ปี 2008
 

Similar a 20320130406013

Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...IRJET Journal
 
Scenario of Small Hydro Power Projects in India and its Environmental Aspect
Scenario of Small Hydro Power Projects in India and its Environmental AspectScenario of Small Hydro Power Projects in India and its Environmental Aspect
Scenario of Small Hydro Power Projects in India and its Environmental AspectIRJET Journal
 
IRJET- Pumping of Water by using Wind Turbine
IRJET- Pumping of Water by using Wind TurbineIRJET- Pumping of Water by using Wind Turbine
IRJET- Pumping of Water by using Wind TurbineIRJET Journal
 
Design hybrid micropower system in mistah village using homer model
Design hybrid micropower system in mistah village using homer modelDesign hybrid micropower system in mistah village using homer model
Design hybrid micropower system in mistah village using homer modelIAEME Publication
 
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...IJERA Editor
 
Domestic Solar - Aero - Hydro Power Generation System
Domestic Solar - Aero - Hydro Power Generation SystemDomestic Solar - Aero - Hydro Power Generation System
Domestic Solar - Aero - Hydro Power Generation SystemIOSR Journals
 
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...Comparison of Differential Evolution and Particle Swarm Optimization for Opti...
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...IOSRJEEE
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at CheeyapparaIRJET Journal
 
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine BladePerformance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine BladeIRJET Journal
 
Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Mellah Hacene
 
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...IRJET Journal
 
Energy Generation By Using Small Hydro Power-An Analysis
Energy Generation By Using Small Hydro Power-An AnalysisEnergy Generation By Using Small Hydro Power-An Analysis
Energy Generation By Using Small Hydro Power-An AnalysisIRJET Journal
 
Convergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlConvergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlIRJET Journal
 
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed Region
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed RegionDesign of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed Region
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed RegionIJERA Editor
 
Modeling of Wind Energy on Isolated Area
Modeling of Wind Energy on Isolated AreaModeling of Wind Energy on Isolated Area
Modeling of Wind Energy on Isolated AreaIJPEDS-IAES
 

Similar a 20320130406013 (20)

Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
 
Scenario of Small Hydro Power Projects in India and its Environmental Aspect
Scenario of Small Hydro Power Projects in India and its Environmental AspectScenario of Small Hydro Power Projects in India and its Environmental Aspect
Scenario of Small Hydro Power Projects in India and its Environmental Aspect
 
IRJET- Pumping of Water by using Wind Turbine
IRJET- Pumping of Water by using Wind TurbineIRJET- Pumping of Water by using Wind Turbine
IRJET- Pumping of Water by using Wind Turbine
 
Design hybrid micropower system in mistah village using homer model
Design hybrid micropower system in mistah village using homer modelDesign hybrid micropower system in mistah village using homer model
Design hybrid micropower system in mistah village using homer model
 
20320130406012
2032013040601220320130406012
20320130406012
 
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...
Designing Of Permanent Magnet Synchronous Machine For Applications In Small H...
 
Domestic Solar - Aero - Hydro Power Generation System
Domestic Solar - Aero - Hydro Power Generation SystemDomestic Solar - Aero - Hydro Power Generation System
Domestic Solar - Aero - Hydro Power Generation System
 
Ba4102382385
Ba4102382385Ba4102382385
Ba4102382385
 
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...Comparison of Differential Evolution and Particle Swarm Optimization for Opti...
Comparison of Differential Evolution and Particle Swarm Optimization for Opti...
 
47 iit powai_ppt
47 iit powai_ppt47 iit powai_ppt
47 iit powai_ppt
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
Wind turbine report
Wind turbine reportWind turbine report
Wind turbine report
 
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine BladePerformance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
 
Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...
 
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...
Study on Fresh and Hardened Properties of Self-Compacting Mortar Containing G...
 
Energy Generation By Using Small Hydro Power-An Analysis
Energy Generation By Using Small Hydro Power-An AnalysisEnergy Generation By Using Small Hydro Power-An Analysis
Energy Generation By Using Small Hydro Power-An Analysis
 
Convergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlConvergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration Control
 
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed Region
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed RegionDesign of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed Region
Design of PVC Bladed Horizontal Axis Wind Turbine for Low Wind Speed Region
 
Allen Report
Allen ReportAllen Report
Allen Report
 
Modeling of Wind Energy on Isolated Area
Modeling of Wind Energy on Isolated AreaModeling of Wind Energy on Isolated Area
Modeling of Wind Energy on Isolated Area
 

Más de IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Más de IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Último

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Nikki Chapple
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 

Último (20)

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 

20320130406013

  • 1. International Journal of Advanced Research in Engineering and Technology IN ENGINEERING INTERNATIONAL JOURNAL OF ADVANCED RESEARCH (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME AND TECHNOLOGY (IJARET) ISSN 0976 - 6480 (Print) ISSN 0976 - 6499 (Online) Volume 4, Issue 7, November - December 2013, pp. 109-119 © IAEME: www.iaeme.com/ijaret.asp Journal Impact Factor (2013): 5.8376 (Calculated by GISI) www.jifactor.com IJARET ©IAEME DEMAND BASED OPTIMAL PERFORMANCE OF A HYDROELECTRIC POWER PLANT Shambhu Ratan Awasthi1, Vishnu Prasad2, Saroj Rangnekar3 1 Department of Energy, Maulana Azad National Institute of Technology, Bhopal, India 2 Department of Civil Engineering, Maulana Azad National Institute of Technology, Bhopal, India 3 Department of Energy, Maulana Azad National Institute of Technology, Bhopal, India ABSTRACT Climate change is emerging as one of the greatest challenges of 21st century for which fossil fuels are mainly responsible which emit green house gases. In order to meet this challenge, it is necessary to adopt alternative sources of energy and make optimum use of natural resources, predominantly water. The paper presents a concept for regulating the release of water so as to achieve optimal performance of the units in a of hydro power plant while meeting the load demand. Present work considers all the hydraulic and electrical losses in a hydro power plant and meets the load demand with minimum quantity of water. The concept is applied to an operational 8x125 MW Indira Sagar hydroelectric power plant in India and conservation of water is computed in three cases viz. near rated head, below rated head and above rated head. Keywords: Optimal Performance, Head Loss in Starts/Stops, Hydro Power Plant, Tail Race Level, Turbine Efficiency, Water Conservation. 1. INTRODUCTION In order to mitigate the challenges imposed by the climate change, it is necessary to minimize dependency of power on fossil fuels and make optimum use of natural resources in a sustainable manner. The reduction in per capita availability of water necessitates meticulous attention on water management. In view of this, efficient operation of hydro power plants is drawing more attention of the researchers in the 21st century. Variation in turbine efficiency play an important role in the optimum generation scheduling. Polynomial functions of 2nd and 4th degree are used to model the efficiency of turbine-generator. 109
  • 2. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Difference in efficiency obtained from these two models is found to be negligible[1]. In generation scheduling of hydro power plants, it is observed that all the hydraulic and electrical losses are not considered [2, 3]. The concept of start-up and shut-down for hydro power plants is presented from cost considerations due to wear and tear caused by start-ups and shut-downs [4, 5]. The start-up and shut-down processes are phased out and loss of water is modeled mathematically [6]. Strategic planning for enhanced generation with same quantity of water is presented [7] which is achieved by optimal operation of large hydroelectric power plants [7]. This paper presents a concept of running the optimum number of units at maximum turbine efficiency to meet the load demand in a short term scheduling of 24-hours so that water required is minimised. The concept is demonstrated by applying to an operational 8x125 MW hydroelectric power plant under three conditions, namely, near rated head, below rated head and above rated head. 2. PROBLEM FORMULATION In this work, the load demand is met by optimizing the quantity of water used. This is achieved by optimum selection of turbine units and their operation at maximum efficiency. 2.1 Objective function (1) subject to constraints : (2) m ≤ n 2.2 Bounds (3) Reservoir level Turbine discharge Unit output Head : MDDL ≥ Hlh ≤ FRL : Qmin < Q < Qmax : Pgmin < Pgeach < Pgmax : Hmin < Hnet < Hmax 3. COMPUTATION OF PARAMETERS 3.1 Turbine output It is computed in kW as: Pt = 9.8*Q*Hnet*Et (3) 3.2 Turbine efficiency In a Francis turbine, variation in efficiency with output is large as shown in Fig. 1 and plays an important role in optimum generation scheduling. Turbine efficiency is read from hill curves of a prototype. 110
  • 3. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Fig. 1. Variation in turbine efficiency with output at rated head 3.3 Electrical losses in transfer of power from generator to switchyard are computed as the difference between generated power and dispatched power 3.4 Turbine output is obtained from generator efficiency curve 3.5 Head water level is read from the level measuring instrument 3.6 Hydraulic losses in water conductor system are directly proportional to the square of discharge. It is calculated as equivalent head loss to obtain net head 3.7 Start–up/Shut down : Water required till loading of the units during start-up and then during shut-down do not contribute in generation of power. This loss of water is taken into account using empirical formulae given below : 3.7.1 Loss of Water in each Start-up (4) In case of Indira Sagar Project, it works out to be 5700 m3 3.7.2 Loss of water in each shut-down (5) In case of a Indira Sagar Project, it works out to be 7000 m 3 4. COMPUTATION OF OPTIMUM PERFORMANCE The computation is carried out in three stages: Stage-I : computation of initial net head For a given load demand, compute gross head, plant discharge, maximum turbine efficiency. Obtain net head by subtracting head loss from gross head. 111
  • 4. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Stage-II : Computation of final net head Compute plant discharge, tail water level, head loss and net head iteratively to obtain final value of net head. Compute number of units to operate. Stage-III : Optimization and optimality check The development of computer program is shown in the form of a flow chart in Fig. 2. Fig. 2. Flow – chart for computation of optimal performance 112
  • 5. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME 5. APPLICATION TO A HYDROELECTRIC POWER PLANT The concept is applied to a 8x125 MW Indira Sagar hydroelectric power plant situated in the state of Madhya Pradesh in India. Relevant project data are given in Table 1. Table 1: Relevant Data of Indira Sagar Project Description Data Reservoir gross storage 12.22 Billion m3 capacity Reservoir area at FRL 913 km2 Rated head 60 m Turbine output 125 MW + 10% overload Rated discharge 229.5 cumecs The optimisation is carried out for 24-h in different seasons of a year for different head conditions. The optimisation is applicable when number of units in operation are two or more. Water requirement on a typical day under following two situations are computed : (i) on the basis of ‘Daily Report’ of Indira Sagar Project (ii) as per the proposed methodology for same generation by operating turbines at maximum efficiency Above two water requirements are compared to obtain water conservation. Case-I : Operation at above rated head Following data on a typical day in November is taken from ‘Daily Report’. Energy generated = 6.7183 MU Energy dispatched = 6.6982 MU Energy transfer efficiency = 0.997% Average reservoir elevation Average plant discharge Cumulative volume of water released in 24 h = 259.855 m = 498.25 cumecs = 43.0488 million m3 No. of start-ups No. of shut-downs Water loss in start-ups Water loss in shut-downs Water utilized in generation =10 =9 = 10 x 5700 = 57,000 m3 = 9 x 7000 = 63,000 m3 = 43.0488 – 0.12 = 42.9288 million m3 The units are operated in different time periods as per ‘Load Dispatch Schedule’. As a general practice, units are equally loaded without any consideration of turbine efficiency. For each head there is a maximum turbine efficiency. Tail water elevation, net head and plant discharge are computed while operating the turbines at maximum efficiencies as given in Table 2. Duration of operation is computed for total quantity of water i.e. 42.9288 million m3. For example, duration of operation of 2 units is calculated as 25.17 hr (42928800 x 3600/473.72). 113
  • 6. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Table 2 : Plant Discharge and Duration of Operation Units in Tail water Net head Maximum Plant Duration of operation level (m) (m) turbine discharge operation (No.) efficiency (cumecs) (hr) 2 194.163 64.621 0.94991 473.72 25.17 3 194.499 64.287 0.95004 710.11 16.79 4 194.838 63.949 0.95015 946.19 12.60 5 195.181 63.608 0.95026 1181.96 10.09 6 195.520 63.271 0.95036 1417.45 8.41 7 195.854 62.937 0.95044 1652.66 7.22 8 196.190 62.603 0.95052 1887.59 6.32 As per the optimization methodology i.e. by operating the units at maximum turbine efficiency, duration of operation for same generation is obtained. For example, to generate 6.7183 MU of energy, 2 units will operate for 24.43 hr (6.7183 MWh/275 MW) as given in Table 3. Table 3 : Water Conservation in Power Generation of 6.7183 MU Units in Output of Total output Duration of Total water Total water of units operation required conserved, operation each unit (No.) (MW) (MW) (hr) (million m3) (million m3) 2 137.50 275.00 24.43 41.6630 1.2658 3 137.50 412.50 16.29 41.6355 1.2933 4 137.50 550.00 12.22 41.6081 1.3207 5 137.50 687.50 9.77 41.5807 1.3481 6 137.01 822.06 8.17 41.7029 1.2259 7 136.21 953.49 7.05 41.9208 1.0080 8 135.41 1083.32 6.20 42.1418 0.7870 Upto 5 units, power output of each unit at maximum turbine efficiency is more than permissible maximum output limit of 137.5 MW. Hence, it is desirable to maximize generation by operating the units at their maximum output limits irrespective of turbine efficiency. In the present case, as per Table 3, the load demand will be met by operating 3 units at maximum output limit of 137.5 MW which will result in water conservation of 3.01%. For different number of units in operation, water conservation from 1.83% to 3.14% will be achieved for same generation as shown in Fig. 3. Fig. 3. Variation in water conservation above rated head 114
  • 7. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME It is observed from Fig. 3 that there is a rising trend in water conservation upto 5 units when each of them operate at their maximum output limit of 137.5 MW though at sub-optimal turbine efficiencies. When 6th unit onwards are added, they operate below maximum output limit but at maximum turbine efficiency. Effect of reduction in net head caused by rise in tail race level is visible with the addition 6th unit onwards, resulting in reduced water conservation. Case-II : Operation near to rated head Following data on a typical day in the month of February is taken from ‘Daily Report’. Energy generated = 2.15 MU Energy dispatched = 2.1251 MU Energy transfer efficiency = 0.98842% Average reservoir elevation = 255.375 m Average plant discharge = 168.98 cumecs Cumulative volume of water released in 24-hr = 14.599872, say 14.6 million m3 No. of start-ups No. of shut-downs Water loss in start-ups Water loss in shut downs Water utilized in generation = 6 = 6 = 6 x 5700 = 34200 m3 = 6 x 7000 = 42000 m3 = 14.6 – 0.0762 = 14.5238 million m3 Tail water elevation, net head and plant discharge are computed while operating the turbines at maximum efficiencies. Duration of operation for total quantity of water i.e. 14.5238 million m3 is computed on the basis of plant discharges given in Table 4. Table 4 : Plant Discharge and Duration of Operation Net head Maximum Plant Duration of Units in Tail water turbine discharge operation operation level (m) (m) efficiency (cumecs) (hr) (No.) 1 193.835 60.487 0.95079 235.06 17.16 2 194.171 60.326 0.95080 470.01 8.58 3 194.513 59.985 0.95080 704.60 5.73 4 194.838 59.661 0.95079 938.96 4.30 5 195.172 59.328 0.95078 1173.04 6 195.507 58.995 0.95075 1406.87 3.44 2.87 7 195.837 58.666 0.95072 1640.46 2.46 8 196.170 58.334 0.95068 1873.80 2.15 It is observed from Table 4 that net head available is near rated head of 60 m. Power output, duration of operation and water conservation are computed at maximum turbine efficiency as given in Table 5. 115
  • 8. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Table 5 : Water Conservation in Power Generation of 2.15 MU Units in Output of Total output Duration of Total water Total water operation each unit of units operation required conserved (No.) (MW) (MW) (hr) (million m3) (million m3) 1 130.17 130.17 16.517 13.9768 0.5470 2 129.99 259.98 8.270 13.9929 0.5309 3 129.18 387.54 5.548 14.0724 0.4514 4 128.41 513.63 4.186 14.1494 0.3744 5 127.62 638.08 3.369 14.2291 0.2947 6 126.82 760.94 2.825 14.3102 0.2136 7 126.04 882.29 2.437 14.3911 0.1327 8 125.25 1002.01 2.146 14.4741 0.0497 It is observed from Table 5 that generation required is so small that it is met by operating only 1 unit at maximum turbine efficiency which results in water conservation of 3.77% as shown in Fig. 4. As the number of units are increased, there is decrease in conservation of water. Fig. 4. Variation in water conservation near rated head Case-III : Operation below rated head conditions Following data on a typical day in the month of May is taken from ‘Daily Report’. Energy generated = 4.976 MU Energy dispatched = 4.8709 MU Energy transfer efficiency = 0.97888% Average reservoir elevation Average plant discharge Cumulative volume of water released in 24 h = 248.72 m = 446 cumecs = 38.5344 million m3 No. of start-ups No. of shut-downs Water loss in start-ups Water loss in shut-downs Total water loss in start-ups and shut-downs Water utilized in generation =6 =5 = 6 x 5700 = 34200 m3 = 5 x 7000 = 35000 m3 = 69200 m3 = 0.0692 million m3 = 38.5344 – 0.0692 = 38.4652 million m3 116
  • 9. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Tail water elevation, net head and plant discharge are computed while operating the turbines at maximum efficiencies. Duration of operation for the total quantity of water i.e. 38.4652 million m3 is computed on the basis of plant discharges given in Table 6. Table 6 : Plant Discharge and Duration of Operation Units in Tail water Net head Maximum Plant Duration of (m) operation operation level (m) discharge turbine (cumecs) (hr) (No.) efficiency 2 194.162 53.528 0.94902 464.94 22.98 3 194.495 53.197 0.94884 697.06 15.33 4 194.823 52.871 0.94866 928.96 11.50 5 195.152 52.544 0.94847 1160.63 9.21 6 195.483 52.216 0.94827 1392.07 7.68 7 195.812 51.890 0.94808 1623.29 6.57 8 196.140 51.567 0.94787 1854.29 5.76 Power output and duration of operation are computed at maximum turbine efficiency. Water conservation achieved is given in Table 7. Table 7 : Water Conservation in Actual Power Generation of 4.976 MU Duration of Total water Total water Units in Output of Total operation each unit output of operation required, conserved, (MW) units (MW) (million m3) (million m3) (No.) (hr) 2 113.84 227.68 21.86 36.5907 1.8745 3 113.05 339.15 14.67 36.8203 1.6449 4 112.28 449.10 11.08 37.0475 1.4177 5 111.50 557.50 8.93 37.2924 1.1728 6 110.71 664.28 7.49 37.5425 0.9227 7 109.94 769.55 6.47 37.8577 0.6075 8 109.16 873.30 5.70 38.0254 0.4398 It is seen from Table 7 that unit output decreases with the increase in number of units. It is due to reduction in net head with increase in plant discharge. Hence, it is most advantageous to operate minimum number of units. In this case, operation of 2 units as above will meet the load demand efficiently with water conservation of 4.87%. Variation in water conservation from 1.14% to 4.87% with number of units in operation is shown in Fig. 7. 117
  • 10. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME Fig. 5. Variation in water conservation below rated head 6. CONCLUSION The concept of demand based optimal generation of a hydroelectric power plant is developed on the basis of operation of turbines at maximum efficiency and applied to a multi-unit hydroelectric power plant. It is found that variation in water conservation varies with the head and number of units to be operated. Maximum upto 4.87% saving in water is achieved when head is below the rated head. Towards the end of summer season, water level in reservoir is low and hence conservation of water becomes crucial. It is also found that in all the cases, saving in water is maximum with lesser number of units in operation. Using above information, the utilities may coordinate with river control authorities and Load Dispatch Centre for operation of the units at maximum turbine efficiencies. In summer when scarcity of water is more and demand of electricity is increased, the role of water management becomes critical to ensure its optimum utilization. The operation of turbines at maximum efficiency minimizes vibrations and cavitation which reduces wear-tear and in-turn maintenance cost. 7. ACKNOWLEDGEMENT The authors gratefully acknowledge Dr. Appu Kuttan K. K., Director, Maulana Azad National Institute of Technology, Bhopal, India for his encouragement in carrying out research work. The authors are thankful to NHDC Ltd. for cooperation and sharing of data on Indira Sagar Hydroelectric Project. NOMENCLATURE Et Etmax FRL Hlh Hmax Hmin Hnet LD MDDL efficiency of turbine max. turbine efficiency Full Reservoir Level (m) Elevation of reservoir (m) maximum head limit (m) minimum head limit (m) net head (m) load demand (MW) Minimum Draw Down Level 118
  • 11. International Journal of Advanced Research in Engineering and Technology (IJARET), ISSN 0976 – 6480(Print), ISSN 0976 – 6499(Online) Volume 4, Issue 7, November – December (2013), © IAEME m n Pgeach Pgmax Pgmin Pi Pt POL PTLi Q Qi Qmax Qmin Qrated ti T1 T2 T3 T4 Vstart_los Vstop_los no. of units in operation no. of units in power plant output of each generator (MW) unit maximum output limit (MW) unit minimum output limit (MW) output of ith unit (MW) output of turbine (MW) part/over load (MW) power transfer loss discharge (cumecs) discharge of ith turbine (cumecs) maximum discharge limit of a turbine (cumecs) minimum discharge limit of a turbine (cumecs) minimum discharge limit of a turbine (cumecs) time of operation of ith turbine (s) time to achieve 90% of rated speed from standstill (30 s) time to reach synchronous speed and synchronizing (60 s) time to load the unit after synchronizing (30 s) stopping time (60 s) loss of water in one start-up (m3) loss of water in one shut-down (m3) REFERENCES [1] A.L. Diniz, P.P.I. Esteves, and C. Sagastizábal, A mathematical model for the efficiency curves of hydroelectric units, IEEE PES General Meeting, Tampa, FL, 2007, 1-7. [2] A. Mahor, and S. Rangnekar, Short term optimal generation scheduling of Narmada cascaded hydro electric system,” Hydro Nepal, 7, 2010, 71-80. [3] J.P.S. Catalão, S.J.P.S. Mariano, V.M.F. Mendes, and L.A.F.M. Ferreira, Scheduling of headSensitive cascaded hydro systems: A nonlinear approach, IEEE Transactions on Power Systems, 24(1), 2009, 337-346. [4] C. Li, E. Hsu, A.J. Svoboda, C. Tseng, and R.B. Johnson, Hydro unit commitment in hydrothermal optimization, IEEE Transactions on Power Systems, 12(2), 1997, 764-769. [5] O. Nilsson, and D. Sjelvgren, Variable splitting applied to modeling of start-up costs in short term hydro generation scheduling,” IEEE Transactions Power Systems, 12(2), 1997, 770-775. [6] O. Nilsson, and D. Sjelvgren, Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish Power Producers, IEEE Transactions Power Systems, 12(1), 1997, 38-44. [7] S.R. Awasthi, V. Prasad, and S. Rangnekar, Operational strategies to increase generation of large hydroelectric power plants, Water and Energy International Journal of CBIP, 70(8), 2013, 7-11. [8] Bilal Abdullah Nasir, “Design of High Efficiency Pelton Turbine for Micro-Hydropower Plant”, International Journal of Electrical Engineering & Technology (IJEET), Volume 4, Issue 1, 2013, pp. 171 - 183, ISSN Print : 0976-6545, ISSN Online: 0976-6553, [9] Deepika Yadav, R. Naresh and V. Sharma, “Fixed Head Short Term Hydro Thermal Generation Scheduling Using Real Variable Genetic Algorithm”, International Journal of Electrical Engineering & Technology (IJEET), Volume 3, Issue 2, 2012, pp. 430 - 443, ISSN Print : 0976-6545, ISSN Online: 0976-6553. 119