Meeting Purpose
• Discussion of project recommendations
• Gather public feedback

Items to Review and Discuss
• Alternatives
▫ Review alternative selection process
▫ Present modeling results and recommendations

• Discussion
• Next step – Final Report and City Council
Presentation
Project Goals
• Reduce probability of flooding by improving
stormwater management
• Identify cost of implementation per level of service

• Do not adversely impact downstream interests
• Maintain and/or enhance water quality

• Long term sustainability
Available Information
• Website
▫ Online at www.uppermallettsstudy.org

• Online Flood Reporting Tool
Original Alternatives
Alternative Development
Areas Outside of City Boundary
Ice Cube
Medium
Meadowinds Basin
Low

X
X
X
2

3

4

X

X
X
X
X
X

5

6
X
X

Alternative Package 7

Alternative Package 5

Alternative Package 6

Alternative Package 4
X
X
X

X

X

X
X

X

1
Low
Low

Alternative Package 3

High
Medium
High
Low
Low
Medium
Low

Alternative Package 2

High
High
Medium
Low
Low
Low
Low

Alternative Package 1

Expected Cost

Name
Lawton Park
Eisenhower Park
Lans Basin
Pioneer HS (W of 7th)
Pioneer HS (E of 7th)
Cardinal Homes
Las Vegas

Impact Potential

Alternative Packages

X
X
X
X
X
X
X
7
Flooding Map – March 15, 2012
Eisenhower/Churchill Park
Initial Volume (cu. ft) 425,000
Conceptual Volume
390,000
Surface Area (acres)
1.9
Anticipated Costs
$1,250,000

Drainage Area
Flooding Map – Post Eisenhower
Pioneer/Scio Church Improvements

Drainage Area

Initial Volume (cu. ft) 80,000
Conceptual Volume
400,000
Surface Area (acres)
2.8
Anticipated Costs
$1,000,000
Flooding Map – Post Pioneer
Lawton Park
Initial Volume (cu. ft) 825,000
Conceptual Volume
340,000
Surface Area (acres)
1.4
Anticipated Costs
$4,500,000

Drainage Area
Flooding Map – Post Lawton
Volume Comparison
Location
Lawton Park
Eisenhower Park
Pioneer (E. of 7th)
Total

Original Est.
Volume

Conceptual
Volume

825,000

340,000

425,000

390,000

80,000

400,000

1,330,000

1,130,000
Footing drain analysis
•
•
•
•

Measured flow approximately 5 gallons per minute
Study using conservative flow of 10 gpm
Total system flow is 483 cubic feet per second
Total footing drain flow is 28 cfs
Footing Drain Flow as Percentage
Of Overall System Flow
5.8%

94.2%
Footing drain analysis
Footing Drain Flow as Percentage
Of Eisenhower Basin Flow

Footing Drain Flow as Percentage
Of Lawton Basin Flow

2.2%

5.4%

97.8%

94.6%

No flow attributed to Pioneer basin due to drainage area specifics
Discussion
Next Steps
• Prepare report
• Presentation to Ann Arbor City Council
Upper Malletts Creek Stormwater Conveyance Study Timeline

Public Engagement

Preliminary
Alternatives
Analysis &
Memo

Finalized
Alternatives
Analysis &
Memo

February 2014

Final Study
Report

January 2014

September 2013

July 2013

April 2013

March 2013

February 2013

Data
Collection, Monitorin
g, & Modeling

Project Award
January 2013

Draft
Study
Report

December 2013

Gather
Information
Upper Malletts Creek
Stormwater Conveyance Study
Project Update
September 30, 2013

Más contenido relacionado

La actualidad más candente

Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)oloofrank
 
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...Deltares
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Timo Brussée
 
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Dirk Kassenaar M.Sc. P.Eng.
 
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...Moudud Hasan
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSAnkit Balyan MBA, B.Tech.
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Dirk Kassenaar M.Sc. P.Eng.
 
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDeltares
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.aueWater
 
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringTransient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringDirk Kassenaar M.Sc. P.Eng.
 
2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_finalbcogcommission
 
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAPPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAbhiram Kanigolla
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Dirk Kassenaar M.Sc. P.Eng.
 
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...Dirk Kassenaar M.Sc. P.Eng.
 

La actualidad más candente (20)

Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)
 
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...
DSD-INT 2017 Application of the SPHY model for the Ganga basin and integratio...
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
 
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
 
Runoff estimation and water management for Holetta River, Awash subbasin, Eth...
Runoff estimation and water management for Holetta River, Awash subbasin, Eth...Runoff estimation and water management for Holetta River, Awash subbasin, Eth...
Runoff estimation and water management for Holetta River, Awash subbasin, Eth...
 
Watertech Booth Slide 2013
Watertech Booth Slide 2013Watertech Booth Slide 2013
Watertech Booth Slide 2013
 
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
 
Assessment of Low Impact Design (LID)
Assessment of Low Impact Design (LID)Assessment of Low Impact Design (LID)
Assessment of Low Impact Design (LID)
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
 
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.au
 
Transforming NOAA Water Prediction for a Water-Prepared Nation
Transforming NOAA Water Prediction for a Water-Prepared NationTransforming NOAA Water Prediction for a Water-Prepared Nation
Transforming NOAA Water Prediction for a Water-Prepared Nation
 
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringTransient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
 
2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final
 
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAPPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
 
Using National Water Model Results to Benefit Industry
Using National Water Model Results to Benefit IndustryUsing National Water Model Results to Benefit Industry
Using National Water Model Results to Benefit Industry
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
 
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
 
Dirk Kassenaar EarthFX Watertech 2016
Dirk Kassenaar EarthFX Watertech 2016 Dirk Kassenaar EarthFX Watertech 2016
Dirk Kassenaar EarthFX Watertech 2016
 

Destacado

Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13Joe Manzella
 
Mullberry Street Cornelius 3 3 09
Mullberry Street Cornelius 3 3 09Mullberry Street Cornelius 3 3 09
Mullberry Street Cornelius 3 3 09johnarthurpettit
 
DTN Charrette 3 Presentation
DTN Charrette 3 PresentationDTN Charrette 3 Presentation
DTN Charrette 3 PresentationJoe Manzella
 
Venezuela tradicional
Venezuela tradicionalVenezuela tradicional
Venezuela tradicionalyulianajulio
 
نظام التأمين التكافلي بالإمارات
نظام التأمين التكافلي بالإماراتنظام التأمين التكافلي بالإمارات
نظام التأمين التكافلي بالإماراتTALBI Amel
 
Amvets Post 25 Events
Amvets Post 25 EventsAmvets Post 25 Events
Amvets Post 25 EventsDana Kapp
 
PPL 891: Harlem Children’s Zone
PPL 891: Harlem Children’s ZonePPL 891: Harlem Children’s Zone
PPL 891: Harlem Children’s ZoneJoe Manzella
 

Destacado (7)

Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
 
Mullberry Street Cornelius 3 3 09
Mullberry Street Cornelius 3 3 09Mullberry Street Cornelius 3 3 09
Mullberry Street Cornelius 3 3 09
 
DTN Charrette 3 Presentation
DTN Charrette 3 PresentationDTN Charrette 3 Presentation
DTN Charrette 3 Presentation
 
Venezuela tradicional
Venezuela tradicionalVenezuela tradicional
Venezuela tradicional
 
نظام التأمين التكافلي بالإمارات
نظام التأمين التكافلي بالإماراتنظام التأمين التكافلي بالإمارات
نظام التأمين التكافلي بالإمارات
 
Amvets Post 25 Events
Amvets Post 25 EventsAmvets Post 25 Events
Amvets Post 25 Events
 
PPL 891: Harlem Children’s Zone
PPL 891: Harlem Children’s ZonePPL 891: Harlem Children’s Zone
PPL 891: Harlem Children’s Zone
 

Similar a 20130901 public meeting_4 (1)

CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04HartTWI
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Fairfax County
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Fairfax County
 
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have ChoicesHazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choicesdmalchow
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingFairfax County
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Fairfax County
 
6 - eWater - General_SOURCE-Sep-16
6 - eWater - General_SOURCE-Sep-166 - eWater - General_SOURCE-Sep-16
6 - eWater - General_SOURCE-Sep-16indiawrm
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanFairfax County
 
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3Ryan McKeon, PMP, GISP
 
Senior design final
Senior design finalSenior design final
Senior design finalkaloveG18
 
Senior design final
Senior design finalSenior design final
Senior design finalAlston Loper
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Fairfax County
 
Highlands Regional Green Infrastructure Workshop Presentation
Highlands Regional Green Infrastructure Workshop PresentationHighlands Regional Green Infrastructure Workshop Presentation
Highlands Regional Green Infrastructure Workshop PresentationNew Jersey Future
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04HartTWI
 

Similar a 20130901 public meeting_4 (1) (20)

CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
 
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have ChoicesHazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014
 
6 - eWater - General_SOURCE-Sep-16
6 - eWater - General_SOURCE-Sep-166 - eWater - General_SOURCE-Sep-16
6 - eWater - General_SOURCE-Sep-16
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3
Esri water_wastewater SIG Charleston, SC 10-16-2014 - Wachs Water v3
 
Senior design final
Senior design finalSenior design final
Senior design final
 
Senior design final
Senior design finalSenior design final
Senior design final
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014
 
Restoration
RestorationRestoration
Restoration
 
2013.05.21 public meeting_3
2013.05.21 public meeting_32013.05.21 public meeting_3
2013.05.21 public meeting_3
 
Korteling 7558
Korteling 7558Korteling 7558
Korteling 7558
 
Highlands Regional Green Infrastructure Workshop Presentation
Highlands Regional Green Infrastructure Workshop PresentationHighlands Regional Green Infrastructure Workshop Presentation
Highlands Regional Green Infrastructure Workshop Presentation
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
 

Último

So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...itnewsafrica
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFMichael Gough
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...BookNet Canada
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...Karmanjay Verma
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentMahmoud Rabie
 

Último (20)

So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDF
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career Development
 

20130901 public meeting_4 (1)

  • 1. Upper Malletts Creek Stormwater Conveyance Study Project Update September 30, 2013
  • 2. Meeting Purpose • Discussion of project recommendations • Gather public feedback Items to Review and Discuss • Alternatives ▫ Review alternative selection process ▫ Present modeling results and recommendations • Discussion • Next step – Final Report and City Council Presentation
  • 3. Project Goals • Reduce probability of flooding by improving stormwater management • Identify cost of implementation per level of service • Do not adversely impact downstream interests • Maintain and/or enhance water quality • Long term sustainability
  • 4. Available Information • Website ▫ Online at www.uppermallettsstudy.org • Online Flood Reporting Tool
  • 7. Areas Outside of City Boundary Ice Cube Medium Meadowinds Basin Low X X X 2 3 4 X X X X X X 5 6 X X Alternative Package 7 Alternative Package 5 Alternative Package 6 Alternative Package 4 X X X X X X X X 1 Low Low Alternative Package 3 High Medium High Low Low Medium Low Alternative Package 2 High High Medium Low Low Low Low Alternative Package 1 Expected Cost Name Lawton Park Eisenhower Park Lans Basin Pioneer HS (W of 7th) Pioneer HS (E of 7th) Cardinal Homes Las Vegas Impact Potential Alternative Packages X X X X X X X 7
  • 8. Flooding Map – March 15, 2012
  • 9. Eisenhower/Churchill Park Initial Volume (cu. ft) 425,000 Conceptual Volume 390,000 Surface Area (acres) 1.9 Anticipated Costs $1,250,000 Drainage Area
  • 10. Flooding Map – Post Eisenhower
  • 11. Pioneer/Scio Church Improvements Drainage Area Initial Volume (cu. ft) 80,000 Conceptual Volume 400,000 Surface Area (acres) 2.8 Anticipated Costs $1,000,000
  • 12. Flooding Map – Post Pioneer
  • 13. Lawton Park Initial Volume (cu. ft) 825,000 Conceptual Volume 340,000 Surface Area (acres) 1.4 Anticipated Costs $4,500,000 Drainage Area
  • 14. Flooding Map – Post Lawton
  • 15. Volume Comparison Location Lawton Park Eisenhower Park Pioneer (E. of 7th) Total Original Est. Volume Conceptual Volume 825,000 340,000 425,000 390,000 80,000 400,000 1,330,000 1,130,000
  • 16. Footing drain analysis • • • • Measured flow approximately 5 gallons per minute Study using conservative flow of 10 gpm Total system flow is 483 cubic feet per second Total footing drain flow is 28 cfs Footing Drain Flow as Percentage Of Overall System Flow 5.8% 94.2%
  • 17. Footing drain analysis Footing Drain Flow as Percentage Of Eisenhower Basin Flow Footing Drain Flow as Percentage Of Lawton Basin Flow 2.2% 5.4% 97.8% 94.6% No flow attributed to Pioneer basin due to drainage area specifics
  • 19. Next Steps • Prepare report • Presentation to Ann Arbor City Council
  • 20. Upper Malletts Creek Stormwater Conveyance Study Timeline Public Engagement Preliminary Alternatives Analysis & Memo Finalized Alternatives Analysis & Memo February 2014 Final Study Report January 2014 September 2013 July 2013 April 2013 March 2013 February 2013 Data Collection, Monitorin g, & Modeling Project Award January 2013 Draft Study Report December 2013 Gather Information
  • 21. Upper Malletts Creek Stormwater Conveyance Study Project Update September 30, 2013

Notas del editor

  1. Higgins sent pictures
  2. Difficult for City to maintain all.
  3. Give dates when people on-site