iFour ConsultancyProject Monitoring and Control
 Introduction
 Objectives
 Practices
 Monitor Project Against Plan
 Manage Corrective Action to Closure
 Achieve Specific Goals
 Institutionalize a Managed Process
 Institutionalize a Defined Process
 Institutionalize a Quantitatively Managed Process
 Institutionalize an Optimizing Process
 Techniques
 Earned value management
 Critical ratio
 Stakeholders involved
 Recourses
 References
Roadmap
http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
Project Monitoring and Control
 Involves measuring progress toward project objectives, monitoring deviation from the
plan, and taking correction actions
 Monitoring – collecting, recording, and reporting information concerning project
performance
 Control – Uses monitoring to bring actual performance to planned performance
•A markup language is a set of markup tags
http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
 Key control objective area
Cost - human and other resources
Time - time to deliver
Quality - value and goals of the project
 Project monitoring and control of project costs
Mainly tracking human resources, or people hours
 Project monitoring and control of the project timeline
Project Timeline – Monitoring time allocated to resources
 Project monitoring and control of the project deliverables
Monitor the quality of work product
Project Monitoring and Control: Objectives
 Actual performance and progress of the project are monitored against the project plan
 Monitor Project Against Plan involves following activities
 Monitor Project Planning Parameters
 Schedule
 Estimated cost
 Work product and task in terms of size and complexity
 Resource provided and actually used
 Knowledge and skills of personnel
 Monitor Commitments
1. Review commitments regularly
2. Identify not satisfied or at risk commitments
3. Document the results
Practices: Monitor Project Against Plan
 Monitor Project Risks
1. Risk in current status of project
2. Revise the risk documentation accordingly
3. Communicate to stakeholders
 Monitor Data Management
1. Review the data management activities – types of data, plan for their management
2. Identify issue and their impact
3. Document the result
 Monitor Stakeholder Involvement
1. Review the status of involvement - To monitor appropriate interactions are occurring
2. Identify issue and their impact
3. Document the results
Practices: Monitor Project Against Plan (Cont.)
http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
 Conduct Progress Reviews
1. Communicate the project progress, performance and issue to stakeholders
2. Review the results of collecting and analyzing measures – using measuring and analysis process
3. Identify issue and their impact
4. Document the change request
5. Document the result
6. Track the change request
 Conduct Milestone Reviews
1. Reviews at meaningful points in the projects schedule
2. Review the commitments, plan, status, and risks of the project
3. Identify issue and their impact
4. Document the result
5. Track action items to closure.
Practices: Monitor Project Against Plan (Cont.)
 Corrective actions are managed to closure when the project's results deviate from
the plan
 Manage Corrective Action to Closure involves following processes
Analyze issue
 Gather the issues
 Analyze the issues to take action on it
Take Corrective Action
 Document the action required to correct
 Review and get agreement from relevant stakeholders
 Negotiate changes to internal and external commitments
Practices : Manage Corrective Action to Closure
Manage Corrective Action
Monitor corrective actions for completion.
Analyze results of corrective actions to determine the effectiveness
Determine and document appropriate actions to correct deviation
Practices : Manage Corrective Action to Closure (Cont.)
 Enables achievement of specific goals by transforming identifiable input to produce
identifiable output work products
Perform Specific practices
- To develop work products and provide services
Practices: Achieve Specific Goals
 Institutionalize a Managed Process involves following sub process
Establish an Organizational Policy
 This policy establishes organizational expectations
 for monitoring performance against the project plan
 managing corrective action to closure
Plan the Process
 Maintain the plan for performing the PMC
 Can be a part of project planning phase
Provide Resources
 For performing the project monitoring and control process
 For developing the work products
 For providing the services of the process
Practices: Institutionalize a Managed Process
Assign Responsibility
 For performing the project monitoring and control process
 For developing the work products
 For providing the services of the process
Train People
 Train the people performing or supporting PMC
Manage Configurations
 Place designated work products(Schedules, Earned value reports) under appropriate levels of control
Practices: Institutionalize a Managed Process (Cont.)
Identify and Involve Relevant Stakeholders
Examples of activities for stakeholder involvement include the following
 Assessing the project against the plan
 Reviewing commitments and resolving issues
 Reviewing project risks
 Reviewing data management activities
 Reviewing project progress
 Managing corrective actions to closure
Monitor and Control the Process
 Monitor and control PMC
Objectively Evaluate Adherence
 Against its process description, standards, and procedures, and address noncompliance
Review Status with Higher Level Management
Practices: Institutionalize a Managed Process (Cont.)
 This generic goal's appearance here reflects its location in the continuous
representation
 Following are the processes involved in Institutionalize a Defined Process
Establish a Defined Process
 Establish and maintain the description of PMC process
Collect Improvement Information
 Collect the following information from PMC for future use
 products, measures
 measurement results
 improvement information
Practices: Institutionalize a Defined Process
 Institutionalize a Quantitatively Managed Process involves following processes
Establish Quantitative Objectives for the Process
 Address quality and process performance, based on customer needs and business objectives
Stabilize Sub process Performance
 To determine the ability of PMC of establishing quality and process performance
Practices: Institutionalize a Quantitatively Managed Process
 Institutionalize an Optimizing Process involves following processes
 Ensure Continuous Process Improvement
 For fulfilling the relevant business objectives of the organisation
 Correct Root Causes of Problems
 Identify and correct the root causes of defects and other problems
Practices: Institutionalize an Optimizing Process
Earned value management(EVM)
Critical Ratio
Techniques for monitoring and control
 Way of determining overall performance
Earned value (EV)
formerly called the budgeted cost of work performed (BCWP)
estimate of the value of the physical work actually completed
based on the original planned and the rate it is completing to date
 Baseline cost to completion –referred to as budget at completion (BAC)
 Actual cost to date –referred to as estimated cost at completion (EAC)
Earned value management
 Cost variance (CV) – difference between budgeted cost of work performed (earned
value) (BCWP) and actual cost of that work (ACWP)
 Schedule variance (SV) – difference between earned value (BCWP) and cost of
work we scheduled to perform to date (BCWS)
 Time variance (TV) – difference between time scheduled for work performed
(STWP) and actual time to perform it (ATWP)
Earned value management - Variances
Term Formula Impact
Cost Variance CV= BCWP –ACWP negative value -cost
overrun
Schedule Variance SV = BCWP –BCWS negative value -behind
schedule
Time variance TV = STWP –ATWP negative value -delay
Cost Performance Index (CPI) = BCWP/ACWP less than 1 indicate cost
overrun
Schedule Performance
Index
(SPI) = BCWP/BCWS less than 1 indicate behind
schedule
Time Performance Index TPI) = STWP/ATWP less than 1 indicate delay
Earned value management - Formulas
Earned Value Management (cont.)
 EAC point is above and to the right of the BAC point means the project is projected
to cost more and take longer than planned
 The critical ratio is
actual progress x budgeted cost
scheduled progress actual cost
 If ratio is 1 everything is probably on target
 The further away form 1 the ratio is, the more we may need to investigate
Critical Ratio
 The project manager
 The project team
 Support staff
 Customers
 Users
 Suppliers
Project Monitoring and Control : Stakeholders
 Input Documents
Project Plan
Project schedule
Project budget
 Result Documents
Records of significant deviations
Risk status document
Project measurement data and analysis
Earned value reports
Corrective action plan
Corrective action results
Project monitoring and Control: Recourses
http://dqsindia.com/cmmi/getting-started/
 https://en.wikipedia.org/wiki/Process_area_(CMMI)
http://www.tutorialspoint.com/cmmi/cmmi-process-areas.htm
http://www.software-quality-assurance.org/cmmi-project-monitoring-and-
control.html#intro
 http://oec.ac.in/images/upload/Project%20Monitoring%20&%20Control.pdf
References
http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
Questions?
http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India

More Related Content

What's hot

Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control ChecklistAnand Subramaniam
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Editionpankajsh10
 
Presentation project management
Presentation project managementPresentation project management
Presentation project managementFlobz Caloy
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
Project Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesProject Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesSlideTeam
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Mena M. Eissa
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 

What's hot (20)

Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Project Planning Checklist
Project Planning ChecklistProject Planning Checklist
Project Planning Checklist
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Project management
Project managementProject management
Project management
 
Project scope management
 Project scope management Project scope management
Project scope management
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 
Presentation project management
Presentation project managementPresentation project management
Presentation project management
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Project Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesProject Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation Slides
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project Management
Project ManagementProject Management
Project Management
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 

Similar to Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.

CMM L2- Quality Management System
CMM L2- Quality Management SystemCMM L2- Quality Management System
CMM L2- Quality Management SystemSuyog Raut
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project ManagementNoman Aftab
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process groupHossam Maghrabi
 
Cmmi process overview
Cmmi process overviewCmmi process overview
Cmmi process overviewpvinbox
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management proceduresselinasimpson1201
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changesPeg Duggan
 
L03 integration management
L03 integration managementL03 integration management
L03 integration managementAsa Chan
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneHossam Maghrabi
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementTrue Corporation
 
Topic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfTopic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfHuyNguyen657394
 
Module 4 - IDP.pptx
Module 4 - IDP.pptxModule 4 - IDP.pptx
Module 4 - IDP.pptxRAJESH S
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
Total Quality Management-Performance-Measures.ppt
Total Quality Management-Performance-Measures.pptTotal Quality Management-Performance-Measures.ppt
Total Quality Management-Performance-Measures.pptSabrinaNishat1
 

Similar to Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd. (20)

CMM L2- Quality Management System
CMM L2- Quality Management SystemCMM L2- Quality Management System
CMM L2- Quality Management System
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
Cmmi process overview
Cmmi process overviewCmmi process overview
Cmmi process overview
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changes
 
L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part One
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Topic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdfTopic 12 - Project Cost Management.pdf
Topic 12 - Project Cost Management.pdf
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 
Module 4 - IDP.pptx
Module 4 - IDP.pptxModule 4 - IDP.pptx
Module 4 - IDP.pptx
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Total Quality Management-Performance-Measures.ppt
Total Quality Management-Performance-Measures.pptTotal Quality Management-Performance-Measures.ppt
Total Quality Management-Performance-Measures.ppt
 

More from iFour Institute - Sustainable Learning

Project management : Causal analysis and Resolution by iFour Technolab Pvt. ...
Project management :  Causal analysis and Resolution by iFour Technolab Pvt. ...Project management :  Causal analysis and Resolution by iFour Technolab Pvt. ...
Project management : Causal analysis and Resolution by iFour Technolab Pvt. ...iFour Institute - Sustainable Learning
 
Here are proven techniques to Organizing effective training by iFour Technola...
Here are proven techniques to Organizing effective training by iFour Technola...Here are proven techniques to Organizing effective training by iFour Technola...
Here are proven techniques to Organizing effective training by iFour Technola...iFour Institute - Sustainable Learning
 

More from iFour Institute - Sustainable Learning (12)

Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.
 
Project management : Causal analysis and Resolution by iFour Technolab Pvt. ...
Project management :  Causal analysis and Resolution by iFour Technolab Pvt. ...Project management :  Causal analysis and Resolution by iFour Technolab Pvt. ...
Project management : Causal analysis and Resolution by iFour Technolab Pvt. ...
 
Here are proven techniques to Organizing effective training by iFour Technola...
Here are proven techniques to Organizing effective training by iFour Technola...Here are proven techniques to Organizing effective training by iFour Technola...
Here are proven techniques to Organizing effective training by iFour Technola...
 
ADO.NET by ASP.NET Development Company in india
ADO.NET by ASP.NET  Development Company in indiaADO.NET by ASP.NET  Development Company in india
ADO.NET by ASP.NET Development Company in india
 
Web API with ASP.NET MVC by Software development company in india
Web API with ASP.NET  MVC  by Software development company in indiaWeb API with ASP.NET  MVC  by Software development company in india
Web API with ASP.NET MVC by Software development company in india
 
jQuery plugins & JSON
jQuery plugins & JSONjQuery plugins & JSON
jQuery plugins & JSON
 
Mvc by asp.net development company in india - part 2
Mvc by asp.net development company in india  - part 2Mvc by asp.net development company in india  - part 2
Mvc by asp.net development company in india - part 2
 
MVC by asp.net development company in india
MVC by asp.net development company in indiaMVC by asp.net development company in india
MVC by asp.net development company in india
 
C# fundamentals Part 2
C# fundamentals Part 2C# fundamentals Part 2
C# fundamentals Part 2
 
jQuery for web development
jQuery for web developmentjQuery for web development
jQuery for web development
 
Cascading style sheets - CSS
Cascading style sheets - CSSCascading style sheets - CSS
Cascading style sheets - CSS
 
HTML Basics by software development company india
HTML Basics by software development company indiaHTML Basics by software development company india
HTML Basics by software development company india
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 

Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.

  • 2.  Introduction  Objectives  Practices  Monitor Project Against Plan  Manage Corrective Action to Closure  Achieve Specific Goals  Institutionalize a Managed Process  Institutionalize a Defined Process  Institutionalize a Quantitatively Managed Process  Institutionalize an Optimizing Process  Techniques  Earned value management  Critical ratio  Stakeholders involved  Recourses  References Roadmap http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
  • 3. Project Monitoring and Control  Involves measuring progress toward project objectives, monitoring deviation from the plan, and taking correction actions  Monitoring – collecting, recording, and reporting information concerning project performance  Control – Uses monitoring to bring actual performance to planned performance •A markup language is a set of markup tags http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
  • 4.  Key control objective area Cost - human and other resources Time - time to deliver Quality - value and goals of the project  Project monitoring and control of project costs Mainly tracking human resources, or people hours  Project monitoring and control of the project timeline Project Timeline – Monitoring time allocated to resources  Project monitoring and control of the project deliverables Monitor the quality of work product Project Monitoring and Control: Objectives
  • 5.  Actual performance and progress of the project are monitored against the project plan  Monitor Project Against Plan involves following activities  Monitor Project Planning Parameters  Schedule  Estimated cost  Work product and task in terms of size and complexity  Resource provided and actually used  Knowledge and skills of personnel  Monitor Commitments 1. Review commitments regularly 2. Identify not satisfied or at risk commitments 3. Document the results Practices: Monitor Project Against Plan
  • 6.  Monitor Project Risks 1. Risk in current status of project 2. Revise the risk documentation accordingly 3. Communicate to stakeholders  Monitor Data Management 1. Review the data management activities – types of data, plan for their management 2. Identify issue and their impact 3. Document the result  Monitor Stakeholder Involvement 1. Review the status of involvement - To monitor appropriate interactions are occurring 2. Identify issue and their impact 3. Document the results Practices: Monitor Project Against Plan (Cont.) http://www.ifourtechnolab.com/ ASP.NET Software Development Companies India
  • 7.  Conduct Progress Reviews 1. Communicate the project progress, performance and issue to stakeholders 2. Review the results of collecting and analyzing measures – using measuring and analysis process 3. Identify issue and their impact 4. Document the change request 5. Document the result 6. Track the change request  Conduct Milestone Reviews 1. Reviews at meaningful points in the projects schedule 2. Review the commitments, plan, status, and risks of the project 3. Identify issue and their impact 4. Document the result 5. Track action items to closure. Practices: Monitor Project Against Plan (Cont.)
  • 8.  Corrective actions are managed to closure when the project's results deviate from the plan  Manage Corrective Action to Closure involves following processes Analyze issue  Gather the issues  Analyze the issues to take action on it Take Corrective Action  Document the action required to correct  Review and get agreement from relevant stakeholders  Negotiate changes to internal and external commitments Practices : Manage Corrective Action to Closure
  • 9. Manage Corrective Action Monitor corrective actions for completion. Analyze results of corrective actions to determine the effectiveness Determine and document appropriate actions to correct deviation Practices : Manage Corrective Action to Closure (Cont.)
  • 10.  Enables achievement of specific goals by transforming identifiable input to produce identifiable output work products Perform Specific practices - To develop work products and provide services Practices: Achieve Specific Goals
  • 11.  Institutionalize a Managed Process involves following sub process Establish an Organizational Policy  This policy establishes organizational expectations  for monitoring performance against the project plan  managing corrective action to closure Plan the Process  Maintain the plan for performing the PMC  Can be a part of project planning phase Provide Resources  For performing the project monitoring and control process  For developing the work products  For providing the services of the process Practices: Institutionalize a Managed Process
  • 12. Assign Responsibility  For performing the project monitoring and control process  For developing the work products  For providing the services of the process Train People  Train the people performing or supporting PMC Manage Configurations  Place designated work products(Schedules, Earned value reports) under appropriate levels of control Practices: Institutionalize a Managed Process (Cont.)
  • 13. Identify and Involve Relevant Stakeholders Examples of activities for stakeholder involvement include the following  Assessing the project against the plan  Reviewing commitments and resolving issues  Reviewing project risks  Reviewing data management activities  Reviewing project progress  Managing corrective actions to closure Monitor and Control the Process  Monitor and control PMC Objectively Evaluate Adherence  Against its process description, standards, and procedures, and address noncompliance Review Status with Higher Level Management Practices: Institutionalize a Managed Process (Cont.)
  • 14.  This generic goal's appearance here reflects its location in the continuous representation  Following are the processes involved in Institutionalize a Defined Process Establish a Defined Process  Establish and maintain the description of PMC process Collect Improvement Information  Collect the following information from PMC for future use  products, measures  measurement results  improvement information Practices: Institutionalize a Defined Process
  • 15.  Institutionalize a Quantitatively Managed Process involves following processes Establish Quantitative Objectives for the Process  Address quality and process performance, based on customer needs and business objectives Stabilize Sub process Performance  To determine the ability of PMC of establishing quality and process performance Practices: Institutionalize a Quantitatively Managed Process
  • 16.  Institutionalize an Optimizing Process involves following processes  Ensure Continuous Process Improvement  For fulfilling the relevant business objectives of the organisation  Correct Root Causes of Problems  Identify and correct the root causes of defects and other problems Practices: Institutionalize an Optimizing Process
  • 17. Earned value management(EVM) Critical Ratio Techniques for monitoring and control
  • 18.  Way of determining overall performance Earned value (EV) formerly called the budgeted cost of work performed (BCWP) estimate of the value of the physical work actually completed based on the original planned and the rate it is completing to date  Baseline cost to completion –referred to as budget at completion (BAC)  Actual cost to date –referred to as estimated cost at completion (EAC) Earned value management
  • 19.  Cost variance (CV) – difference between budgeted cost of work performed (earned value) (BCWP) and actual cost of that work (ACWP)  Schedule variance (SV) – difference between earned value (BCWP) and cost of work we scheduled to perform to date (BCWS)  Time variance (TV) – difference between time scheduled for work performed (STWP) and actual time to perform it (ATWP) Earned value management - Variances
  • 20. Term Formula Impact Cost Variance CV= BCWP –ACWP negative value -cost overrun Schedule Variance SV = BCWP –BCWS negative value -behind schedule Time variance TV = STWP –ATWP negative value -delay Cost Performance Index (CPI) = BCWP/ACWP less than 1 indicate cost overrun Schedule Performance Index (SPI) = BCWP/BCWS less than 1 indicate behind schedule Time Performance Index TPI) = STWP/ATWP less than 1 indicate delay Earned value management - Formulas
  • 21. Earned Value Management (cont.)  EAC point is above and to the right of the BAC point means the project is projected to cost more and take longer than planned
  • 22.  The critical ratio is actual progress x budgeted cost scheduled progress actual cost  If ratio is 1 everything is probably on target  The further away form 1 the ratio is, the more we may need to investigate Critical Ratio
  • 23.  The project manager  The project team  Support staff  Customers  Users  Suppliers Project Monitoring and Control : Stakeholders
  • 24.  Input Documents Project Plan Project schedule Project budget  Result Documents Records of significant deviations Risk status document Project measurement data and analysis Earned value reports Corrective action plan Corrective action results Project monitoring and Control: Recourses

Editor's Notes

  1. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  2. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  3. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  4. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  5. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  6. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  7. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  8. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  9. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  10. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  11. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  12. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  13. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  14. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  15. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  16. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  17. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  18. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  19. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  20. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  21. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  22. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  23. Software Outsourcing Company India - http://www.ifourtechnolab.com/
  24. Software Outsourcing Company India - http://www.ifourtechnolab.com/