3. Introduction
North–South Railway (NSR) Project connects Qurayyat /
Al Jalamid in the North of the Kingdom with Ras Al Khair
in the East via Hail and Az Zabirah through a single-
track railway line.
The main aim of this project is to transport Phosphate
ore from the mines situated in the North and Bauxite
ore from Az Zabirah to the industrial complex in the
East (Ras Al Khair).
Saudi Railway (SAR) Projects
CTW 100
CTW 110
The main aim of this project is to connect Ras al Khair
to Jubail Industrial City.
4. Description CTW 100 CTW 110
Track Length 741.672 km 90.685 km
Earthwork – Railways (Cut &
Fill)
42.048 million
m3
08.049 million
m3
Earthwork – Roads 6.822 million m3 02.907 million
m3
Subgrade 3.502 million m3 0.943 million
m3
Subballast 2.002 million m3 0.328 million
m3
Ballast 1.705 million
m3
0.209 million
m3
Concrete Sleepers 1,236,367 Nos. 174,774 Nos.
Culverts (Box & Pipe) 594 Nos. 62 Nos.
Projects Overview
Saudi Railway (SAR) Projects
CTW-110 Project is very unique in terms of 104
Interface Utilities to be dealt with before Track
8. Km000
Zabirah
570 kms, 09 Camps
km38
Sub Camp
Zabirah
km110
Sub Camp
Samuda
km283
Sub Camp
Hira
km349
Sub Camp
Saeriyah
km501
Sub Camp
Track
Works
km244
Sub Camp
Structures
km487
Sub Camp
Naeriyah
km559
Sub Camp
MBLC
km188
Main Camp
Km570
Saudi Railway (SAR) Project
CTW 100