SlideShare a Scribd company logo
1 of 6
Download to read offline
International Journal of Trend in Scientific Research and Development (IJTSRD)
Volume 4 Issue 3, April 2020 Available Online: www.ijtsrd.com e-ISSN: 2456 – 6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 765
Mass-Haul Diagrams in Optimization of
Earthwork Computations
Koustav Dutta, Nilmay Mondal, Mrityunjay Malakar
Student (UG), Department of Civil Engineering,
Purulia Government Engineering College (Govt. of WB), Purulia, West Bengal, India
ABSTRACT
One important aspect of Roadway design is determining the amount of
Earthwork necessary on a project. The execution of earthwork
comprises four fundamental operations, viz., cutting, loading, hauling
and filling. Except hauling, the costs of all the remaining three
operations depend upon the character of the material. The haulage cost
is a function of the weight of the material as well as the distance from
the place of excavation to the place of fill. Since overhaul is an added
cost and as it affects the economy of the project considerably, it is highly
desirable to deal with the problem very carefully. This necessitates
proper planning of movements of excavated soil of work site from cuts
to fills so that the haul distance is minimum to reduce the cost of
Earthwork. This may be accomplished graphically by means of a
distribution diagram known as the Mass Diagram or Mass Curve or
Mass-Haul Diagram. It is an important tool in Civil Engineering
discipline used to compare the economy of various alternatives
methods of Earthwork distributions on road or railway construction
schemes to ultimately determine the most feasible option for Earthwork
as far as economic viability and suitability is concerned to subsequently
reduce the costs, labour, time and the complexity involved in the
project. This paper aims at discussing the effectiveness and the
suitability of Mass-Haul Diagrams in any operation of Earthwork
involved in any Civil Engineering project thus undergoing a
comprehensive discussion on its various aspects through suitable
illustrations as and when required. At the end of this paper, the
implications of Mass Diagrams using some popular computer softwares
such as MS Excel and Autodesk CIVIL 3D has also been discussed, which
considerably increases the efficiency of the project, that is otherwise
lost in the preparation of the diagrams using the conventional methods
involving manual plotting of graphs.
KEYWORDS: Mass-Haul Diagram, Earthwork, Cut & Fill, Haulage, Formation
Level, Cost Economy
How to cite this paper: Koustav Dutta |
Nilmay Mondal | Mrityunjay Malakar
"Mass-Haul Diagrams in Optimization of
Earthwork Computations" Published in
International
Journal of Trend in
Scientific Research
and Development
(ijtsrd), ISSN: 2456-
6470, Volume-4 |
Issue-3, April 2020,
pp.765-770, URL:
www.ijtsrd.com/papers/ijtsrd30681.pdf
Copyright © 2020 by author(s) and
International Journal of Trend in
Scientific Research and Development
Journal. This is an Open Access article
distributed under
the terms of the
Creative Commons
Attribution License (CC BY 4.0)
(http://creativecommons.org/licenses/
by/4.0)
INTRODUCTION
Mass haul is defined as the volume of material multiplied
by the distance it is moved during construction. A Mass-
Haul Diagram consists of two objects: a mass haul line and
a mass haul view. The mass haul lines represent the free
haul and overhaul volumes in cut and fill conditions along
an alignment. On the other hand the mass haul view is the
grid on which the mass haul line is drawn. The middle axis
of the mass haul view is known as the balance line. The
location of the mass haul line relative to the balance line
indicates material movement in the current design. When
the mass haul line rises above the balance line, it indicates
a region in which material is cut. When the mass haul line
falls below the balance line, it indicates a region in which
material is fill. There are two methods to compare free haul
volume and overhaul volume:
A. Grade Points Method
Grade points are stations at which the proposed project
design transitions from cut to fill occur. In a mass haul
diagram, a grade point is the highest or lowest point in a
mass haul region. Thus a grade point is the highest point in
a mass haul region where the profile transitions from a cut
condition to a fill condition takes place. It may also be the
lowest point in a mass haul region where the profile
transitions from a fill condition to a cut condition.
In the grade points method of measuring free haul, a
horizontal line that is the length of the specified free haul
distance is drawn. The line is positioned so that it is both
parallel to the balance line and touches the mass haul line.
The volume that is enclosed in the area formed by this line
and the mass haul line is free haul.
B. Balance Points Method
Balance points are the stations at which the net cut and fill
volumes are equal. In a mass haul diagram, the balance
points are located on the balance line, where the net
volume is zero. In the balance points method of measuring
IJTSRD30681
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 766
free haul, the mass haul line is duplicated and shifted
horizontally to the right (where the project transitions
from cut to fill) or to the left (where the project transitions
from fill to cut) by the free haul distance.
Fig. 1: Grade Points Method: In the above image, the
green areas are free haul volume, and the red areas are
overhaul volume. The magenta circles and arrows indicate
the grade points on the mass haul line and profile. The
vertical magenta lines illustrate the relationship between
the mass haul line and profile in the grade point balancing
method.
Fig. 2: Balance Points Method: In the above image, the
green areas are free haul volume, and the red areas are
overhaul. The arrows illustrate the free haul distance in cut
and fill conditions.
Some of the important associated terms are hereby
discussed as follow:
Haul Distance (d) is the distance from the working face of
excavation to that where the material is deposited.
Average Haul Distance (D) is the distance between the
centre of gravity of cutting to that of filling, where the
material is deposited.
Haul is the sum of the products of each load by its haul
distance = Σ v. d = V. D, where V is the total volume of
excavation.
Free Haul is the distance upto which no extra charge is
required to be paid.
Overhaul is the distance for which extra charge of haulage
is to be paid.
For example, the contractor may offer to haul material upto
150 m at Rs. 5 per m3 but thereafter charge at the rate of
Rs. 0.50 per m3 per 100 m. The distance of 150 m is the
Free Haul distance and is based on the economical hauling
distance of the earth moving plant used by the contractor.
It may range from 100 m for a bull dozer to 3000 m for
self-propelled scrapers. The haul beyond the Free Haul
distance is termed as Overhaul.
Waste is the material excavated from cuts but not used for
embankments.
Borrow is the material needed for the formation of
embankments, obtained not from excavation of
construction works but from the borrow-pits.
Limit of Economical Haul is the maximum overhaul
distance plus the free haul distance. When this limit is
reached it is more economical to waste and borrow
material.
To illustrate, supposing the free haul distance = 300 m, the
overhaul is charged at the rate of Rs. 0.50 per m3 per 100 m
and the borrowed material at the rate of Rs. 2 per m3. It is
evident that, to overhaul 1 m3 over 400 m, it will cost Rs. 2
m3. Therefore the limit for economical haul = 300 m (free
haul) + 400 m (overhaul) = 700 m
Bulking and Shrinkage: Excavated material is loose and
occupies 20% more volume than measured in situ.
However when used and compacted in embankment, it
shrinks and occupies less volume than when originally in
situ. On the other hand excavated rock bulks by 30 to 40%.
To allow for this change in volume a correction factor is
generally applied to the cut and fills volumes.
RESULTS AND DISCUSSIONS
Mass-Haul Diagrams are plots of the cumulative volumes
of cut and fill along an alignment. Typically, the Mass
Diagram is plotted below a profile of the route, with the
ordinate at any station representing the sum of the
volumes of cut and fill upto that station. It is thus a
diagram, usually regular, whose abscissa represent
distances and ordinates the volume of Earthwork.
The sign convention used for cuts is positive (+ve) and
that for fills is negative (-ve). Thus, the total positive
volumes are plotted above the distance base and the
negative volumes below it. The ends of the ordinates are
joined by a smooth curve. The resulting Mass Curve,
therefore, consists of positive and negative peaks. Since
the slope of the Mass Curve for Earthwork can be positive
as well as negative, hence the concept can be used to gain
economic advantages in Earthworks.
By the combined use of the Mass-Haul Diagrams plotted
directly below the longitudinal sections of the proposed
centre line it is possible to find:
1. The distances over which cut and fill will balance.
2. Quantities of materials to be moved and the preferable
direction of the movement.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 767
3. Areas where the earth may have to be taken from
borrow-pits or waste material and the corresponding
amounts involved.
4. The best policy to adopt to obtain the most
economical use of the earth moving plant.
Construction of Mass-Haul Diagram
 Workout accumulated volume as the algebraic sum of
volume of earthwork at each station/ chainage.
 Draw a base line and mark the stations/ chainage
points with suitable scale.
 From every station/ chainage point, draw vertical line
and mark it on a suitable scale for the volume of
Earthwork.
 On the ordinates of each station/ chainage point, mark
the respective scaled cumulative heights. Thus, the
height of an ordinate at any point on the base line
represents the algebraic sum of volume of Earthwork
upto that particular station/ chainage point.
 Join all the points by a smooth curve and the curve
thus obtained represents the Mass-Haul Diagram for
the corresponding longitudinal profile of the land
obtained before.
 From the Mass Curve, workout quantities of
Earthwork such as the earth to be taken away from
the site or earth to be brought at the site.
 Shift the base line above/ below to obtain the most
economical condition of cut and fill.
Characteristics of Mass-Haul Diagram
 Upward slope of the curve indicates cuts/ excavations.
 Downward slope of the curve indicates a fill.
 The peak occurring at the end of an excavation is
known as the maxima point.
 The peak occurring at the end of an embankment is
known as the minima point.
 The vertical distance between a maxima point and the
nest minima point represents the total volume of
cutting.
 The vertical distance between two points, on the curve,
which have no maxima or minima points between
them represents the volume of Earthwork between
their chainages.
 The algebraic difference between the ordinates at
adjacent maxima and minima points represents the
haulage between the two points.
 A horizontal (base) line drawn to intercept the Mass
Diagram cuts it in two points, between which the cut
exactly balances the fill.
 The length of the base line intercepted by a loop of the
Mass Diagram represents the maximum haul distance
in that section.
 The area bounded by a loop of the mass diagram and
the base line measures the haul in that section.
 The haul is minimum when the base line is so selected
that the sum of all the areas cut off by it, without
regards to sign, is a minimum.
Uses of Mass-Haul Diagram
In using a mass diagram, the selection of the base line plays
an important role in the economy of the project. Different
base lines are assumed, each of which provides possible
methods of distributing the excavated material. The one
which gives the most economical scheme is selected and
the overhaul and haulage is computed.
Mass diagrams find its applications in the following
activities:
 Transportation
The simplest application of the Mass-Haul Diagram is to
calculate the average Transportation distance.
For example, if the area under the loop of the Mass Curve is
20,00,000 m4, and the volume of earth transported is 8000
m3, then the average distance of each truck load is
2000000
8000
= 250 m
If the truck carrying capacity is 5 m3, then the number of
trucks journeys required is
8000
5
= 1600
If only one truck is used, it would have to travel = 1600 x
250 = 400 km each way. Such calculations will help the Site
Engineer-In-Charge to take the decision on the type and the
number of trucks (or any other suitable vehicle) to be used.
 Design
There is a close link between the Mass-Haul Diagram and
the formation level of the ground. If several formation
levels are tried and a Mass-Haul Diagram constructed for
each, that formation, which gives the most economical
result and maintains any stipulated standards, for example,
gradient restrictions n vertical design curve, can be used.
 Financing
Once the formation level has been designed, the Mass-Haul
Diagram can be used to indicate the most economical
method of moving the earth round the project and a good
estimate of the overall cost of the earth moving can be
calculated.
 Construction
The required volumes of material are known before
construction begins, enabling suitable plant and machinery
to be chosen, sites for spoil heaps and borrow-pits to be
located and the directions of the haul to be established.
 Planning Ahead
The Mass-Haul Diagram can be used to indicate the effect
of some other engineering works, for example, tunnels and
bridges, within the overall project will have on the earth
moving. Such construction works upset the pattern of the
Mass-Haul Diagram by restricting the directions of the haul
but, since the volumes and hence the quantities of any
waste and borrow will be known beforehand, hence
suitable areas for spoil heaps and borrow-pits can be
located in advance of construction work, enabling the work
to proceed smoothly without any overlapping action
Sources of Errors in Mass-Haul Diagram
Some of the common sources of errors in a Mass Diagram
are noted below:
 Approximating the end areas.
 Failing to apply prismoidal and curvature corrections
in the computation of volume of Earthwork.
 Computing the areas of cross-sections beyond the limit
justified by the field data.
 Computing the volumes beyond the nearest cubic
metre.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 768
Common Mistakes in Mass-Haul Diagram
Some of the typical mistakes often encountered in a Mass
Diagram are noted below:
 Errors in arithmetic and approximations assumed.
 Using the prismoidal formula when end area volumes
are sufficiently accurate.
 Mixing cut and fill quantities
 Failing to consider transition sections when passing
from cut to fill, or from fill to cut.
Table 1: Typical Calculation for the preparation of Mass-Haul Diagram using the predetermined data of the
existing Ground Level and assumed Formation Level
DISTANCE (m)
VOLUME (𝐦 𝟑
)
CUMULATIVE VOLUME (𝐦 𝟑
)
CUT ( + ) FILL ( - )
0 - - 0
4.572 - 1.981 -1.981
9.144 0.719 - -1.262
13.716 1.212 - -0.05
18.288 0.700 - +0.65
22.86 0.883 - +1.533
27.432 - 1.311 +0.222
32.004 - 2.379 -2.157
36.576 - 5.074 -7.231
Σ = +3.514 m3
Σ = -10.745 m3
-7.231 m3
Fig. 3: Mass-Haul Diagram drawn to its corresponding Longitudinal Profile of the existing Ground
and an arbitrarily assumed Formation Level
Mass Haul Diagram Using Computer Software
Apart from the conventional methods of drawing a Mass-
Haul Diagram by plotting graphs, several other computer
softwares such as MS Excel, Autodesk CIVIL 3D have also
their implications in the plotting of Mass Curves using
several special in-built functions and commands.
They are discussed and illustrated as follows:
several special in-built functions and commands.
They are discussed and illustrated as follows:
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 769
 Using MS Excel
Mass-Haul Diagrams can easily be drawn in MS Excel by
simply plotting the points (Chainage points on X-axis and
Cumulative Volume on Y-axis) using the in-built Charts and
Graphs available in it.
 Using Autodesk CIVIL 3D
Mass-Haul Diagrams can easily be drawn in CIVIL 3D
software, created by Autodesk by simply making use of the
in-built functions available in it. It can also be successfully
implemented in balancing the Mass Haul Volumes by
shifting the base line above/ below to determine the most
economically feasible one.
Fig. 4: Mass-Haul Diagram showing the general features of
a Mass Curve. The portions of Cut, Fill, Waste, and Borrow
have been indicated. Note that Cut and Waste are
considered to be positive (+ve). On the other hand Fill and
Borrow are considered to be negative (-ve) for all
computations.
Fig. 5: Mass-Haul Diagram by the manual plotting of
graphs, which yields less accuracy in results due to the
common errors/ mistakes as discussed.
Fig. 6: Mass-Haul Diagram by the plotting of graphs in MS
Excel, which yields better accuracy in results due to the less
probability of common errors/ mistakes as discussed.
Fig. 7: Mass-Haul Diagram plotted in Softree Optimal
software which has nearly 0.01% error in plotting.
Fig. 8: Mass-Haul Diagram plotted in Autodesk CIVIL 3D
software which has nearly 0.001% error in plotting.
Fig. 9: Balancing of Mass Haul Volumes above and below
the base line, which will help to eliminate overhaul, if any,
for cost economy using Autodesk CIVIL 3D SOFTWARE.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 770
Fig. 10: Balancing the mass haul volumes in the third
region by adding a dump site at station 11+50 in Autodesk
CIVIL 3D
CONCLUSION
After the Mass-Haul Diagram has been plotted, an estimate
of the total cost of the Earthwork is made as per the
following equations:
Haul =
𝐇𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐇𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞
𝟏𝟎𝟎
… [1]
Free Haul =
𝐅𝐫𝐞𝐞 𝐇𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐅𝐫𝐞𝐞 𝐇𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞
𝟏𝟎𝟎
… [2]
Overhaul =
𝐎𝐯𝐞𝐫𝐡𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 (𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐎𝐯𝐞𝐫𝐡𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞−
𝐅𝐫𝐞𝐞𝐇𝐚𝐮𝐥 𝐝𝐢𝐬𝐭𝐚𝐧𝐜𝐞)
𝟏𝟎𝟎
… [3]
Table 2: Calculation of Total Cost of Earthwork
Total Cost of Earthwork
Free Haul prices in
Free Haul distance
Free Haul volume x Free Haul
distance x Free Haul prices
Overhaul prices in
Free Haul distance
Overhaul volume x Free Haul
distance x Free Haul prices
Overhaul prices in
Overhaul distance
Overhaul volume x (Average
Overhaul distance – Free Haul
distance) x Overhaul prices
Borrow prices Borrow volume x Borrow prices
Waste Prices Waste volume x Waste prices
Therefore,
Total Cost of Earthwork = Free Haul prices in Free Haul
distance + Overhaul prices in Free Haul distance +
Overhaul prices in Overhaul distance + Borrow prices +
Waste prices … [4]
Thus the Earthwork computations are completed
considering the cost economy of the project and ultimately
the most viable alternative is chosen among the all the
others for executing the process of Earthwork operations,
namely, cutting, loading, hauling, and filling in the field so
as to minimize the cost, effort, time, and other
complications as much as possible. Therefore Mass-Haul
Diagram or Mass Diagram or Mass Curve proves to be a
very powerful tool as far as the economic viability of a
project is concerned. Hence its proper implications will
surely increase the efficiency of the execution of the works
related to Earthworks in any project.
References
[1] Kanetkar, T. P. & Kulkarni, S. V., “Surveying &
Levelling: Part 1”, Twenty Fourth Revised Edition,
August 2015, Pune Vidyarthi Griha Prakashan, pp.
468-519
[2] Duggal, S. K., “Surveying: Volume 1”, Forth Edition,
2013, McGraw Hill Education (India) Private Limited,
pp. 558-561
[3] “Balancing Mass Haul Volumes”, Exercise 2 in CIVIL
3D, Autodesk Knowledge Network

More Related Content

What's hot

Moment Distribution Method
Moment Distribution MethodMoment Distribution Method
Moment Distribution MethodAnas Share
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...India Water Portal
 
14 three moment equation
14 three moment equation14 three moment equation
14 three moment equationalokbshukla
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studiesYogi Yogesh
 
Table of Fixed End Moments Formulas
Table of Fixed End Moments FormulasTable of Fixed End Moments Formulas
Table of Fixed End Moments FormulasAnas Share
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveyingSHAMJITH KM
 
Lightening Ventiltion Dust control Safety And Safety in tunnel
Lightening Ventiltion Dust control Safety And Safety in tunnelLightening Ventiltion Dust control Safety And Safety in tunnel
Lightening Ventiltion Dust control Safety And Safety in tunnelAbhishek Kansara
 
Canal alignment
Canal alignmentCanal alignment
Canal alignmentNaveenaa
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)ahsanrabbani
 
Design of rectangular beam by USD
Design of rectangular beam by USDDesign of rectangular beam by USD
Design of rectangular beam by USDSadia Mahjabeen
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
 
Fundamentals of estimating_and_costing
Fundamentals of estimating_and_costingFundamentals of estimating_and_costing
Fundamentals of estimating_and_costingPrasad Manerikar
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methodsriyasood003
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 

What's hot (20)

Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
Moment Distribution Method
Moment Distribution MethodMoment Distribution Method
Moment Distribution Method
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
 
14 three moment equation
14 three moment equation14 three moment equation
14 three moment equation
 
water demand Problems and solutions
water demand Problems and solutionswater demand Problems and solutions
water demand Problems and solutions
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
Table of Fixed End Moments Formulas
Table of Fixed End Moments FormulasTable of Fixed End Moments Formulas
Table of Fixed End Moments Formulas
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 
Lightening Ventiltion Dust control Safety And Safety in tunnel
Lightening Ventiltion Dust control Safety And Safety in tunnelLightening Ventiltion Dust control Safety And Safety in tunnel
Lightening Ventiltion Dust control Safety And Safety in tunnel
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 
Design of rectangular beam by USD
Design of rectangular beam by USDDesign of rectangular beam by USD
Design of rectangular beam by USD
 
3370 2
3370 23370 2
3370 2
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
Fundamentals of estimating_and_costing
Fundamentals of estimating_and_costingFundamentals of estimating_and_costing
Fundamentals of estimating_and_costing
 
Singly reinforced beam design
Singly reinforced beam   designSingly reinforced beam   design
Singly reinforced beam design
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 

Similar to Mass Haul Diagrams in Optimization of Earthwork Computations

Lec.5 earthworks for various engineering projects
Lec.5  earthworks for various engineering projectsLec.5  earthworks for various engineering projects
Lec.5 earthworks for various engineering projectsMuthanna Abbu
 
Conduct cadastral Survey work and apply earth work estimation.pptx
Conduct cadastral Survey work and apply earth work estimation.pptxConduct cadastral Survey work and apply earth work estimation.pptx
Conduct cadastral Survey work and apply earth work estimation.pptxBehailuzenebe1
 
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfCHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfMohdMusaHashim1
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)IJERA Editor
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET Journal
 
Numerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadNumerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadeSAT Journals
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram pptArunKumar6667
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building shahidibn hussain
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-iiMarvin Ken
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET Journal
 
Central moments of traffic delay at a signalized intersection
Central moments of traffic delay at a signalized intersectionCentral moments of traffic delay at a signalized intersection
Central moments of traffic delay at a signalized intersectionAlexander Decker
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentIRJET Journal
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines ArticleCisco
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocationJatin Mandhyan
 
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...IJRES Journal
 

Similar to Mass Haul Diagrams in Optimization of Earthwork Computations (20)

Lec.5 earthworks for various engineering projects
Lec.5  earthworks for various engineering projectsLec.5  earthworks for various engineering projects
Lec.5 earthworks for various engineering projects
 
Conduct cadastral Survey work and apply earth work estimation.pptx
Conduct cadastral Survey work and apply earth work estimation.pptxConduct cadastral Survey work and apply earth work estimation.pptx
Conduct cadastral Survey work and apply earth work estimation.pptx
 
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdfCHAPTER 5 Earth work quantity and mass haul diagram..pdf
CHAPTER 5 Earth work quantity and mass haul diagram..pdf
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
Contouring
ContouringContouring
Contouring
 
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
 
Numerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadNumerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral load
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram ppt
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
 
L8PDF.pdf
L8PDF.pdfL8PDF.pdf
L8PDF.pdf
 
Contouring
ContouringContouring
Contouring
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
 
Central moments of traffic delay at a signalized intersection
Central moments of traffic delay at a signalized intersectionCentral moments of traffic delay at a signalized intersection
Central moments of traffic delay at a signalized intersection
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines Article
 
my final paper
my final papermy final paper
my final paper
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...
Experimental Comparison of Trajectory Planning Algorithms for Wheeled Mobile ...
 

More from ijtsrd

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementationijtsrd
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...ijtsrd
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospectsijtsrd
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...ijtsrd
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...ijtsrd
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...ijtsrd
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Studyijtsrd
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...ijtsrd
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...ijtsrd
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...ijtsrd
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...ijtsrd
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...ijtsrd
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadikuijtsrd
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...ijtsrd
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...ijtsrd
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Mapijtsrd
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Societyijtsrd
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...ijtsrd
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...ijtsrd
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learningijtsrd
 

More from ijtsrd (20)

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 

Recently uploaded (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 

Mass Haul Diagrams in Optimization of Earthwork Computations

  • 1. International Journal of Trend in Scientific Research and Development (IJTSRD) Volume 4 Issue 3, April 2020 Available Online: www.ijtsrd.com e-ISSN: 2456 – 6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 765 Mass-Haul Diagrams in Optimization of Earthwork Computations Koustav Dutta, Nilmay Mondal, Mrityunjay Malakar Student (UG), Department of Civil Engineering, Purulia Government Engineering College (Govt. of WB), Purulia, West Bengal, India ABSTRACT One important aspect of Roadway design is determining the amount of Earthwork necessary on a project. The execution of earthwork comprises four fundamental operations, viz., cutting, loading, hauling and filling. Except hauling, the costs of all the remaining three operations depend upon the character of the material. The haulage cost is a function of the weight of the material as well as the distance from the place of excavation to the place of fill. Since overhaul is an added cost and as it affects the economy of the project considerably, it is highly desirable to deal with the problem very carefully. This necessitates proper planning of movements of excavated soil of work site from cuts to fills so that the haul distance is minimum to reduce the cost of Earthwork. This may be accomplished graphically by means of a distribution diagram known as the Mass Diagram or Mass Curve or Mass-Haul Diagram. It is an important tool in Civil Engineering discipline used to compare the economy of various alternatives methods of Earthwork distributions on road or railway construction schemes to ultimately determine the most feasible option for Earthwork as far as economic viability and suitability is concerned to subsequently reduce the costs, labour, time and the complexity involved in the project. This paper aims at discussing the effectiveness and the suitability of Mass-Haul Diagrams in any operation of Earthwork involved in any Civil Engineering project thus undergoing a comprehensive discussion on its various aspects through suitable illustrations as and when required. At the end of this paper, the implications of Mass Diagrams using some popular computer softwares such as MS Excel and Autodesk CIVIL 3D has also been discussed, which considerably increases the efficiency of the project, that is otherwise lost in the preparation of the diagrams using the conventional methods involving manual plotting of graphs. KEYWORDS: Mass-Haul Diagram, Earthwork, Cut & Fill, Haulage, Formation Level, Cost Economy How to cite this paper: Koustav Dutta | Nilmay Mondal | Mrityunjay Malakar "Mass-Haul Diagrams in Optimization of Earthwork Computations" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456- 6470, Volume-4 | Issue-3, April 2020, pp.765-770, URL: www.ijtsrd.com/papers/ijtsrd30681.pdf Copyright © 2020 by author(s) and International Journal of Trend in Scientific Research and Development Journal. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0) (http://creativecommons.org/licenses/ by/4.0) INTRODUCTION Mass haul is defined as the volume of material multiplied by the distance it is moved during construction. A Mass- Haul Diagram consists of two objects: a mass haul line and a mass haul view. The mass haul lines represent the free haul and overhaul volumes in cut and fill conditions along an alignment. On the other hand the mass haul view is the grid on which the mass haul line is drawn. The middle axis of the mass haul view is known as the balance line. The location of the mass haul line relative to the balance line indicates material movement in the current design. When the mass haul line rises above the balance line, it indicates a region in which material is cut. When the mass haul line falls below the balance line, it indicates a region in which material is fill. There are two methods to compare free haul volume and overhaul volume: A. Grade Points Method Grade points are stations at which the proposed project design transitions from cut to fill occur. In a mass haul diagram, a grade point is the highest or lowest point in a mass haul region. Thus a grade point is the highest point in a mass haul region where the profile transitions from a cut condition to a fill condition takes place. It may also be the lowest point in a mass haul region where the profile transitions from a fill condition to a cut condition. In the grade points method of measuring free haul, a horizontal line that is the length of the specified free haul distance is drawn. The line is positioned so that it is both parallel to the balance line and touches the mass haul line. The volume that is enclosed in the area formed by this line and the mass haul line is free haul. B. Balance Points Method Balance points are the stations at which the net cut and fill volumes are equal. In a mass haul diagram, the balance points are located on the balance line, where the net volume is zero. In the balance points method of measuring IJTSRD30681
  • 2. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 766 free haul, the mass haul line is duplicated and shifted horizontally to the right (where the project transitions from cut to fill) or to the left (where the project transitions from fill to cut) by the free haul distance. Fig. 1: Grade Points Method: In the above image, the green areas are free haul volume, and the red areas are overhaul volume. The magenta circles and arrows indicate the grade points on the mass haul line and profile. The vertical magenta lines illustrate the relationship between the mass haul line and profile in the grade point balancing method. Fig. 2: Balance Points Method: In the above image, the green areas are free haul volume, and the red areas are overhaul. The arrows illustrate the free haul distance in cut and fill conditions. Some of the important associated terms are hereby discussed as follow: Haul Distance (d) is the distance from the working face of excavation to that where the material is deposited. Average Haul Distance (D) is the distance between the centre of gravity of cutting to that of filling, where the material is deposited. Haul is the sum of the products of each load by its haul distance = Σ v. d = V. D, where V is the total volume of excavation. Free Haul is the distance upto which no extra charge is required to be paid. Overhaul is the distance for which extra charge of haulage is to be paid. For example, the contractor may offer to haul material upto 150 m at Rs. 5 per m3 but thereafter charge at the rate of Rs. 0.50 per m3 per 100 m. The distance of 150 m is the Free Haul distance and is based on the economical hauling distance of the earth moving plant used by the contractor. It may range from 100 m for a bull dozer to 3000 m for self-propelled scrapers. The haul beyond the Free Haul distance is termed as Overhaul. Waste is the material excavated from cuts but not used for embankments. Borrow is the material needed for the formation of embankments, obtained not from excavation of construction works but from the borrow-pits. Limit of Economical Haul is the maximum overhaul distance plus the free haul distance. When this limit is reached it is more economical to waste and borrow material. To illustrate, supposing the free haul distance = 300 m, the overhaul is charged at the rate of Rs. 0.50 per m3 per 100 m and the borrowed material at the rate of Rs. 2 per m3. It is evident that, to overhaul 1 m3 over 400 m, it will cost Rs. 2 m3. Therefore the limit for economical haul = 300 m (free haul) + 400 m (overhaul) = 700 m Bulking and Shrinkage: Excavated material is loose and occupies 20% more volume than measured in situ. However when used and compacted in embankment, it shrinks and occupies less volume than when originally in situ. On the other hand excavated rock bulks by 30 to 40%. To allow for this change in volume a correction factor is generally applied to the cut and fills volumes. RESULTS AND DISCUSSIONS Mass-Haul Diagrams are plots of the cumulative volumes of cut and fill along an alignment. Typically, the Mass Diagram is plotted below a profile of the route, with the ordinate at any station representing the sum of the volumes of cut and fill upto that station. It is thus a diagram, usually regular, whose abscissa represent distances and ordinates the volume of Earthwork. The sign convention used for cuts is positive (+ve) and that for fills is negative (-ve). Thus, the total positive volumes are plotted above the distance base and the negative volumes below it. The ends of the ordinates are joined by a smooth curve. The resulting Mass Curve, therefore, consists of positive and negative peaks. Since the slope of the Mass Curve for Earthwork can be positive as well as negative, hence the concept can be used to gain economic advantages in Earthworks. By the combined use of the Mass-Haul Diagrams plotted directly below the longitudinal sections of the proposed centre line it is possible to find: 1. The distances over which cut and fill will balance. 2. Quantities of materials to be moved and the preferable direction of the movement.
  • 3. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 767 3. Areas where the earth may have to be taken from borrow-pits or waste material and the corresponding amounts involved. 4. The best policy to adopt to obtain the most economical use of the earth moving plant. Construction of Mass-Haul Diagram  Workout accumulated volume as the algebraic sum of volume of earthwork at each station/ chainage.  Draw a base line and mark the stations/ chainage points with suitable scale.  From every station/ chainage point, draw vertical line and mark it on a suitable scale for the volume of Earthwork.  On the ordinates of each station/ chainage point, mark the respective scaled cumulative heights. Thus, the height of an ordinate at any point on the base line represents the algebraic sum of volume of Earthwork upto that particular station/ chainage point.  Join all the points by a smooth curve and the curve thus obtained represents the Mass-Haul Diagram for the corresponding longitudinal profile of the land obtained before.  From the Mass Curve, workout quantities of Earthwork such as the earth to be taken away from the site or earth to be brought at the site.  Shift the base line above/ below to obtain the most economical condition of cut and fill. Characteristics of Mass-Haul Diagram  Upward slope of the curve indicates cuts/ excavations.  Downward slope of the curve indicates a fill.  The peak occurring at the end of an excavation is known as the maxima point.  The peak occurring at the end of an embankment is known as the minima point.  The vertical distance between a maxima point and the nest minima point represents the total volume of cutting.  The vertical distance between two points, on the curve, which have no maxima or minima points between them represents the volume of Earthwork between their chainages.  The algebraic difference between the ordinates at adjacent maxima and minima points represents the haulage between the two points.  A horizontal (base) line drawn to intercept the Mass Diagram cuts it in two points, between which the cut exactly balances the fill.  The length of the base line intercepted by a loop of the Mass Diagram represents the maximum haul distance in that section.  The area bounded by a loop of the mass diagram and the base line measures the haul in that section.  The haul is minimum when the base line is so selected that the sum of all the areas cut off by it, without regards to sign, is a minimum. Uses of Mass-Haul Diagram In using a mass diagram, the selection of the base line plays an important role in the economy of the project. Different base lines are assumed, each of which provides possible methods of distributing the excavated material. The one which gives the most economical scheme is selected and the overhaul and haulage is computed. Mass diagrams find its applications in the following activities:  Transportation The simplest application of the Mass-Haul Diagram is to calculate the average Transportation distance. For example, if the area under the loop of the Mass Curve is 20,00,000 m4, and the volume of earth transported is 8000 m3, then the average distance of each truck load is 2000000 8000 = 250 m If the truck carrying capacity is 5 m3, then the number of trucks journeys required is 8000 5 = 1600 If only one truck is used, it would have to travel = 1600 x 250 = 400 km each way. Such calculations will help the Site Engineer-In-Charge to take the decision on the type and the number of trucks (or any other suitable vehicle) to be used.  Design There is a close link between the Mass-Haul Diagram and the formation level of the ground. If several formation levels are tried and a Mass-Haul Diagram constructed for each, that formation, which gives the most economical result and maintains any stipulated standards, for example, gradient restrictions n vertical design curve, can be used.  Financing Once the formation level has been designed, the Mass-Haul Diagram can be used to indicate the most economical method of moving the earth round the project and a good estimate of the overall cost of the earth moving can be calculated.  Construction The required volumes of material are known before construction begins, enabling suitable plant and machinery to be chosen, sites for spoil heaps and borrow-pits to be located and the directions of the haul to be established.  Planning Ahead The Mass-Haul Diagram can be used to indicate the effect of some other engineering works, for example, tunnels and bridges, within the overall project will have on the earth moving. Such construction works upset the pattern of the Mass-Haul Diagram by restricting the directions of the haul but, since the volumes and hence the quantities of any waste and borrow will be known beforehand, hence suitable areas for spoil heaps and borrow-pits can be located in advance of construction work, enabling the work to proceed smoothly without any overlapping action Sources of Errors in Mass-Haul Diagram Some of the common sources of errors in a Mass Diagram are noted below:  Approximating the end areas.  Failing to apply prismoidal and curvature corrections in the computation of volume of Earthwork.  Computing the areas of cross-sections beyond the limit justified by the field data.  Computing the volumes beyond the nearest cubic metre.
  • 4. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 768 Common Mistakes in Mass-Haul Diagram Some of the typical mistakes often encountered in a Mass Diagram are noted below:  Errors in arithmetic and approximations assumed.  Using the prismoidal formula when end area volumes are sufficiently accurate.  Mixing cut and fill quantities  Failing to consider transition sections when passing from cut to fill, or from fill to cut. Table 1: Typical Calculation for the preparation of Mass-Haul Diagram using the predetermined data of the existing Ground Level and assumed Formation Level DISTANCE (m) VOLUME (𝐦 𝟑 ) CUMULATIVE VOLUME (𝐦 𝟑 ) CUT ( + ) FILL ( - ) 0 - - 0 4.572 - 1.981 -1.981 9.144 0.719 - -1.262 13.716 1.212 - -0.05 18.288 0.700 - +0.65 22.86 0.883 - +1.533 27.432 - 1.311 +0.222 32.004 - 2.379 -2.157 36.576 - 5.074 -7.231 Σ = +3.514 m3 Σ = -10.745 m3 -7.231 m3 Fig. 3: Mass-Haul Diagram drawn to its corresponding Longitudinal Profile of the existing Ground and an arbitrarily assumed Formation Level Mass Haul Diagram Using Computer Software Apart from the conventional methods of drawing a Mass- Haul Diagram by plotting graphs, several other computer softwares such as MS Excel, Autodesk CIVIL 3D have also their implications in the plotting of Mass Curves using several special in-built functions and commands. They are discussed and illustrated as follows: several special in-built functions and commands. They are discussed and illustrated as follows:
  • 5. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 769  Using MS Excel Mass-Haul Diagrams can easily be drawn in MS Excel by simply plotting the points (Chainage points on X-axis and Cumulative Volume on Y-axis) using the in-built Charts and Graphs available in it.  Using Autodesk CIVIL 3D Mass-Haul Diagrams can easily be drawn in CIVIL 3D software, created by Autodesk by simply making use of the in-built functions available in it. It can also be successfully implemented in balancing the Mass Haul Volumes by shifting the base line above/ below to determine the most economically feasible one. Fig. 4: Mass-Haul Diagram showing the general features of a Mass Curve. The portions of Cut, Fill, Waste, and Borrow have been indicated. Note that Cut and Waste are considered to be positive (+ve). On the other hand Fill and Borrow are considered to be negative (-ve) for all computations. Fig. 5: Mass-Haul Diagram by the manual plotting of graphs, which yields less accuracy in results due to the common errors/ mistakes as discussed. Fig. 6: Mass-Haul Diagram by the plotting of graphs in MS Excel, which yields better accuracy in results due to the less probability of common errors/ mistakes as discussed. Fig. 7: Mass-Haul Diagram plotted in Softree Optimal software which has nearly 0.01% error in plotting. Fig. 8: Mass-Haul Diagram plotted in Autodesk CIVIL 3D software which has nearly 0.001% error in plotting. Fig. 9: Balancing of Mass Haul Volumes above and below the base line, which will help to eliminate overhaul, if any, for cost economy using Autodesk CIVIL 3D SOFTWARE.
  • 6. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30681 | Volume – 4 | Issue – 3 | March-April 2020 Page 770 Fig. 10: Balancing the mass haul volumes in the third region by adding a dump site at station 11+50 in Autodesk CIVIL 3D CONCLUSION After the Mass-Haul Diagram has been plotted, an estimate of the total cost of the Earthwork is made as per the following equations: Haul = 𝐇𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐇𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞 𝟏𝟎𝟎 … [1] Free Haul = 𝐅𝐫𝐞𝐞 𝐇𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐅𝐫𝐞𝐞 𝐇𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞 𝟏𝟎𝟎 … [2] Overhaul = 𝐎𝐯𝐞𝐫𝐡𝐚𝐮𝐥 𝐕𝐨𝐥𝐮𝐦𝐞 𝐱 (𝐀𝐯𝐞𝐫𝐚𝐠𝐞 𝐎𝐯𝐞𝐫𝐡𝐚𝐮𝐥 𝐃𝐢𝐬𝐭𝐚𝐧𝐜𝐞− 𝐅𝐫𝐞𝐞𝐇𝐚𝐮𝐥 𝐝𝐢𝐬𝐭𝐚𝐧𝐜𝐞) 𝟏𝟎𝟎 … [3] Table 2: Calculation of Total Cost of Earthwork Total Cost of Earthwork Free Haul prices in Free Haul distance Free Haul volume x Free Haul distance x Free Haul prices Overhaul prices in Free Haul distance Overhaul volume x Free Haul distance x Free Haul prices Overhaul prices in Overhaul distance Overhaul volume x (Average Overhaul distance – Free Haul distance) x Overhaul prices Borrow prices Borrow volume x Borrow prices Waste Prices Waste volume x Waste prices Therefore, Total Cost of Earthwork = Free Haul prices in Free Haul distance + Overhaul prices in Free Haul distance + Overhaul prices in Overhaul distance + Borrow prices + Waste prices … [4] Thus the Earthwork computations are completed considering the cost economy of the project and ultimately the most viable alternative is chosen among the all the others for executing the process of Earthwork operations, namely, cutting, loading, hauling, and filling in the field so as to minimize the cost, effort, time, and other complications as much as possible. Therefore Mass-Haul Diagram or Mass Diagram or Mass Curve proves to be a very powerful tool as far as the economic viability of a project is concerned. Hence its proper implications will surely increase the efficiency of the execution of the works related to Earthworks in any project. References [1] Kanetkar, T. P. & Kulkarni, S. V., “Surveying & Levelling: Part 1”, Twenty Fourth Revised Edition, August 2015, Pune Vidyarthi Griha Prakashan, pp. 468-519 [2] Duggal, S. K., “Surveying: Volume 1”, Forth Edition, 2013, McGraw Hill Education (India) Private Limited, pp. 558-561 [3] “Balancing Mass Haul Volumes”, Exercise 2 in CIVIL 3D, Autodesk Knowledge Network