SlideShare a Scribd company logo
1 of 4
Download to read offline
Absorption (Total) Costing
DEFINITION
In this method of costing, all overheads (indirect costs) must be absorbed (recovered) by
the products produced. This method of costing on the full production cost (direct plus
indirect costs) of manufactured products.
NEW TERMS
1. Direct Costs – are those costs directly linked to a product being manufactured. Eg
labour and materials needed to make the product.
2. Indirect Costs – those costs not directly linked to a product being manufactured
(also known as overheads). Eg administrative and selling expenses.
3. Fixed Costs – those costs that do not change as the amount of products
manufactured changes (in the short term). Fixed costs per product decrease as the
level of production increases (and vice versa). Eg Rent expense.
4. Variable Costs – are those costs which change as the amount of products being
manufactured changes. Variable costs per product do not change as the level of
production changes. Eg Raw Materials.
5. Total Costs = Fixed Costs + Variable Costs
6. Cost Centre – any department or process in a business to which costs may be
attributed
APPORTIONING COSTS TO PRODUCTION COST CENTRES
Direct costs and some indirect costs (overheads) can be identified and allocated to
specific cost centres.
Other indirect costs (overheads) incurred are apportioned between cost centres on one
of the following bases:
a) Floor area
b) Cost or Book Value of the assets in each centre
c) Number or value of requisitions (orders)
d) Number of personnel
In this way the Total Cost per cost centre can be calculated.
Edited by D. El-Hoss
www.aslevelaccounts.com
www.aslevelaccounts.com
APPORTIONING SERVICE COST CENTRE OVERHEADS TO PRODUCTION
COST CENTRES
Service cost centres provide services to the production centres. Eg Stores, Canteens
Maintenance etc.
The overheads of service departments must be shared / apportioned between the
Production Cost Centres in order to calculate the Total Cost of goods produced..
Methods of apportioning:
a) The Elimination Method
The costs of the service departments are apportioned between the
Production centres and other service centres. Once the costs of one service
centre have been apportioned it is eliminated from the next apportionment.
The basis of apportionment of the service centres could be:
a) Floor area
b) Cost or Book Value of the assets in each centre
c) Number or value of requisitions (orders)
d) Number of personnel
Example:
Stores must be apportioned on the basis of personnel
Canteen must be apportioned on the basis of number of requisitions
Cutting Sanding Assembly Stores Canteen
No of personnel 20 10 30 5 5
No of Requisitions 15 5 10 2 7
Apportionment:
Cutting Sanding Assembly Stores Canteen
Overheads 10 000 12 000 24 000 3000 6000
First Apportionment (based on 65 staff) 923 462 1385 (3000) 230
Second App (based on 30 requisitions) 3000 1000 2000 (6000)
TOTAL COSTS 13923 13462 23385 - -
Edited by D. El-Hoss
www.aslevelaccounts.com
www.aslevelaccounts.com
CALCULATING OVERHEAD ABSORPTION RATES (OAR)
Once overheads have been apportioned to production cost centres, the next step is to
calculate the Overhead Absorption Rates.
NOTE: Overhead Absorption Rates are calculated on future planned volumes of
production and overhead expenditure because the cost of production must be known in
advance in order to set the selling prices for the products.
Methods of calculating Overhead Absorption Rates:
a) On the basis of Direct Labour Hours (if production is labour intensive)
Total budgeted expenditure x No of labour hours taken to produce one product
Total budgeted labour hours
Example:
A company plans to produce 10 000 units of P and 8 000 units of Q
Each unit of P requires 1 ½ hours to make and each unit of Q Takes ¾ of an hour
The total budgeted overheads for the company are $131 250
Answer
Total labour hours = (10 000 x 1 ½) + (8 000 x ¾)
= 21 000 hours
OAR for P = 131 220
21000
= $6.25 per direct labour hour
The overhead absorbed by one unit of P = $6.25 x 1 ½ = $9.37
The overhead absorbed by one unit of Q = $6.25 x ¾ = $4.69
Total overhead will be absorbed as follows:
P = 10 000 x $9.37 = 93 700
Q = 8 000 x $4.69 = 37 520
131220
Edited by D. El-Hoss
www.aslevelaccounts.com
www.aslevelaccounts.com
b) On the basis of Machine Hours (if production is capital intensive)
Total budgeted expenditure x No of machine hours taken to produce one product
Total budgeted machine hours
c) On any other basis that management decide upon
Eg direct material costs; prime cost; direct wages
OVER – ABSORPTION AND UNDER- ABSORPTION OF OVERHEADS
Remember that Overhead Absorption Rates are calculated on future planned volumes of
production and budgeted expenditure. It is most likely that the actual volume of goods
produced and expenditure will be different from these forecasts.
This will result in overhead expenditure being either under or over absorbed.
Under-absorption – occurs actual expenditure is more than the budgeted figure and/or
actual production is less than the planned level.
Over-absorption – occurs when actual expenditure is less than the budgeted figure
and/or actual production is more than the planned level.
Example:
2005 2006
Budgeted expenditure $200 000 $240 000
Planned volume of production(units) 80 000 100 000
OAR = 200 000 = $2.50 240 000 = $2.40
80 000 100 000
Actual expenditure $215 000 $230 000
Actual volume of production (units) 76 000 106 000
Overhead Recovered 76 000 x $2.50 106 000 x $2.40
= $190 000 = $254 400
Therefore in 2005, there was an under-absorption of:
$215 000 - $190 000
= $25 000
And in 2006 there was an over-absorption of :
$230 000 – 254 400
= $24 400
Edited by D. El-Hoss
www.aslevelaccounts.com
www.aslevelaccounts.com

More Related Content

What's hot

Process costing
Process costingProcess costing
Process costing
Prem Chand
 
Flexible budgets & overhead costs
Flexible budgets & overhead costsFlexible budgets & overhead costs
Flexible budgets & overhead costs
akanksha_020
 
Process cost systems
Process cost systemsProcess cost systems
Process cost systems
Khalid Aziz
 

What's hot (14)

Process costing
Process costingProcess costing
Process costing
 
Abnormal loss
Abnormal lossAbnormal loss
Abnormal loss
 
Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016
 
Case study 1 greetings inc. job order costing MANAGERIAL ACCOUNTING
Case study 1 greetings inc. job order costing MANAGERIAL ACCOUNTINGCase study 1 greetings inc. job order costing MANAGERIAL ACCOUNTING
Case study 1 greetings inc. job order costing MANAGERIAL ACCOUNTING
 
Flexible budgets & overhead costs
Flexible budgets & overhead costsFlexible budgets & overhead costs
Flexible budgets & overhead costs
 
Management and Cost Accounting 7th Edition Drury Solutions Manual
Management and Cost Accounting 7th Edition Drury Solutions ManualManagement and Cost Accounting 7th Edition Drury Solutions Manual
Management and Cost Accounting 7th Edition Drury Solutions Manual
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Bsr3 a unit 1 2016
Bsr3 a unit 1   2016Bsr3 a unit 1   2016
Bsr3 a unit 1 2016
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentation
 
Process cost systems
Process cost systemsProcess cost systems
Process cost systems
 
Ch04 m 06_09_10
Ch04 m 06_09_10Ch04 m 06_09_10
Ch04 m 06_09_10
 
COST ACCOUNTING
COST ACCOUNTINGCOST ACCOUNTING
COST ACCOUNTING
 
Acc mgt noreen04 systems design process costing
Acc mgt noreen04 systems design process costingAcc mgt noreen04 systems design process costing
Acc mgt noreen04 systems design process costing
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
 

Similar to Absorption costing

Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
ObsaKamil
 
Management AccountingActivity Based Costing vs Absorption Cost.docx
Management AccountingActivity Based Costing vs Absorption Cost.docxManagement AccountingActivity Based Costing vs Absorption Cost.docx
Management AccountingActivity Based Costing vs Absorption Cost.docx
infantsuk
 
CA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdfCA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdf
sandiibrahim3
 
Unit 9 cost measurement
Unit 9 cost measurementUnit 9 cost measurement
Unit 9 cost measurement
Ryk Ramos
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
Rahul Kumar
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
gk44
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
gk44
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
lililalalala
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
lililalalala
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
lililalalala
 

Similar to Absorption costing (20)

ACCOUNTING FOR OH.pptx
ACCOUNTING FOR OH.pptxACCOUNTING FOR OH.pptx
ACCOUNTING FOR OH.pptx
 
Ma
MaMa
Ma
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 
Management AccountingActivity Based Costing vs Absorption Cost.docx
Management AccountingActivity Based Costing vs Absorption Cost.docxManagement AccountingActivity Based Costing vs Absorption Cost.docx
Management AccountingActivity Based Costing vs Absorption Cost.docx
 
CA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdfCA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdf
 
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
 
Unit 9 cost measurement
Unit 9 cost measurementUnit 9 cost measurement
Unit 9 cost measurement
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Overhead cost
Overhead costOverhead cost
Overhead cost
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
 
Job and batch costing
Job and batch costingJob and batch costing
Job and batch costing
 
PPT on PM_Unit 1 .pptx.
PPT                  on PM_Unit 1 .pptx.PPT                  on PM_Unit 1 .pptx.
PPT on PM_Unit 1 .pptx.
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
 
Factory overhead slides
Factory overhead slidesFactory overhead slides
Factory overhead slides
 
Managerial economics
Managerial economicsManagerial economics
Managerial economics
 

Recently uploaded

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Absorption costing

  • 1. Absorption (Total) Costing DEFINITION In this method of costing, all overheads (indirect costs) must be absorbed (recovered) by the products produced. This method of costing on the full production cost (direct plus indirect costs) of manufactured products. NEW TERMS 1. Direct Costs – are those costs directly linked to a product being manufactured. Eg labour and materials needed to make the product. 2. Indirect Costs – those costs not directly linked to a product being manufactured (also known as overheads). Eg administrative and selling expenses. 3. Fixed Costs – those costs that do not change as the amount of products manufactured changes (in the short term). Fixed costs per product decrease as the level of production increases (and vice versa). Eg Rent expense. 4. Variable Costs – are those costs which change as the amount of products being manufactured changes. Variable costs per product do not change as the level of production changes. Eg Raw Materials. 5. Total Costs = Fixed Costs + Variable Costs 6. Cost Centre – any department or process in a business to which costs may be attributed APPORTIONING COSTS TO PRODUCTION COST CENTRES Direct costs and some indirect costs (overheads) can be identified and allocated to specific cost centres. Other indirect costs (overheads) incurred are apportioned between cost centres on one of the following bases: a) Floor area b) Cost or Book Value of the assets in each centre c) Number or value of requisitions (orders) d) Number of personnel In this way the Total Cost per cost centre can be calculated. Edited by D. El-Hoss www.aslevelaccounts.com www.aslevelaccounts.com
  • 2. APPORTIONING SERVICE COST CENTRE OVERHEADS TO PRODUCTION COST CENTRES Service cost centres provide services to the production centres. Eg Stores, Canteens Maintenance etc. The overheads of service departments must be shared / apportioned between the Production Cost Centres in order to calculate the Total Cost of goods produced.. Methods of apportioning: a) The Elimination Method The costs of the service departments are apportioned between the Production centres and other service centres. Once the costs of one service centre have been apportioned it is eliminated from the next apportionment. The basis of apportionment of the service centres could be: a) Floor area b) Cost or Book Value of the assets in each centre c) Number or value of requisitions (orders) d) Number of personnel Example: Stores must be apportioned on the basis of personnel Canteen must be apportioned on the basis of number of requisitions Cutting Sanding Assembly Stores Canteen No of personnel 20 10 30 5 5 No of Requisitions 15 5 10 2 7 Apportionment: Cutting Sanding Assembly Stores Canteen Overheads 10 000 12 000 24 000 3000 6000 First Apportionment (based on 65 staff) 923 462 1385 (3000) 230 Second App (based on 30 requisitions) 3000 1000 2000 (6000) TOTAL COSTS 13923 13462 23385 - - Edited by D. El-Hoss www.aslevelaccounts.com www.aslevelaccounts.com
  • 3. CALCULATING OVERHEAD ABSORPTION RATES (OAR) Once overheads have been apportioned to production cost centres, the next step is to calculate the Overhead Absorption Rates. NOTE: Overhead Absorption Rates are calculated on future planned volumes of production and overhead expenditure because the cost of production must be known in advance in order to set the selling prices for the products. Methods of calculating Overhead Absorption Rates: a) On the basis of Direct Labour Hours (if production is labour intensive) Total budgeted expenditure x No of labour hours taken to produce one product Total budgeted labour hours Example: A company plans to produce 10 000 units of P and 8 000 units of Q Each unit of P requires 1 ½ hours to make and each unit of Q Takes ¾ of an hour The total budgeted overheads for the company are $131 250 Answer Total labour hours = (10 000 x 1 ½) + (8 000 x ¾) = 21 000 hours OAR for P = 131 220 21000 = $6.25 per direct labour hour The overhead absorbed by one unit of P = $6.25 x 1 ½ = $9.37 The overhead absorbed by one unit of Q = $6.25 x ¾ = $4.69 Total overhead will be absorbed as follows: P = 10 000 x $9.37 = 93 700 Q = 8 000 x $4.69 = 37 520 131220 Edited by D. El-Hoss www.aslevelaccounts.com www.aslevelaccounts.com
  • 4. b) On the basis of Machine Hours (if production is capital intensive) Total budgeted expenditure x No of machine hours taken to produce one product Total budgeted machine hours c) On any other basis that management decide upon Eg direct material costs; prime cost; direct wages OVER – ABSORPTION AND UNDER- ABSORPTION OF OVERHEADS Remember that Overhead Absorption Rates are calculated on future planned volumes of production and budgeted expenditure. It is most likely that the actual volume of goods produced and expenditure will be different from these forecasts. This will result in overhead expenditure being either under or over absorbed. Under-absorption – occurs actual expenditure is more than the budgeted figure and/or actual production is less than the planned level. Over-absorption – occurs when actual expenditure is less than the budgeted figure and/or actual production is more than the planned level. Example: 2005 2006 Budgeted expenditure $200 000 $240 000 Planned volume of production(units) 80 000 100 000 OAR = 200 000 = $2.50 240 000 = $2.40 80 000 100 000 Actual expenditure $215 000 $230 000 Actual volume of production (units) 76 000 106 000 Overhead Recovered 76 000 x $2.50 106 000 x $2.40 = $190 000 = $254 400 Therefore in 2005, there was an under-absorption of: $215 000 - $190 000 = $25 000 And in 2006 there was an over-absorption of : $230 000 – 254 400 = $24 400 Edited by D. El-Hoss www.aslevelaccounts.com www.aslevelaccounts.com