HOUSE DRAINAGE PLAN
TESTING OF DRAINS AND PIPES
ENVIRONMENTAL ENGINEERING
-: CREATED BY :-
AALAY MEHTA 141080106011
SHIVANI PATEL 141080106021
KAVIN RAVAL 141080106026
KUNTAL SONI 141080106028
-: SUBMITTED TO :-
PROF. KINNARY RANGPARIYA
CONTENT
 HOUSE DRAINAGE PLAN
 TESTING OF DRAINS AND PIPES
HOUSE DRAINAGE PLAN
 Before starting the plumbing work, it is most essential first to prepare the
drainage plan.
 The site plan is drawn to a suitable scale, showing onto it the position of
baths, w.c., Urinals, wash basins, and other units, along with the position of
gully traps and floor traps.
 The longitudinal section of the drain is also drawn, showing distances, invert
levels, size and levels of inspection chambers and man holes, gradient of
pipes and position and level of the public sewer.
HOUSE DRAINAGE PLAN
 The following points should be kept in mind while preparing the drainage
plan:
1. the drains should be laid in such a way so as to remove the sewage quickly
from the building. The drains should be laid at a slope that self cleansing
velocity is developed in them.
the following slopes are usually sufficient :
Diameter of pipe Gradient
100 mm 1 in 40
150 mm 1 in 60
230 mm 1 in 90
HOUSE DRAINAGE PLAN
2. Entire drainage system should be properly ventilated on the house side. The
ventilation pipe should be carried sufficiently high above the buildings. All the
inspection chambers should be provided with fresh air inlets.
3. All the drains should be laid in such a way so as to ensure their safety in
future.
4. The drain should be laid in such a way that in future, extension can be done
easily.
5. All soil pipes should be carried direct to the manholes without gully trap.
6. Pipes should be laid in straight lines both horizontal as well as in the vertical
directions . Any abrupt change in the direction of the flow should be avoided.
7. Where pipes intersect or where there is change in the direction of pipe .
Inspection chambers should be provided.
8. All rain water pipes should discharge over gully traps and should be
disconnected from the drains.
HOUSE DRAINAGE PLAN
TESTING OF DRAINS AND PIPES
 After laying the house drains and fittings in the pipes , their water tightness
should be ascertained by applying various tests . The drains are usually tested
in sections between successive chambers, and vertical pipes are tested in
groups having one common inspection chamber.
 The following tests are usually conducted :
1. Air test
2. Coloured water test
3. Hydraulic test
4. Smell test
5. Smoke test
TESTING OF DRAINS AND PIPES
air test
 The air test can be applied from underground and vertical pipes. The
particular section is selected and the plugs are provided at the upper and
lower ends. The air is forced in the pipe by suitable equipment such as pump.
The leaky joints are found out by applying soap solution. The escape of air
from leaky joints will form bubbles which are visible . These joints are then
repaired.
TESTING OF DRAINS AND PIPES
coloured water test
 When coloured water is allowed to flow from one point to the other point of
the drain, it will come out through the leaky joints. Thus, the leakage can be
detected and suitable remedies may be applied.
TESTING OF DRAINS AND PIPES
hydraulic test
 This is the most important test which is applied for the water tightness of the
underground drains . The lower end is provided with a plug and at the upper
manhole, the water is filled to a height of about 600mm to 900mm in case of
house drains. If there is no drop in water level for a period of about 10
minutes, it can be safely assumed that no joint is leaking. Otherwise from
leaky joints are detected and repaired.
TESTING OF DRAINS AND PIPES
smell test
 This test is similar to the air test. But, in this case air is mixed with some
smelling gas which can be easily recognized. Such air is allowed to pass
through the drain. The escape of air fro leaky joints is detected by smell and
such joints are then repaired.
TESTING OF DRAINS AND PIPES
smoke test
 This test is also similar to the air test, except that the smoke is introduced in
the drains instead of air. The test is generally applied for detecting leakage in
existing drains.
Environmental engineering PPT
Environmental engineering PPT

More Related Content

What's hot

All About Plumbing
All About PlumbingAll About Plumbing
All About Plumbing
vortexcas
 

What's hot (20)

L3 -Intake Structures.ppt
L3 -Intake Structures.pptL3 -Intake Structures.ppt
L3 -Intake Structures.ppt
 
Sanitary and water supply
Sanitary and water supplySanitary and water supply
Sanitary and water supply
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
water distribution system
water distribution systemwater distribution system
water distribution system
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPSDRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
 
All About Plumbing
All About PlumbingAll About Plumbing
All About Plumbing
 
PLUMBING SYSTEM
PLUMBING SYSTEMPLUMBING SYSTEM
PLUMBING SYSTEM
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Sanitary fitting & house drainage system
Sanitary fitting & house drainage systemSanitary fitting & house drainage system
Sanitary fitting & house drainage system
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
Sewer appurtenances [recovered]
Sewer appurtenances [recovered]Sewer appurtenances [recovered]
Sewer appurtenances [recovered]
 
Traps
TrapsTraps
Traps
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & Layout
 
Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply Sanitary engineering-1-Water treatment and water supply
Sanitary engineering-1-Water treatment and water supply
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 

Similar to Environmental engineering PPT

Unit 5 final
Unit 5 finalUnit 5 final
Unit 5 final
iampichu
 
presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
sakshivaswani2
 

Similar to Environmental engineering PPT (20)

sewage layy out lec
sewage layy out lecsewage layy out lec
sewage layy out lec
 
S3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENTS3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENT
 
HOUSE DRAINAGE
 HOUSE DRAINAGE HOUSE DRAINAGE
HOUSE DRAINAGE
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Plumbing_Week 4.pptx
Plumbing_Week 4.pptxPlumbing_Week 4.pptx
Plumbing_Week 4.pptx
 
House drainage system
House drainage systemHouse drainage system
House drainage system
 
J. PLANS _ SPECS.pptx
J. PLANS _ SPECS.pptxJ. PLANS _ SPECS.pptx
J. PLANS _ SPECS.pptx
 
construction of drain and seers
construction of drain and seersconstruction of drain and seers
construction of drain and seers
 
16
1616
16
 
Drainage
DrainageDrainage
Drainage
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
 
Unit 5 final
Unit 5 finalUnit 5 final
Unit 5 final
 
presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
 
Plumbing
PlumbingPlumbing
Plumbing
 
Sewer Appurtances
Sewer AppurtancesSewer Appurtances
Sewer Appurtances
 
Maintenance of sewer
Maintenance of sewerMaintenance of sewer
Maintenance of sewer
 
waste water drainage
waste water drainagewaste water drainage
waste water drainage
 
House drainage
House drainageHouse drainage
House drainage
 
Drains and sewer
Drains and sewerDrains and sewer
Drains and sewer
 
Che 4 house drainage system
Che 4 house drainage systemChe 4 house drainage system
Che 4 house drainage system
 

More from Kavin Raval

More from Kavin Raval (20)

Valuation - professional prractice and valuation
Valuation - professional prractice and valuationValuation - professional prractice and valuation
Valuation - professional prractice and valuation
 
Retaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structureRetaining wall - design of reinforced concrete structure
Retaining wall - design of reinforced concrete structure
 
Energy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringEnergy dissipation - irrigation engineering
Energy dissipation - irrigation engineering
 
Structure analysis PTT
Structure analysis PTTStructure analysis PTT
Structure analysis PTT
 
Soil mechanics PPT
Soil mechanics PPTSoil mechanics PPT
Soil mechanics PPT
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTHYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
 
Cyber security PPT
Cyber security PPTCyber security PPT
Cyber security PPT
 
MILNE'S PREDICTOR CORRECTOR METHOD
MILNE'S PREDICTOR CORRECTOR METHODMILNE'S PREDICTOR CORRECTOR METHOD
MILNE'S PREDICTOR CORRECTOR METHOD
 
FIELD ASTRONOMY SURVEYING
FIELD ASTRONOMY SURVEYINGFIELD ASTRONOMY SURVEYING
FIELD ASTRONOMY SURVEYING
 
ARCHES
ARCHESARCHES
ARCHES
 
CONCRETE- ADVANTAGES,HISTORY,FUTURE TRENDS
CONCRETE- ADVANTAGES,HISTORY,FUTURE TRENDSCONCRETE- ADVANTAGES,HISTORY,FUTURE TRENDS
CONCRETE- ADVANTAGES,HISTORY,FUTURE TRENDS
 
LAND USE PLANNING CONSTRUCTION
LAND USE PLANNING CONSTRUCTIONLAND USE PLANNING CONSTRUCTION
LAND USE PLANNING CONSTRUCTION
 
MARKET- CONCEPTS OF MARKET
MARKET- CONCEPTS OF MARKETMARKET- CONCEPTS OF MARKET
MARKET- CONCEPTS OF MARKET
 
Classification of soil
Classification of soilClassification of soil
Classification of soil
 
Computation of area
Computation of areaComputation of area
Computation of area
 
SERIES SOLUTION OF ORDINARY DIFFERENTIALL EQUATION
SERIES SOLUTION OF ORDINARY DIFFERENTIALL EQUATIONSERIES SOLUTION OF ORDINARY DIFFERENTIALL EQUATION
SERIES SOLUTION OF ORDINARY DIFFERENTIALL EQUATION
 
Shallow foundation
Shallow foundationShallow foundation
Shallow foundation
 
FRICTION
FRICTIONFRICTION
FRICTION
 
Buoyancy and floatation
Buoyancy and floatationBuoyancy and floatation
Buoyancy and floatation
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Environmental engineering PPT

  • 1. HOUSE DRAINAGE PLAN TESTING OF DRAINS AND PIPES ENVIRONMENTAL ENGINEERING
  • 2. -: CREATED BY :- AALAY MEHTA 141080106011 SHIVANI PATEL 141080106021 KAVIN RAVAL 141080106026 KUNTAL SONI 141080106028 -: SUBMITTED TO :- PROF. KINNARY RANGPARIYA
  • 3. CONTENT  HOUSE DRAINAGE PLAN  TESTING OF DRAINS AND PIPES
  • 4. HOUSE DRAINAGE PLAN  Before starting the plumbing work, it is most essential first to prepare the drainage plan.  The site plan is drawn to a suitable scale, showing onto it the position of baths, w.c., Urinals, wash basins, and other units, along with the position of gully traps and floor traps.  The longitudinal section of the drain is also drawn, showing distances, invert levels, size and levels of inspection chambers and man holes, gradient of pipes and position and level of the public sewer.
  • 5. HOUSE DRAINAGE PLAN  The following points should be kept in mind while preparing the drainage plan: 1. the drains should be laid in such a way so as to remove the sewage quickly from the building. The drains should be laid at a slope that self cleansing velocity is developed in them. the following slopes are usually sufficient : Diameter of pipe Gradient 100 mm 1 in 40 150 mm 1 in 60 230 mm 1 in 90
  • 6. HOUSE DRAINAGE PLAN 2. Entire drainage system should be properly ventilated on the house side. The ventilation pipe should be carried sufficiently high above the buildings. All the inspection chambers should be provided with fresh air inlets. 3. All the drains should be laid in such a way so as to ensure their safety in future. 4. The drain should be laid in such a way that in future, extension can be done easily. 5. All soil pipes should be carried direct to the manholes without gully trap. 6. Pipes should be laid in straight lines both horizontal as well as in the vertical directions . Any abrupt change in the direction of the flow should be avoided. 7. Where pipes intersect or where there is change in the direction of pipe . Inspection chambers should be provided. 8. All rain water pipes should discharge over gully traps and should be disconnected from the drains.
  • 8. TESTING OF DRAINS AND PIPES  After laying the house drains and fittings in the pipes , their water tightness should be ascertained by applying various tests . The drains are usually tested in sections between successive chambers, and vertical pipes are tested in groups having one common inspection chamber.  The following tests are usually conducted : 1. Air test 2. Coloured water test 3. Hydraulic test 4. Smell test 5. Smoke test
  • 9. TESTING OF DRAINS AND PIPES air test  The air test can be applied from underground and vertical pipes. The particular section is selected and the plugs are provided at the upper and lower ends. The air is forced in the pipe by suitable equipment such as pump. The leaky joints are found out by applying soap solution. The escape of air from leaky joints will form bubbles which are visible . These joints are then repaired.
  • 10. TESTING OF DRAINS AND PIPES coloured water test  When coloured water is allowed to flow from one point to the other point of the drain, it will come out through the leaky joints. Thus, the leakage can be detected and suitable remedies may be applied.
  • 11. TESTING OF DRAINS AND PIPES hydraulic test  This is the most important test which is applied for the water tightness of the underground drains . The lower end is provided with a plug and at the upper manhole, the water is filled to a height of about 600mm to 900mm in case of house drains. If there is no drop in water level for a period of about 10 minutes, it can be safely assumed that no joint is leaking. Otherwise from leaky joints are detected and repaired.
  • 12. TESTING OF DRAINS AND PIPES smell test  This test is similar to the air test. But, in this case air is mixed with some smelling gas which can be easily recognized. Such air is allowed to pass through the drain. The escape of air fro leaky joints is detected by smell and such joints are then repaired.
  • 13. TESTING OF DRAINS AND PIPES smoke test  This test is also similar to the air test, except that the smoke is introduced in the drains instead of air. The test is generally applied for detecting leakage in existing drains.