Productivity Improvement Plan
            Year 2007, Q3


  Prepared: Jansen Cheng (Manufacturing
          Engineering Manager)
Review: P.C. Yeung ( Sr. Operation Manager )
Content–manpower reduction
● 1. Production line change to Stand up operation
● 2. Step up stencil
● 3. Recycle solder bar
● 4. FFC cable hand soldering
● 5. Component Preform automation
● 6. Outsource reduction
● 7. Electricity expense
Content
● 8. Standard time improvement
● 9. Inspection headcount
● 10. Floor space allocated

 ● Attached files : Details of this
   presentation please ref to the attached
   file:
manpower reduction 20070413.xls
Production line change to Stand up
Operators are stand up to work,
efficiency is increased by 5.7 % and up
to 20% in some case.
Floor space is increased by reclamation.




             Preform lines
Production line change to Stand up
Already implemented in Manual insertion,
WS and packaging lines, and most of the
Preform lines.




   Manual insertion       WS to packaging
Production line change to Stand up

● Nine of fourteen lines will change to
  Stand up operation before Jun.2007.

● Totally reduce 40 operators

● Responsible : M.E. Dept.
Step up stencil
Use "Step up stencil" to add extra
glue to the IC location. The “hand-
add-glue” operator is saved.

                                            通过开设向
                                            上孔洞,
                                            可以增加选
                                            定元件
                                            的 red glue
                                            用量。




 Before change        New Step up stencil
Step up stencil
 ● Affected 14 lines by reduce one
   operator per SMT line.
 ● Totally reduce 28 operators.
   Complete before May.31.
 ● Responsible : M.E. Dept.
Recycle solder bar
● Using Recycle machine to
  regenerate solder bar

● Saving is 7 % of monthly solder
  consumption

 ● Countermeasure to rising price of
SAC305 solder
Recycle solder bar - RoHS
Compliance Test
● The sample will also be subjected to
  RoHS compliance testing using XRF
  analyzer in our QRS Lab.

● Responsible : QA
FFC cable hand soldering
● Replace hand soldering process by
  Heat seal machine to solder FFC.
● Total reduce 22 operators.
● Complete date: Jul.2007
● Responsible: M.E. dept.




 Heat seal machine
Component Preform automation
● Hand cutting lead change to
  machine cutting.

● Two operators is saved. Affected 6
  lines.

● Responsible: PIE dept.
Outsource reduction
 ● Add new Auto-insertion line in
Production and reduce outsource
equivalent line equals to 2 lines.

● Complete by: Apr.07
● Responsible: M.E. dept.
Electricity expense
● Use city electricity to replace power
  generator in-house. The electricity
  cost is reduced.

● Responsible: PTE dept
Standard time improvement
● Work with CEE to improve std time.

● Continuous improvement by regular
  review of std time.

● Responsile: CEE, M.E.dept. and
  Production
Attached file
● manpower reduction 20070413
  (rev1).xls, this file is delibrately
  deleted to protect intellectual
  privacy.
● The content of this presentation file
  is not allowed to reproduce without
  permission of the author.

More Related Content

Similar to Ems Productivity Improvement Apr 07

Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Iijfjohnson6
 
Board report August 07
Board report August 07Board report August 07
Board report August 07Robert Tilley
 
2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_BangaloreDeepak Parackal
 
Re Use Plug Core Pin - Maintenance Dies
Re Use Plug Core Pin - Maintenance DiesRe Use Plug Core Pin - Maintenance Dies
Re Use Plug Core Pin - Maintenance DiesFaizal Amri
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
Presntation (MNIT).pptx
Presntation (MNIT).pptxPresntation (MNIT).pptx
Presntation (MNIT).pptxrajtashee725
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plantAmit Kumar
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Shaun West
 
John dermody intro
John dermody introJohn dermody intro
John dermody introJohn Dermody
 
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+IRJET Journal
 
Curriculum vitae meganathan n e-16302
Curriculum vitae  meganathan n  e-16302Curriculum vitae  meganathan n  e-16302
Curriculum vitae meganathan n e-16302MeganathanNagaraj
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
Eng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingEng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingKurt Holobaugh
 
Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar ResumeBharath Kumar
 
Greenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final OutlineGreenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final Outlineguest098cf2fe
 
Rohini Patil Profile
Rohini Patil ProfileRohini Patil Profile
Rohini Patil ProfileRohini PATIL
 

Similar to Ems Productivity Improvement Apr 07 (20)

Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
 
Board report August 07
Board report August 07Board report August 07
Board report August 07
 
2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore2012W32_Toolsharing_Bangalore
2012W32_Toolsharing_Bangalore
 
Re Use Plug Core Pin - Maintenance Dies
Re Use Plug Core Pin - Maintenance DiesRe Use Plug Core Pin - Maintenance Dies
Re Use Plug Core Pin - Maintenance Dies
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Presntation (MNIT).pptx
Presntation (MNIT).pptxPresntation (MNIT).pptx
Presntation (MNIT).pptx
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
John dermody intro
John dermody introJohn dermody intro
John dermody intro
 
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+
IRJET- CFD Analysis of 4 Cylinder Intake Manifold using STAR CCM+
 
Curriculum vitae meganathan n e-16302
Curriculum vitae  meganathan n  e-16302Curriculum vitae  meganathan n  e-16302
Curriculum vitae meganathan n e-16302
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
Eng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingEng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops Meeting
 
Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar Resume
 
Nodal analysis
Nodal analysisNodal analysis
Nodal analysis
 
Six Sigma Final Outline
Six Sigma Final OutlineSix Sigma Final Outline
Six Sigma Final Outline
 
Greenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final OutlineGreenbelt Six Sigma Final Outline
Greenbelt Six Sigma Final Outline
 
Rohini Patil Profile
Rohini Patil ProfileRohini Patil Profile
Rohini Patil Profile
 
Resume-Manas-May-16
Resume-Manas-May-16Resume-Manas-May-16
Resume-Manas-May-16
 

Ems Productivity Improvement Apr 07

  • 1. Productivity Improvement Plan Year 2007, Q3 Prepared: Jansen Cheng (Manufacturing Engineering Manager) Review: P.C. Yeung ( Sr. Operation Manager )
  • 2. Content–manpower reduction ● 1. Production line change to Stand up operation ● 2. Step up stencil ● 3. Recycle solder bar ● 4. FFC cable hand soldering ● 5. Component Preform automation ● 6. Outsource reduction ● 7. Electricity expense
  • 3. Content ● 8. Standard time improvement ● 9. Inspection headcount ● 10. Floor space allocated ● Attached files : Details of this presentation please ref to the attached file: manpower reduction 20070413.xls
  • 4. Production line change to Stand up Operators are stand up to work, efficiency is increased by 5.7 % and up to 20% in some case. Floor space is increased by reclamation. Preform lines
  • 5. Production line change to Stand up Already implemented in Manual insertion, WS and packaging lines, and most of the Preform lines. Manual insertion WS to packaging
  • 6. Production line change to Stand up ● Nine of fourteen lines will change to Stand up operation before Jun.2007. ● Totally reduce 40 operators ● Responsible : M.E. Dept.
  • 7. Step up stencil Use "Step up stencil" to add extra glue to the IC location. The “hand- add-glue” operator is saved. 通过开设向 上孔洞, 可以增加选 定元件 的 red glue 用量。 Before change New Step up stencil
  • 8. Step up stencil ● Affected 14 lines by reduce one operator per SMT line. ● Totally reduce 28 operators. Complete before May.31. ● Responsible : M.E. Dept.
  • 9. Recycle solder bar ● Using Recycle machine to regenerate solder bar ● Saving is 7 % of monthly solder consumption ● Countermeasure to rising price of SAC305 solder
  • 10. Recycle solder bar - RoHS Compliance Test ● The sample will also be subjected to RoHS compliance testing using XRF analyzer in our QRS Lab. ● Responsible : QA
  • 11. FFC cable hand soldering ● Replace hand soldering process by Heat seal machine to solder FFC. ● Total reduce 22 operators. ● Complete date: Jul.2007 ● Responsible: M.E. dept. Heat seal machine
  • 12. Component Preform automation ● Hand cutting lead change to machine cutting. ● Two operators is saved. Affected 6 lines. ● Responsible: PIE dept.
  • 13. Outsource reduction ● Add new Auto-insertion line in Production and reduce outsource equivalent line equals to 2 lines. ● Complete by: Apr.07 ● Responsible: M.E. dept.
  • 14. Electricity expense ● Use city electricity to replace power generator in-house. The electricity cost is reduced. ● Responsible: PTE dept
  • 15. Standard time improvement ● Work with CEE to improve std time. ● Continuous improvement by regular review of std time. ● Responsile: CEE, M.E.dept. and Production
  • 16. Attached file ● manpower reduction 20070413 (rev1).xls, this file is delibrately deleted to protect intellectual privacy. ● The content of this presentation file is not allowed to reproduce without permission of the author.