Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.

Air Quality Monitoring for International ESIAs - Jeremy Metcalf

15 visualizaciones

Publicado el

Early Career Group Meetup, Manchester, January 2018

Publicado en: Medio ambiente
  • Sé el primero en comentar

  • Sé el primero en recomendar esto

Air Quality Monitoring for International ESIAs - Jeremy Metcalf

  1. 1. Copyright of RSK 08 November 2018 1 Air Quality Monitoring for International ESIAs Jeremy Metcalfe
  2. 2. Copyright of RSK 08 November 2018 2 About Me/ Why this talk? •BSc Physical Geography 2008 •MSc Environmental Management and Sustainable Development 2016 •Stockport Homes •RSK Environment Limited •TAV and EACOP ESIAs
  3. 3. Copyright of RSK 08 November 2018 3 Project Background Saudi Arabia – Airport Expansion Project ESIA Tanzania – East Africa Crude Oil Pipeline ESIA •3 separate ESIAs •Air quality lead for all 3 •Airport Expansion Project •1 Month of monitoring - 2 visits – set up/ De-mob •3 separate ESIAs – Uganda/ Tanzania/ upstream •Air quality lead for Tanzania •6 months monitoring •Training with in country partners and continued Project Management
  4. 4. Copyright of RSK 08 November 2018 4 Monitoring – Equipment/ Methods Spot measurements Particulate Matter (PM2.5 and PM10) •TSI Dustrack – with environmental enclosure Carbon monoxide/ dioxide •TSI Q track Continuous measurements NOx and NO2 (New passam tubes), O3, SO2, VOCs and H2S •Diffusion Tubes (Gradko International) Lead (Saudi Only) •Met One E-Sampler (with filter) – also PM10 continuous
  5. 5. Copyright of RSK 08 November 2018 5 Monitoring – Equipment/ Methods Cont...
  6. 6. Copyright of RSK 08 November 2018 6 Monitoring – Equipment/ Methods Cont...
  7. 7. Copyright of RSK 08 November 2018 7 Challenges •Planning – date changes/ Unforeseen delays •Customs – getting equipment through •Cultural Differences •Schedule pressures •Workload management (Reporting) •Managing a project from distance
  8. 8. Copyright of RSK 08 November 2018 8 Conclusion/ keys to successful projects •Plan •Flexible but decisive in the field •Know your methods/ equipment •Organised reporting/ Project Management •Enjoy the experience
  9. 9. Copyright of RSK 08 November 2018 9 Q and A

×