SlideShare a Scribd company logo
1 of 17
S TATEMENT OF WORK
       (S OW)

  PERFORMANCE BASED
     CONTRACTING

                      1
Statement of Work
Performance-Based Contracting

 Performance-based contracting
 involves structuring all aspects of
 an acquisition around the purpose
 of the work to be performed as
 opposed to either the manner by
 which the work is to be performed
 or a broad and imprecise
 statement of work.
                                       2
Statement of Work
            What vs. How
• Lower costs
• Flexibility to achieve a solution
• Solution is the responsibility on the
  contractor




                                          3
What Is An SOW?

 A formal written description of your
  minimum requirements to be performed by
  a contractor

 The “heart of your procurement”


                                        4
Why is a Clear and Concise
            SOW Important ?

 Provides a clear understanding of the requirements

 Establishes a baseline for proposal evaluation

 Reduces evaluation and negotiation time

 Minimizes need for future changes

 Baselines contractor performance measures
                                                       5
Many Documents Are Based
                        On The SOW

                                            SOW


            NAFI                              QA                       R E P O R T IN G
    C O S T E S T IM A T E           S U R V E IL L A N C E         R E Q U IR E M E N T S
                                            PLAN


E V A L U A T I O N C R I T E R IA                                 IN S T R U C T IO N F O R
        S E C T IO N (M )                                     P R O P O S A L P R E P A R A T IO N
                                                                        S E C T IO N (L )


                                                                                                     6
STATEMENT OF WORK
                    PROCESS OVERVIEW
The following is a summary of the recommended process steps for
     preparing a Statement of Work SOW :
4.    Establish a preliminary scope statement ( i.e., the purpose or
      objective of your procurement)
5.    List the tasks to be performed ( i.e., All performance requirements
      you intend the contractor to satisfy, all requirements that the
      contractor must comply with during contract performance )
6.    Group similar and related tasks.
7.    Organize the tasks in logical sequence
8.    Identify the input ( Required resources to perform the tasks)
9.    Identify the output ( Required results or deliverables )
10.   Identify the timeline or frequency of the deliverables (output)
11.   Develop the parameters for acceptable quality and performance
12.   Determine how you will monitor the deliverables

                                                                       7
Statement of Work
                     Step 1
• ESTABLISH A PRELIMINARY SCOPE
  STATEMENT THAT:

  –   Identifies the objective or purpose of the procurement
  –   Description of work to be performed
  –   Define the magnitude of work to be performed
  –   Defines the boundaries of performance and
      responsibilities




                                                               8
Statement of Work
                 Step 2
• List task to be performed that will:

   – Accomplish the objective of the SOW

   – Focus of “what” not “how” the contractor will perform




                                                             9
Statement of Work
             Step 3
• Group similar and related task
• Categorize tasks as either major or
  sub-tasks
• Add any additional tasks as you
  work through this



                                        10
Statement of Work
                 Step 4
• Organized task in logical sequence
   – Chronological order
   – Time-phase
   – Discipline
• Ensure task required meet the minimum
  requirements
• Delete unnecessary or repetitive tasks




                                           11
Statement of Work
                Step 5
• Identify the required resources for each
  task (input)
  – May be labor, equipment and material
  – May be NAFI or government provided
• Identify any operating restrictions or
  procedures


                                             12
Statement of Work
              Step 6
• Identify required results and or
  deliverables (output)
  – Meetings
  – Reports
• Provides information to develop
  oversight plan
• Contractor responsible for the work
  (input to output)
                                        13
Statement of Work
              Step 7
• Identify the frequency and timeline of
  deliverables
• Assists in
  – Refining SOW
  – Method of surveillance
  – Surveillance plan
  – Cost estimate

                                       14
Statement of Work
                     Step 8
• Develop performance standard or acceptance
  criteria expressed in
  –   Quality
  –   Quantity
  –   Time
  –   Appearance
• Should include elements such as “What, when,
  where, how many times
• Should be appropriate for the contract and
  – Necessary
  – Realistic
  – Objective and measurable



                                                 15
Statement of Work
                       Step 9
•   Determine how you will monitor the deliverables
•   Must be appropriate for the contract
•   Cost effective
•   Methods include:
    –   100% inspection
    –   Random sampling
    –   Periodic inspection
    –   Customer copleaints
    –   Review of progress milestons
    –   Reports by contractor


                                                      16
Statement of Work
              Conclusion
Lastly, the key factor in the success of the
Performance Based Contract is the ability
of you, the customer, to write good
requirements.




                                           17

More Related Content

Viewers also liked

Marshall Cassidy-horse-around-lyrics
Marshall Cassidy-horse-around-lyricsMarshall Cassidy-horse-around-lyrics
Marshall Cassidy-horse-around-lyrics
VOCAL SPIN
 
термины литер в презентации
термины литер в презентациитермины литер в презентации
термины литер в презентации
kryljanauki
 
กระแสใจ กระแสธรรม
กระแสใจ กระแสธรรมกระแสใจ กระแสธรรม
กระแสใจ กระแสธรรม
Na Tak
 
Marshall Cassidy-ugly-like-me-lyrics
Marshall Cassidy-ugly-like-me-lyricsMarshall Cassidy-ugly-like-me-lyrics
Marshall Cassidy-ugly-like-me-lyrics
VOCAL SPIN
 
เรื่องประทับใจ ให้ข้อคิด 5
เรื่องประทับใจ ให้ข้อคิด 5เรื่องประทับใจ ให้ข้อคิด 5
เรื่องประทับใจ ให้ข้อคิด 5
Na Tak
 

Viewers also liked (17)

Marshall Cassidy-horse-around-lyrics
Marshall Cassidy-horse-around-lyricsMarshall Cassidy-horse-around-lyrics
Marshall Cassidy-horse-around-lyrics
 
Смотр войск на Дворцовой площади
Смотр войск на Дворцовой площадиСмотр войск на Дворцовой площади
Смотр войск на Дворцовой площади
 
Growing Great Test Analysts
Growing Great Test AnalystsGrowing Great Test Analysts
Growing Great Test Analysts
 
Android Wearables ii
Android Wearables iiAndroid Wearables ii
Android Wearables ii
 
beTarte
beTartebeTarte
beTarte
 
Marshall Cassidy : VOCALSpin : Sunny
Marshall Cassidy : VOCALSpin : SunnyMarshall Cassidy : VOCALSpin : Sunny
Marshall Cassidy : VOCALSpin : Sunny
 
Улицы и площади
Улицы и площадиУлицы и площади
Улицы и площади
 
Advanced Social Media Techniques in Higher Education
Advanced Social Media Techniques in Higher EducationAdvanced Social Media Techniques in Higher Education
Advanced Social Media Techniques in Higher Education
 
термины литер в презентации
термины литер в презентациитермины литер в презентации
термины литер в презентации
 
Angie rodriguez 4,9
Angie rodriguez 4,9Angie rodriguez 4,9
Angie rodriguez 4,9
 
365 powerpoint ad
365 powerpoint ad365 powerpoint ad
365 powerpoint ad
 
лекція № 4
лекція № 4лекція № 4
лекція № 4
 
The right way coding for ios app development
The right way coding for ios app developmentThe right way coding for ios app development
The right way coding for ios app development
 
Cv updated
Cv updatedCv updated
Cv updated
 
กระแสใจ กระแสธรรม
กระแสใจ กระแสธรรมกระแสใจ กระแสธรรม
กระแสใจ กระแสธรรม
 
Marshall Cassidy-ugly-like-me-lyrics
Marshall Cassidy-ugly-like-me-lyricsMarshall Cassidy-ugly-like-me-lyrics
Marshall Cassidy-ugly-like-me-lyrics
 
เรื่องประทับใจ ให้ข้อคิด 5
เรื่องประทับใจ ให้ข้อคิด 5เรื่องประทับใจ ให้ข้อคิด 5
เรื่องประทับใจ ให้ข้อคิด 5
 

Similar to Developing Performance Based Work Statements

SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
Durga Prasad Mishra
 
10 steps metrics
10 steps metrics10 steps metrics
10 steps metrics
Myrna Brown
 
Defining The Project
Defining The ProjectDefining The Project
Defining The Project
Earl Tongol
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
Leanleaders.org
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
amirashraf61
 

Similar to Developing Performance Based Work Statements (20)

Business Value Enhancement Methodology
Business Value Enhancement MethodologyBusiness Value Enhancement Methodology
Business Value Enhancement Methodology
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
10 steps metrics
10 steps metrics10 steps metrics
10 steps metrics
 
Defining The Project
Defining The ProjectDefining The Project
Defining The Project
 
The 3 Steps to a Successful Statement of Work
The 3 Steps to a Successful Statement of WorkThe 3 Steps to a Successful Statement of Work
The 3 Steps to a Successful Statement of Work
 
project Development Management (Scope Management )
project Development Management (Scope Management )project Development Management (Scope Management )
project Development Management (Scope Management )
 
The Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessThe Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccess
 
A Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersA Guide for Capital Project Mamnagers
A Guide for Capital Project Mamnagers
 
Becoming a real business partner
Becoming a real business partnerBecoming a real business partner
Becoming a real business partner
 
ITIL DevOps and PBR
ITIL DevOps and PBRITIL DevOps and PBR
ITIL DevOps and PBR
 
Capabilities Based Planning
Capabilities Based PlanningCapabilities Based Planning
Capabilities Based Planning
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
Deliverables Based Planning
Deliverables Based PlanningDeliverables Based Planning
Deliverables Based Planning
 
OKR framing (1).pdf
OKR framing (1).pdfOKR framing (1).pdf
OKR framing (1).pdf
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
getsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfgetsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdf
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 

More from kahogan62 (20)

Reward systems & legal issues
Reward systems & legal issuesReward systems & legal issues
Reward systems & legal issues
 
Define performance & choosing a measurement approach
Define performance & choosing a measurement approachDefine performance & choosing a measurement approach
Define performance & choosing a measurement approach
 
Eoq model
Eoq modelEoq model
Eoq model
 
Supply chain risk mgmt
Supply chain risk mgmtSupply chain risk mgmt
Supply chain risk mgmt
 
Value chain SCM
Value chain SCMValue chain SCM
Value chain SCM
 
Contractor Relationship OPS405
Contractor Relationship OPS405Contractor Relationship OPS405
Contractor Relationship OPS405
 
Chap016 suppply management ops405
Chap016 suppply management ops405Chap016 suppply management ops405
Chap016 suppply management ops405
 
Cost of ownership gsa
Cost of ownership gsaCost of ownership gsa
Cost of ownership gsa
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450
 
Supply chain management ops 405
Supply chain management ops 405Supply chain management ops 405
Supply chain management ops 405
 
Krause corporation ops4505
Krause corporation ops4505Krause corporation ops4505
Krause corporation ops4505
 
Value chain thru general electric
Value chain thru general electricValue chain thru general electric
Value chain thru general electric
 
Inventory & Inflation
Inventory & InflationInventory & Inflation
Inventory & Inflation
 
Price vs quality
Price vs qualityPrice vs quality
Price vs quality
 
Best practices in_leading_change
Best practices in_leading_changeBest practices in_leading_change
Best practices in_leading_change
 
Cost, diff, responce
Cost, diff, responceCost, diff, responce
Cost, diff, responce
 
Vertical integration
Vertical integrationVertical integration
Vertical integration
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operations
 
Inventory management
Inventory managementInventory management
Inventory management
 
Operational efficiencies
Operational efficienciesOperational efficiencies
Operational efficiencies
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Recently uploaded (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Developing Performance Based Work Statements

  • 1. S TATEMENT OF WORK (S OW) PERFORMANCE BASED CONTRACTING 1
  • 2. Statement of Work Performance-Based Contracting Performance-based contracting involves structuring all aspects of an acquisition around the purpose of the work to be performed as opposed to either the manner by which the work is to be performed or a broad and imprecise statement of work. 2
  • 3. Statement of Work What vs. How • Lower costs • Flexibility to achieve a solution • Solution is the responsibility on the contractor 3
  • 4. What Is An SOW?  A formal written description of your minimum requirements to be performed by a contractor  The “heart of your procurement” 4
  • 5. Why is a Clear and Concise SOW Important ?  Provides a clear understanding of the requirements  Establishes a baseline for proposal evaluation  Reduces evaluation and negotiation time  Minimizes need for future changes  Baselines contractor performance measures 5
  • 6. Many Documents Are Based On The SOW SOW NAFI QA R E P O R T IN G C O S T E S T IM A T E S U R V E IL L A N C E R E Q U IR E M E N T S PLAN E V A L U A T I O N C R I T E R IA IN S T R U C T IO N F O R S E C T IO N (M ) P R O P O S A L P R E P A R A T IO N S E C T IO N (L ) 6
  • 7. STATEMENT OF WORK PROCESS OVERVIEW The following is a summary of the recommended process steps for preparing a Statement of Work SOW : 4. Establish a preliminary scope statement ( i.e., the purpose or objective of your procurement) 5. List the tasks to be performed ( i.e., All performance requirements you intend the contractor to satisfy, all requirements that the contractor must comply with during contract performance ) 6. Group similar and related tasks. 7. Organize the tasks in logical sequence 8. Identify the input ( Required resources to perform the tasks) 9. Identify the output ( Required results or deliverables ) 10. Identify the timeline or frequency of the deliverables (output) 11. Develop the parameters for acceptable quality and performance 12. Determine how you will monitor the deliverables 7
  • 8. Statement of Work Step 1 • ESTABLISH A PRELIMINARY SCOPE STATEMENT THAT: – Identifies the objective or purpose of the procurement – Description of work to be performed – Define the magnitude of work to be performed – Defines the boundaries of performance and responsibilities 8
  • 9. Statement of Work Step 2 • List task to be performed that will: – Accomplish the objective of the SOW – Focus of “what” not “how” the contractor will perform 9
  • 10. Statement of Work Step 3 • Group similar and related task • Categorize tasks as either major or sub-tasks • Add any additional tasks as you work through this 10
  • 11. Statement of Work Step 4 • Organized task in logical sequence – Chronological order – Time-phase – Discipline • Ensure task required meet the minimum requirements • Delete unnecessary or repetitive tasks 11
  • 12. Statement of Work Step 5 • Identify the required resources for each task (input) – May be labor, equipment and material – May be NAFI or government provided • Identify any operating restrictions or procedures 12
  • 13. Statement of Work Step 6 • Identify required results and or deliverables (output) – Meetings – Reports • Provides information to develop oversight plan • Contractor responsible for the work (input to output) 13
  • 14. Statement of Work Step 7 • Identify the frequency and timeline of deliverables • Assists in – Refining SOW – Method of surveillance – Surveillance plan – Cost estimate 14
  • 15. Statement of Work Step 8 • Develop performance standard or acceptance criteria expressed in – Quality – Quantity – Time – Appearance • Should include elements such as “What, when, where, how many times • Should be appropriate for the contract and – Necessary – Realistic – Objective and measurable 15
  • 16. Statement of Work Step 9 • Determine how you will monitor the deliverables • Must be appropriate for the contract • Cost effective • Methods include: – 100% inspection – Random sampling – Periodic inspection – Customer copleaints – Review of progress milestons – Reports by contractor 16
  • 17. Statement of Work Conclusion Lastly, the key factor in the success of the Performance Based Contract is the ability of you, the customer, to write good requirements. 17

Editor's Notes

  1. A performance based SOW promises to lower costs for both the customer and the vendor, allows more flexibility in developing a solution to the customer ’s requirements, and places the responsibility for a solution that meets the customer ’s requirements on the contractor. A performance based SOW promises to lower costs for both the customer and the vendor, allows more flexibility in developing a solution to the customer ’s requirements, and places the responsibility for a solution that meets the customer ’s requirements on the vendor.
  2. SOWs must reflect the full requirement to include a description of the work to be accomplished, the outcomes or deliverables, any NAFI/Government information to be provided the contractor, All other documents must be consistent with your SOW. We will go into this a litlle later, however some examples are the evaluation factors/criteria, instructions for proposal presentation,
  3. Amendments during the solicitation and evaluation process Ensures ease of administration – lessens possibility of misinterpretations of requirements. Additional cost as a result of inadequate specification
  4. All areas of the RFP are directly related to the SOW. Refer back to the Acquisition Plan and all the elements that were developed
  5. The scope of work of your SOW should identify the objective or purpose of your procurement, and should define the magnitude of the work to be performed. It should also define the outside boundaries of the contractor ’s performance responsibilities. This becomes important during contract performance in determining whether additional tasks or work is considered within the scope of the originally planned responsibilities or is considered new work.
  6. Now you should identify all tasks that may be required to accomplish the objective or purpose of the SOW. The tasks should focus on what the contractor will be required to do rather than how the contractor should accomplish the effort.
  7. From the list of tasks generated, now identify the major tasks and sub-tasks. You need to group similar and related requirements; make sure you separate the major tasks from one another and list the sub-tasks under their appropriate major task. If you find that additional tasks (i.e., major or sub-tasks) are identified as you group and categorize, then add them to your outline accordingly.
  8. The major tasks and their corresponding sub-tasks must be arranged in a logical sequence (e.g., chronological order, time-phase, grouped by discipline or task, or some combination). This is a good time to make sure all the tasks required to meet the NAFI ’s minimum requirements and successfully perform the contract have been identified. Repetitive orunnecessary tasks should be deleted at this step.
  9. You need to identify the required resources (the input) for each task in your final task list. Inputs are the resources such as labor, equipment and material that are necessary to perform the task(s). The identified input will assist you with developing your list of NAFI furnished property and cost estimate. You will also need to identify any NAFI furnished property that is not necessarily associated with a particular task but that will provided as a part of the contract (e.g., office space, telephones, etc.).For NAFI furnished property that involves equipment that is being provided to the contractor, you will need to identify the proper nomenclature, quantity, serial number and estimated value for each item that will be provided as NAFI furnished property. In addition, you will need to identify the condition of the property (e.g.,good/ready for use, needs repair, etc.), physical location and when the property will be provided to the contractor. You will need to identify any restrictions or operating procedures (force protection level, hours of operation )that must be complied with when facilities are provided. The NAFI furnished property information will be included in your acquisition/purchase request package and will be used by your contracting officer to prepare the solicitation.
  10. You need to identify the output for each task in your final task list. Outputs are the services (or the results) provided by the contractor and also deliverables such as reports, software, designs or hardware. The identified output will help you develop your SOW, surveillance plan (if appropriate), reporting requirements and cost estimate. Remember, the contractor will be responsible for the work (transforming the input into the output). Therefore, the output, should not, to the maximum extent practicable, include procedures, methods or processes. The outputs should identify all deliverables required. These deliverables should: 1) Be necessary; 2) Meet the minimum needs of the NAFI; 3) Be identified in the quantity required; and 4) Have delivery schedules specified. Reports should be limited to data which are essential to manage and monitor the contract (e.g., Labor Management Report, Quality Control Report, etc.) or those which are the purpose of the contractor ’s performance (Final Technical Report, Environmental Impact Statement, Certifications, Permits, etc.). If you are procuring commercial services, then required reports should be limited to those normally required in commercial business.
  11. You need to identify how often each output will be furnished. The frequency of some of the outputs will be easy to count or quantify (monthly reports) while others will not (computer systems contract, respond within 2 hours of notification- you will never know in advance the frequency). You may use any available historical data plus projected changes to estimate how often the contractor will be required to furnish the output. If this procurement is for commercial services, you will need to consider what the standard practices are in the commercial marketplace. You may have found out how often the outputs are provided in the commercial world while conducting your market research. The frequencies of the output will assist you with developing your SOW, method of surveillance, surveillance plan (if appropriate) and cost estimate. Potential contractors will need to know how often the outputs are required so that they can understand the magnitude of the work and can propose a reasonably accurate price.
  12. Performance standards or acceptance criteria may be expressed in terms of quality, quantity, time, appearance, etc. and should include elements such as “what, when, where, how many and how well. ” These standards do not need to include all of these elements only those that are appropriate to the acquisition. Performance standards or acceptance criteria should be: Necessary Realistic Specific and to the greatest extent possible: verifiable, objective, measurable The use of objective performance standards is emphasized since they are easier to enforce than subjective standards when the contractor ’s performance is unsatisfactory. Objective standards eliminate personal biases and normally are not subject to different interpretations.Performance standards or acceptance criteria are those performance levels or criteria that a contractor must meet to be considered acceptable during contract performance. These standards and criteria identify what the contractor ’s performance or deliverable product will be measured against. The standards or criteria may be published or recognized industry-wide standards or may be developed by you and tailored to identify the results needed for your procurement. Selection of performance standards or acceptance criteria is critical because they directly affect the cost of service. Therefore, you have to consider the potential cost verses the benefit of the standard or criteria.
  13. Some form of surveillance is necessary to determine the acceptability of the output. The method and extent of surveillance will depend on what is minimally necessary to ensure the contractor complied with the performance standard or met the acceptance criteria. Careful selection of appropriate surveillance methods enables you to determine the amount of resources and associated costs needed to monitor and measure contractor performance. Surveillance may be accomplished by various methods such as 100 percent inspection; random sampling; periodic inspection; customer complaints; review of progress/milestones reports (accomplishments or activities completed) interim or final reports; or a comparison of the delivered output to a set of acceptance criteria.As you develop your final SOW, keep in mind how you might what to monitor and measure performance or deliverables to determine acceptability.