GOLDSTRIKETM 1: COINTERRA’S FIRST GENERATION CRYPTO-CURRENCY PROCESSOR FOR BITCOIN MINING MACHINES

1

Compartir

Próximo SlideShare
Implementing qrcode
Implementing qrcode
Cargando en…3
×
2 de 16
2 de 16

GOLDSTRIKETM 1: COINTERRA’S FIRST GENERATION CRYPTO-CURRENCY PROCESSOR FOR BITCOIN MINING MACHINES

1

Compartir

Descargar para leer sin conexión

This presentation describes the design of Cointerra's first generation Bitcoin mining ASIC and system hardware. This was presented by Dr. Javed Barkatullah at Hot Chips 26 Symposium on August 12, 2014 in Cupertino, CA.

This presentation describes the design of Cointerra's first generation Bitcoin mining ASIC and system hardware. This was presented by Dr. Javed Barkatullah at Hot Chips 26 Symposium on August 12, 2014 in Cupertino, CA.

Más Contenido Relacionado

Similares a GOLDSTRIKETM 1: COINTERRA’S FIRST GENERATION CRYPTO-CURRENCY PROCESSOR FOR BITCOIN MINING MACHINES

Libros relacionados

Gratis con una prueba de 14 días de Scribd

Ver todo

Audiolibros relacionados

Gratis con una prueba de 14 días de Scribd

Ver todo

GOLDSTRIKETM 1: COINTERRA’S FIRST GENERATION CRYPTO-CURRENCY PROCESSOR FOR BITCOIN MINING MACHINES

  1. 1. GOLDSTRIKETM 1: COINTERRA’S FIRST GENERATION CRYPTO-CURRENCY PROCESSOR FOR BITCOIN MINING MACHINES Javed Barkatullah, Ph.D., MBA Timo Hanke, Ph.D. Ravi Iyengar Ricky Lewelling Jim O’Connor
  2. 2. BITCOIN MINING WORK For a message m find a nonce n such that the 256-bit result Sha-256 (Sha-256 (m || n) ) has a specified number of leading zero bits (“target”) • Sha-256 is a cryptographic hash function • Cryptographic hash functions are “one way” functions • This search problem is best solved by trial-and-error Version Previous Hash Merkle Root Target Time Nonce Hash Double Sha Tx_id_0 Tx_id_1 Tx_id_n Tx_id_n+1 Tx_id_0,1 Tx_id_n,n+1 Merkle Root Version Previous Hash Merkle Root Target Time Nonce Message Hash Double Sha Entry m Entry m+1 Transaction 0 Transaction 1 Double Sha Double Sha Block Header
  3. 3. HISTORY OF BITCOIN MINING HARDWARE GPU based Platform FPGA based Platform Graph source: http://bitcoin.sipa.be Custom ASIC based Platform First Bitcoin Network & CPU based Platform ↑Hashing Capacity ↑Network Difficulty ↑Platform Hashing Power Network Difficulty adjusted every 2016 blocks mined 1e-06 1e-04 1e-02 1 100 1e04 THash/s 1e-06 1e-04 1e-02 1 100 1e04 Difficultyx106
  4. 4. GOLDSTRIKE™ 1 DEVELOPMENT TIMELINE • 4 months from RTL start to tape out! • 49 days from tape out to first silicon • Packaged silicon arrived on Dec. 28, 2013 • First system shipped to customer around mid January, 2014 Cointerra, Inc. Founded May 2013 June 2013 July 2013 August 2013 Sept. 2013 Oct. 2013 Nov. 2013 Dec 2013 Jan. 2014 RTL Start RTL Freeze Tape Out First Silicon System Shipped! Board & System Design Start Feb. 2014
  5. 5. • Motorola compatible 4-pin SPI Port • PLL with simple bit-bang interface • 120 Hash Engines arranged into 16 super-pipes • 128 deep Input Work FIFO • 128 deep Output Status FIFO • 384-bit Pipe Control Register (PCR) to enable/disable individual hash engine • Low I/O bandwidth requirement • New work (384 bits) every 232 clock cycles per engine GOLDSTRIKE™ 1 ARCHITECTURE
  6. 6. • Two rounds of SHA-256 processing • Searches for a result in 232 nonce range • Each round consists of 64 iterations • Fully unrolled iterations • Two parallel but connected pipelines – message & compressor • Generates a result out only if target criteria met HASH ENGINE Input Interface Output Interface Hash_out Work_in Nonce Counter Comparator Stage 0 Stage 1 Stage 2 Stage 63 Stage 62 Compressor Round1 Stage 0 Stage 1 Stage 2 Stage 63 Stage 62 Message Round2 Stage 0 Stage 1 Stage 2 Stage 63 Stage 62 Message Round1 Stage 0 Stage 1 Stage 2 Stage 63 Stage 62 Compressor Round2
  7. 7. COMPRESSOR STAGE OF SHA-256 PIPELINE S0 Maj S1 Ch + + + + + A DB C E F HG Ain Bin Cin Din Ein Fin Gin Hin Kin Win Ain Bin Cin Ein Fin Gin Aout Bout Cout Dout Eout Fout Gout Hout S0(A) = ( A >>> s1) ( A >>> s2 ) ( A >>> s3) S1(E) = ( E >>> s4) ( E >>> s5 ) ( E >>> s6)  Ch(E,F,G) = (E F)  (~E G) Maj(A,B,C) = (A B)  (B C)  (C A) All registers are 32-bits wide
  8. 8. MESSAGE STAGE SHA-256 PIPELINE • 512 bits message word divided in to 16 words, 32-bit wide (W0 to W15) • s0(W1,in) = (W1,in >>> s7) (W1,in >>> s8 ) (W1,in >>> s9) • s1(W14,in) = (W14,in >>> s10) (W14,in >>> s11 ) (W14,in >>> s12) + W15,in W14,in W13,in W12,in W11,in W10,in W9,in W8,in W7,in W6,in W5,in W4,in W3,in W2,in W1,in W0,in W13 W12 W11 W10 W9 W8 W7 W6 W5 W4 W3 W2 W1 W0W15 W14 s0s1 Win To Compressor
  9. 9. • Global Foundries HKMG 28nm HPP process • 9 metal layers • 120 hash engines in 11x11 array (grey boxes) • Top level logic block in the center DIE MICROGRAPH
  10. 10. • 37.5 x 37.5 mm FCBGA package • 4 bare dies per package • 1296 pins • > 500 GH/s @ 1.05GHz & 0.7v GOLDSTRIKE™-1 (GS1) PACKAGE
  11. 11. HEAT DISSIPATION CHALLENGE • Cooling options examined: • Heat sink + Airflow  Common in CPU applications • Liquid Cooling  Popular among over-clockers • Immersion  Efficient for data centers • Liquid cooling with direct attach cooling head selected • Enable a common platform for both home & data center customers Air Temps on Plane 3mm above PCB Top
  12. 12. Up to 2TH/s hash rate per appliance • Dual PCB with 4 GS1 packages total • Power budget to meet household outlet capacity Layout - 4U chassis Design  Driven by cooling requirements  Radiator cross-section  Fan Size  Similar design for TerraMiner IV data center and home models  Push pull airflow design for maximum performance  Fans chosen for balance between cost, performance & audible noise  Dual 1U power supplies for minimal volume impact TERRAMINER APPLIANCE
  13. 13. TERRAMINER APPLIANCE IMAGES Front View Back View
  14. 14. TERRAMINERTM IN DATACENTER
  15. 15. ASIC DESIGN CHALLENGES & CHOICES Challenges: • High power density and high node toggle rates • Power delivery • Heat dissipation • IR drop and di/dt noise • Very high sequential cell count • Reduce die area and power consumption • Very short (4-month) schedule from RTL start to tape out • Very small design team Choices: • Optimize common core blocks • Maximize design repeat & reuse • Utilize highly experienced design team
  16. 16. CONCLUDING REMARKS • Continued demand for higher performance and lower power appliance • Maintain Cointerra’s leadership position in Bitcoin mining industry • New designs with increased power efficiency and performance

×