Automation in Construction –The Need of Mega Construction and Fast
Track Construction
Shrividya M. Nair1, Dr. (Mrs) Geetha K. Jayaraj2
1(PG student, Department of Civil Engineering, Shivajirao S.Jondhle College of Engineering &Technology)
2(Principal, Professor, Shivajirao S. Jondhle College of Engineering &Technology)
-----------------------------------------------------------------------***-----------------------------------------------------------------------
Abstract- Today most of the people desire to live in
megacities for having better lifestyle due to which the
population in megacities increases drastically. This leads to
the development of megacities and slum rehabilitation
projects. But the development of megacities by conventional
construction is a costly affair as the procurement of huge
quantity of materials, availability of labours, generation of
huge waste and moreover it is time consuming. Also some of
the conventional construction methods are harmful to the
environment as it involves lots of wastage of material and
lot of carbon dioxide emission into the environment. Today
Construction industry is facing so many problems such as
decreasing quality of work, skilled labour shortages, lack of
safety of labour and working conditions,etc. In short,
construction industry requires more number of skilled
workers, good quality of work, safety conditions for laborers
which help to enhance the overall productivity of
construction industry. To meet the above, Automation an
advanced technology has been developed and introduced.
The objective of Automation in construction is to have rapid
construction with less risk and good quality which increases
the productivity of construction project, reduces the time
duration , laborious work, increases the construction safety,
and increases quality of work etc. Automation is very
advanced technology in construction sector but the growth
of automation in construction sector is quite slow because
automation cannot construct large structures. Contour
Crafting (CC) technology has a great potential in automated
construction of whole structures as well as its sub-
components. Contour Crafting is an advanced building
printing technology. This is a recently invented technology
which is researched by Behrokh Khoshnevis.[5] In CC,
computer control is used to make the superior surface
forming capability of troweling to create smooth and
accurate, planar and free-form surfaces. Automated
reinforcement, plumbing, electrical wiring, painting etc. can
be done by using contour crafting (CC) technology. Today
CC technology is very much involved in emergency housing
and low cost housing. An attempt has been made in this
paper to discuss the developments of Automation and
Contour Crafting technology in Construction Sector as well
as a comparison between contour crafting and the
conventional methods.
Key Words: Automation, contour crafting
I. INTRODUCTION
Construction phase is one of the important aspects of civil
engineering. Success of construction project depends upon
when the project is completed with the lowest possible
cost, the highest quality, no accidents, etc. Construction
industry is labor-intensive and construction works
performed in dangerous or risky situations because of
many problems associated with labours like education,
skill, experience, human tendency, strike, etc Construction
industry is facing so many problems such as decreasing
quality of work, labour shortages, safety of labour and
working conditions of project. Basically construction
industry requires more number of skilled workers, good
quality of work which helps to increase the overall
productivity of industry. To overcome the problems
associated with construction industry new innovative
technology such as automation has the potential to improve
the quality of industry. Hence, the importance of
construction automation has grown rapidly. Automation is
defined as a self-regulating process performed by using
programmable machines to carry out series of tasks.
Introducing the use of machines to a production process is
called mechanization. Automation goes one step further
and the process is not only supported by machines but
these machines can work in accordance with a program
that regulates the behavior of the machine. [4] Automation
increases the productivity of the construction project,
reduces the duration and laborious work, and increases the
construction safety, increases the quality of work as
compared to unskilled workers.[1] Automation in
construction can be done in building construction which
includes uniform brick laying, plastering work, interior and
exterior walls, wall painting, tiling of floor and wall,
plumbing work, reinforcement, electric work, road
construction, ports and tunnels etc.
II. OBJECTIVE
The objective of Automation in construction is rapid
construction with less risk and good quality which
increases the productivity of construction project, reduces
the duration &laborious work , increases the construction
safety, and increases quality of work.
INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056
VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2318
III. SCOPE
The scope of automation in construction is broad,
encompassing all the stages of construction life from initial
planning and design, through construction of the facility, its
operation and maintenance, prefabrication of construction
components, on site construction, to the eventual
dismantling and recycling of buildings and engineering
structures.
IV. ADVANTAGES
Automation and robotics in construction work execution
has various advantages that could help the implementation
of these systems. Among the most meaningful advantages
belong:
A. Less dependency on direct labour –
Fewer problems related to quality and the repetitiveness
of work carried out, as well as costs may be reduced by
reducing labour, whereas less operators are needed for the
automated system
B. Productivity increase –
Besides the speed of production increasing the productivity
is improved by disengaging the operation of the limitations
of the human factor.
Occupational safety increase –
The automated systems may carry out their work in
dangerous zones for humans, this makes it possible to
reduce labour injuries.
C. Quality increase –
Operations with automated systems are typically carried
out with less variability than human workers.
D. Greater control over the productive process –
Problems may be detected in an easier was as each stage of
the process is controlled in order to verify the correct
functioning of the system and the result of each one.
E. Greater control over the final result of the process –
The final result may be controlled in a more efficient way
by controlling the result of each step of the aforementioned
process.
V. DISADVANTAGES
Automation in construction work execution has various
disadvantages –
A. High Cost
Expensive technology is the greater obstacles to
implementation of automation in construction. Cost would
be a major factor in deciding on whether take or not to take
on a technology. Cost consideration should include not only
the purchasing cost, but also the maintaining the
automation technologies and see that it can improve overall
efficiency and productivity.
B. Limited Resource Available to Small and Medium Size
Firms
For small and medium size firms the resource should be
available for using automation technology. The funding of
small and medium size firm is sufficient to purchase the
automation technology according to their turnover. The
small and medium size firms are unable to purchase new
technologies because of fund available is very less as
compared to big firms. Small and medium size firms have
not enough skilled labor which can handle automation
techniques.
C. Automation Technologies are Expensive to Update and
Maintain
As discuss earlier, that the cost of implementing
automation techniques are high. These techniques are so
expensive to update and maintain the progress of
automation techniques. There maintenance cost is also high
so that nobody wants to invest in such expensive
technologies, especially the smaller companies. The main
obstacle in implementing automation technologies is
mostly on-site construction work.
D. Automation Technologies are Unavailable Locally or
Difficult to Acquire
Automation would suit repetitive works where standard
components or layouts are used, may be pre-cast
components or pre-fabricated housing, siphorex blocks etc,
but these are only application within certain areas.
Implementation of automation may be a problem if the
technology is not readily available commercially or is
difficult to acquire because of some restrictions or other.
INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056
VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2319
VI. AUTOMATED CONSTRUCTION BY CONTOUR
CRAFTING
Automation is very advanced technology in manufacturing
sector but the growth of automation in construction sector
has been quite slow. The rate of growth in construction
automation is slow because conventional methods of
manufacturing automation cannot construct large
structure. Contour Crafting has a great potential in
automated construction of whole structures as well as its
sub-components. Contour Crafting (CC) is an advanced
building printing technology. Contour Crafting (CC)
technology is researched by Behrokh Khoshnevis. Contour
Crafting (CC) technology uses a computer controlled crane
to build homes quickly and efficiently with less manual
labour. Contour Crafting is an emerging technology that
uses robotics to construct free form building structures. By
using Contour Crafting (CC) technology a single house or a
colony of houses with different design and shape can be
automatically constructed in a single run.[3]
VII. COMPARISON BETWEEN CONVENTIONAL
CONSTRUCTION METHOD AND CONTOUR CRAFTING
METHOD
Contour Crafting method differs from conventional
construction method with respect to speed of construction,
cost of construction, architectural flexibility, safety of
construction & sustainable to environment are explained
below:
TABLE VII. I COMPARISON BETWEEN CONVENTIONAL CONSTRUCTION METHOD AND CONTOUR CRAFTING METHOD
Particulars Conventional Construction Method Contour Crafting Method
Speed of Construction Conventional building method requires at least
about a month construction of a single house
unit excluding painting work
Contour crafting technique boasts of
completing a multiple units within 24
hours
Cost of Construction In the conventional method, there is a high cost
of production because of the quantity of
materials, labor, waste, and time. In addition,
sometimes it becomes even higher due to the
complexity of projects.
Contour Crafting can
decrease about four times of the
construction cost because of its
simplicity, materials saving and short
time productivity
Architectural Flexibility Construction of irregular and dome shaped
structures will difficult to construct
Irregular and dome shaped
structures will also be able to be
constructed with ease
Safety Conventional construction is risky in labour
point of view.
With Contour Crafting, work injuries
and fatalities are reduced to zero
because of the very safe method of
construction.
Sustainability This method is very harmful to the environment.
This is because the process involved in
construction of any structure by conventional
methods involves lot of wastage of materials as
well as emission of lot of Carbon Dioxide into
the environment.
Due to its accuracy, Contour Crafting
technology provides construction
without waste, being considered as
environmental friendly and a
sustainable process
INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056
VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2320
VIII..APPLICATIONS OF CONTOUR CRAFTING
TECHNOLOGY [2]
i) Contour crafting technology provides flexibility while
designing structures.
ii) Different types of materials for outside surfaces and as
fillers between surfaces may be used in Contour Crafting.
iii) Contour Crafting (CC) technology can create shapes
with smooth outer surfaces and reinforced internal
structure automatically and in single setup.
iv)Automated Reinforcement, automated painting,
automated plumbing, automated electrical wiring can be
possible by Contour Crafting technology.
v) Contour Crafting can significantly reduce the cost of
commercial construction.
vi) Contour Crafting technology has the potential to build
safe, reliable, and affordable lunar and Martian structures,
habitats, laboratories, and other facilities before the arrival
of human beings.
vii) Contour Crafting can build dignified houses or colony of
houses with all the utilities for electrical and plumbing in
less than 24 hours (per house).
viii) Contour Crafting technology can deliver strong
dignified houses to disaster victims very rapidly.
IX. CASE STUDY ON AUTOMATED CONSTRUCTION BY
CONTOUR CRAFTING[3]
In China, a company named WinSun Decoration Design
Engineering has built ten 3D printed houses entirely out of
recycled materials in less than 24 hours. The printer used
for this purpose was assembled by importing its parts from
overseas. It measures 32 meters long by 10 meters wide
and is 6.6 meters in height. The printer is capable of
printing houses having a plan area of about 200sq.m. The
materials used for construction included a mixture of
industrial wastes and other inexpensive materials.
The construction task was fully automated and there was
no requirement of labour at all. The approximate cost for
construction of each unit was under 5000 USD, which is
quite an achievement for a relatively new construction
process.
X. INDIAN SCENARIO OF CONTOUR CRAFTING
India is one of the fast developing nations of the world
which is facing an acute shortage of space due to major
population migrating towards the big cities in search for
jobs and better living. As a result of this various
redevelopment projects are being undertaken in the mega
cities. But with the use of conventional techniques the rate
of construction is very slow to match the demand for space
and moreover the harm to the environment due to these
construction practices is very alarming. Also the rate of
construction is bound by the economy as the cost involved
in the redevelopment and city expansion projects is huge.
But with the advent of contour crafting.
XI. CURRENT DEVELOPMENTS OF CONTOUR CRAFTING
WORLDWIDE
a) A New York City Architect/Contractor Adam Kushner
has begun the construction of the first ever 3D printed
estate which will feature a 2400 Sq.ft. home, with 4
bedrooms and a swimming pool. The rebar’s to be used in
the constructed will also be automatically placed using the
3D printer itself.
b) The Chinese have built another gigantic 3D Printer
which will be used to print a replica of the
world famous ‘Temple Of Heaven’ which is located in
central Beijing. The replica will be 7 meters in diameter and
8 meters high, and is expected to take around 6 months to
complete.
c) In USA, NASA is sponsoring a project in co-ordination
with University Of Southern California headed by Dr.
Behrokh Khoshnevis himself. The project is based on
building bots similar to the 3D printers used in Contour
Crafting which would be used to construct roads, landing
pads, hangars for landing, radiation proof walls etc. on the
lunar surface.
XII. CONCLUSION
Automation is very advanced technology in manufacturing
sector but the growth of automation in construction sector
has been quite slow. Contour Crafting is a new approach to
solving problems facing the construction industry,
particularly at the automation and process level. Contour
Crafting has a great potential in automated construction of
whole structures as well as its sub-components. Contour
Crafting(CC) is an advanced building printing technology. In
building construction, operations like design, plumbing,
reinforcement, electrical systems, painting has been
possible by using CC technology. Contour Crafting
technology has a great advantage of building houses in few
hours, without wasting any material. As workers and
materials used in CC technology are less it’s cost can be
much lower than conventional method. This has been
environmental friendly technology as it does not pollute or
cause any bad effect to our environment. However, even
with all its benefits, Contour Crafting has some challenges
to overcome. First, CC developers should study how this
technology would be managed at a construction site.
Second, it is necessary to see how people would react to
this transition between conventional method of
construction (many workers, wasting and fatalities) and
INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056
VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2321
the automated construction method (less workers, wasting
and more safety). Lack of job opportunities has been
important issue of this CC technology. Finally, the great
challenge is to overcome the current cost barrier of this
technology.
XIII.REFERENCES
[1] Akash S. Tambi et.al (May- Jun. 2014),” Obstacles in
Implementing Automation in Indian Infrastructure
Projects” IOSR Journal of Mechanical and Civil Engineering
(IOSR-JMCE) e-ISSN: 2278-1684, p-ISSN: 2320-334X,
Volume 11, Issue 3 Ver. III (May- Jun. 2014), PP 42-44.
[2]Behrokh Khoshnevis (2004),”Automated construction
by contour crafting-Related Robotics and Technologies”,
Science direct Automation in construction, Vol.13, pp 5-19.
[3]Nohil B. Thakur(2016)” Contour Crafting a potential
revolution in the construction industry” International
Journal of Research in Advent Technology (E-ISSN: 2321-
9637),Special Issue National Conference “VishwaCon'16”,
19 March 2016,pp 22-26
[4]Paresh S Mistri1, Hiren. A. Rathod2,” Remedies over
barriers of automation and robotics for construction
industry” International Journal of Advanced Research In
Engineering, Science &Management (IJARESM), ISSN :
2394-1766, pp 1-4.
[5] Piyush Sharma (June 2015), “Automated construction
by Contour Crafting” Journal of The International
Association of Advanced Technology and Science, ISSN-
3347-4482,volume 16,pp no.

More Related Content

What's hot

Importance of Teaching Automation
Importance of Teaching AutomationImportance of Teaching Automation
Importance of Teaching Automation
Pramod Raichurkar
 

What's hot (19)

IRJET- Construction Planning and management of Airport
IRJET-  	  Construction Planning and management of AirportIRJET-  	  Construction Planning and management of Airport
IRJET- Construction Planning and management of Airport
 
Bim & supply chain
Bim & supply chainBim & supply chain
Bim & supply chain
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET- Time Optimization of Precast Planning using BIM Software
IRJET- Time Optimization of Precast Planning using BIM SoftwareIRJET- Time Optimization of Precast Planning using BIM Software
IRJET- Time Optimization of Precast Planning using BIM Software
 
IRJET- Structural Auditing of RCC Building
IRJET- Structural Auditing of RCC BuildingIRJET- Structural Auditing of RCC Building
IRJET- Structural Auditing of RCC Building
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
Importance of Teaching Automation
Importance of Teaching AutomationImportance of Teaching Automation
Importance of Teaching Automation
 
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
 
H0341034041
H0341034041H0341034041
H0341034041
 
Mechanical engineers and society
Mechanical engineers and societyMechanical engineers and society
Mechanical engineers and society
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
IRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From Height
 
“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...
 
Exploring the adoption of building information
Exploring the adoption of building informationExploring the adoption of building information
Exploring the adoption of building information
 
Advanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenyaAdvanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenya
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...
 
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
PRESENT APPLICATION OFRESOURCE MANAGEMENT IN PREFABRICATED AND IN-SITU CONSTR...
 

Similar to IRJET-Automation in Construction –The Need of Mega Construction and Fast Track Construction

Similar to IRJET-Automation in Construction –The Need of Mega Construction and Fast Track Construction (20)

IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...
 
IRJET- Contour Crafting (A Management Tool for Swift Construction)
IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)
IRJET- Contour Crafting (A Management Tool for Swift Construction)
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
 
A Review of 5G and its use Cases.docx
A Review of 5G and its use Cases.docxA Review of 5G and its use Cases.docx
A Review of 5G and its use Cases.docx
 
Automation in civil engineering , TECH
Automation in civil engineering , TECHAutomation in civil engineering , TECH
Automation in civil engineering , TECH
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 
Plc and scada report
Plc and scada reportPlc and scada report
Plc and scada report
 
IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...
IRJET- A Study and Analysis of Construction Equipment Management used in ...
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
Robo Paver 1
Robo Paver 1Robo Paver 1
Robo Paver 1
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
IRJET- Effect of ICT Application in Manufacturing Industry
IRJET- Effect of ICT Application in Manufacturing IndustryIRJET- Effect of ICT Application in Manufacturing Industry
IRJET- Effect of ICT Application in Manufacturing Industry
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station Construction
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Recently uploaded (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

IRJET-Automation in Construction –The Need of Mega Construction and Fast Track Construction

  • 1. INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056 VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2317 Automation in Construction –The Need of Mega Construction and Fast Track Construction Shrividya M. Nair1, Dr. (Mrs) Geetha K. Jayaraj2 1(PG student, Department of Civil Engineering, Shivajirao S.Jondhle College of Engineering &Technology) 2(Principal, Professor, Shivajirao S. Jondhle College of Engineering &Technology) -----------------------------------------------------------------------***----------------------------------------------------------------------- Abstract- Today most of the people desire to live in megacities for having better lifestyle due to which the population in megacities increases drastically. This leads to the development of megacities and slum rehabilitation projects. But the development of megacities by conventional construction is a costly affair as the procurement of huge quantity of materials, availability of labours, generation of huge waste and moreover it is time consuming. Also some of the conventional construction methods are harmful to the environment as it involves lots of wastage of material and lot of carbon dioxide emission into the environment. Today Construction industry is facing so many problems such as decreasing quality of work, skilled labour shortages, lack of safety of labour and working conditions,etc. In short, construction industry requires more number of skilled workers, good quality of work, safety conditions for laborers which help to enhance the overall productivity of construction industry. To meet the above, Automation an advanced technology has been developed and introduced. The objective of Automation in construction is to have rapid construction with less risk and good quality which increases the productivity of construction project, reduces the time duration , laborious work, increases the construction safety, and increases quality of work etc. Automation is very advanced technology in construction sector but the growth of automation in construction sector is quite slow because automation cannot construct large structures. Contour Crafting (CC) technology has a great potential in automated construction of whole structures as well as its sub- components. Contour Crafting is an advanced building printing technology. This is a recently invented technology which is researched by Behrokh Khoshnevis.[5] In CC, computer control is used to make the superior surface forming capability of troweling to create smooth and accurate, planar and free-form surfaces. Automated reinforcement, plumbing, electrical wiring, painting etc. can be done by using contour crafting (CC) technology. Today CC technology is very much involved in emergency housing and low cost housing. An attempt has been made in this paper to discuss the developments of Automation and Contour Crafting technology in Construction Sector as well as a comparison between contour crafting and the conventional methods. Key Words: Automation, contour crafting I. INTRODUCTION Construction phase is one of the important aspects of civil engineering. Success of construction project depends upon when the project is completed with the lowest possible cost, the highest quality, no accidents, etc. Construction industry is labor-intensive and construction works performed in dangerous or risky situations because of many problems associated with labours like education, skill, experience, human tendency, strike, etc Construction industry is facing so many problems such as decreasing quality of work, labour shortages, safety of labour and working conditions of project. Basically construction industry requires more number of skilled workers, good quality of work which helps to increase the overall productivity of industry. To overcome the problems associated with construction industry new innovative technology such as automation has the potential to improve the quality of industry. Hence, the importance of construction automation has grown rapidly. Automation is defined as a self-regulating process performed by using programmable machines to carry out series of tasks. Introducing the use of machines to a production process is called mechanization. Automation goes one step further and the process is not only supported by machines but these machines can work in accordance with a program that regulates the behavior of the machine. [4] Automation increases the productivity of the construction project, reduces the duration and laborious work, and increases the construction safety, increases the quality of work as compared to unskilled workers.[1] Automation in construction can be done in building construction which includes uniform brick laying, plastering work, interior and exterior walls, wall painting, tiling of floor and wall, plumbing work, reinforcement, electric work, road construction, ports and tunnels etc. II. OBJECTIVE The objective of Automation in construction is rapid construction with less risk and good quality which increases the productivity of construction project, reduces the duration &laborious work , increases the construction safety, and increases quality of work.
  • 2. INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056 VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2318 III. SCOPE The scope of automation in construction is broad, encompassing all the stages of construction life from initial planning and design, through construction of the facility, its operation and maintenance, prefabrication of construction components, on site construction, to the eventual dismantling and recycling of buildings and engineering structures. IV. ADVANTAGES Automation and robotics in construction work execution has various advantages that could help the implementation of these systems. Among the most meaningful advantages belong: A. Less dependency on direct labour – Fewer problems related to quality and the repetitiveness of work carried out, as well as costs may be reduced by reducing labour, whereas less operators are needed for the automated system B. Productivity increase – Besides the speed of production increasing the productivity is improved by disengaging the operation of the limitations of the human factor. Occupational safety increase – The automated systems may carry out their work in dangerous zones for humans, this makes it possible to reduce labour injuries. C. Quality increase – Operations with automated systems are typically carried out with less variability than human workers. D. Greater control over the productive process – Problems may be detected in an easier was as each stage of the process is controlled in order to verify the correct functioning of the system and the result of each one. E. Greater control over the final result of the process – The final result may be controlled in a more efficient way by controlling the result of each step of the aforementioned process. V. DISADVANTAGES Automation in construction work execution has various disadvantages – A. High Cost Expensive technology is the greater obstacles to implementation of automation in construction. Cost would be a major factor in deciding on whether take or not to take on a technology. Cost consideration should include not only the purchasing cost, but also the maintaining the automation technologies and see that it can improve overall efficiency and productivity. B. Limited Resource Available to Small and Medium Size Firms For small and medium size firms the resource should be available for using automation technology. The funding of small and medium size firm is sufficient to purchase the automation technology according to their turnover. The small and medium size firms are unable to purchase new technologies because of fund available is very less as compared to big firms. Small and medium size firms have not enough skilled labor which can handle automation techniques. C. Automation Technologies are Expensive to Update and Maintain As discuss earlier, that the cost of implementing automation techniques are high. These techniques are so expensive to update and maintain the progress of automation techniques. There maintenance cost is also high so that nobody wants to invest in such expensive technologies, especially the smaller companies. The main obstacle in implementing automation technologies is mostly on-site construction work. D. Automation Technologies are Unavailable Locally or Difficult to Acquire Automation would suit repetitive works where standard components or layouts are used, may be pre-cast components or pre-fabricated housing, siphorex blocks etc, but these are only application within certain areas. Implementation of automation may be a problem if the technology is not readily available commercially or is difficult to acquire because of some restrictions or other.
  • 3. INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056 VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2319 VI. AUTOMATED CONSTRUCTION BY CONTOUR CRAFTING Automation is very advanced technology in manufacturing sector but the growth of automation in construction sector has been quite slow. The rate of growth in construction automation is slow because conventional methods of manufacturing automation cannot construct large structure. Contour Crafting has a great potential in automated construction of whole structures as well as its sub-components. Contour Crafting (CC) is an advanced building printing technology. Contour Crafting (CC) technology is researched by Behrokh Khoshnevis. Contour Crafting (CC) technology uses a computer controlled crane to build homes quickly and efficiently with less manual labour. Contour Crafting is an emerging technology that uses robotics to construct free form building structures. By using Contour Crafting (CC) technology a single house or a colony of houses with different design and shape can be automatically constructed in a single run.[3] VII. COMPARISON BETWEEN CONVENTIONAL CONSTRUCTION METHOD AND CONTOUR CRAFTING METHOD Contour Crafting method differs from conventional construction method with respect to speed of construction, cost of construction, architectural flexibility, safety of construction & sustainable to environment are explained below: TABLE VII. I COMPARISON BETWEEN CONVENTIONAL CONSTRUCTION METHOD AND CONTOUR CRAFTING METHOD Particulars Conventional Construction Method Contour Crafting Method Speed of Construction Conventional building method requires at least about a month construction of a single house unit excluding painting work Contour crafting technique boasts of completing a multiple units within 24 hours Cost of Construction In the conventional method, there is a high cost of production because of the quantity of materials, labor, waste, and time. In addition, sometimes it becomes even higher due to the complexity of projects. Contour Crafting can decrease about four times of the construction cost because of its simplicity, materials saving and short time productivity Architectural Flexibility Construction of irregular and dome shaped structures will difficult to construct Irregular and dome shaped structures will also be able to be constructed with ease Safety Conventional construction is risky in labour point of view. With Contour Crafting, work injuries and fatalities are reduced to zero because of the very safe method of construction. Sustainability This method is very harmful to the environment. This is because the process involved in construction of any structure by conventional methods involves lot of wastage of materials as well as emission of lot of Carbon Dioxide into the environment. Due to its accuracy, Contour Crafting technology provides construction without waste, being considered as environmental friendly and a sustainable process
  • 4. INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056 VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2320 VIII..APPLICATIONS OF CONTOUR CRAFTING TECHNOLOGY [2] i) Contour crafting technology provides flexibility while designing structures. ii) Different types of materials for outside surfaces and as fillers between surfaces may be used in Contour Crafting. iii) Contour Crafting (CC) technology can create shapes with smooth outer surfaces and reinforced internal structure automatically and in single setup. iv)Automated Reinforcement, automated painting, automated plumbing, automated electrical wiring can be possible by Contour Crafting technology. v) Contour Crafting can significantly reduce the cost of commercial construction. vi) Contour Crafting technology has the potential to build safe, reliable, and affordable lunar and Martian structures, habitats, laboratories, and other facilities before the arrival of human beings. vii) Contour Crafting can build dignified houses or colony of houses with all the utilities for electrical and plumbing in less than 24 hours (per house). viii) Contour Crafting technology can deliver strong dignified houses to disaster victims very rapidly. IX. CASE STUDY ON AUTOMATED CONSTRUCTION BY CONTOUR CRAFTING[3] In China, a company named WinSun Decoration Design Engineering has built ten 3D printed houses entirely out of recycled materials in less than 24 hours. The printer used for this purpose was assembled by importing its parts from overseas. It measures 32 meters long by 10 meters wide and is 6.6 meters in height. The printer is capable of printing houses having a plan area of about 200sq.m. The materials used for construction included a mixture of industrial wastes and other inexpensive materials. The construction task was fully automated and there was no requirement of labour at all. The approximate cost for construction of each unit was under 5000 USD, which is quite an achievement for a relatively new construction process. X. INDIAN SCENARIO OF CONTOUR CRAFTING India is one of the fast developing nations of the world which is facing an acute shortage of space due to major population migrating towards the big cities in search for jobs and better living. As a result of this various redevelopment projects are being undertaken in the mega cities. But with the use of conventional techniques the rate of construction is very slow to match the demand for space and moreover the harm to the environment due to these construction practices is very alarming. Also the rate of construction is bound by the economy as the cost involved in the redevelopment and city expansion projects is huge. But with the advent of contour crafting. XI. CURRENT DEVELOPMENTS OF CONTOUR CRAFTING WORLDWIDE a) A New York City Architect/Contractor Adam Kushner has begun the construction of the first ever 3D printed estate which will feature a 2400 Sq.ft. home, with 4 bedrooms and a swimming pool. The rebar’s to be used in the constructed will also be automatically placed using the 3D printer itself. b) The Chinese have built another gigantic 3D Printer which will be used to print a replica of the world famous ‘Temple Of Heaven’ which is located in central Beijing. The replica will be 7 meters in diameter and 8 meters high, and is expected to take around 6 months to complete. c) In USA, NASA is sponsoring a project in co-ordination with University Of Southern California headed by Dr. Behrokh Khoshnevis himself. The project is based on building bots similar to the 3D printers used in Contour Crafting which would be used to construct roads, landing pads, hangars for landing, radiation proof walls etc. on the lunar surface. XII. CONCLUSION Automation is very advanced technology in manufacturing sector but the growth of automation in construction sector has been quite slow. Contour Crafting is a new approach to solving problems facing the construction industry, particularly at the automation and process level. Contour Crafting has a great potential in automated construction of whole structures as well as its sub-components. Contour Crafting(CC) is an advanced building printing technology. In building construction, operations like design, plumbing, reinforcement, electrical systems, painting has been possible by using CC technology. Contour Crafting technology has a great advantage of building houses in few hours, without wasting any material. As workers and materials used in CC technology are less it’s cost can be much lower than conventional method. This has been environmental friendly technology as it does not pollute or cause any bad effect to our environment. However, even with all its benefits, Contour Crafting has some challenges to overcome. First, CC developers should study how this technology would be managed at a construction site. Second, it is necessary to see how people would react to this transition between conventional method of construction (many workers, wasting and fatalities) and
  • 5. INTERNATIONAL RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY (IRJET) E-ISSN: 2395-0056 VOLUME: 06 ISSUE: 02 | FEB 2019 WWW.IRJET.NET P-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2321 the automated construction method (less workers, wasting and more safety). Lack of job opportunities has been important issue of this CC technology. Finally, the great challenge is to overcome the current cost barrier of this technology. XIII.REFERENCES [1] Akash S. Tambi et.al (May- Jun. 2014),” Obstacles in Implementing Automation in Indian Infrastructure Projects” IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684, p-ISSN: 2320-334X, Volume 11, Issue 3 Ver. III (May- Jun. 2014), PP 42-44. [2]Behrokh Khoshnevis (2004),”Automated construction by contour crafting-Related Robotics and Technologies”, Science direct Automation in construction, Vol.13, pp 5-19. [3]Nohil B. Thakur(2016)” Contour Crafting a potential revolution in the construction industry” International Journal of Research in Advent Technology (E-ISSN: 2321- 9637),Special Issue National Conference “VishwaCon'16”, 19 March 2016,pp 22-26 [4]Paresh S Mistri1, Hiren. A. Rathod2,” Remedies over barriers of automation and robotics for construction industry” International Journal of Advanced Research In Engineering, Science &Management (IJARESM), ISSN : 2394-1766, pp 1-4. [5] Piyush Sharma (June 2015), “Automated construction by Contour Crafting” Journal of The International Association of Advanced Technology and Science, ISSN- 3347-4482,volume 16,pp no.