INTERCEPTORS 
AND MANHOLES 
Reported by: 
Egenias, Arboy M. 
Ganacia, Jemica G. 
BSA-2B
INTERCEPTORS
• A large sewer that receives flow from 
a number of trunk sewers and 
transports the flow to the wastewater 
treatment plant. These sewers do not 
connect to homes, buildings or 
streets.
• In a storm, they allow some of the 
sewage to flow directly into a 
receiving stream, thus keeping it from 
overflowing onto the streets. 
• The interceptor sewer has a 
minimum of 15 feet in diameter.
• Also used in separate systems to 
collect the flows from main and trunk 
sewers and carry them to treatment 
points.
Combined Sewer
Waste Water Flow
• An interceptor could be 36-48 for 
sanitary and 60+ for storm. In terms 
of flow, that is highly dependent on 
the pipe size, material and slope...
GREASE INTERCEPTOR 
• Also known as Grease traps 
are plumbing devices designed to 
intercept most greases and solids 
before they enter a wastewater 
disposal system. 
• It is usually used in restaurants.
• They only have kitchen waste water 
flowing through them and are not 
served by any other drainage system 
such as toilets. They can be made 
from a number of different materials; 
e.g. stainless steel, plastics, concrete 
& cast iron.
• Effectively they are boxes within the 
drain run that flows between the 
sinks in a kitchen to the sewer system.
• They range from 35 litre capacity to 
45,000 litres and above capacity. 
They can be located above ground, 
below ground, inside the kitchen or 
outside the building.
Typical Grease Interceptor 
Installations:
• Grease trap sizing is based on the size 
of the 2 or 3 compartment sink, 
dishwasher, pot sinks, and mop 
sinks.
Sizing for Multiple Fixtures: 
1. Determine the flow rate for each fixture to 
be serviced by the interceptor. 
2. Add together 100% of the largest flow rate, 
50% of the second largest, and 25% of all 
others. 
3. Result is the recommended flow rate of the 
interceptor.
MANHOLES
Types of Connections 
• How drainage fixtures and fittings are connected to 
an existing system via manholes and/or inspection 
chambers? 
• There are 4 ways to connect new drainage to an 
existing system: 
1. - via a new branch junction or access chamber to 
an existing pipeline 
2. - via a saddle onto an existing sewer 
3. - via an existing manhole or existing inspection 
chamber 
4. - via a new inspection chamber or new manhole 
Methods 3 and 4 are the main focus.
Types of Chambers 
• Access chambers are intended to provide 
simple access for cursory inspection and access 
for drain rods or other maintenance equipment. 
They are not intended to provide access for a 
maintenance operative and are generally not 
more than 600mm deep.
Access Chamber - 225-300mm diameter
• Inspection chambers (often abbreviated to 
IC) are larger than access chambers, typically a 
minimum 450mm diameter. Again, they provide 
access for maintenance equipment, but tend to 
have more branches/spurs feeding into them 
and are often up to 1000mm deep.
Manholes tend to have iron covers 
600x600mm 
ICs can be circular, usually 450 or 
600mm diameter...
....or they can be rectangular, usually with 
a concrete cover
MANHOLES 
• A manhole (alternatively utility hole, cable 
chamber, maintenance hole, inspection 
chamber, access chamber or confined space) is 
the top opening to an underground vault used to 
house an access point for making connections or 
performing maintenance on underground and 
buried public utility and other services 
including sewers, telephone, electricity, storm 
drains and gas.
• Manholes (MH) are the largest chambers 
providing access to a sewer or drain for 
maintenance equipment, and, in some cases, for 
operatives to enter the system itself. The 
minimum internal dimensions of a manhole are 
600x900mm and they can be of any depth, 
although most modern manholes tend to be at 
least 1 metre deep with inspection chambers 
used for shallower depths.
Access and inspection chambers are used when 
the depth to the drain is a meter or less; for 
anything deeper, something more robust is 
required. The most common forms of manhole 
construction are... 
• brick-built 
• sectional pre-cast concrete 
• sectional plastic 
• cast in-situ concrete around a plastic 
liner
• For depths up to 2.7m, the minimum internal 
dimensions for a rectangular manhole are 
1200x750mm, although manholes with more 
than 3 branches may be even bigger. Anything 
deeper than 2.7m is a major project best left to 
professional drainage contractors. 
• Circular manholes are commonly used for main 
sewers; for depths up to 1.5m, they must have a 
minimum diameter of 1050mm and for anything 
deeper than 1.5m, the diameter has to be 
1200mm.
• This cross-section shows a typical construction 
for a manhole in a residential setting, such as 
beneath a driveway. It depicts the two most 
common constructions, using, on the left, pcc 
(Plain Cement Concrete) chamber sections, and 
on the right, Engineering brickwork. 
• The cover detail may be different for a manhole 
within a trafficked area, or if recess tray 
cover for block paving was to be used.
Plastic Manhole by Polypipe Civils Ltd.
• The step-irons should be built into the 
brickwork, or mortared into the pre-formed 
holes in pcc sections. 
• Note the minimum permissible opening size of 
any manhole is 600x600mm.
Manhole ring section with in-built steps
• The number of branches entering a manhole will 
determine the length dimension. A manhole 
with more than 4 branches may need to be 
longer to fit them all in. Similarly, manholes 
utilising 150mm diameter channels may need to 
be larger.
Plan view of typical manhole with a single branch oblique junction, 
again illustrating two construction types.
Sectional concrete inspection chamber with crown unit and cover
Adoptable Manholes 
• There are several different types of manhole to 
suit a variety of purposes and conditions, but an 
idealized manhole construction is shown here to 
illustrate the basic concepts and components. 
Not all features depicted will be found on all 
manholes.
Some definitions: 
• Shallow Manhole - a manhole that has a 
constant diameter or same cross-section 
throughout 
• Deep Manhole - a manhole with an access 
shaft of a smaller diameter or plan size than the 
main shaft 
• Cover and Frame - see table for guidance on 
strength rating of various covers 
• Seating ring - sometimes used in place of 
regulating between cover and cover slab 
• Brickwork - only engineering brick should be 
used, laid to English Bond
• Corbelling - the method of projecting brickwork 
outwards to reduce an opening or to carry a load. 
Each course should not oversail by more than 50mm 
• Cover slab - also known as a 'biscuit'. Best thought 
of as a 'lid' for the main shaft, with a single access 
opening, minimum 600x600mm 
• Reducing slab - used to accommodate a change in 
chamber diameter from a larger diameter main shaft 
to a narrower diameter entrance shaft 
• Straight back tapers - perform the same function 
as reducing slabs, ie to accommodate a change in 
shaft diameter, but without providing a landing. 
Also known as 'Cone Sections'
• Landing Slab - used in Deep Manholes, these 
limit the maximum shaft depth to 6 metres, and 
may be thought of as shaft dividers, providing a 
resting point or 'landing' at convenient intervals 
• Chamber sections - the individual sections 
used to construct a sectional shaft. Obviously not 
present with brick-built shafts 
• Soffit - the underside of a cover slab, arch or 
other structure. Opposite of Invert 
• Benching - a smoothed concrete topping, 
usually a granolithic mortar, sloping at not less 
than 1:30 and neatly shaped and finished to the 
base of a manhole
• Invert - the lowest point on the surface of a 
pipe, channel or culvert 
• Rocker Pipe - a short length of pipe, usually 
less than 1 metre, placed at the inlet/outlet of a 
solid structure, such as a manhole or building, to 
accommodate differential settlement between 
the structure and the drainage system
Idealized Adoptable Deep Manhole 
Cross-section
Idealized Adoptable Manhole Plan view
PCC Manhole components
Cover Slabs 
• Cover slabs are the 'lid' for many manholes, 
especially the larger ones. They are also known 
as 'Reducing Slabs', because they reduce the 
opening size or the chamber dimensions, and, on 
site, they are affectionately referred to as 
'biscuits' because that's the sort of humour that 
gets us sent to serve in the trenches.
• The basic role of a cover slab is to provide a firm 
platform to both 'cap' the chamber and to carry 
the cover along with any regulating brickwork. 
They are typically manufactured in a high-strength, 
steel-reinforced concrete, and, for 
manholes, the minimum opening size of 
600x600mm is created within the cover slab 
during the casting process. Although the vast 
majority of cover slabs are supplied fully-cured 
from specialist manufacturers, custom slabs may 
be cast on site and lifted into position once 
cured, or, in certain cases, cast in-situ atop the 
chamber itself.
• A secondary role for cover slabs is to reduce the 
apparent size of the chamber, so that, for 
example, a circular 1800mm diameter chamber 
or a rectangular 1200x750mm chamber, can be 
fitted with a standard 600x600mm cover at the 
surface. 
• These are heavy items, and they are generally 
fitted with two or more 'lifting eyes', which are 
steel, loops embedded into the concrete, that 
should be used to sling the biscuits from a crane 
or excavator during lifting and placement.
• The cover slab is normally mortar-bedded onto 
the top of the chamber with the internal face of 
the joint tooled smooth. When the surround 
concrete is placed around the chamber, it is 
brought up to be level with the top of the cover 
slab, as shown opposite. The regulating 
brickwork can then be built on top of the cover 
slab and the cover and frame fitted to suit the 
required level.
Manhole covers 
• Covers for manholes come in a wide variety of 
shapes, sizes and materials. The specification of 
manhole and access covers for public areas is laid 
down, which is summarized in the table opposite. 
Domestic driveways and patios often have the 
appallingly unattractive pre-cast concrete crown 
units and covers, and most block paved areas now 
feature recessed tray covers, fabricated from 
galvanized steel. Over recent years, covers 
manufactured from new high-strength composite 
materials have started to be used, primarily in 
pedestrian areas.
Class Test Load 
(tonnes) 
Typical Uses 
A15 1.5 Pedestrian areas only 
B125 12.5 Car parks, domestic 
driveways, 
areas with occasional 
vehicle access 
C250 25 Carriageways if <500mm 
from 
kerb face, car parks, 
service stations. 
Must be non-rocking/ 
silent type 
D400 40 Carriageways and hard 
shoulders. 
Must be non-rocking/ 
silent type 
E600 60 Loading areas, docks, 
commercial/industrial 
areas 
F900 90 Exceptionally heavy 
loads, ports, airports
Ductile and Cast Iron covers 
• are manufactured to conform to but other 
materials, such as galvanized steel or pre-cast 
concrete are not included within the scope of 
that standard. Manufacturers of galvanized steel 
covers have formed a Trade Association 
(FACTA) in order to impose some standards and 
quality into the market, but, at the time of 
writing, there is no nationally or internationally 
recognized standard.
• Most covers actually consist of 2 components; 
the cover itself, and a frame. The frame is 
typically bedded on mortar to a specified height 
set to suit the surrounding paving or ground 
level and the cover sits inside the frame, from 
where it can be lifted and possibly removed 
when access to the manhole is required.
Manhole cover and frame construction
• Many of the heavier units have the cover itself 
split into 2 triangles, known as 'double 
triangular' format. The two halves can be bolted 
together but are often left unattached to 
facilitate easier removal. Removal is achieved by 
the use of 'keys' which fit into the eyes on the 
surface of the cover, are turned through 90° and 
then it's down to brute force, although there are 
special cover-lifting contraptions now available.
• As mentioned above, many paving projects now 
use Recess Tray Covers rather than the types of 
covers illustrated above. Recess Trays can be 
used with any type of paving, although they are 
most commonly associated with Block Paving. 
Opening double-triangular cover with MH keys

More Related Content

What's hot (20)

Building services water supply
Building services   water supplyBuilding services   water supply
Building services water supply
 
WATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESWATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICES
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGWATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
 
Building dranage system
Building dranage systemBuilding dranage system
Building dranage system
 
Traps
TrapsTraps
Traps
 
Sanitary fittings and accesories
Sanitary fittings and accesoriesSanitary fittings and accesories
Sanitary fittings and accesories
 
Flooring
FlooringFlooring
Flooring
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
House plumbing
House plumbingHouse plumbing
House plumbing
 
Che 4 house drainage system
Che 4 house drainage systemChe 4 house drainage system
Che 4 house drainage system
 
Waterproofing and insulaton
Waterproofing and insulatonWaterproofing and insulaton
Waterproofing and insulaton
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Water closets and urinals
Water closets and urinalsWater closets and urinals
Water closets and urinals
 
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPSDRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
 
Traps
TrapsTraps
Traps
 
Building Services
Building ServicesBuilding Services
Building Services
 
Week 06 lecture 06 water connection
Week 06 lecture 06 water connectionWeek 06 lecture 06 water connection
Week 06 lecture 06 water connection
 
Escalators
EscalatorsEscalators
Escalators
 

Similar to Philippines Technological University Report on Interceptors and Manholes

Similar to Philippines Technological University Report on Interceptors and Manholes (20)

Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer line
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
 
Interior services unit 2
Interior services unit 2Interior services unit 2
Interior services unit 2
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Know about pipes and fittings
Know about pipes and fittingsKnow about pipes and fittings
Know about pipes and fittings
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
 
Sewer Appurtanances
Sewer AppurtanancesSewer Appurtanances
Sewer Appurtanances
 
WRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsWRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity dams
 
Fitting and fixtures
Fitting and fixturesFitting and fixtures
Fitting and fixtures
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
 
Drains and sewer
Drains and sewerDrains and sewer
Drains and sewer
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewage
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & sovent
 
pipes and fittings
pipes and fittingspipes and fittings
pipes and fittings
 
6300 l20_inverted_siphons
6300  l20_inverted_siphons6300  l20_inverted_siphons
6300 l20_inverted_siphons
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
House drainage
House drainageHouse drainage
House drainage
 
Sanitary sewer outlet
Sanitary sewer outletSanitary sewer outlet
Sanitary sewer outlet
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 

Philippines Technological University Report on Interceptors and Manholes

  • 1. Republic of the Philippines TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES COLLEGE OF ARCHITECTURE AND FINE ARTS Ayala Boulevard cor. San Marcelino St., Ermita Manila INTERCEPTORS AND MANHOLES Reported by: Egenias, Arboy M. Ganacia, Jemica G. BSA-2B
  • 3. • A large sewer that receives flow from a number of trunk sewers and transports the flow to the wastewater treatment plant. These sewers do not connect to homes, buildings or streets.
  • 4.
  • 5. • In a storm, they allow some of the sewage to flow directly into a receiving stream, thus keeping it from overflowing onto the streets. • The interceptor sewer has a minimum of 15 feet in diameter.
  • 6.
  • 7. • Also used in separate systems to collect the flows from main and trunk sewers and carry them to treatment points.
  • 8.
  • 10.
  • 11.
  • 13.
  • 14. • An interceptor could be 36-48 for sanitary and 60+ for storm. In terms of flow, that is highly dependent on the pipe size, material and slope...
  • 15. GREASE INTERCEPTOR • Also known as Grease traps are plumbing devices designed to intercept most greases and solids before they enter a wastewater disposal system. • It is usually used in restaurants.
  • 16.
  • 17. • They only have kitchen waste water flowing through them and are not served by any other drainage system such as toilets. They can be made from a number of different materials; e.g. stainless steel, plastics, concrete & cast iron.
  • 18.
  • 19. • Effectively they are boxes within the drain run that flows between the sinks in a kitchen to the sewer system.
  • 20. • They range from 35 litre capacity to 45,000 litres and above capacity. They can be located above ground, below ground, inside the kitchen or outside the building.
  • 21. Typical Grease Interceptor Installations:
  • 22. • Grease trap sizing is based on the size of the 2 or 3 compartment sink, dishwasher, pot sinks, and mop sinks.
  • 23.
  • 24.
  • 25. Sizing for Multiple Fixtures: 1. Determine the flow rate for each fixture to be serviced by the interceptor. 2. Add together 100% of the largest flow rate, 50% of the second largest, and 25% of all others. 3. Result is the recommended flow rate of the interceptor.
  • 27. Types of Connections • How drainage fixtures and fittings are connected to an existing system via manholes and/or inspection chambers? • There are 4 ways to connect new drainage to an existing system: 1. - via a new branch junction or access chamber to an existing pipeline 2. - via a saddle onto an existing sewer 3. - via an existing manhole or existing inspection chamber 4. - via a new inspection chamber or new manhole Methods 3 and 4 are the main focus.
  • 28. Types of Chambers • Access chambers are intended to provide simple access for cursory inspection and access for drain rods or other maintenance equipment. They are not intended to provide access for a maintenance operative and are generally not more than 600mm deep.
  • 29. Access Chamber - 225-300mm diameter
  • 30. • Inspection chambers (often abbreviated to IC) are larger than access chambers, typically a minimum 450mm diameter. Again, they provide access for maintenance equipment, but tend to have more branches/spurs feeding into them and are often up to 1000mm deep.
  • 31. Manholes tend to have iron covers 600x600mm ICs can be circular, usually 450 or 600mm diameter...
  • 32. ....or they can be rectangular, usually with a concrete cover
  • 33. MANHOLES • A manhole (alternatively utility hole, cable chamber, maintenance hole, inspection chamber, access chamber or confined space) is the top opening to an underground vault used to house an access point for making connections or performing maintenance on underground and buried public utility and other services including sewers, telephone, electricity, storm drains and gas.
  • 34. • Manholes (MH) are the largest chambers providing access to a sewer or drain for maintenance equipment, and, in some cases, for operatives to enter the system itself. The minimum internal dimensions of a manhole are 600x900mm and they can be of any depth, although most modern manholes tend to be at least 1 metre deep with inspection chambers used for shallower depths.
  • 35. Access and inspection chambers are used when the depth to the drain is a meter or less; for anything deeper, something more robust is required. The most common forms of manhole construction are... • brick-built • sectional pre-cast concrete • sectional plastic • cast in-situ concrete around a plastic liner
  • 36. • For depths up to 2.7m, the minimum internal dimensions for a rectangular manhole are 1200x750mm, although manholes with more than 3 branches may be even bigger. Anything deeper than 2.7m is a major project best left to professional drainage contractors. • Circular manholes are commonly used for main sewers; for depths up to 1.5m, they must have a minimum diameter of 1050mm and for anything deeper than 1.5m, the diameter has to be 1200mm.
  • 37.
  • 38. • This cross-section shows a typical construction for a manhole in a residential setting, such as beneath a driveway. It depicts the two most common constructions, using, on the left, pcc (Plain Cement Concrete) chamber sections, and on the right, Engineering brickwork. • The cover detail may be different for a manhole within a trafficked area, or if recess tray cover for block paving was to be used.
  • 39. Plastic Manhole by Polypipe Civils Ltd.
  • 40. • The step-irons should be built into the brickwork, or mortared into the pre-formed holes in pcc sections. • Note the minimum permissible opening size of any manhole is 600x600mm.
  • 41. Manhole ring section with in-built steps
  • 42. • The number of branches entering a manhole will determine the length dimension. A manhole with more than 4 branches may need to be longer to fit them all in. Similarly, manholes utilising 150mm diameter channels may need to be larger.
  • 43. Plan view of typical manhole with a single branch oblique junction, again illustrating two construction types.
  • 44. Sectional concrete inspection chamber with crown unit and cover
  • 45. Adoptable Manholes • There are several different types of manhole to suit a variety of purposes and conditions, but an idealized manhole construction is shown here to illustrate the basic concepts and components. Not all features depicted will be found on all manholes.
  • 46. Some definitions: • Shallow Manhole - a manhole that has a constant diameter or same cross-section throughout • Deep Manhole - a manhole with an access shaft of a smaller diameter or plan size than the main shaft • Cover and Frame - see table for guidance on strength rating of various covers • Seating ring - sometimes used in place of regulating between cover and cover slab • Brickwork - only engineering brick should be used, laid to English Bond
  • 47. • Corbelling - the method of projecting brickwork outwards to reduce an opening or to carry a load. Each course should not oversail by more than 50mm • Cover slab - also known as a 'biscuit'. Best thought of as a 'lid' for the main shaft, with a single access opening, minimum 600x600mm • Reducing slab - used to accommodate a change in chamber diameter from a larger diameter main shaft to a narrower diameter entrance shaft • Straight back tapers - perform the same function as reducing slabs, ie to accommodate a change in shaft diameter, but without providing a landing. Also known as 'Cone Sections'
  • 48. • Landing Slab - used in Deep Manholes, these limit the maximum shaft depth to 6 metres, and may be thought of as shaft dividers, providing a resting point or 'landing' at convenient intervals • Chamber sections - the individual sections used to construct a sectional shaft. Obviously not present with brick-built shafts • Soffit - the underside of a cover slab, arch or other structure. Opposite of Invert • Benching - a smoothed concrete topping, usually a granolithic mortar, sloping at not less than 1:30 and neatly shaped and finished to the base of a manhole
  • 49. • Invert - the lowest point on the surface of a pipe, channel or culvert • Rocker Pipe - a short length of pipe, usually less than 1 metre, placed at the inlet/outlet of a solid structure, such as a manhole or building, to accommodate differential settlement between the structure and the drainage system
  • 50. Idealized Adoptable Deep Manhole Cross-section
  • 53. Cover Slabs • Cover slabs are the 'lid' for many manholes, especially the larger ones. They are also known as 'Reducing Slabs', because they reduce the opening size or the chamber dimensions, and, on site, they are affectionately referred to as 'biscuits' because that's the sort of humour that gets us sent to serve in the trenches.
  • 54. • The basic role of a cover slab is to provide a firm platform to both 'cap' the chamber and to carry the cover along with any regulating brickwork. They are typically manufactured in a high-strength, steel-reinforced concrete, and, for manholes, the minimum opening size of 600x600mm is created within the cover slab during the casting process. Although the vast majority of cover slabs are supplied fully-cured from specialist manufacturers, custom slabs may be cast on site and lifted into position once cured, or, in certain cases, cast in-situ atop the chamber itself.
  • 55.
  • 56. • A secondary role for cover slabs is to reduce the apparent size of the chamber, so that, for example, a circular 1800mm diameter chamber or a rectangular 1200x750mm chamber, can be fitted with a standard 600x600mm cover at the surface. • These are heavy items, and they are generally fitted with two or more 'lifting eyes', which are steel, loops embedded into the concrete, that should be used to sling the biscuits from a crane or excavator during lifting and placement.
  • 57. • The cover slab is normally mortar-bedded onto the top of the chamber with the internal face of the joint tooled smooth. When the surround concrete is placed around the chamber, it is brought up to be level with the top of the cover slab, as shown opposite. The regulating brickwork can then be built on top of the cover slab and the cover and frame fitted to suit the required level.
  • 58.
  • 59. Manhole covers • Covers for manholes come in a wide variety of shapes, sizes and materials. The specification of manhole and access covers for public areas is laid down, which is summarized in the table opposite. Domestic driveways and patios often have the appallingly unattractive pre-cast concrete crown units and covers, and most block paved areas now feature recessed tray covers, fabricated from galvanized steel. Over recent years, covers manufactured from new high-strength composite materials have started to be used, primarily in pedestrian areas.
  • 60. Class Test Load (tonnes) Typical Uses A15 1.5 Pedestrian areas only B125 12.5 Car parks, domestic driveways, areas with occasional vehicle access C250 25 Carriageways if <500mm from kerb face, car parks, service stations. Must be non-rocking/ silent type D400 40 Carriageways and hard shoulders. Must be non-rocking/ silent type E600 60 Loading areas, docks, commercial/industrial areas F900 90 Exceptionally heavy loads, ports, airports
  • 61. Ductile and Cast Iron covers • are manufactured to conform to but other materials, such as galvanized steel or pre-cast concrete are not included within the scope of that standard. Manufacturers of galvanized steel covers have formed a Trade Association (FACTA) in order to impose some standards and quality into the market, but, at the time of writing, there is no nationally or internationally recognized standard.
  • 62.
  • 63. • Most covers actually consist of 2 components; the cover itself, and a frame. The frame is typically bedded on mortar to a specified height set to suit the surrounding paving or ground level and the cover sits inside the frame, from where it can be lifted and possibly removed when access to the manhole is required.
  • 64. Manhole cover and frame construction
  • 65. • Many of the heavier units have the cover itself split into 2 triangles, known as 'double triangular' format. The two halves can be bolted together but are often left unattached to facilitate easier removal. Removal is achieved by the use of 'keys' which fit into the eyes on the surface of the cover, are turned through 90° and then it's down to brute force, although there are special cover-lifting contraptions now available.
  • 66. • As mentioned above, many paving projects now use Recess Tray Covers rather than the types of covers illustrated above. Recess Trays can be used with any type of paving, although they are most commonly associated with Block Paving. Opening double-triangular cover with MH keys