SlideShare una empresa de Scribd logo
1 de 90
Descargar para leer sin conexión
Company Profile

     Ver. 120308
Contents

I.    Company Introduction --------------------------------------------------------------------------------3
           General Information
           Company History
           Business with the United Nations
           Business with CHF International
           Business with FIFA
           Business with Japan Ministry of Defense



II.   Division Introduction-----------------------------------------------------------------------------------7


III. Products Divisions------------------------------------------------------------------------------------- 12
       1.    International Public-Procurement
       2.    Prefabricated Building System
       3.    Village Design & Construction (Field Labor Camp)
       4.    Green Technology & Systems
       5.    Sports & System
       6.    Housing
       7.    Emergency & Transitional House
       8.    Next Generation Military Tent
       9.    Caravan RS(Radiation Shielding) System



                                                                                                                  2
Company Introduction
  General Information

Company Name      Caravan Engineered Structures, Inc. (Caravan ES)
Products           1. UN PKO Items
                      (1) Prefabricated Structures (Accommodation, Storage, Workshop and Other Use)
                      (2) Electrical Materials for Field Operation (Cables, Lamps, Distribution Boards and Transformers)
                      (3) Sanitation Fixtures
                   2. Prefabricated Building System
                      (1) Prefabricated Hardwall & Softwall Buildings
                      (2) Prefabricated Buildings
                   3. Village Design & Construction (Filed Labor Camp)
                   4. Green Technology & Greenhouse
                   5. Sports System
                   6. Housing
                   7. Emergency & Transitional Houses
                   8. Next Generation Military Tent
                   9. Caravan RS(Radiation Shielding) System


Locations         Office
                   (1) Seoul (HQ): 41st Floor, Trade Tower, World Trade Center, Samseong-dong, Gangnam-gu, Seoul, Korea.
                       Tel: +82-2-6000-6800, Fax: +82-2-6000-6688
                   (2) New York: 200 West 70th Street #16M(Manhattan), New York, NY 10023 USA
                       Tel: +1-212-579-5600, Fax: +1-212-579-5602
                   (3) Tokyo: 5th Floor, Kyobashi Koyo Bld., 1-14-6 Kyobashi, Chuoku, 104- 0031, Tokyo, Japan
                       Tel: +81-3-6228-6988, Fax: +81-3-6228-6980
                   (4) Sendai: 201, Nippo proceed Tsutsujigaoka, 1-11-10 Miyagino, Miyagino-ku, Sendai, 983-0045 , Japan
                       Tel: +81-22-781-5470 , FAX: +81-22-781-5471
                  Factory
                   (1) Qingdao (China) : South of the Countryside, Yang Jialin, Beiguan Office, Jiaozhou, Qingdao City, China
                   (2) I-Cheon (Korea) : Pyogyo-lee 21-1,21-2, Majang-myun, Icheon-si, Kyungki-do, Korea
                                                                                                                                3
Company Introduction
Company History
2002       Company Foundation

2004        IFAI (Industrial Fabric Association International, USA) Membership
            Next World-class Product Award (Minister of Commerce, Industry and Energy Republic of Korea, No. 2004-350)

2005        Korea Venture Business Association Membership (No. 051121031-1-00361)
            Establishment of New York Branch
            Awarded for Outstanding Export performance -million USD (Korea International Trade Association)

2006        Establishment of Company Annex Research Center
            Korean INNO-BIZ (Innovation Business) Membership (Small and Medium Business Administration)
            Certification for ISO 9001:2000 / KS A 9001:2001

2007       Certification of Appreciation (Maryland, USA)
           Awarded Commendation (Korea Small Business Association, No 2007-160)

2008       Certification for ISO 14001:2004/ KS A 14001:2004
           Designated as Prospective Exporter (Small and Medium Business Administration)
           Awarded Commendation (Small and Medium Business Administration)
           Awarded Commendation (Ministry of Knowledge Economy)
           Awarded Commendation (Prime Minister Korea No.148489)


2009        Establishment of Qingdao Factory, China (March)
            Establishment of Tokyo Branch (November)
            Awarded Commendation (Ministry of Knowledge Economy)
            Awarded for Outstanding Export performance-10million USD (Korea International Trade Association)


2010        Registered as Member of United Nations Global Compact
            Awarded Commendation (Ministry of Knowledge Economy)
            Awarded for Outstanding Export performance-20million USD (Korea International Trade Association)
            Establishment of First Factory in I-Cheon
            Establishment of Second manufacturing facility in China (Qingdao Factory)
            Obtained approval for Second Factory in I-Cheon (Moga Industrial Estate)

2011       Establishment of Sendai Branch
           Establishment of Tokyo and Washington,D.C manufacturing Factory (in progress )
           Establishment of UAE Branch (in progress )
           Awarded Commendation (Ministry of Knowledge Economy)
           Current World-class Product Award (Minister of Knowledge Economy Republic of Korea, No. 2011-045)
                                                                                                                         4
Company Introduction
Business with the United Nations
1. June, 2003      : Contract No. PD/C0012/03 (RFPG-117, Prefabricated Soft-wall Building)
2. May, 2007       : Contract No. PD/C0101/07 (RFPG-359, Ablution & Sanitation Fixtures)
3. March, 2008     : Contract No. PD/C0018/08 (ITBG-1583, Electrical Materials)
4. January, 2009   : Contract No. PD/C0277/08 (RFPG-403, Various Structures for Accommodation, Storage and Workshop)
5. July, 2010      : Purchase Order No. 10MIT-200433 (10RFP/MM/10/UNMIT, Aircraft Hangar)
6. October, 2011   : Contract No. PD/C0227/11 (2TBG-1989, Ablution & Sanitation Fixtures)




               Consultant
1.   Law Firm              : Law Firm BUSAN / Law Office of Byung-Wook Jung
2.   Auditing Firm         : Deloitte Anjin LLC
3.   Labor Corporation     : Labor Corporation Sang Saeng
4.   Tax Accounting Firm   : JTT Partners

                                                                                                                       5
Company Introduction
               Business with CHF
• February, 2011 : Contract No. KATYE-PC-11-02-CES (2-story shelter)
  New 2-story shelter for family camp and resettlement

               Business with FIFA

• March, 2011 : Contract with Federation International de Football Association (FIFA)
    Execution of the construction of indoor futsal stadium for the National Football Training Centre in Paju, Korea

 Business with TV Asahi Create Co., Ltd.

• October, 2010 : Contract No. CR-111021 (3-story building)
  Design and construction of the police station for filming

    Business with Japan Ministry of Defense




• September, 2010 : Japan Ministry of Defense Contract No. 3-22-1001-021A-G-0049 (Battery for Generator)
• June,      2010 : Japan Maritime Self-Defense Force Contract No. 22-1-2214-1290-4048-00 (Angle attachment)

      Business with Samsung Engineering
•   September, 2011 : Samsung Engineering, Contract No.     4500081490-0 (Office & Warehouse, Shaybah NGL Project)
•   September, 2011 : Samsung Engineering, Contract No.     4500081594-0 (Office & Warehouse, Shaybah NGL Project)
•   September, 2011 : Samsung Engineering, Contract No.     4500081596-0 (Office & Warehouse, Shaybah NGL Project)
•   September, 2011 : Samsung Engineering, Contract No.     4500081606-0 (Office & Warehouse, Shaybah NGL Project)
                                                                                                                      6
Division Introduction
 1. International Public-Procurement Division
As a prime contractor of UN Headquarter, we design, manufacture and supply products for UN PKO(Peacekeeping Operation).
We have established a supply contract valued 130 million with UN Headquarter in 2011.
▪ Prefabricated Structures (PBS) : structural and environmental designed housing, warehouses, hangars, gymnasium etc.
▪ Electrical Installation (Electrical materials): Cables, Lamps, Distribution Panels, Light Towers.
▪ Outdoor sanitation facilities (Ablutions / Sanitations fixtures): 100% Stainless Steel Water Savings, Dual-flush Toilets, Shower Trays
▪ ET House (Emergency & Transitional House): Fabric Shelter, Steel House, 2 story shelter, etc.
 In addition, we are planning to supply our prefabricated structures, camp equipment and other products in many other procurement markets
         such as the U.S.Department of Defense(DOD) and U.S. troops in the Pacific Command, U.S. Army, the Japanese Self-Defense etc.




 2. Prefabricated Building System
 With a high strength steel frame, our innovative Prefabricated Building System (PBS) is capable to easily assemble, dis-assemble, and re-
 install. PBS retains not only an excellent quality selecting reinforced PH-beam (Prefabricated H beam) and Galvalumesteel panels but a
 high energy-efficiency through Double-wall system. PBS is use for hangars, warehouses, offices, accommodations, shipyards, etc.
 Features
  Delivered as Complete Kit: Ready to assemble on site by installation manual
  Welding-Free System: Using bolts and nuts only to assemble by unskilled technician
  Fast Installation: 50% shorter work-period comparing others, no heavy equipment needed
  High Strength Light Weight Structure: Earthquake-resistant design, Wind load resists up to 240km/h
  Custom-made Design on sizes, materials, doors, wind-load, snow load, etc.




                                                                                                                                             7
Division Introduction
3. Village Design & Construction (Field Labor Camp) Division

With our experience and advanced technologies, Caravan ES now provides Field Camps that can be applied to Village Reconstruction,
Military Base Camps, and Temporary Construction Facilities.
Features
 - Speedy and easy construction with cost-benefit
 - Turn Key Service: From camp design to civil works, road paving, power & water supply, etc.
 - Various facilities: Accommodation, office, canteen, warehouse, gymnasium, mosque, etc.

Village Reconstruction
We design and rebuild villages that are under poor conditions and damaged by flood, fire, war, and other unexpected disasters. Our
design is based on thorough site survey and careful study on the local features.
Military Base Camps
Caravan ES Military Base Camps are designed to the UN standards, and have incomparably high strength and durability. We provide
the most safe base camps even in difficult conditions and war zones.
Temporary Construction Facilities
Large-scale construction projects require facilities to serve a host of task-force. To ensure efficient and successful implementation of
the projects, we provide temporary construction facilities with infrastructure. Since our structures are completely relocatable &
reusable, we assure high cost efficiency.




                                                                                                                                           8
Division Introductions
4. Green Technology & Greenhouse Division
Our greenhouse is an innovative product that makes up for the weakness of plastic and glass greenhouse. For cladding, we use the
PMMA sheet of which transparency lasts for more than 30 years. We supply and install various sizes of greenhouses from small-
sized to more than 10,000 ㎡ of mega-sized ones.
 All around services from supply and installation of the greenhouse to consulting on growing, production, and marketing of the plants
 High strength H-Beam and Truss that withstand storms and hurricanes
 Excellent insulation as well as energy saving effect with super-transparent double wall
 Versatility, other uses available: Free and easy operation of any type and size of machinery because of NO inner column
 City Farm: Design & consulting service for plant factory, installation and maintenance of vertical garden and roof-top greenhouses




             24m(W) x 51m(L)              80m(W) x 180m(L)                   3m(W) x 6m(L)


5. Sports & System Division
Caravan SS(Sports & System) has newly introduced prefabricated ‘Sports Complex’, the most economical and cost-effective
development for all types of indoor sports. Its patented technology has not only substantially reduced the construction period, but
optimized the use of natural resources while providing adequate functionality and convenience for the users.
 Double-layered transparency structure: Composition of uniquely designed transparent double-layer that transmits a large amount of
  natural light to improve visual effect and energy efficiency.
 Sports facilities & accessories: Functional developments include nationally recognized sports flooring system, sports-oriented indoor
  lighting system, professional installation of audio system, LED scoreboard, spectator’s seat, and many more.
 Application of sports: Various models of Sports Complex with flexible sizes and shapes are offered for utilizing each and every sports
  types, including futsal, basketball, volley ball, horse-riding track, badminton, gateball, and etc.




                                                <36(W) x 51(L) x 14(C.H)m>
Division Introductions

6. Housing (Permanent House & Prefabricated House)
100% prefabricated house using Prefabricated H-Beam(Light-weight prefabricated steel H-Beam). Various size(40㎡~150㎡) and customized
design.
- Fast and easy : Fast and easy construction without heavy equipment and unskilled worker can assemble with installation manual.
                 Short-term installation (32hours with 6 people), Sanitary, Kitchen equipment and Electrical material
- More than 30-year life span: Durable and safe house using Patent Light-weight prefabricated steel H-Beam
- Fast supply: Packable in 20’ ISO containers and dry construction method
               (Available 500 units in one(1) month and 5000units in six(6)months)




7. ET-House: Emergency & Transitional House

Emergency and Transitional House is designed specifically to relief refugees from emergency situations quickly, cost-efficiently and
effectively.
- Two(2) separate rooms in one(1) structure with partition
- Option: Floor, Hard Wall system, shelves, bed, table and electrical equipment
- Cost efficiency, Designed for Transitional Function
- Fast supply: Packable in 20’ ISO containers, easy assemble and disassemble, and Fast & mass production and transport for urgent needs
               (Available 10,000 unit in one(1) month, 60,000 units in six(6) months)
- Various products: Tent, Steel House , and 2 story shelter can be supplied by customer’s need
- Various uses: Caravan’s emergency and transitional house can be used for accommodation, classroom, church, hall and warehouse.




                                                                                                                                          10
Division Introductions
8. Next Generation Military Tent
Core features of light weight and durability, and its distinct supplements, such as ballistic protection, stealth capability, and radiation shielding
provide residence convenience, survivability, and rapid response of the soldiers in the combat field.
 Rapid Set-up: 15 minutes for standard type and even faster installation when in emergency set-up
 Extreme Weather Resistant: Extra insulation set-up (extendable air layer) and strong wind kit for the most challenging climates
 Battlefield Solution: ballistic protection (Test standard: MIL-STD-662F), stealth capability with infrared detector cut-off, and radiation shielding
Functional Materials
 Double Foldable Frame: High strength lightweight aluminum alloy that is expandable for air insulation and adjustable in angles
 Advanced Fabric: Features water repellent, flame and mildew resistant, blacked-out, high tearing strength, and excellent thermal performance




9. Caravan RS (Radiation Shielding) System
Caravan RS Pad is an innovated radiation shielding that has been developed to complement the defects of existing radiation protection sheets.
 Great Flexibility - Highly flexible to be used in any curved surfaces with great miscibility and moldability.
 Verified Technology - Protection capability calculated based on Standard: NCRP 49 (Conducted by Korea Atomic Energy Research Institute)
 Easy Installation – Easily applicable to all Caravan’s structures systems without any special equipment
 Lighter-weight and easier installation than lead and concrete..
 Lower overall cost in respects of material and installation.
 Outstanding protection capacity - 100 % radiation shielding against α, β rays and 99% shielding capacity against X rays
                                   - gamma and neurton rays also effectively shielded.




                                                                                                                                                         11
1. International Public-Procurement
International Public-Procurement

 UN PKO Field Camps


  We provide complete Turnkey Solutions which cover everything from camp design and road
  construction to procuring water purification systems. With our detailed knowledge and
  experience in camp operations, we can design, procure, construct, and operate the facilities.




Caravan ES Turnkey Solution is based on an eco-friendly concept by utilizing cost-effective and environmentally-sound materials.


 Details of Our Scope of Work
 • Designing Camps
 • Accommodations, warehouses, offices, hospitals, education centers, maintenance facilities,
  hangars, water-purification devices, etc.
 • Supporting Infrastructures
   - Full Range of Electrical Fixtures - International standard cables, distribution boards,
    generators, transformers, lamps, emergency light towers, etc.
   - Sanitary Systems : Dual-flush toilet, wall-hung urinals, wash basins, janitor’s rooms,
     Hot & Cold faucets, shower trays, tissue dispensers, etc.
   - Food Service Facilities: Kitchenware, Tables and Chairs, utensils, etc.
   - Security Systems : Centralized security systems, Hesco barrier and barbed wires                                   18m(W)x42m(L)
   - Water-Purification Systems
   - Other Facilities: Communication satellite networks
 • Fire Fighting Systems
 • Construction and Building: Road, billeting facilities, etc.
 • Services: Camp maintenance, catering services, etc.
                                                                                                              6.4m(W)x18m(L) x3.54m(H)



                                                                                                                                         13
International Public-Procurement

 Prefabricated Building System

Packable Building Systems are the most innovative building systems for
field missions.
These systems are designed to maximize the function of transportation, storage
and relocation.
The buildings have been precisely designed and manufactured for easy handling
and transportation in ISO containers.

                                       1.   Packable
                                       •    Various Structures for Accommodation, Storage and Workshop
                                       •    Packable, re-locatable and transportable building systems
                                       •    The fastest construction & demounting time with bolting systems
                                       •    The size and weight of parts have been precisely designed, which enables easy manual
                                            installation

                                       2. High-Strength Structural Steel Frame
                                       • Strongest and lightest weight frame systems
                                       • Patented technologies based on the latest structural engineering methods and theories
                                          (Wind load capacity: up to 240km/h)
                                       • Prefabricated Steel H-Beam (PH-Beam) provides manual construction without heavy
                                           equipment.
                                       • Arch-shaped roof provides better structural strength than Gable-shaped roof.
                                       3. Engineered Composite Plastic (FRP)
                                       • FRP (Fiberglass Reinforced Plastic) H-Beam opened a new era of FRP frame for
                                          building structures
                                       • FRP H-Beam is developed to the customer’s specifications, including various colors,
                                          lighter weight and higher strength.
                                       • Light-weight FRP (Specific gravity: 1.8~2.4) is easy to handle but as strong as steel frame.
                                       • Rust-free: Ideal for the Marine industry

                                                                                                                                        14
International Public-Procurement

Ablution & Sanitation Fixtures

• Durable and cost-efficient ablution
• Sanitation fixtures for field usage, transportation and storage
• Products include dual-flush toilets, wall-hung urinals, wash basins, janitor’s rooms,
  hot & cold faucets and tissue dispensers as part of our supply scope
• Wide range of ablution and sanitation products based on customer requirements


                                            Advantages
                                            • Made from durable field materials (100% stainless steel)
                                            • Water-free urinals available: water efficient
                                            • Environment friendly
                                            • Installed in the least possible time
                                            • Dual-flush toilets, wall-hung urinals, wash basins, janitor’s rooms, hot & cold
                                              faucets, shower trays, tissue dispensers, etc.

                                           Installation
                                           • Fixtures designed to be installed in the least possible time.
                                           • Size, volume and weight of each unit is designed such that it is easy to handle,
                                             permitting ease of installation without using mechanical handling equipment.


                                           Design & Material Specification
                                           • All Sanitation Fixtures supplied in compliance with international environmental
                                             and water conservation standards.
                                           • Water Closets (WC), Shower Tray, Wash Basins, Urinals, Soap Dishes, Shower
                                             Curtain Rails, Clothes Hooks Panels and Towel Rails are fabricated of heavy gauge
                                             type 304 stainless steel with exposed surfaces polished.

                                                                                                                                 15
International Public-Procurement

 Electrical Materials
• Complete electrical package for base camps and village constructions
• International standard cables (with accessories), distribution boards,
  transformers, lamps, portable light tower, etc.
• Prime Contractor to the United Nations
  (Contract No. PD/C0018/08, Electrical Materials)




   <Transformer>            <Cable>               <Flood Light>            <Lamps>          <Distribution Panel>   <Portable Light Tower>


  Other Products
We offer a wide range of products to meet client’s various needs. Products such as water tanks, emergency tents, security items
and wires are also available for order.




    <Water Tank>        <Observation Tower>          <Emergency Tent>                <Security Wire>                <Generator>


                                                                                                                                            16
2. Prefabricated Building System
Prefabricated Building System




PBS (Prefabricated Building Systems)
PBS (Prefabricated Building System)
• Assembled at site with bolting systems without heavy equipment
• Designed to be dismantled, re-located, and re-assembled easily and quickly
• Strong, fast, and cost-efficient systems for commercial and military uses

Features                                                            Advantages
Unique Structural Frame                                             Short, Fast, and Easy
• Prefabricated H-Beam(PH Beam) for fast and easy                   • Bolt and Nut Assembly System (No welding required)
   assembly with bolts & nuts                                       • Pre-assembled components
• Patented technology (Patent no. 10-0972535) on flange             Ideal for Rigorous Environments
  reinforced beams (Compact and Light)
                                                                    • High durability and various loads resistance
Double Wall System
                                                                    • Earthquake-resistant design available
• Natural insulation reduces maintenance cost
• Double wall with outer steel sheet and inner PVC fabric           Eco-Friendly
  Suitable for both hot and cold climates                           • No construction waste when installing and dismantling
Arch-Type Roof                                                      • Eco-friendly options: solar panels, transparent panels, rain
                                                                      reuse and natural air cooling systems
• Available maximum space use
• Structurally substantial and durable                              Easy Maintenance
                                                                    • Simple and compact components minimize maintenance
                                                                    • Repair kit provided for easy mending of components

                                                                                                                                     18
Prefabricated Building System

3-STEP SOLUTIONS

Easy Packing Solution                     Rapid Building Solution                   Customized Building Solution
• Light weight PH-Beams and compact       • Ready to dispatch in shortest period    • Size, material, and loads are concerned to
components offer easy installation,       • Factory-made components reduced           suit local conditions and customers’ needs.
  dismantlement and relocation.             the manufacturing time.                 • Providing various installations include
• Packable in ISO standard containers     • Bolting systems and light-weight          options such as electric fixtures and
allowing for shipment of                    components enable fast manual             sanitary wares.
  the structures to the world-wide          installation.                           • Diverse options providing: bullet proofing,
                                          • Providing simple foundation solution      and solar systems, etc.


COMPARISON WITH OTHERS

 No.                   Categories                           CaravanES                                Competitors
                       Assembly
  1                                                   Unique Bolting System                    Mainly Welding System
                        Method
  2                Frequency in Use                          Reusable                               A Single Usage

  3                  Prefabrication             Complete Prefabrication Available               On-site Work Required


OPTIONAL ITEMS
▪ Hangar /Cargo door                              ▪ Bullet-proof wall                         ▪ Skylight
▪ Transparent/translucent wall and roof           ▪ Air cooling system                       ▪ Solar system
▪ Earthquake-resistance system                    ▪ Wind-load design                         ▪ Snow-load design
▪ Temperature control system                      ▪ Partitions                               ▪ Various insulation materials



                                                                                                                                    19
Prefabricated Building System

 MANUAL INSTALLATION PROCESS




Installation                                                       Shipping
• Easy and Fast Installation using minimum mechanical              • Suitable for handling by crane, fork-lift, and truck
  equipment                                                        • Packable and re-locatable buildings by Sea Freight, Air Freight,
• Simple foundation solution provided                                and Rail Freight.
• 300sqm structure can be built in one week with six(6) laborers   • The size and weight of each component is designed to fit in
                                                                     standard ISO containers.

Quality Assurance
• Quality Management System fulfils the requirement of ISO9001:2000 standard.



                                                                                                                                    20
Prefabricated Building System

 Project Summary
A. RFPG-403 (PD/C0277/08) - Prefabricated Structures             B. 10MIT-200433 - Aircraft Hangar


                        Model:   Type B                                                 Model: Caravan Hangar
VARIOUS APPLICATIONS Prefab-Structure
               Type:                                                                    Type:     Hangar
                        Size(m): 12(W) x 24(L) x 2.4(W.H),                              Size(m): 30(W) x 31(L) x 5(W.H),
                                  5.6(C.H)                                                        8.2(C.H)
                        Frame: Steel Frame (zinc coating)                               Frame: Steel Frame (zinc coating)
                        Cladding: Steel Cladding / PVC                                  Cladding: Steel Frame
                        Roof:     Arch                                                  Roof:     Arch
                        Door:     4.8(w) x 4.8m (h)                                     Door: 3m 3(w) x 5.8m (h)
                                  0.9(w) x 2.1m (h)                                               0.9(w) x 2.1m (h)



                        Model: Type C
                        Type:     Prefab-Structure
                        Size(m): 18(W) x 36(L) x 3.6(W.H),
                                  8.1(C.H)
                        Frame: Steel Frame (zinc coating)
                        Cladding: Steel Cladding / PVC
                        Roof:     Arch
                        Door:     4.8(w) x 4.8m (h)/
                                  12(w) x 16m (h)
                                  0.9(w) x 2.1m (h)

Details
1. January, 2009: Contract No. PD/C0277/08       (RFPG-403, Various Structures for Accommodation, Storage, and Workshop)
2. July, 2010:    Purchase Order No.10MIT-200433 (10RFP/MM/10/UNMIT, Supply and Delivery of Frame Supported Membrane
                                                  Structure (Aircraft Hangar))


                                                                                                                            21
Prefabricated Building System

   PBS Standard Dimension




※ Every component is able to customize in response to customer demand.
Prefabricated Building System

 WAREHOUSE
Economical, Easy, and Fast

                                                             Caravan Warehouse has been precisely designed for maximum
                                                             portability and functionality with easy installation and reparation. All
                                                             of erection is proceed by bolts and nuts without heavy equipment at
                                                             site. This heavy duty and light-weight Caravan warehouse employs
                                                             various patents and is offered in various sizes accurately.

                                                             Since 2003, the structure has been provided to United Nations through
                                                             long term system contract PD/C0277/08. With full of satisfaction and
                                                             collaborating faith, we are supplying the goods to all over the UN
                                                             operation missions in the world.




 Key Features

 • UN qualified warehouse
 • Supplied to all over the world under UN System contract
 • Manually installable by local labors, without heavy equipment
 • Minimum maintenance with various anti-corrosion treatment
 • Reusable and relocatable with minimum cost
 • Complete bolting system (No welding required)



                                                                                                                                        23
Prefabricated Building System

  Japan Warehouse



VARIOUS APPLICATIONS




                                                       24
Prefabricated Building System

    ACCOMODATION
Comfortable, Relocatable, and Customizable
Innovative Accommodation provider, CaravanES, offers the most variety of
accommodations in different configurations, dimension, materials, and optional items.
Basically the structures are distinguished by Commercial and Military use which
manufacture individually based on customer’s environment and condition.                          6 (W) x 6 (L) x 3 (W.H) x 4.7m (C.H)
Mostly Caravan Accommodations are specially designed to produce the best structure
applied space efficiency and re-locatable as a form of prefabricated structure. Therefore, it
is perfectly suitable to use without any difficulties with meeting international building code
standards for various loads.

Key Features
 • Both standard and customizable designs available                                              6 (W) x 12 (L) x 3 (W.H) x 4.7m (C.H)
 • Complement the defects of existing prefab building in respects of insulation,
   soundproof, waterproof, and material reuse
 • Rapid and relocatable building solution
 • Easy maintenance
 • Efficient space utilization
 • Long-term warranty
                                                                                                 9 (W) x 18 (L) x 3 (W.H) x 5.5m (C.H)
 • Suitable as accommodation and office for military base camp, temporary works,
   and public institution

 Supplement
▪ Various doors                   ▪ Bullet-proof wall       ▪ Solar system
▪ Furniture                       ▪ Wind-load design        ▪ Snow-load design
▪ Temperature control system      ▪ Partitions              ▪ Various insulation materials
                                                                                                 9 (W) x 21 (L) x 3 (W.H) x 5.5m (C.H)


                                                                                                                                         25
Prefabricated Building System

     HANGAR
                                                 PBS (Prefabricated Building System) Hangar
                                                 Light Weight and Large, Clear Span structure that emphasizes low cost in long-
                                                 term, sustainability in harsh environment, and rapid manufacturing and installation.

                                                      Maximum                       Minimum                       Minimum
                                                  Factory Processing                Site Work                    Maintenance
                                                 • Mass production            • Manual assembly            • Rust-free materials
                                                 • Computer-controlled        • Minimum laborers           • Replaceable parts
                                                 • Quality controlled         • Fastest construction       • Interchangeable
                                                 • Standardized parts         • Bolt and nut assembly        components
                                                                                system                     • Over 30 years lifetime


         QUALITY                             PROVEN                        ENVIRONMENTAL
        ATTRIBUTES                        PERFORMANCE                        ATTRIBUTES
• Wind Load over 240km/hour         • Supplied to the UN Field       • 95% of Reusable Materials,
• Seismic Load of 8.0 Richter         Missions in Africa, Middle       Multiple Assembly Available
                                      East and Haiti                 • Double-wall System:
• Over 50m Span Available per
  Request                             (Model No. PBS 1836)             Natural Insulation and
                                    • Supplied to the UNMIT in         Sound Absorption
• Rust Free Material
                                       East-Timor                    • Solar-Powered Air Conditioning
• Computer Controlled
                                                                       Applicable
  Manufacturing                       (Model No. PBS 3230 )
                                                                     • Free of Hazardous Material, and
• Sustainable from Desert to        • Various Size and Design
                                                                       Heavy Metal
  Arctic                              Customizable per Specific
                                                                     • RoHS Compliant
• Ballistic Protection, Radiation     Requirements
  Shielding applicable



                                                                                                                                        26
Prefabricated Building System

UNMIT Aircraft Hangar



VARIOUS APPLICATIONS




                                                        27
3. Village Design & Construction (Field Labor Camp)
3. Village Design & Construction (Field Labor Camp)


 Caravan ES Village & Field Camps
As a prime contractor to the UN, Caravan Engineered Structures Inc. supplies prefabricated structures, soft-wall tents, electrical
fixtures, and sanitary wares to all of the UN Missions worldwide. With many years of experience and development, Caravan ES now
provides Field Camps that can be applied to Military Base, Temporary Construction Camp and Village Design & Construction. We
offer complete Turnkey Solutions from camp design to civil works, road paving, water-purification systems, catering service, etc.
As a world leader in the industry, we are confident that our camp solutions will satisfy clients with their time and cost efficiency,
flexibility, durability and excellent customer service.

Temporary Construction Camp
Mega projects like petrochemical, refinery, plant construction require facilities to service a large number of project task-force. To
ensure project success and to allow fast implementation of projects, we provide camp accommodations, utilities & infrastructure,
and temporary construction facilities i.e. offices, accommodations, warehouses, canteens, recreation halls, gymnasium, maintenance
shop, public shower room, mosque, etc.

 Relocatable & Reusable
 - Completely relocatable from one site to another
 - Easy to pack & transport with 20’ ISO containers
 - More than 95% of building materials can be reusable


 Competitive Price & High Quality
                                                                                                          <Temporary Site Facilities>
 - Cost and time saving from manual installation without heavy equipment
 - ISO 9001:2000/ISO 14001:2004
 - Designed to the United Nations standards                       * PMMA: Polymethyl methacrylate


 Eco-friendly Design
 - Complete demobilization & reinstatement without environmental damage
 - Energy saving with solar panels
 - Natural lighting with transparent (PMMA) panels                                                        <Temporary Camp Facilities>

                                                                                                                                        29
3. Village Design & Construction (Field Labor Camp)

Accommodation
Contractor / VIP Guest
   Unshared House




                                                                               7 (W) x 15(L) x 2.4(WH) m x3.3(CH)m

                         < Interior View >                         < Exterior View >



Labor
   4-men Room, Shared Toilet/Shower




                                                                                10(W) x 78(L) x 5.1(WH) x 5.5(CH)m

                         < Interior View >                         < Exterior View >

                                                                                                                     30
3. Village Design & Construction (Field Labor Camp)

Office




                                                              14 (W) x 60 (L) x 6.4 (WH) x 7.2 (CH)m

         < Interior View >                         < Exterior View >




                                                                23 (W) x 53 (L) x 3 (WH) x 4.3 (CH)m

         < Interior View >                         < Exterior View >


                                                                                                       31
3. Village Design & Construction (Field Labor Camp)

Support Facilities

         <Recreation Center>                         <Staff Canteen>                              <Laundry>




           24 (W) x 33 (L) x 3.3 (WH) x 6 (CH)m                                               22 (W) x 33 (L) x 3.3 (WH ), 3 (CH)m
                                                     24 (W) x 33 (L) x3.3 (WH) x5.7 (CH)m


              <Hospital>                            <Labor Canteen>                            <Warehouse>




           25 (W) x 51 (L) x 3.2 (WH) x 4.5 (CH)m    45 (W) x 108 (L) x 3 (WH) x 6 (CH)m      6 (W) x 18 (L) x 3 (WH) x 4.3 (CH)m



        <Maintenance Shop>                             <Car Shelter>                          <Rest Shed>




             10 (W) x 30 (L) x 4 (WH), 5.9 (CH)m    5.5 (W) x 54 (L) x 2.5 (WH), 2.8 (CH)m   5.5 (W) x 2 (L) x 2.5 (WH), 3.1 (CH)m




                                                                                                                                     32
3. Village Design & Construction (Field Labor Camp)

Insulation

Multi-layers Insulation for extreme climate:
- Outer cladding + PE foam + Glasswool insulator + Air barrier sheet + EPS
   panel with Air curtains


Additional Insulation:
- PE waterproof cloth between inner & outer materials
- Fillers applied to every joint parts for excellent airtightness.


Insulation for Foundation Available:
- Insulators could be applied to foundation and slab to maximize insulation
   performance by client’s choice.




                                                                                    33
3. Village Design & Construction (Field Labor Camp)

Ballistic Protection


Prefabricated walls and roofs with ballistic design are by using engineered structural framework. Over 500mm space in the double
wall system and the space is filled in with an ideal amount of various composite components resulting in bullet and explosion proof.


The roof is specially designed with top and inner ballistic protection as a double protected structure.



                                      Engineered Composited Material                                             Top ballistic protection

                                      Ballistic stuffing Material

                                     Engineered Composited Material                                              Inner ballistic protection

                                      Steel Plate



Windows are protected by hard steel cover which is installed outside wall. It could be opened for ventilation.




                    < Front view >                                                < Window with steel cover >

                                                                                                                                              34
3. Village Design & Construction (Field Labor Camp)

 Military Base Camps

Our prefabricated structures are designed to UN standards, and have incomparably high strength and durability. Even in most
difficult conditions and war zones, we deliver the most safe and complete base camps for all missions.



  Easy & Fast to Install
  - Capable of building field camps quickly and safely in emergencies
  - 150-man camp can be built in only 1-2 months
  - All buildings can be manually installed without heavy equipment and skilled labor




  Safety & Security
  - Bullet-proof system (patented) to in all buildings
  - Installation of gates, fences, HESCO, CCTV, observation tower, guard hut, etc.
  - Double wall systems feature high strength and durability




  Suitable for Difficult Site
  - Easy installation on uneven or slopping sites
  - Suitable for sites with extreme weather conditions
  - Wind load: up to 240km/h




                                                                                                                              35
3. Village Design & Construction (Field Labor Camp)

Military Base Camps

                                                                      NEW CHALIE-A, RFPS-1443 HAITI CAMP
                                                                                           LEGEND
                  12                                                          ACCOMMODATION      1.    COMMANDER’S
                                                                                                 2.    WARRANT
                                                                                                       OFFICER’S
            15                           13               8                                      3.    COMMISSIONED
                                                                                                       OFFICER’S
                 16             17
                                              5                   7                              4.    TROOPS’
                       10                                                                        5.    RESTROOM &
                                                  6                   5                                SHOWERROOM
                            4            14           11                  9   DINING & KITCHEN   6.    OFFICER’SDINING
                                4                                                                7.    TROOPSDINING
                                                              2                                  8.    KITCHEN
                                     4
                                                                              HEALTH & FITNESS   9. LEVEL1.HOSPITAL

                                         4                    1                                  10. GYM & RECREATION
                                                                                                     CENTER
                                                                          3
                                              4                               OTHER FACILITIES   11. OFFICE
                                                                                                 12. WORKSHOP
                                                                                                 13. STORAGR
                                                      4                                          14. LAUNDRY ROOM
                                                                                                 15. FUEL STORAGE
                                                                                                     CONTAINER
                                                                                                 16. GENERATORS
                                                                                                 17. WATER TANK




                                                                                                                         36
3. Village Design & Construction (Field Labor Camp)

Military Base Camps

            <Troop’s Accommodation>                                                <Office>




                                                9 (W) x 18 (L)                                         6 (W) x 18 (L)




       < Level 1. Hospital >                                       < Hangar >                 < Gymnasium >
                                  < Exterior of Facilities >
          9 (W) x 21 (L)                                         18 (W) x 36 (L)              24 (W) x 48 (L)



                                                                                                                        37
3. Village Design & Construction (Field Labor Camp)

 Village Design and Construction

In disaster when people are in desperate need for housing, health care, and water treatment, Caravan ES provides them comfort
home fast and safe. With our experience and advanced technology, we design, and rebuild villages that are under poor conditions and
damaged by flood, fire, war, and other unfortunate incidents. Based on site survey and careful studies of local culture, inhabitants,
and customs, we design a village that is consistent with the region. With safe water supply and waste disposal system, the village will
turn out to be clean and safe home, preventing the locals from fatal infections.

 Local Village Design
 - Upon customer’s request, various facilities like hospital, school, water supply & sewer
   system, recreation center, gymnasium, and community hall provided
 - From village design to civil works, building structures, road paving, and water supply,
   turnkey base service provided
 - Designed to fit in surrounding environment, local culture, weather and religion


 Fast & Safe Reconstruction
 - Using welding-free prefabricated house, village can be built quickly and safely
   in emergencies
 - 150 man village can be built approximately 1~2 months
 - High standards of sanitation in structures are applied to prevent and minimize outbreaks
   of disease and infection


 P-House (Prefabricated House)
 - High-strength PH-Beam and rigid floor system
 - Extremely easy and fast to build
 - Equipped with kitchen, bathroom, ventilation, electrical fixtures, heating system, AC,
   and furniture
 - Designed to be consistent with local housing interiors


                                                                                                                                          38
4. Green Technology & Greenhouse Division
Green Technology & Greenhouse

Our super–transparent greenhouses are the most innovative systems incomparable with any other greenhouse in the agricultural and
horticultural industries. Our greenhouses have been developed to make up for the weakness of glass and plastic greenhouses. With
high strength H-beam and Truss, our products have outstanding features such as high durability, heavy wind load resistance. We
supply and install various sizes of greenhouses from small-sized to more than 10,000 ㎡ of mega-sized ones. We also provide all the
services for greenhouse operations from its designing to consulting service on cultivation methods as a turnkey project.

                                                                                         FEATURES
                                                              Turnkey Solutions
                                                              The services we offer are as follows:
                                                               Design
                                                               Manufacturing
                                                               Supply/Transportation
                                                               Construction
                                                               Technical Supervision
                                                               Consultation on Cultivation Methods
                                                               Maintenance and Repair


                                                              Fast & Easy Installation
                                                              • Fast construction with bolting system
                                                              • Size and weight of the parts have been precisely designed,
                                                                which enables easy manual installation



                                                              High-Strength Steel Frame: Prefabricated Steel H-Beam and Truss
                                                              • Rigid, but light
                                                              • Various patented technologies based on the latest structural engineering
                                                              • Heavy equipment or welding are not necessary for manual construction
                                                              • Arch-shaped roof provides great structural strength and effective air
                                                                ventilation
                                                              • Corrosion resistant in extreme weather conditions


                                                                                                                                           40
Green Technology & Greenhouse

                                                           Double Cladding
                                   (Thickness: 8mm)
                                                           • Outer: TP Panel (Super-transparent Plastic Sheet)
Material                               Remarks
                                                             Extreme durability                     More than 90% excellent light
 Glass            20                 Single sheet            Energy-saving                           transmission rate
                                                                                                     Break-resistant
 PVC              11.2                     -
                                                           • Inner: PE Film (Vinyl), Excellent Thermal Insulation
TP Panel          1.5               double-sheet
                                                           *Other claddings (e.g. Glass, PC, F-clean, PO, PE) also available based on
                                                            customer specifications

                                                           Easy Division
                                                           • Supports cultivation of a variety of crops in one greenhouse
                                                           • Better utilization of the space
                                                               (e.g. Office, storage, laboratory, seedling room, germination room, additional
                                                             facilities for processing crops)

                                                            Fully Automated High-Tech Climate Control
                                                            • Enables customers to control their environment with touch of finger
                              Total Surface: 1,210 sqm
                         24m(W) x 50.4m (L) x 8m(CH)        • Maintains uniform temperature in extreme cold or dry hot climates
                                                            • Make higher profits through yielding high quality products
            <Easy Division>
                                                           Versatile Structure
                                                           • Other uses available with our structures
                                                             e.g. botanical gardens, livestock shelters, storage for heavy equipment

                                                           Eco-friendly, Energy Efficient Design
                                                           • Solar panels available
                                                           • Patented temperature-controlled double-wall system
                                                           • Perfect insulation with Sheath heating systems
                                                           • 100% reusable, re-locatable, packable structures
                                                           • Rainwater drainage systems for irrigation and sprinklers
           <Botanical Garden>
                                                                                                                                                41
Green Technology & Greenhouse

Various Sizes
We offer various sizes according to customers’ needs.




                                                                                                    Facilities for Seedling, Breeding,
                                     Roof and side wall ventilation                                          Working unit, Boiler and
                                       Potting benches (Optional)                                       Irrigation tank, Packing, etc.
                                            Total Surface: 18sqm                                         Total Surface: 14,400sqm
                      Size: 3m(W) x 6m(L) x 1.8m(WH) x 3m(CH)                        Size: 80m(W) x 180m(L) x 5m(WH) x 17m(CH)


   - Frame: Aluminum, FRP (Fiberglass Reinforced Plastic)             - Frame: Prefabricated H-beam, Truss
   - Cladding: TP Panel, F-clean, Vinyl                               - Cladding: : TP Panel, F-clean, Vinyl
   - Use for backyard and patios                                      - Complete dome design to withstand storms and hurricanes
   - Ready to assemble                                                - Spatial advantage of dome structure
   - Structure expandable after installation                          - Optimum for botanical garden




                                                                                                                                         42
Green Technology & Greenhouse

Wide Span, Giant Greenhouse (Double-wall)                                                                 Specifications

                                                                                               Prefabricated H-beam SD Greenhouse

                                                                                             General Specifications
                                                                                            − C.H: below 10m
                                                                                            − Frame: Galvanized PH-beam, Square steel pipe
                                                                                            − Cladding: TP Panel, Glass, F-clean
                                                                                            − Ventilation type: push & pull, rack & pinion
                                                                                            − Wind load: 40m/sec
                                                                                            − Snow load: 40cm

                                                                                             Roof Type and Size
                                                                                            a. Gable-shape
                        Total Surface: 1,224sqm
                                                                                               (W: 18, 24, 32m x H: 4, 4.5m )
     24m (W) x 51m (L) x 3m (W.H) x 10m (C.H)
                                                                                            b. Arch-shape
                                                                                               (W: 12, 16, 18m x H: 4, 4.5m )
Wide      Span, Giant Greenhouses (Double wall) are designed for free and easy
operation of any type and size of machinery, and for maximum flexibility of use,
which makes them ideal for both soil and soil-free cultivation. Since there is no inner         Prefabricated Truss SD Greenhouse
column, customers can expect to grow more of an assortment of crops in the greater
open space.                                                                                  General Specifications
The center height of our Greenhouse is quite high (±10m), so it is optimal for growing      − C.H: more than 10m
tall fruits and vegetables such as peppers, tomatoes, cucumbers, eggplants, etc.            − Frame: Galvanized prefabricated Truss,
                                                                                                     Galvanized PH-beam , Square steel pipe
                                             Also, there is much less risk of damage
                                                                                            − Cladding: TP Panel, Glass, F-clean
                                             from pests because there is no hiding place
                                                                                            − Ventilation type: push & pull, rack & pinion
                                             for rodents. Abundant interior sunlight and
                                                                                            − Wind load: 40m/sec
                                             excellent ventilation make the plants higher
                                                                                            − Snow load: 40cm
                                             quality and reduce the cost of heating.
                                                                                             Roof Type and Size
                                                                                            − Arch and gable shape
                                           *Customized according to customers’ needs
                                                                                              (W: 24, 32m x H: 4, 4.5m )


                                                                                                                                              43
Green Technology & Greenhouse

          Indoor Vertical Garden
We have developed and provided Vertical Garden and Vertical Gardenbox® . Our eco-friendly Vertical Garden provides many benefits
such as the air-purification, lower energy consumption by mounting planters on the wall. The dead spaces are changed into beautiful
green interior spaces, and it provides the refreshed air from plants. The artificial lighting system provides the optimal quantity of light to
grow the plants well. Also, our professional designers will meet our customers’ need by creating various and detailed colorful
patterns with the plants optimal for the environment to be installed.
                                                                                              Features
                                                                 Easy Installation
                                                                  • Patent pending unit panel
                                                                  • Easy to replace plant species
                                                                  • Easy for vertical as well as horizontal expansion

                                                                 Hydroponic System
                                                                  • Nutrient solution using hydro balls and charcoals without soil
                                                                  • Helps to maintain the moisture
                                                                  • Protects plants from other infections such as bacteria
                                                                  • Provision of fertilizer optimal for plants growth

                                                                 Air purification
                                                                  • Enhances air quality from the leaves and roots of the plants
                                                                  • Controls indoor humidity

                                                                 Other Benefits
                                                                  • Improved aesthetic appearance
                                                                  • Improve heat insulation
                                                                  • Reduce airborne pollutants
                                                                  • Improved sound insulation
                                                                  • Space saving
                                                 After

                                                                                                                                                 44
Green Technology & Greenhouse

    Vertical Garden Design and Consulting Service

We have professional plant designers, horticultural experts and nursery managers. Our staff members provide the optimal services on
customers’ needs. Especially, our professional designers create various and detailed colorful patterns with the plants optimal for the
environment to be installed.



   Our Consulting service includes:

   • Design consulting for
   v Indoor Vertical Garden
   v Outdoor Vertical Gardenbox®
   v Commercial advertising

   • Installation consulting
   v Provision of blue prints
                 Shop drawings

   • Nursery management

   • Maintenance and Repair




  Process of Consulting Service
          1. Consultation on plant designs by grade and suggestion on various design patterns and species of the plants suitable for the spaces to be installed

           2. Provision of blue prints and shop drawings for installation of Vertical Garden and Vertical Gardenbox®

             3. Consulting on post- installation service (maintenance and repair)




                                                                                                                                                                  45
Green Technology & Greenhouse

    Examples of Vertical Garden Plants Design
  <Inside Café>




It is possible to create living art by utilizing this diversity and incorporating hundreds of plants


  <Smoking Area>




By installation of the vertical garden in the smoking areas, it provides aesthetic visual effect as well as air-purification from plants.


                                                                                                                                            46
Green Technology & Greenhouse

Examples of Vertical Garden Plants Design


                                            Plants selections are site-specific and determined by light
                                            availability, location, size, color, texture, and growth habit.
                                            By utilizing this diversity and incorporating hundreds of
                                            plants it is possible to create living art. Our vertical
                                            gardens are appreciated by anyone who stops and takes a
                                            moment to be captivated by beauty and diversity.




                                            We grow plants with nutrient solution instead of soil. We
                                            have developed this system with hydro- balls, charcoals,
                                            and other ingredients. The advantage of this method is to
                                            help maintain the moisture and protect plants from other
                                            infections. Also, because we do not use soil; this method
                                            prevents to get the worms.



                                                                                                              47
Green Technology & Greenhouse

        Outdoor Vertical Gardenbox®                                                Problems with Traditional Outdoor Vertical Gardens
                                                                                        Geological and Seasonal Problem
                                                                                       • Green vegetation is sensitive in climate change. For this
                                                                                       reason, in desert or extremely cold areas, it is hard to
                                                                                       grow various species.

                                                                                        Direct Exposure by External Environment
                                                                                       • Plants grown vertically are exposed to more sun and wind, so
                                                                                       They can dry out quickly. They may need more frequent
                                                                                       watering and fertilizing.

                                                                                        Spatial Problem
                                                                                       • Even though exterior vertical gardens can utilize the
                                                                                       dead spaces, it is hard to maintain and replace in multi-story
                                                                                       buildings; therefore, it costs a lot to maintain.




Vertical Garden                                     Transparent Greenhouse                          Outdoor Vertical Gardenbox®
•   Mounts a variety of plants on the wall of the   •   Excellent light transmission with super-    : Our Vertical Gardenbox® is a vertical greenhouse. By covering the
    building                                            transparent cladding                        existing vertical garden with our transparent cladding, all plants grow
•   Radically enhances urban residential and        •   Excellent ventilation for air-circulation
                                                                                                    well regardless of the surrounding environment - and are managed by
    commercial structures                           •   Plants are protected from extreme weather
•   Aesthetic visual design utilizing dead space    •   Fully-automated climate control system      automatic climate control system.
•   Significantly improves the quality of the air

                                                                                                                                                                              48
Green Technology & Greenhouse

     Outdoor Vertical Gardenbox®
Caravan Vertical Gardenbox®     improves the strength of existing Vertical Garden that mounts plants on the outer walls of the building,
and makes up for the weakness of it. Whereas the Vertical Garden is directly affected by the climatic seasonality and surrounding
environment, the Vertical Gardenbox® , a vertical greenhouse covered with the transparent cladding, prevents the plants from the extreme
weather, and enables plants to be grown well all year round through the natural light.
                                                                                               Features
                                                               Air-Circulation System
                                                                • By installing the air fans between the Vertical Gardenbox® and the
                                                                  inside of the building, it lets out the purified air by the leaves and
                                                                  roots of the plants indoors.
                                                                • Forced circulation with air fans when necessary
                                                                • Controls indoor temperature through air circulation

                                                               Ventilation System
                                                                • Fully automated ventilation system for plants
                                                                • Controls indoor humidity
                                                                • Controls inner temperature
                        <Air-circulation>
                                                               Irrigation and Fertilizer system
                                                                • Fully automated dosing system
                                                                • Labor saving: Easy to handle and maintain

                                                               Double Cladding
                                                                • Energy-saving (Heat insulation)
                                                                • Excellent sound insulation through double cladding and plants
                                                                • Prevents the plants from the extreme weather and external environment

                                                               Fogging and Screening System
                                                                • Controls inner temperature and humidity
                                                                • Excellent shade through the mist and screens
               <Proposal Image of Vertical Gardenbox® >

                                                                                                                                           49
Green Technology & Greenhouse

                 Kitchen-Farm

By hanging Kitchen Farm on the wall, not in the garden and patio, you can easily grow an assortment of organic vegetables as well as
fruits on your own. Also, Kitchen Farm can be used as an educational purpose for children.

                                                                                         Features
                                                            Easy Assembly
                                                             • 600(W) x 600(L)
                                                             • DIY kit (Easy for anyone to assemble)
                                                             • Expansion available on customers' needs

                                                            Eco-friendly and High Strength Frame
                                                             • Materials: Aluminum
                                                             • Erosion resistant
                                                             • Harmless materials
                                                             • High strength light weight frame
                                                             • 100% Reusable and recycled materials

                                                            Ease of cultivation
                                                             • Provides optimal manuals for growing
                                                             • Provides fertilizers for growth promotion
                                                             • Lighting system for provides the optimal quantity of light

                                                            Optimal Interior Design
                                                             • Aesthetic appearance
                                                             • Greening wall with vegetables and fruits
                                                             • Designed for customers to grow and harvest easily

                                                                                                                                   50
5. Sports & System
Sports & System

Caravan SS (Sports & Systems) has adopted the advantageous characteristics of Prefabricated Building System and innovated the most
economical and cost-effective ‘Sports Complex’. It has been designed to optimize the use of natural resources while providing
adequate functionality and convenience for the users.


               Technology                                   Efficiency                                 Environmental

• Dry method of construction                 • Optimize the use of natural resources        • Removable and reusable structure
• Easy & fast installation and assembly        through double-layered transparent wall
                                                                                            • Lifespan : Over 30-years
                                                 - Natural lighting and insulation
• Suitable for any type of soil and site         - Cutting energy consumption more          • Double-layered transparent structure
• High Strength Prefabricated Steel Frame          than 50%                                    - 0~100% transmission rates
   - Easily expandable modular structure                                                       - Natural lighting and insulation
                                             • Flexible designs and various options to
   - Wind load capacity: up to 240km/h                                                         - UV protection (optional)
                                               meet essential criteria only within budget
                                                                                               - Solar Panel (optional)




                                                                                                                                     52
Sports & System




Double-layered transparent structure
• Composition of uniquely designed transparent double-layer that transmits a large amount
  of natural light to improve visual effect and energy efficiency.
• 0~100% transmitting rate with combination of various finishing materials for claddings.
- Options including PMMA, PC, steel, and many more are offered upon customer’s request.
- UV protection, smoked finish, color variations are also offered as optional




                                                         Custom Design and Size Variations
                                                             •    Offering selection of structure designs that are adequate for
                                                                  different sports types
                                                             •    Customizing in structure size, layout, and materials to reflect the
                                                                  client’s demand and budget
                                                             •    Adding annex buildings/partitions for the use of locker room,
                                                                  office, media room, storage, bathroom/shower, and many more.



                                                                                                                                        53
Sports & System

Installation Example




    Application

  Badminton (20x54x11x16m)       Futsal (36x51x4.8x14m)       Horse-riding (25x60x6x8.5m)




 Gymnasium (24x30x6.3x3.8m)   Horse-riding (21x42x3.6x9.2m)    Badminton (20x54x8x13m)




                                                                                            54
Sports & System

                                      NFC FUTSAL COURT IN PAJU, KOREA

• Contract with Federation International de Football Association(FIFA) on 21st March, 2011.




                                                       < Exterior View >




                       < Nighttime View>                                                      < Interior View>



                                                                                                                 55
Sports & System




SFS - SPORTS FLOORING SYSTEMS (INDOOR)
 The most advanced/functional ‘Sports Flooring System’ that maximizes exercise performance while
 assuring the safety of end-users.                                                                 250(W) x 250(L) x 13(T)mm

 Economical & Reliable
 - Module Type: Economical, partially repairable (easy maintenance)
 - Fast and easy installation by hands,
 - Standard Color: Green, orange, yellow (and various color options)
 - Reliable Quality: Surpassed EN 14904 Test
 Safety
 - Less Joint Strain: Minimizes the impact applied to the players
 - Reduce Injury: Non-slippery surface that provides extra cushioning support
 Performance
 - Non-Slippery: Provides sufficient friction required for the game play
 - Exclusively developed rubber underlayment provides noise reduction and extra cushioning




                                                                                                      Rubber underlayment
                                                                                                    1,200(W) x 1.5~15(T)mm
Sports & System

SFS - SPORTS FLOORING SYSTEMS (OUTDOOR)




 Roll-Sheet (Spreadable Elastic Material)
 •   Performance
 -   Upper rubber sheet with embossing effect
 -   Lower rubber sheet with honeycombed structure
 -   Outstanding friction force and elasticity (shock absorption)
 • Various Designs
 - Computerized embroidery and logos can be permanently embedded
 • Easy Care, Low Maintenance
 - Simple partial repair without showing any defects
 - Eco-friendly materials, and 100% recyclable without any waste material

 Synthetic Turf
 • Performance of Natural Turf Grass
 - Synthetic turf that is the most similar to the natural grass ever developed
 • Combustion and Weather Resistance
 - Non-flammable and durable under all climates (weather resisting treatment applied)
 • Anti-Static Technology
 - Reduces static build up on the surface that causes electrical shock
 • Color Preserving
 - No change of color through solution dyed chip - over 10 years
 • Relieve Eye-Strain
 - Diffused reflection through special sections of turf that reduces eye-strain
Sports & System




INDOOR SPORTS LIGHTING
Caravan SS has developed new generation of lighting system exclusively designed for sports games,
Indoor Sports Lighting. It is highly efficient yet offers outstanding performance and extensive
features, providing the best visual experience for both players and spectators.

• High quality lamps with anti-dazzling, control of light intensity, and light absorption
• Long-life, virtually indestructible lamps that resists intense ball impacts

                                                                           Frame                     Steel
                                                                            Size                1530 x 236 x 70
                                                                           Ballast          DALI Qti 2*80/220-240V   OSRAM
                                                                           Lamp              FQ 80W/865 Constant     OSRAM
                                                                           Weight                   5.4 kg
                                                                       Consumption                  160W
Sports & System




ACCESSORIES & FACILITIES

 Sound System
 • The most appropriate architectural acoustic design provided by professional
 • Various audio equipment from diffusion brands to top-class quality

 Grandstand
 •   Different types of grandstand available
 •   Options of mobile and fixed grandstand
 •   Customized design upon customer’s request
 •   Welding-free grandstand available

 LED Scoreboard
 • Regular scoreboard, 3-color multi scoreboard, and full-color multi scoreboard
 • Various composition of picture, and program operations
 • All the components in the scoreboard has surpassed official standard and requirements
                                                                                           Sound System – Tower Speaker
6. Housing
Permanent House

Overall for Residential Apartment




                                                      61
Permanent House

1. 100 sqm(A-1407) Apartment

No.         Category                  Details          < 3D view>
 1         House plan                100sqm

 2            Size               14m(W) x 7m(L)

         Number of units
 3                               8 houses/ 1 floor
           on 1 floor

            Detailed              3 bedrooms with
 4
           house plan          kitchen & dining area




                                                       < Inner View >




                                                                        62
Permanent House

2. 120 sqm(A-1508) Apartment

No.         Category                  Details          < 3D view>
 1         House plan                120sqm

 2            Size               15m(W) x 8m(L)

         Number of units
 3                               8 houses/ 1 floor
           on 1 floor

            Detailed              3 bedrooms with
 4
           house plan          kitchen & dining area




                                                       < Inner View >




                                                                        63
Permanent House

3. 140 sqm(A-1410) Apartment

No.         Category                  Details          < 3D view>
 1         House plan                140sqm

 2            Size              14m(W) x 10m(L)

         Number of units
 3                               8 houses/ 1 floor
           on 1 floor

            Detailed              3 bedrooms with
 4
           house plan          kitchen & dining area




                                                       < Inner View >


                                                                        Kitchen
                                                           Bedroom 1           & Dining      Bedroom 2




                                                           Bath
                                                           room 2                         Bathroom 1



                                                          Bedroom 3        Living room           Bed
                                                                                                 room 4




                                                                                                          64
Permanent House


       Construction Order




 Step 1: H-Beam Structure                    Step 2: 100% Concrete Structure            Step 3: Completed House

• Structurally strong with precise design   • Concrete will be casted with SCM         • The subsidiary works (flooring,
  to accommodate any circumstance             technology, which will mold and dry        finishing, window, bathroom works)
• H-beams sustain the weight of the           in exceptionally short period of time.     are proceed in regular sequence.
  building                                  • This method has the advantages           • The house is fully equipped with
• Not required any additional supporting      of maintaining proper humidity level,      customizable components, including
  materials.                                  sound absorption and fire protection       UBR, electrical fixtures, sanitation
• Reduce construction period                                                             fixtures, flooring system, windows,
                                                                                         and doors.
Permanent House

   Wall Material
  Steel-Concrete Monolithic (SCM) Technology                  Outstanding Features
  • Specially good at protection of fire                      • Fastest Constructing Method
  • Easy to build using H-beam and Concrete only              • Strong Structure
  • Control humidity to protect dew condensation,             • Economical Price
    and keep strength and comfort ability                     • Mass production in a short time

    Electrical Materials                                       Unit Bathroom System
    Control box-Open               Control box-Closed




           Switch                          Outlet




           Lamps                    Fluorescent Light




• Supply international standard electrical materials
• Completed electrical package
• Supply to the United Nations
  (Contract No. PD/C0018/08, Electrical Materials)
                                                                                                  66
Prefabricated House

       PH-0710
Product Specifications
• Frame: Prefabricated H-Beam (PH-Beam)
  - Light-weight prefabricated steel H-Beam
• Size: 10.2m (W) x 7.2m (L) x 2.7m (Wall Height) , 4.5m (Center Height),
  - Extendable based on the customer requirements
• Three(3) bedrooms, one(1) bathroom, one (1) kitchen
• Sheeting & Finishing materials:
  ① Floor tiles for Bathroom
  ② Steel sandwich panel + Stone chip coated steel roof tile for Roof
  ③ Gypsum boards for Inner wall
  ④ Corrugated steel sandwich panels for Outer wall
  ⑤ Ceramic tiles for Floor (Bedrooms, Living room, Kitchen)                      < Exterior View >
  ⑥ Decoration tiles for Bathroom walls
  * Customer can choose the materials
Features
• Eco-friendly structure
  - Relocatable - Reusable
  - Double (Inner-Outer) wall systems save energy
• Using dry construction method, numerous houses can be built instantly
• Prefabricated H-Beam (Light-weight prefabricated steel H-Beam)
  - High durability        - Welding-free structure: Assembly with Bolt and Nut
• Competitive price
• Fast and easy construction without heavy equipment
  - Dry construction method
  - Short-term installation (4 days with 6 people based on 8 working hour/day)
• Excellent Ventilation System
• One(1) house fits into two(2) ISO 20’ containers
• Available Radiation Shielding Systems                                            < Floor Plan >


                                                                                                      67
Prefabricated House

Inner View
                                         No        Image     No       Image



                                  ④      ①                    ②
                                       Entrance             Kitchen
                                  ②
             ⑤           ⑥
                              ③

             ①        
                                         ③                    ④
                                       Room                 Sink

             < Floor Plan >




                                         ⑤                    ⑥
                                        Door                 Door




                                                             ⑧
                                        Bath                Window
                                        room


             < Internal Layout>


                                                                              68
Prefabricated House


Installation Process




       1. Lay the floor              2. Build the column      3. Connect main frame with Purlin       4. Finish the frame
                                                                                                       and purlin work




       5. Cover roof with            6.Finish roof work                7. Assemble                 8. Assemble Outer Sheeting,
        Sandwich Panel                                                Inner Sheeting                   Windows and Doors



                                                                                                  *Installation takes about
                                                                                                    4 days with 6 people
                                                                                                   (8 working hours/day)


 9. Cover the roof with Tarpaulin   10. Cover the roof with           11. Completed View
                                       Metal Roof Tiles




                                                                                                                                 69
Prefabricated House

        PH-0507
Product Specification
• Frame: Prefabricated H-Beam (PH-Beam)
  - Light weight prefabricated steel H-Beam
• Size: 7.2m (W) x 5.4m (L) x 2.7m (Wall Height), 4.5m (Center Height)
• Expandable based on the customers’ needs
• Two (2) bedrooms, one (1) bathroom, one (1) kitchen
• Sheeting & Finishing Materials:
  ① Floor tile for Bathroom
  ② Steel panel for Roof
  ③ Gypsum Board for Inner Walls                                                         <Exterior View>
  ④ Corrugated steel sandwich panels for Outer Walls
  ⑤ Monorium Carpet for Floor (Bedrooms, Living room, Kitchen)
  ⑥ Decoration tile for bathroom walls
  * Customer can choose the materials
Features
• Eco-friendly structure
  - Relocatable               - Reusable
  - Double(Inner-Outer) wall system can save energy
• Drywall construction method provides numerous houses instantly
• Prefabricated H-Beam (Light-weight prefabricated steel H-Beam)
  - High durability             - Welding free structure: Assembly with Bolts and Nuts
• Competitive price
• Fast and easy assembly doesn’t require heavy-duty equipment
  - Dry construction method
  - Short-term installation (4 days with 6 people based on 8 working hours/day)
• Excellent Ventilation Systems
• One(1) house fits into two(2) ISO 20’ containers                                         < Floor Plan >
• Available Radiation Shielding Systems
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile
Caravan Es Company Profile

Más contenido relacionado

La actualidad más candente

Staffing and Recruitment at FedEx
Staffing and Recruitment at FedExStaffing and Recruitment at FedEx
Staffing and Recruitment at FedExAyeshaFaroqui
 
Assignment taj hotels services by nilesh shukla
Assignment taj hotels services  by nilesh shuklaAssignment taj hotels services  by nilesh shukla
Assignment taj hotels services by nilesh shuklaNILESH SHUKLA
 
Jami Masjid,Gulbarga
Jami Masjid,GulbargaJami Masjid,Gulbarga
Jami Masjid,Gulbargahebasayeed
 
Avari Ramada Hotel, Lahore Case Study
Avari Ramada Hotel, Lahore Case StudyAvari Ramada Hotel, Lahore Case Study
Avari Ramada Hotel, Lahore Case StudyMohammad Mohtashim
 
Viability of inland waterways in india
Viability of inland waterways in indiaViability of inland waterways in india
Viability of inland waterways in indiaVEENA VIKRAMAN
 
Hauz khas
Hauz khasHauz khas
Hauz khasIHCSEM1
 
Sahastra bahu mandir (gwalior)
Sahastra bahu mandir (gwalior)Sahastra bahu mandir (gwalior)
Sahastra bahu mandir (gwalior)BISHAL KHANAL
 
Jama masjid: An architectural masterpiece
Jama masjid: An architectural masterpieceJama masjid: An architectural masterpiece
Jama masjid: An architectural masterpieceGhufran Ahmad Khan
 
Shangri La Colombo Pitch Presentation
Shangri La Colombo Pitch PresentationShangri La Colombo Pitch Presentation
Shangri La Colombo Pitch PresentationLyndon Hale
 
Business Justification Improvements Strategic Requirements Inorganic Growth F...
Business Justification Improvements Strategic Requirements Inorganic Growth F...Business Justification Improvements Strategic Requirements Inorganic Growth F...
Business Justification Improvements Strategic Requirements Inorganic Growth F...SlideTeam
 
Real Estate Insights of Mira Bhayandar Region
Real Estate Insights of Mira Bhayandar RegionReal Estate Insights of Mira Bhayandar Region
Real Estate Insights of Mira Bhayandar RegionOMKAR CHODANKAR
 

La actualidad más candente (20)

Staffing and Recruitment at FedEx
Staffing and Recruitment at FedExStaffing and Recruitment at FedEx
Staffing and Recruitment at FedEx
 
DHL Presentation
DHL PresentationDHL Presentation
DHL Presentation
 
Assignment taj hotels services by nilesh shukla
Assignment taj hotels services  by nilesh shuklaAssignment taj hotels services  by nilesh shukla
Assignment taj hotels services by nilesh shukla
 
Jami Masjid,Gulbarga
Jami Masjid,GulbargaJami Masjid,Gulbarga
Jami Masjid,Gulbarga
 
Avari Ramada Hotel, Lahore Case Study
Avari Ramada Hotel, Lahore Case StudyAvari Ramada Hotel, Lahore Case Study
Avari Ramada Hotel, Lahore Case Study
 
Jaipur
JaipurJaipur
Jaipur
 
Qutub minar
Qutub minarQutub minar
Qutub minar
 
Viability of inland waterways in india
Viability of inland waterways in indiaViability of inland waterways in india
Viability of inland waterways in india
 
Hauz khas
Hauz khasHauz khas
Hauz khas
 
Sahastra bahu mandir (gwalior)
Sahastra bahu mandir (gwalior)Sahastra bahu mandir (gwalior)
Sahastra bahu mandir (gwalior)
 
Business Model Canvas of ITC Hotel
Business Model Canvas of ITC HotelBusiness Model Canvas of ITC Hotel
Business Model Canvas of ITC Hotel
 
Jama masjid: An architectural masterpiece
Jama masjid: An architectural masterpieceJama masjid: An architectural masterpiece
Jama masjid: An architectural masterpiece
 
Shangri La Colombo Pitch Presentation
Shangri La Colombo Pitch PresentationShangri La Colombo Pitch Presentation
Shangri La Colombo Pitch Presentation
 
Renaissance Fort Worth Wedding Package
Renaissance Fort Worth Wedding PackageRenaissance Fort Worth Wedding Package
Renaissance Fort Worth Wedding Package
 
Business Justification Improvements Strategic Requirements Inorganic Growth F...
Business Justification Improvements Strategic Requirements Inorganic Growth F...Business Justification Improvements Strategic Requirements Inorganic Growth F...
Business Justification Improvements Strategic Requirements Inorganic Growth F...
 
Real Estate Insights of Mira Bhayandar Region
Real Estate Insights of Mira Bhayandar RegionReal Estate Insights of Mira Bhayandar Region
Real Estate Insights of Mira Bhayandar Region
 
Taj hotels and resort
Taj hotels and resortTaj hotels and resort
Taj hotels and resort
 
Tesco
TescoTesco
Tesco
 
Godiva europe company
Godiva europe companyGodiva europe company
Godiva europe company
 
Strategic supply chain management of DHL
Strategic supply chain management of DHLStrategic supply chain management of DHL
Strategic supply chain management of DHL
 

Destacado

GPL Brief Introduction Of MgO Eco Prefab House System AAA
GPL Brief Introduction Of MgO Eco Prefab House System AAAGPL Brief Introduction Of MgO Eco Prefab House System AAA
GPL Brief Introduction Of MgO Eco Prefab House System AAAKingsley Osuh Sr.
 
Village Disaster Management Plan (VDMP)
Village Disaster Management Plan (VDMP)Village Disaster Management Plan (VDMP)
Village Disaster Management Plan (VDMP)Independent
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Derrick Teal
 
Caravan Industry of Victoria
Caravan Industry of VictoriaCaravan Industry of Victoria
Caravan Industry of VictoriaJames Everard
 
Project Company Profile Main Copy 1
Project Company Profile Main Copy 1Project Company Profile Main Copy 1
Project Company Profile Main Copy 1Jayakrishna J
 
Company Profile PT Goe Tech Indonesia Karawang
Company Profile PT Goe Tech Indonesia KarawangCompany Profile PT Goe Tech Indonesia Karawang
Company Profile PT Goe Tech Indonesia Karawangbadar masbadar
 
SEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTINGSEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTINGgmrlongrich2014
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 
AL BADDAD INTERNATIONAL - Company Profile 2014
AL BADDAD INTERNATIONAL - Company Profile 2014AL BADDAD INTERNATIONAL - Company Profile 2014
AL BADDAD INTERNATIONAL - Company Profile 2014Sameh_Mohsen
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hranshse2
 
Shipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 

Destacado (15)

GPL Brief Introduction Of MgO Eco Prefab House System AAA
GPL Brief Introduction Of MgO Eco Prefab House System AAAGPL Brief Introduction Of MgO Eco Prefab House System AAA
GPL Brief Introduction Of MgO Eco Prefab House System AAA
 
Village Disaster Management Plan (VDMP)
Village Disaster Management Plan (VDMP)Village Disaster Management Plan (VDMP)
Village Disaster Management Plan (VDMP)
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...
 
Caravan Industry of Victoria
Caravan Industry of VictoriaCaravan Industry of Victoria
Caravan Industry of Victoria
 
Project Company Profile Main Copy 1
Project Company Profile Main Copy 1Project Company Profile Main Copy 1
Project Company Profile Main Copy 1
 
Company Profile PT Goe Tech Indonesia Karawang
Company Profile PT Goe Tech Indonesia KarawangCompany Profile PT Goe Tech Indonesia Karawang
Company Profile PT Goe Tech Indonesia Karawang
 
SEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTINGSEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTING
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
AL BADDAD INTERNATIONAL - Company Profile 2014
AL BADDAD INTERNATIONAL - Company Profile 2014AL BADDAD INTERNATIONAL - Company Profile 2014
AL BADDAD INTERNATIONAL - Company Profile 2014
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hr
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
365 travel company profile
365 travel company profile365 travel company profile
365 travel company profile
 
Shipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej Company Profile
Shipyard Begej Company Profile
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 

Similar a Caravan Es Company Profile

Jks ppt may 17th
Jks ppt may 17thJks ppt may 17th
Jks ppt may 17thwqq19850502
 
Xa vi cn-gen-2017-y2
Xa vi cn-gen-2017-y2Xa vi cn-gen-2017-y2
Xa vi cn-gen-2017-y2YC Pan
 
TCI 2015 Sungmoon Co. Ltd
TCI 2015 Sungmoon Co. LtdTCI 2015 Sungmoon Co. Ltd
TCI 2015 Sungmoon Co. LtdTCI Network
 
Company Profile_OST SBU 1
Company Profile_OST SBU 1Company Profile_OST SBU 1
Company Profile_OST SBU 1James Chua
 
Yeebo company profile
Yeebo company profileYeebo company profile
Yeebo company profileJim Cao
 
100318 (electronic materials) crown jewel of electronics industry
100318 (electronic materials) crown jewel of electronics industry100318 (electronic materials) crown jewel of electronics industry
100318 (electronic materials) crown jewel of electronics industryUC Berkeley
 
Global and china solar cell (photovoltaic) equipment industry report, 2010
Global and china solar cell (photovoltaic) equipment industry report, 2010Global and china solar cell (photovoltaic) equipment industry report, 2010
Global and china solar cell (photovoltaic) equipment industry report, 2010ResearchInChina
 
Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice Tech Co.,Ltd.
 
Good-Ark company profile
Good-Ark company profileGood-Ark company profile
Good-Ark company profileDavid Chen
 
2015_Daewoo_International_Presentation_Material(20150625)
2015_Daewoo_International_Presentation_Material(20150625)2015_Daewoo_International_Presentation_Material(20150625)
2015_Daewoo_International_Presentation_Material(20150625)Rajat Pareek
 
HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.Matt KING
 
Advantec Co., Presentation 2016
Advantec Co., Presentation 2016Advantec Co., Presentation 2016
Advantec Co., Presentation 2016Alexis Salvosa
 
machine2010 (1).pptx
machine2010 (1).pptxmachine2010 (1).pptx
machine2010 (1).pptxAbishek43310
 
Global tft lcd equipment industry report, 2009
Global tft lcd equipment industry report, 2009Global tft lcd equipment industry report, 2009
Global tft lcd equipment industry report, 2009168report
 

Similar a Caravan Es Company Profile (20)

Jks ppt may 17th
Jks ppt may 17thJks ppt may 17th
Jks ppt may 17th
 
Xa vi cn-gen-2017-y2
Xa vi cn-gen-2017-y2Xa vi cn-gen-2017-y2
Xa vi cn-gen-2017-y2
 
TCI 2015 Sungmoon Co. Ltd
TCI 2015 Sungmoon Co. LtdTCI 2015 Sungmoon Co. Ltd
TCI 2015 Sungmoon Co. Ltd
 
Company Profile_OST SBU 1
Company Profile_OST SBU 1Company Profile_OST SBU 1
Company Profile_OST SBU 1
 
Yeebo company profile
Yeebo company profileYeebo company profile
Yeebo company profile
 
100318 (electronic materials) crown jewel of electronics industry
100318 (electronic materials) crown jewel of electronics industry100318 (electronic materials) crown jewel of electronics industry
100318 (electronic materials) crown jewel of electronics industry
 
English company profile
English company profileEnglish company profile
English company profile
 
Global and china solar cell (photovoltaic) equipment industry report, 2010
Global and china solar cell (photovoltaic) equipment industry report, 2010Global and china solar cell (photovoltaic) equipment industry report, 2010
Global and china solar cell (photovoltaic) equipment industry report, 2010
 
Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1
 
Ch25 new
Ch25 newCh25 new
Ch25 new
 
Good-Ark company profile
Good-Ark company profileGood-Ark company profile
Good-Ark company profile
 
2015_Daewoo_International_Presentation_Material(20150625)
2015_Daewoo_International_Presentation_Material(20150625)2015_Daewoo_International_Presentation_Material(20150625)
2015_Daewoo_International_Presentation_Material(20150625)
 
2016 Company Presentation
2016 Company Presentation2016 Company Presentation
2016 Company Presentation
 
dust handing
dust handingdust handing
dust handing
 
HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.HANJUNG TECH Co., Ltd_About info.
HANJUNG TECH Co., Ltd_About info.
 
대림_OVERVIEW(영)_2013
대림_OVERVIEW(영)_2013대림_OVERVIEW(영)_2013
대림_OVERVIEW(영)_2013
 
Advantec Co., Presentation 2016
Advantec Co., Presentation 2016Advantec Co., Presentation 2016
Advantec Co., Presentation 2016
 
Project 2015
Project 2015Project 2015
Project 2015
 
machine2010 (1).pptx
machine2010 (1).pptxmachine2010 (1).pptx
machine2010 (1).pptx
 
Global tft lcd equipment industry report, 2009
Global tft lcd equipment industry report, 2009Global tft lcd equipment industry report, 2009
Global tft lcd equipment industry report, 2009
 

Caravan Es Company Profile

  • 1. Company Profile Ver. 120308
  • 2. Contents I. Company Introduction --------------------------------------------------------------------------------3  General Information  Company History  Business with the United Nations  Business with CHF International  Business with FIFA  Business with Japan Ministry of Defense II. Division Introduction-----------------------------------------------------------------------------------7 III. Products Divisions------------------------------------------------------------------------------------- 12 1. International Public-Procurement 2. Prefabricated Building System 3. Village Design & Construction (Field Labor Camp) 4. Green Technology & Systems 5. Sports & System 6. Housing 7. Emergency & Transitional House 8. Next Generation Military Tent 9. Caravan RS(Radiation Shielding) System 2
  • 3. Company Introduction General Information Company Name Caravan Engineered Structures, Inc. (Caravan ES) Products 1. UN PKO Items (1) Prefabricated Structures (Accommodation, Storage, Workshop and Other Use) (2) Electrical Materials for Field Operation (Cables, Lamps, Distribution Boards and Transformers) (3) Sanitation Fixtures 2. Prefabricated Building System (1) Prefabricated Hardwall & Softwall Buildings (2) Prefabricated Buildings 3. Village Design & Construction (Filed Labor Camp) 4. Green Technology & Greenhouse 5. Sports System 6. Housing 7. Emergency & Transitional Houses 8. Next Generation Military Tent 9. Caravan RS(Radiation Shielding) System Locations Office (1) Seoul (HQ): 41st Floor, Trade Tower, World Trade Center, Samseong-dong, Gangnam-gu, Seoul, Korea. Tel: +82-2-6000-6800, Fax: +82-2-6000-6688 (2) New York: 200 West 70th Street #16M(Manhattan), New York, NY 10023 USA Tel: +1-212-579-5600, Fax: +1-212-579-5602 (3) Tokyo: 5th Floor, Kyobashi Koyo Bld., 1-14-6 Kyobashi, Chuoku, 104- 0031, Tokyo, Japan Tel: +81-3-6228-6988, Fax: +81-3-6228-6980 (4) Sendai: 201, Nippo proceed Tsutsujigaoka, 1-11-10 Miyagino, Miyagino-ku, Sendai, 983-0045 , Japan Tel: +81-22-781-5470 , FAX: +81-22-781-5471 Factory (1) Qingdao (China) : South of the Countryside, Yang Jialin, Beiguan Office, Jiaozhou, Qingdao City, China (2) I-Cheon (Korea) : Pyogyo-lee 21-1,21-2, Majang-myun, Icheon-si, Kyungki-do, Korea 3
  • 4. Company Introduction Company History 2002 Company Foundation 2004 IFAI (Industrial Fabric Association International, USA) Membership Next World-class Product Award (Minister of Commerce, Industry and Energy Republic of Korea, No. 2004-350) 2005 Korea Venture Business Association Membership (No. 051121031-1-00361) Establishment of New York Branch Awarded for Outstanding Export performance -million USD (Korea International Trade Association) 2006 Establishment of Company Annex Research Center Korean INNO-BIZ (Innovation Business) Membership (Small and Medium Business Administration) Certification for ISO 9001:2000 / KS A 9001:2001 2007 Certification of Appreciation (Maryland, USA) Awarded Commendation (Korea Small Business Association, No 2007-160) 2008 Certification for ISO 14001:2004/ KS A 14001:2004 Designated as Prospective Exporter (Small and Medium Business Administration) Awarded Commendation (Small and Medium Business Administration) Awarded Commendation (Ministry of Knowledge Economy) Awarded Commendation (Prime Minister Korea No.148489) 2009 Establishment of Qingdao Factory, China (March) Establishment of Tokyo Branch (November) Awarded Commendation (Ministry of Knowledge Economy) Awarded for Outstanding Export performance-10million USD (Korea International Trade Association) 2010 Registered as Member of United Nations Global Compact Awarded Commendation (Ministry of Knowledge Economy) Awarded for Outstanding Export performance-20million USD (Korea International Trade Association) Establishment of First Factory in I-Cheon Establishment of Second manufacturing facility in China (Qingdao Factory) Obtained approval for Second Factory in I-Cheon (Moga Industrial Estate) 2011 Establishment of Sendai Branch Establishment of Tokyo and Washington,D.C manufacturing Factory (in progress ) Establishment of UAE Branch (in progress ) Awarded Commendation (Ministry of Knowledge Economy) Current World-class Product Award (Minister of Knowledge Economy Republic of Korea, No. 2011-045) 4
  • 5. Company Introduction Business with the United Nations 1. June, 2003 : Contract No. PD/C0012/03 (RFPG-117, Prefabricated Soft-wall Building) 2. May, 2007 : Contract No. PD/C0101/07 (RFPG-359, Ablution & Sanitation Fixtures) 3. March, 2008 : Contract No. PD/C0018/08 (ITBG-1583, Electrical Materials) 4. January, 2009 : Contract No. PD/C0277/08 (RFPG-403, Various Structures for Accommodation, Storage and Workshop) 5. July, 2010 : Purchase Order No. 10MIT-200433 (10RFP/MM/10/UNMIT, Aircraft Hangar) 6. October, 2011 : Contract No. PD/C0227/11 (2TBG-1989, Ablution & Sanitation Fixtures) Consultant 1. Law Firm : Law Firm BUSAN / Law Office of Byung-Wook Jung 2. Auditing Firm : Deloitte Anjin LLC 3. Labor Corporation : Labor Corporation Sang Saeng 4. Tax Accounting Firm : JTT Partners 5
  • 6. Company Introduction Business with CHF • February, 2011 : Contract No. KATYE-PC-11-02-CES (2-story shelter) New 2-story shelter for family camp and resettlement Business with FIFA • March, 2011 : Contract with Federation International de Football Association (FIFA) Execution of the construction of indoor futsal stadium for the National Football Training Centre in Paju, Korea Business with TV Asahi Create Co., Ltd. • October, 2010 : Contract No. CR-111021 (3-story building) Design and construction of the police station for filming Business with Japan Ministry of Defense • September, 2010 : Japan Ministry of Defense Contract No. 3-22-1001-021A-G-0049 (Battery for Generator) • June, 2010 : Japan Maritime Self-Defense Force Contract No. 22-1-2214-1290-4048-00 (Angle attachment) Business with Samsung Engineering • September, 2011 : Samsung Engineering, Contract No. 4500081490-0 (Office & Warehouse, Shaybah NGL Project) • September, 2011 : Samsung Engineering, Contract No. 4500081594-0 (Office & Warehouse, Shaybah NGL Project) • September, 2011 : Samsung Engineering, Contract No. 4500081596-0 (Office & Warehouse, Shaybah NGL Project) • September, 2011 : Samsung Engineering, Contract No. 4500081606-0 (Office & Warehouse, Shaybah NGL Project) 6
  • 7. Division Introduction 1. International Public-Procurement Division As a prime contractor of UN Headquarter, we design, manufacture and supply products for UN PKO(Peacekeeping Operation). We have established a supply contract valued 130 million with UN Headquarter in 2011. ▪ Prefabricated Structures (PBS) : structural and environmental designed housing, warehouses, hangars, gymnasium etc. ▪ Electrical Installation (Electrical materials): Cables, Lamps, Distribution Panels, Light Towers. ▪ Outdoor sanitation facilities (Ablutions / Sanitations fixtures): 100% Stainless Steel Water Savings, Dual-flush Toilets, Shower Trays ▪ ET House (Emergency & Transitional House): Fabric Shelter, Steel House, 2 story shelter, etc. In addition, we are planning to supply our prefabricated structures, camp equipment and other products in many other procurement markets such as the U.S.Department of Defense(DOD) and U.S. troops in the Pacific Command, U.S. Army, the Japanese Self-Defense etc. 2. Prefabricated Building System With a high strength steel frame, our innovative Prefabricated Building System (PBS) is capable to easily assemble, dis-assemble, and re- install. PBS retains not only an excellent quality selecting reinforced PH-beam (Prefabricated H beam) and Galvalumesteel panels but a high energy-efficiency through Double-wall system. PBS is use for hangars, warehouses, offices, accommodations, shipyards, etc. Features  Delivered as Complete Kit: Ready to assemble on site by installation manual  Welding-Free System: Using bolts and nuts only to assemble by unskilled technician  Fast Installation: 50% shorter work-period comparing others, no heavy equipment needed  High Strength Light Weight Structure: Earthquake-resistant design, Wind load resists up to 240km/h  Custom-made Design on sizes, materials, doors, wind-load, snow load, etc. 7
  • 8. Division Introduction 3. Village Design & Construction (Field Labor Camp) Division With our experience and advanced technologies, Caravan ES now provides Field Camps that can be applied to Village Reconstruction, Military Base Camps, and Temporary Construction Facilities. Features - Speedy and easy construction with cost-benefit - Turn Key Service: From camp design to civil works, road paving, power & water supply, etc. - Various facilities: Accommodation, office, canteen, warehouse, gymnasium, mosque, etc. Village Reconstruction We design and rebuild villages that are under poor conditions and damaged by flood, fire, war, and other unexpected disasters. Our design is based on thorough site survey and careful study on the local features. Military Base Camps Caravan ES Military Base Camps are designed to the UN standards, and have incomparably high strength and durability. We provide the most safe base camps even in difficult conditions and war zones. Temporary Construction Facilities Large-scale construction projects require facilities to serve a host of task-force. To ensure efficient and successful implementation of the projects, we provide temporary construction facilities with infrastructure. Since our structures are completely relocatable & reusable, we assure high cost efficiency. 8
  • 9. Division Introductions 4. Green Technology & Greenhouse Division Our greenhouse is an innovative product that makes up for the weakness of plastic and glass greenhouse. For cladding, we use the PMMA sheet of which transparency lasts for more than 30 years. We supply and install various sizes of greenhouses from small- sized to more than 10,000 ㎡ of mega-sized ones.  All around services from supply and installation of the greenhouse to consulting on growing, production, and marketing of the plants  High strength H-Beam and Truss that withstand storms and hurricanes  Excellent insulation as well as energy saving effect with super-transparent double wall  Versatility, other uses available: Free and easy operation of any type and size of machinery because of NO inner column  City Farm: Design & consulting service for plant factory, installation and maintenance of vertical garden and roof-top greenhouses 24m(W) x 51m(L) 80m(W) x 180m(L) 3m(W) x 6m(L) 5. Sports & System Division Caravan SS(Sports & System) has newly introduced prefabricated ‘Sports Complex’, the most economical and cost-effective development for all types of indoor sports. Its patented technology has not only substantially reduced the construction period, but optimized the use of natural resources while providing adequate functionality and convenience for the users.  Double-layered transparency structure: Composition of uniquely designed transparent double-layer that transmits a large amount of natural light to improve visual effect and energy efficiency.  Sports facilities & accessories: Functional developments include nationally recognized sports flooring system, sports-oriented indoor lighting system, professional installation of audio system, LED scoreboard, spectator’s seat, and many more.  Application of sports: Various models of Sports Complex with flexible sizes and shapes are offered for utilizing each and every sports types, including futsal, basketball, volley ball, horse-riding track, badminton, gateball, and etc. <36(W) x 51(L) x 14(C.H)m>
  • 10. Division Introductions 6. Housing (Permanent House & Prefabricated House) 100% prefabricated house using Prefabricated H-Beam(Light-weight prefabricated steel H-Beam). Various size(40㎡~150㎡) and customized design. - Fast and easy : Fast and easy construction without heavy equipment and unskilled worker can assemble with installation manual. Short-term installation (32hours with 6 people), Sanitary, Kitchen equipment and Electrical material - More than 30-year life span: Durable and safe house using Patent Light-weight prefabricated steel H-Beam - Fast supply: Packable in 20’ ISO containers and dry construction method (Available 500 units in one(1) month and 5000units in six(6)months) 7. ET-House: Emergency & Transitional House Emergency and Transitional House is designed specifically to relief refugees from emergency situations quickly, cost-efficiently and effectively. - Two(2) separate rooms in one(1) structure with partition - Option: Floor, Hard Wall system, shelves, bed, table and electrical equipment - Cost efficiency, Designed for Transitional Function - Fast supply: Packable in 20’ ISO containers, easy assemble and disassemble, and Fast & mass production and transport for urgent needs (Available 10,000 unit in one(1) month, 60,000 units in six(6) months) - Various products: Tent, Steel House , and 2 story shelter can be supplied by customer’s need - Various uses: Caravan’s emergency and transitional house can be used for accommodation, classroom, church, hall and warehouse. 10
  • 11. Division Introductions 8. Next Generation Military Tent Core features of light weight and durability, and its distinct supplements, such as ballistic protection, stealth capability, and radiation shielding provide residence convenience, survivability, and rapid response of the soldiers in the combat field.  Rapid Set-up: 15 minutes for standard type and even faster installation when in emergency set-up  Extreme Weather Resistant: Extra insulation set-up (extendable air layer) and strong wind kit for the most challenging climates  Battlefield Solution: ballistic protection (Test standard: MIL-STD-662F), stealth capability with infrared detector cut-off, and radiation shielding Functional Materials  Double Foldable Frame: High strength lightweight aluminum alloy that is expandable for air insulation and adjustable in angles  Advanced Fabric: Features water repellent, flame and mildew resistant, blacked-out, high tearing strength, and excellent thermal performance 9. Caravan RS (Radiation Shielding) System Caravan RS Pad is an innovated radiation shielding that has been developed to complement the defects of existing radiation protection sheets.  Great Flexibility - Highly flexible to be used in any curved surfaces with great miscibility and moldability.  Verified Technology - Protection capability calculated based on Standard: NCRP 49 (Conducted by Korea Atomic Energy Research Institute)  Easy Installation – Easily applicable to all Caravan’s structures systems without any special equipment  Lighter-weight and easier installation than lead and concrete..  Lower overall cost in respects of material and installation.  Outstanding protection capacity - 100 % radiation shielding against α, β rays and 99% shielding capacity against X rays - gamma and neurton rays also effectively shielded. 11
  • 13. International Public-Procurement UN PKO Field Camps We provide complete Turnkey Solutions which cover everything from camp design and road construction to procuring water purification systems. With our detailed knowledge and experience in camp operations, we can design, procure, construct, and operate the facilities. Caravan ES Turnkey Solution is based on an eco-friendly concept by utilizing cost-effective and environmentally-sound materials. Details of Our Scope of Work • Designing Camps • Accommodations, warehouses, offices, hospitals, education centers, maintenance facilities, hangars, water-purification devices, etc. • Supporting Infrastructures - Full Range of Electrical Fixtures - International standard cables, distribution boards, generators, transformers, lamps, emergency light towers, etc. - Sanitary Systems : Dual-flush toilet, wall-hung urinals, wash basins, janitor’s rooms, Hot & Cold faucets, shower trays, tissue dispensers, etc. - Food Service Facilities: Kitchenware, Tables and Chairs, utensils, etc. - Security Systems : Centralized security systems, Hesco barrier and barbed wires 18m(W)x42m(L) - Water-Purification Systems - Other Facilities: Communication satellite networks • Fire Fighting Systems • Construction and Building: Road, billeting facilities, etc. • Services: Camp maintenance, catering services, etc. 6.4m(W)x18m(L) x3.54m(H) 13
  • 14. International Public-Procurement Prefabricated Building System Packable Building Systems are the most innovative building systems for field missions. These systems are designed to maximize the function of transportation, storage and relocation. The buildings have been precisely designed and manufactured for easy handling and transportation in ISO containers. 1. Packable • Various Structures for Accommodation, Storage and Workshop • Packable, re-locatable and transportable building systems • The fastest construction & demounting time with bolting systems • The size and weight of parts have been precisely designed, which enables easy manual installation 2. High-Strength Structural Steel Frame • Strongest and lightest weight frame systems • Patented technologies based on the latest structural engineering methods and theories (Wind load capacity: up to 240km/h) • Prefabricated Steel H-Beam (PH-Beam) provides manual construction without heavy equipment. • Arch-shaped roof provides better structural strength than Gable-shaped roof. 3. Engineered Composite Plastic (FRP) • FRP (Fiberglass Reinforced Plastic) H-Beam opened a new era of FRP frame for building structures • FRP H-Beam is developed to the customer’s specifications, including various colors, lighter weight and higher strength. • Light-weight FRP (Specific gravity: 1.8~2.4) is easy to handle but as strong as steel frame. • Rust-free: Ideal for the Marine industry 14
  • 15. International Public-Procurement Ablution & Sanitation Fixtures • Durable and cost-efficient ablution • Sanitation fixtures for field usage, transportation and storage • Products include dual-flush toilets, wall-hung urinals, wash basins, janitor’s rooms, hot & cold faucets and tissue dispensers as part of our supply scope • Wide range of ablution and sanitation products based on customer requirements Advantages • Made from durable field materials (100% stainless steel) • Water-free urinals available: water efficient • Environment friendly • Installed in the least possible time • Dual-flush toilets, wall-hung urinals, wash basins, janitor’s rooms, hot & cold faucets, shower trays, tissue dispensers, etc. Installation • Fixtures designed to be installed in the least possible time. • Size, volume and weight of each unit is designed such that it is easy to handle, permitting ease of installation without using mechanical handling equipment. Design & Material Specification • All Sanitation Fixtures supplied in compliance with international environmental and water conservation standards. • Water Closets (WC), Shower Tray, Wash Basins, Urinals, Soap Dishes, Shower Curtain Rails, Clothes Hooks Panels and Towel Rails are fabricated of heavy gauge type 304 stainless steel with exposed surfaces polished. 15
  • 16. International Public-Procurement Electrical Materials • Complete electrical package for base camps and village constructions • International standard cables (with accessories), distribution boards, transformers, lamps, portable light tower, etc. • Prime Contractor to the United Nations (Contract No. PD/C0018/08, Electrical Materials) <Transformer> <Cable> <Flood Light> <Lamps> <Distribution Panel> <Portable Light Tower> Other Products We offer a wide range of products to meet client’s various needs. Products such as water tanks, emergency tents, security items and wires are also available for order. <Water Tank> <Observation Tower> <Emergency Tent> <Security Wire> <Generator> 16
  • 18. Prefabricated Building System PBS (Prefabricated Building Systems) PBS (Prefabricated Building System) • Assembled at site with bolting systems without heavy equipment • Designed to be dismantled, re-located, and re-assembled easily and quickly • Strong, fast, and cost-efficient systems for commercial and military uses Features Advantages Unique Structural Frame Short, Fast, and Easy • Prefabricated H-Beam(PH Beam) for fast and easy • Bolt and Nut Assembly System (No welding required) assembly with bolts & nuts • Pre-assembled components • Patented technology (Patent no. 10-0972535) on flange Ideal for Rigorous Environments reinforced beams (Compact and Light) • High durability and various loads resistance Double Wall System • Earthquake-resistant design available • Natural insulation reduces maintenance cost • Double wall with outer steel sheet and inner PVC fabric Eco-Friendly Suitable for both hot and cold climates • No construction waste when installing and dismantling Arch-Type Roof • Eco-friendly options: solar panels, transparent panels, rain reuse and natural air cooling systems • Available maximum space use • Structurally substantial and durable Easy Maintenance • Simple and compact components minimize maintenance • Repair kit provided for easy mending of components 18
  • 19. Prefabricated Building System 3-STEP SOLUTIONS Easy Packing Solution Rapid Building Solution Customized Building Solution • Light weight PH-Beams and compact • Ready to dispatch in shortest period • Size, material, and loads are concerned to components offer easy installation, • Factory-made components reduced suit local conditions and customers’ needs. dismantlement and relocation. the manufacturing time. • Providing various installations include • Packable in ISO standard containers • Bolting systems and light-weight options such as electric fixtures and allowing for shipment of components enable fast manual sanitary wares. the structures to the world-wide installation. • Diverse options providing: bullet proofing, • Providing simple foundation solution and solar systems, etc. COMPARISON WITH OTHERS No. Categories CaravanES Competitors Assembly 1 Unique Bolting System Mainly Welding System Method 2 Frequency in Use Reusable A Single Usage 3 Prefabrication Complete Prefabrication Available On-site Work Required OPTIONAL ITEMS ▪ Hangar /Cargo door ▪ Bullet-proof wall ▪ Skylight ▪ Transparent/translucent wall and roof ▪ Air cooling system ▪ Solar system ▪ Earthquake-resistance system ▪ Wind-load design ▪ Snow-load design ▪ Temperature control system ▪ Partitions ▪ Various insulation materials 19
  • 20. Prefabricated Building System MANUAL INSTALLATION PROCESS Installation Shipping • Easy and Fast Installation using minimum mechanical • Suitable for handling by crane, fork-lift, and truck equipment • Packable and re-locatable buildings by Sea Freight, Air Freight, • Simple foundation solution provided and Rail Freight. • 300sqm structure can be built in one week with six(6) laborers • The size and weight of each component is designed to fit in standard ISO containers. Quality Assurance • Quality Management System fulfils the requirement of ISO9001:2000 standard. 20
  • 21. Prefabricated Building System Project Summary A. RFPG-403 (PD/C0277/08) - Prefabricated Structures B. 10MIT-200433 - Aircraft Hangar Model: Type B Model: Caravan Hangar VARIOUS APPLICATIONS Prefab-Structure Type: Type: Hangar Size(m): 12(W) x 24(L) x 2.4(W.H), Size(m): 30(W) x 31(L) x 5(W.H), 5.6(C.H) 8.2(C.H) Frame: Steel Frame (zinc coating) Frame: Steel Frame (zinc coating) Cladding: Steel Cladding / PVC Cladding: Steel Frame Roof: Arch Roof: Arch Door: 4.8(w) x 4.8m (h) Door: 3m 3(w) x 5.8m (h) 0.9(w) x 2.1m (h) 0.9(w) x 2.1m (h) Model: Type C Type: Prefab-Structure Size(m): 18(W) x 36(L) x 3.6(W.H), 8.1(C.H) Frame: Steel Frame (zinc coating) Cladding: Steel Cladding / PVC Roof: Arch Door: 4.8(w) x 4.8m (h)/ 12(w) x 16m (h) 0.9(w) x 2.1m (h) Details 1. January, 2009: Contract No. PD/C0277/08 (RFPG-403, Various Structures for Accommodation, Storage, and Workshop) 2. July, 2010: Purchase Order No.10MIT-200433 (10RFP/MM/10/UNMIT, Supply and Delivery of Frame Supported Membrane Structure (Aircraft Hangar)) 21
  • 22. Prefabricated Building System PBS Standard Dimension ※ Every component is able to customize in response to customer demand.
  • 23. Prefabricated Building System WAREHOUSE Economical, Easy, and Fast Caravan Warehouse has been precisely designed for maximum portability and functionality with easy installation and reparation. All of erection is proceed by bolts and nuts without heavy equipment at site. This heavy duty and light-weight Caravan warehouse employs various patents and is offered in various sizes accurately. Since 2003, the structure has been provided to United Nations through long term system contract PD/C0277/08. With full of satisfaction and collaborating faith, we are supplying the goods to all over the UN operation missions in the world. Key Features • UN qualified warehouse • Supplied to all over the world under UN System contract • Manually installable by local labors, without heavy equipment • Minimum maintenance with various anti-corrosion treatment • Reusable and relocatable with minimum cost • Complete bolting system (No welding required) 23
  • 24. Prefabricated Building System Japan Warehouse VARIOUS APPLICATIONS 24
  • 25. Prefabricated Building System ACCOMODATION Comfortable, Relocatable, and Customizable Innovative Accommodation provider, CaravanES, offers the most variety of accommodations in different configurations, dimension, materials, and optional items. Basically the structures are distinguished by Commercial and Military use which manufacture individually based on customer’s environment and condition. 6 (W) x 6 (L) x 3 (W.H) x 4.7m (C.H) Mostly Caravan Accommodations are specially designed to produce the best structure applied space efficiency and re-locatable as a form of prefabricated structure. Therefore, it is perfectly suitable to use without any difficulties with meeting international building code standards for various loads. Key Features • Both standard and customizable designs available 6 (W) x 12 (L) x 3 (W.H) x 4.7m (C.H) • Complement the defects of existing prefab building in respects of insulation, soundproof, waterproof, and material reuse • Rapid and relocatable building solution • Easy maintenance • Efficient space utilization • Long-term warranty 9 (W) x 18 (L) x 3 (W.H) x 5.5m (C.H) • Suitable as accommodation and office for military base camp, temporary works, and public institution Supplement ▪ Various doors ▪ Bullet-proof wall ▪ Solar system ▪ Furniture ▪ Wind-load design ▪ Snow-load design ▪ Temperature control system ▪ Partitions ▪ Various insulation materials 9 (W) x 21 (L) x 3 (W.H) x 5.5m (C.H) 25
  • 26. Prefabricated Building System HANGAR PBS (Prefabricated Building System) Hangar Light Weight and Large, Clear Span structure that emphasizes low cost in long- term, sustainability in harsh environment, and rapid manufacturing and installation. Maximum Minimum Minimum Factory Processing Site Work Maintenance • Mass production • Manual assembly • Rust-free materials • Computer-controlled • Minimum laborers • Replaceable parts • Quality controlled • Fastest construction • Interchangeable • Standardized parts • Bolt and nut assembly components system • Over 30 years lifetime QUALITY PROVEN ENVIRONMENTAL ATTRIBUTES PERFORMANCE ATTRIBUTES • Wind Load over 240km/hour • Supplied to the UN Field • 95% of Reusable Materials, • Seismic Load of 8.0 Richter Missions in Africa, Middle Multiple Assembly Available East and Haiti • Double-wall System: • Over 50m Span Available per Request (Model No. PBS 1836) Natural Insulation and • Supplied to the UNMIT in Sound Absorption • Rust Free Material East-Timor • Solar-Powered Air Conditioning • Computer Controlled Applicable Manufacturing (Model No. PBS 3230 ) • Free of Hazardous Material, and • Sustainable from Desert to • Various Size and Design Heavy Metal Arctic Customizable per Specific • RoHS Compliant • Ballistic Protection, Radiation Requirements Shielding applicable 26
  • 27. Prefabricated Building System UNMIT Aircraft Hangar VARIOUS APPLICATIONS 27
  • 28. 3. Village Design & Construction (Field Labor Camp)
  • 29. 3. Village Design & Construction (Field Labor Camp) Caravan ES Village & Field Camps As a prime contractor to the UN, Caravan Engineered Structures Inc. supplies prefabricated structures, soft-wall tents, electrical fixtures, and sanitary wares to all of the UN Missions worldwide. With many years of experience and development, Caravan ES now provides Field Camps that can be applied to Military Base, Temporary Construction Camp and Village Design & Construction. We offer complete Turnkey Solutions from camp design to civil works, road paving, water-purification systems, catering service, etc. As a world leader in the industry, we are confident that our camp solutions will satisfy clients with their time and cost efficiency, flexibility, durability and excellent customer service. Temporary Construction Camp Mega projects like petrochemical, refinery, plant construction require facilities to service a large number of project task-force. To ensure project success and to allow fast implementation of projects, we provide camp accommodations, utilities & infrastructure, and temporary construction facilities i.e. offices, accommodations, warehouses, canteens, recreation halls, gymnasium, maintenance shop, public shower room, mosque, etc. Relocatable & Reusable - Completely relocatable from one site to another - Easy to pack & transport with 20’ ISO containers - More than 95% of building materials can be reusable Competitive Price & High Quality <Temporary Site Facilities> - Cost and time saving from manual installation without heavy equipment - ISO 9001:2000/ISO 14001:2004 - Designed to the United Nations standards * PMMA: Polymethyl methacrylate Eco-friendly Design - Complete demobilization & reinstatement without environmental damage - Energy saving with solar panels - Natural lighting with transparent (PMMA) panels <Temporary Camp Facilities> 29
  • 30. 3. Village Design & Construction (Field Labor Camp) Accommodation Contractor / VIP Guest Unshared House 7 (W) x 15(L) x 2.4(WH) m x3.3(CH)m < Interior View > < Exterior View > Labor 4-men Room, Shared Toilet/Shower 10(W) x 78(L) x 5.1(WH) x 5.5(CH)m < Interior View > < Exterior View > 30
  • 31. 3. Village Design & Construction (Field Labor Camp) Office 14 (W) x 60 (L) x 6.4 (WH) x 7.2 (CH)m < Interior View > < Exterior View > 23 (W) x 53 (L) x 3 (WH) x 4.3 (CH)m < Interior View > < Exterior View > 31
  • 32. 3. Village Design & Construction (Field Labor Camp) Support Facilities <Recreation Center> <Staff Canteen> <Laundry> 24 (W) x 33 (L) x 3.3 (WH) x 6 (CH)m 22 (W) x 33 (L) x 3.3 (WH ), 3 (CH)m 24 (W) x 33 (L) x3.3 (WH) x5.7 (CH)m <Hospital> <Labor Canteen> <Warehouse> 25 (W) x 51 (L) x 3.2 (WH) x 4.5 (CH)m 45 (W) x 108 (L) x 3 (WH) x 6 (CH)m 6 (W) x 18 (L) x 3 (WH) x 4.3 (CH)m <Maintenance Shop> <Car Shelter> <Rest Shed> 10 (W) x 30 (L) x 4 (WH), 5.9 (CH)m 5.5 (W) x 54 (L) x 2.5 (WH), 2.8 (CH)m 5.5 (W) x 2 (L) x 2.5 (WH), 3.1 (CH)m 32
  • 33. 3. Village Design & Construction (Field Labor Camp) Insulation Multi-layers Insulation for extreme climate: - Outer cladding + PE foam + Glasswool insulator + Air barrier sheet + EPS panel with Air curtains Additional Insulation: - PE waterproof cloth between inner & outer materials - Fillers applied to every joint parts for excellent airtightness. Insulation for Foundation Available: - Insulators could be applied to foundation and slab to maximize insulation performance by client’s choice. 33
  • 34. 3. Village Design & Construction (Field Labor Camp) Ballistic Protection Prefabricated walls and roofs with ballistic design are by using engineered structural framework. Over 500mm space in the double wall system and the space is filled in with an ideal amount of various composite components resulting in bullet and explosion proof. The roof is specially designed with top and inner ballistic protection as a double protected structure. Engineered Composited Material Top ballistic protection Ballistic stuffing Material Engineered Composited Material Inner ballistic protection Steel Plate Windows are protected by hard steel cover which is installed outside wall. It could be opened for ventilation. < Front view > < Window with steel cover > 34
  • 35. 3. Village Design & Construction (Field Labor Camp) Military Base Camps Our prefabricated structures are designed to UN standards, and have incomparably high strength and durability. Even in most difficult conditions and war zones, we deliver the most safe and complete base camps for all missions. Easy & Fast to Install - Capable of building field camps quickly and safely in emergencies - 150-man camp can be built in only 1-2 months - All buildings can be manually installed without heavy equipment and skilled labor Safety & Security - Bullet-proof system (patented) to in all buildings - Installation of gates, fences, HESCO, CCTV, observation tower, guard hut, etc. - Double wall systems feature high strength and durability Suitable for Difficult Site - Easy installation on uneven or slopping sites - Suitable for sites with extreme weather conditions - Wind load: up to 240km/h 35
  • 36. 3. Village Design & Construction (Field Labor Camp) Military Base Camps NEW CHALIE-A, RFPS-1443 HAITI CAMP LEGEND 12 ACCOMMODATION 1. COMMANDER’S 2. WARRANT OFFICER’S 15 13 8 3. COMMISSIONED OFFICER’S 16 17 5 7 4. TROOPS’ 10 5. RESTROOM & 6 5 SHOWERROOM 4 14 11 9 DINING & KITCHEN 6. OFFICER’SDINING 4 7. TROOPSDINING 2 8. KITCHEN 4 HEALTH & FITNESS 9. LEVEL1.HOSPITAL 4 1 10. GYM & RECREATION CENTER 3 4 OTHER FACILITIES 11. OFFICE 12. WORKSHOP 13. STORAGR 4 14. LAUNDRY ROOM 15. FUEL STORAGE CONTAINER 16. GENERATORS 17. WATER TANK 36
  • 37. 3. Village Design & Construction (Field Labor Camp) Military Base Camps <Troop’s Accommodation> <Office> 9 (W) x 18 (L) 6 (W) x 18 (L) < Level 1. Hospital > < Hangar > < Gymnasium > < Exterior of Facilities > 9 (W) x 21 (L) 18 (W) x 36 (L) 24 (W) x 48 (L) 37
  • 38. 3. Village Design & Construction (Field Labor Camp) Village Design and Construction In disaster when people are in desperate need for housing, health care, and water treatment, Caravan ES provides them comfort home fast and safe. With our experience and advanced technology, we design, and rebuild villages that are under poor conditions and damaged by flood, fire, war, and other unfortunate incidents. Based on site survey and careful studies of local culture, inhabitants, and customs, we design a village that is consistent with the region. With safe water supply and waste disposal system, the village will turn out to be clean and safe home, preventing the locals from fatal infections. Local Village Design - Upon customer’s request, various facilities like hospital, school, water supply & sewer system, recreation center, gymnasium, and community hall provided - From village design to civil works, building structures, road paving, and water supply, turnkey base service provided - Designed to fit in surrounding environment, local culture, weather and religion Fast & Safe Reconstruction - Using welding-free prefabricated house, village can be built quickly and safely in emergencies - 150 man village can be built approximately 1~2 months - High standards of sanitation in structures are applied to prevent and minimize outbreaks of disease and infection P-House (Prefabricated House) - High-strength PH-Beam and rigid floor system - Extremely easy and fast to build - Equipped with kitchen, bathroom, ventilation, electrical fixtures, heating system, AC, and furniture - Designed to be consistent with local housing interiors 38
  • 39. 4. Green Technology & Greenhouse Division
  • 40. Green Technology & Greenhouse Our super–transparent greenhouses are the most innovative systems incomparable with any other greenhouse in the agricultural and horticultural industries. Our greenhouses have been developed to make up for the weakness of glass and plastic greenhouses. With high strength H-beam and Truss, our products have outstanding features such as high durability, heavy wind load resistance. We supply and install various sizes of greenhouses from small-sized to more than 10,000 ㎡ of mega-sized ones. We also provide all the services for greenhouse operations from its designing to consulting service on cultivation methods as a turnkey project. FEATURES Turnkey Solutions The services we offer are as follows:  Design  Manufacturing  Supply/Transportation  Construction  Technical Supervision  Consultation on Cultivation Methods  Maintenance and Repair Fast & Easy Installation • Fast construction with bolting system • Size and weight of the parts have been precisely designed, which enables easy manual installation High-Strength Steel Frame: Prefabricated Steel H-Beam and Truss • Rigid, but light • Various patented technologies based on the latest structural engineering • Heavy equipment or welding are not necessary for manual construction • Arch-shaped roof provides great structural strength and effective air ventilation • Corrosion resistant in extreme weather conditions 40
  • 41. Green Technology & Greenhouse Double Cladding (Thickness: 8mm) • Outer: TP Panel (Super-transparent Plastic Sheet) Material Remarks  Extreme durability  More than 90% excellent light Glass 20 Single sheet  Energy-saving transmission rate  Break-resistant PVC 11.2 - • Inner: PE Film (Vinyl), Excellent Thermal Insulation TP Panel 1.5 double-sheet *Other claddings (e.g. Glass, PC, F-clean, PO, PE) also available based on customer specifications Easy Division • Supports cultivation of a variety of crops in one greenhouse • Better utilization of the space (e.g. Office, storage, laboratory, seedling room, germination room, additional facilities for processing crops) Fully Automated High-Tech Climate Control • Enables customers to control their environment with touch of finger Total Surface: 1,210 sqm 24m(W) x 50.4m (L) x 8m(CH) • Maintains uniform temperature in extreme cold or dry hot climates • Make higher profits through yielding high quality products <Easy Division> Versatile Structure • Other uses available with our structures e.g. botanical gardens, livestock shelters, storage for heavy equipment Eco-friendly, Energy Efficient Design • Solar panels available • Patented temperature-controlled double-wall system • Perfect insulation with Sheath heating systems • 100% reusable, re-locatable, packable structures • Rainwater drainage systems for irrigation and sprinklers <Botanical Garden> 41
  • 42. Green Technology & Greenhouse Various Sizes We offer various sizes according to customers’ needs. Facilities for Seedling, Breeding, Roof and side wall ventilation Working unit, Boiler and Potting benches (Optional) Irrigation tank, Packing, etc. Total Surface: 18sqm Total Surface: 14,400sqm Size: 3m(W) x 6m(L) x 1.8m(WH) x 3m(CH) Size: 80m(W) x 180m(L) x 5m(WH) x 17m(CH) - Frame: Aluminum, FRP (Fiberglass Reinforced Plastic) - Frame: Prefabricated H-beam, Truss - Cladding: TP Panel, F-clean, Vinyl - Cladding: : TP Panel, F-clean, Vinyl - Use for backyard and patios - Complete dome design to withstand storms and hurricanes - Ready to assemble - Spatial advantage of dome structure - Structure expandable after installation - Optimum for botanical garden 42
  • 43. Green Technology & Greenhouse Wide Span, Giant Greenhouse (Double-wall) Specifications Prefabricated H-beam SD Greenhouse  General Specifications − C.H: below 10m − Frame: Galvanized PH-beam, Square steel pipe − Cladding: TP Panel, Glass, F-clean − Ventilation type: push & pull, rack & pinion − Wind load: 40m/sec − Snow load: 40cm  Roof Type and Size a. Gable-shape Total Surface: 1,224sqm (W: 18, 24, 32m x H: 4, 4.5m ) 24m (W) x 51m (L) x 3m (W.H) x 10m (C.H) b. Arch-shape (W: 12, 16, 18m x H: 4, 4.5m ) Wide Span, Giant Greenhouses (Double wall) are designed for free and easy operation of any type and size of machinery, and for maximum flexibility of use, which makes them ideal for both soil and soil-free cultivation. Since there is no inner Prefabricated Truss SD Greenhouse column, customers can expect to grow more of an assortment of crops in the greater open space.  General Specifications The center height of our Greenhouse is quite high (±10m), so it is optimal for growing − C.H: more than 10m tall fruits and vegetables such as peppers, tomatoes, cucumbers, eggplants, etc. − Frame: Galvanized prefabricated Truss, Galvanized PH-beam , Square steel pipe Also, there is much less risk of damage − Cladding: TP Panel, Glass, F-clean from pests because there is no hiding place − Ventilation type: push & pull, rack & pinion for rodents. Abundant interior sunlight and − Wind load: 40m/sec excellent ventilation make the plants higher − Snow load: 40cm quality and reduce the cost of heating.  Roof Type and Size − Arch and gable shape *Customized according to customers’ needs (W: 24, 32m x H: 4, 4.5m ) 43
  • 44. Green Technology & Greenhouse Indoor Vertical Garden We have developed and provided Vertical Garden and Vertical Gardenbox® . Our eco-friendly Vertical Garden provides many benefits such as the air-purification, lower energy consumption by mounting planters on the wall. The dead spaces are changed into beautiful green interior spaces, and it provides the refreshed air from plants. The artificial lighting system provides the optimal quantity of light to grow the plants well. Also, our professional designers will meet our customers’ need by creating various and detailed colorful patterns with the plants optimal for the environment to be installed. Features Easy Installation • Patent pending unit panel • Easy to replace plant species • Easy for vertical as well as horizontal expansion Hydroponic System • Nutrient solution using hydro balls and charcoals without soil • Helps to maintain the moisture • Protects plants from other infections such as bacteria • Provision of fertilizer optimal for plants growth Air purification • Enhances air quality from the leaves and roots of the plants • Controls indoor humidity Other Benefits • Improved aesthetic appearance • Improve heat insulation • Reduce airborne pollutants • Improved sound insulation • Space saving After 44
  • 45. Green Technology & Greenhouse Vertical Garden Design and Consulting Service We have professional plant designers, horticultural experts and nursery managers. Our staff members provide the optimal services on customers’ needs. Especially, our professional designers create various and detailed colorful patterns with the plants optimal for the environment to be installed. Our Consulting service includes: • Design consulting for v Indoor Vertical Garden v Outdoor Vertical Gardenbox® v Commercial advertising • Installation consulting v Provision of blue prints Shop drawings • Nursery management • Maintenance and Repair Process of Consulting Service 1. Consultation on plant designs by grade and suggestion on various design patterns and species of the plants suitable for the spaces to be installed 2. Provision of blue prints and shop drawings for installation of Vertical Garden and Vertical Gardenbox® 3. Consulting on post- installation service (maintenance and repair) 45
  • 46. Green Technology & Greenhouse Examples of Vertical Garden Plants Design <Inside Café> It is possible to create living art by utilizing this diversity and incorporating hundreds of plants <Smoking Area> By installation of the vertical garden in the smoking areas, it provides aesthetic visual effect as well as air-purification from plants. 46
  • 47. Green Technology & Greenhouse Examples of Vertical Garden Plants Design Plants selections are site-specific and determined by light availability, location, size, color, texture, and growth habit. By utilizing this diversity and incorporating hundreds of plants it is possible to create living art. Our vertical gardens are appreciated by anyone who stops and takes a moment to be captivated by beauty and diversity. We grow plants with nutrient solution instead of soil. We have developed this system with hydro- balls, charcoals, and other ingredients. The advantage of this method is to help maintain the moisture and protect plants from other infections. Also, because we do not use soil; this method prevents to get the worms. 47
  • 48. Green Technology & Greenhouse Outdoor Vertical Gardenbox® Problems with Traditional Outdoor Vertical Gardens Geological and Seasonal Problem • Green vegetation is sensitive in climate change. For this reason, in desert or extremely cold areas, it is hard to grow various species. Direct Exposure by External Environment • Plants grown vertically are exposed to more sun and wind, so They can dry out quickly. They may need more frequent watering and fertilizing. Spatial Problem • Even though exterior vertical gardens can utilize the dead spaces, it is hard to maintain and replace in multi-story buildings; therefore, it costs a lot to maintain. Vertical Garden Transparent Greenhouse Outdoor Vertical Gardenbox® • Mounts a variety of plants on the wall of the • Excellent light transmission with super- : Our Vertical Gardenbox® is a vertical greenhouse. By covering the building transparent cladding existing vertical garden with our transparent cladding, all plants grow • Radically enhances urban residential and • Excellent ventilation for air-circulation well regardless of the surrounding environment - and are managed by commercial structures • Plants are protected from extreme weather • Aesthetic visual design utilizing dead space • Fully-automated climate control system automatic climate control system. • Significantly improves the quality of the air 48
  • 49. Green Technology & Greenhouse Outdoor Vertical Gardenbox® Caravan Vertical Gardenbox® improves the strength of existing Vertical Garden that mounts plants on the outer walls of the building, and makes up for the weakness of it. Whereas the Vertical Garden is directly affected by the climatic seasonality and surrounding environment, the Vertical Gardenbox® , a vertical greenhouse covered with the transparent cladding, prevents the plants from the extreme weather, and enables plants to be grown well all year round through the natural light. Features Air-Circulation System • By installing the air fans between the Vertical Gardenbox® and the inside of the building, it lets out the purified air by the leaves and roots of the plants indoors. • Forced circulation with air fans when necessary • Controls indoor temperature through air circulation Ventilation System • Fully automated ventilation system for plants • Controls indoor humidity • Controls inner temperature <Air-circulation> Irrigation and Fertilizer system • Fully automated dosing system • Labor saving: Easy to handle and maintain Double Cladding • Energy-saving (Heat insulation) • Excellent sound insulation through double cladding and plants • Prevents the plants from the extreme weather and external environment Fogging and Screening System • Controls inner temperature and humidity • Excellent shade through the mist and screens <Proposal Image of Vertical Gardenbox® > 49
  • 50. Green Technology & Greenhouse Kitchen-Farm By hanging Kitchen Farm on the wall, not in the garden and patio, you can easily grow an assortment of organic vegetables as well as fruits on your own. Also, Kitchen Farm can be used as an educational purpose for children. Features Easy Assembly • 600(W) x 600(L) • DIY kit (Easy for anyone to assemble) • Expansion available on customers' needs Eco-friendly and High Strength Frame • Materials: Aluminum • Erosion resistant • Harmless materials • High strength light weight frame • 100% Reusable and recycled materials Ease of cultivation • Provides optimal manuals for growing • Provides fertilizers for growth promotion • Lighting system for provides the optimal quantity of light Optimal Interior Design • Aesthetic appearance • Greening wall with vegetables and fruits • Designed for customers to grow and harvest easily 50
  • 51. 5. Sports & System
  • 52. Sports & System Caravan SS (Sports & Systems) has adopted the advantageous characteristics of Prefabricated Building System and innovated the most economical and cost-effective ‘Sports Complex’. It has been designed to optimize the use of natural resources while providing adequate functionality and convenience for the users. Technology Efficiency Environmental • Dry method of construction • Optimize the use of natural resources • Removable and reusable structure • Easy & fast installation and assembly through double-layered transparent wall • Lifespan : Over 30-years - Natural lighting and insulation • Suitable for any type of soil and site - Cutting energy consumption more • Double-layered transparent structure • High Strength Prefabricated Steel Frame than 50% - 0~100% transmission rates - Easily expandable modular structure - Natural lighting and insulation • Flexible designs and various options to - Wind load capacity: up to 240km/h - UV protection (optional) meet essential criteria only within budget - Solar Panel (optional) 52
  • 53. Sports & System Double-layered transparent structure • Composition of uniquely designed transparent double-layer that transmits a large amount of natural light to improve visual effect and energy efficiency. • 0~100% transmitting rate with combination of various finishing materials for claddings. - Options including PMMA, PC, steel, and many more are offered upon customer’s request. - UV protection, smoked finish, color variations are also offered as optional Custom Design and Size Variations • Offering selection of structure designs that are adequate for different sports types • Customizing in structure size, layout, and materials to reflect the client’s demand and budget • Adding annex buildings/partitions for the use of locker room, office, media room, storage, bathroom/shower, and many more. 53
  • 54. Sports & System Installation Example Application Badminton (20x54x11x16m) Futsal (36x51x4.8x14m) Horse-riding (25x60x6x8.5m) Gymnasium (24x30x6.3x3.8m) Horse-riding (21x42x3.6x9.2m) Badminton (20x54x8x13m) 54
  • 55. Sports & System NFC FUTSAL COURT IN PAJU, KOREA • Contract with Federation International de Football Association(FIFA) on 21st March, 2011. < Exterior View > < Nighttime View> < Interior View> 55
  • 56. Sports & System SFS - SPORTS FLOORING SYSTEMS (INDOOR) The most advanced/functional ‘Sports Flooring System’ that maximizes exercise performance while assuring the safety of end-users. 250(W) x 250(L) x 13(T)mm Economical & Reliable - Module Type: Economical, partially repairable (easy maintenance) - Fast and easy installation by hands, - Standard Color: Green, orange, yellow (and various color options) - Reliable Quality: Surpassed EN 14904 Test Safety - Less Joint Strain: Minimizes the impact applied to the players - Reduce Injury: Non-slippery surface that provides extra cushioning support Performance - Non-Slippery: Provides sufficient friction required for the game play - Exclusively developed rubber underlayment provides noise reduction and extra cushioning Rubber underlayment 1,200(W) x 1.5~15(T)mm
  • 57. Sports & System SFS - SPORTS FLOORING SYSTEMS (OUTDOOR) Roll-Sheet (Spreadable Elastic Material) • Performance - Upper rubber sheet with embossing effect - Lower rubber sheet with honeycombed structure - Outstanding friction force and elasticity (shock absorption) • Various Designs - Computerized embroidery and logos can be permanently embedded • Easy Care, Low Maintenance - Simple partial repair without showing any defects - Eco-friendly materials, and 100% recyclable without any waste material Synthetic Turf • Performance of Natural Turf Grass - Synthetic turf that is the most similar to the natural grass ever developed • Combustion and Weather Resistance - Non-flammable and durable under all climates (weather resisting treatment applied) • Anti-Static Technology - Reduces static build up on the surface that causes electrical shock • Color Preserving - No change of color through solution dyed chip - over 10 years • Relieve Eye-Strain - Diffused reflection through special sections of turf that reduces eye-strain
  • 58. Sports & System INDOOR SPORTS LIGHTING Caravan SS has developed new generation of lighting system exclusively designed for sports games, Indoor Sports Lighting. It is highly efficient yet offers outstanding performance and extensive features, providing the best visual experience for both players and spectators. • High quality lamps with anti-dazzling, control of light intensity, and light absorption • Long-life, virtually indestructible lamps that resists intense ball impacts Frame Steel Size 1530 x 236 x 70 Ballast DALI Qti 2*80/220-240V OSRAM Lamp FQ 80W/865 Constant OSRAM Weight 5.4 kg Consumption 160W
  • 59. Sports & System ACCESSORIES & FACILITIES Sound System • The most appropriate architectural acoustic design provided by professional • Various audio equipment from diffusion brands to top-class quality Grandstand • Different types of grandstand available • Options of mobile and fixed grandstand • Customized design upon customer’s request • Welding-free grandstand available LED Scoreboard • Regular scoreboard, 3-color multi scoreboard, and full-color multi scoreboard • Various composition of picture, and program operations • All the components in the scoreboard has surpassed official standard and requirements Sound System – Tower Speaker
  • 61. Permanent House Overall for Residential Apartment 61
  • 62. Permanent House 1. 100 sqm(A-1407) Apartment No. Category Details < 3D view> 1 House plan 100sqm 2 Size 14m(W) x 7m(L) Number of units 3 8 houses/ 1 floor on 1 floor Detailed 3 bedrooms with 4 house plan kitchen & dining area < Inner View > 62
  • 63. Permanent House 2. 120 sqm(A-1508) Apartment No. Category Details < 3D view> 1 House plan 120sqm 2 Size 15m(W) x 8m(L) Number of units 3 8 houses/ 1 floor on 1 floor Detailed 3 bedrooms with 4 house plan kitchen & dining area < Inner View > 63
  • 64. Permanent House 3. 140 sqm(A-1410) Apartment No. Category Details < 3D view> 1 House plan 140sqm 2 Size 14m(W) x 10m(L) Number of units 3 8 houses/ 1 floor on 1 floor Detailed 3 bedrooms with 4 house plan kitchen & dining area < Inner View > Kitchen Bedroom 1 & Dining Bedroom 2 Bath room 2 Bathroom 1 Bedroom 3 Living room Bed room 4 64
  • 65. Permanent House Construction Order Step 1: H-Beam Structure Step 2: 100% Concrete Structure Step 3: Completed House • Structurally strong with precise design • Concrete will be casted with SCM • The subsidiary works (flooring, to accommodate any circumstance technology, which will mold and dry finishing, window, bathroom works) • H-beams sustain the weight of the in exceptionally short period of time. are proceed in regular sequence. building • This method has the advantages • The house is fully equipped with • Not required any additional supporting of maintaining proper humidity level, customizable components, including materials. sound absorption and fire protection UBR, electrical fixtures, sanitation • Reduce construction period fixtures, flooring system, windows, and doors.
  • 66. Permanent House Wall Material Steel-Concrete Monolithic (SCM) Technology Outstanding Features • Specially good at protection of fire • Fastest Constructing Method • Easy to build using H-beam and Concrete only • Strong Structure • Control humidity to protect dew condensation, • Economical Price and keep strength and comfort ability • Mass production in a short time Electrical Materials Unit Bathroom System Control box-Open Control box-Closed Switch Outlet Lamps Fluorescent Light • Supply international standard electrical materials • Completed electrical package • Supply to the United Nations (Contract No. PD/C0018/08, Electrical Materials) 66
  • 67. Prefabricated House PH-0710 Product Specifications • Frame: Prefabricated H-Beam (PH-Beam) - Light-weight prefabricated steel H-Beam • Size: 10.2m (W) x 7.2m (L) x 2.7m (Wall Height) , 4.5m (Center Height), - Extendable based on the customer requirements • Three(3) bedrooms, one(1) bathroom, one (1) kitchen • Sheeting & Finishing materials: ① Floor tiles for Bathroom ② Steel sandwich panel + Stone chip coated steel roof tile for Roof ③ Gypsum boards for Inner wall ④ Corrugated steel sandwich panels for Outer wall ⑤ Ceramic tiles for Floor (Bedrooms, Living room, Kitchen) < Exterior View > ⑥ Decoration tiles for Bathroom walls * Customer can choose the materials Features • Eco-friendly structure - Relocatable - Reusable - Double (Inner-Outer) wall systems save energy • Using dry construction method, numerous houses can be built instantly • Prefabricated H-Beam (Light-weight prefabricated steel H-Beam) - High durability - Welding-free structure: Assembly with Bolt and Nut • Competitive price • Fast and easy construction without heavy equipment - Dry construction method - Short-term installation (4 days with 6 people based on 8 working hour/day) • Excellent Ventilation System • One(1) house fits into two(2) ISO 20’ containers • Available Radiation Shielding Systems < Floor Plan > 67
  • 68. Prefabricated House Inner View No Image No Image ④ ① ② Entrance Kitchen ② ⑤ ⑥ ③ ①  ③ ④  Room Sink < Floor Plan > ⑤ ⑥ Door Door  ⑧ Bath Window room < Internal Layout> 68
  • 69. Prefabricated House Installation Process 1. Lay the floor 2. Build the column 3. Connect main frame with Purlin 4. Finish the frame and purlin work 5. Cover roof with 6.Finish roof work 7. Assemble 8. Assemble Outer Sheeting, Sandwich Panel Inner Sheeting Windows and Doors *Installation takes about 4 days with 6 people (8 working hours/day) 9. Cover the roof with Tarpaulin 10. Cover the roof with 11. Completed View Metal Roof Tiles 69
  • 70. Prefabricated House PH-0507 Product Specification • Frame: Prefabricated H-Beam (PH-Beam) - Light weight prefabricated steel H-Beam • Size: 7.2m (W) x 5.4m (L) x 2.7m (Wall Height), 4.5m (Center Height) • Expandable based on the customers’ needs • Two (2) bedrooms, one (1) bathroom, one (1) kitchen • Sheeting & Finishing Materials: ① Floor tile for Bathroom ② Steel panel for Roof ③ Gypsum Board for Inner Walls <Exterior View> ④ Corrugated steel sandwich panels for Outer Walls ⑤ Monorium Carpet for Floor (Bedrooms, Living room, Kitchen) ⑥ Decoration tile for bathroom walls * Customer can choose the materials Features • Eco-friendly structure - Relocatable - Reusable - Double(Inner-Outer) wall system can save energy • Drywall construction method provides numerous houses instantly • Prefabricated H-Beam (Light-weight prefabricated steel H-Beam) - High durability - Welding free structure: Assembly with Bolts and Nuts • Competitive price • Fast and easy assembly doesn’t require heavy-duty equipment - Dry construction method - Short-term installation (4 days with 6 people based on 8 working hours/day) • Excellent Ventilation Systems • One(1) house fits into two(2) ISO 20’ containers < Floor Plan > • Available Radiation Shielding Systems