Six Sigma DMAIC Project




                    Kaiser Permanente – Asset Management




                                  Project Leader/Green Belt: Kahlil Rahaman
                           Project Leader Title: Enterprise Planning & Strategy Analyst
                                        Project Start Date: July 24, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                           Serial # - Model # Match

Customer Profile         - 130,000 Seat Health Care Provider

Business Problem & Impact
The Serial numbers within the current asset management databases             Process Capability – Before
(NOIS, AssetCenter, USS & DISCO) are not accurately matched to the
                                                                                             Success 37
Model numbers (affixed to the servers by the manufacturers). This
impacts problem solving, change management and maintenance contract       Defects 160           19%
management.                                                                  81%
 Measure & Analyze
 Data Collection: Focused on Servers within the Corona Data Center
 Root Causes: 1. Multiple Databases
                   2. Data must be verified across all databases
                   3. Manual replication of data
                   4. No documented processes                                 Process Capability – After
                   5. Databases not accurately maintained
                                                                               30 Defect
Improve & Control                                                                             91 Success
1. One Central CMDB established in Asset Center 4.x                               25%
2. Any Serial Number to Model Number inaccuracies found in                                        75%
   AssetCenter through physical audits will be corrected and root cause
   analysis done
Results/Benefits
Multiple CMDB’s consolidated into one definitive CMDB, AssetCenter
Process Improvement from Z_ST = 2.5 Sigma to Z_ST = 2.7 Sigma.

                       Reduced Defects and Increased Sigma Level!

Más contenido relacionado

Más de Kevin Egan

Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

Más de Kevin Egan (11)

Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Sn Model Accuracy Six Sigma Case Study

  • 1. Six Sigma DMAIC Project Kaiser Permanente – Asset Management Project Leader/Green Belt: Kahlil Rahaman Project Leader Title: Enterprise Planning & Strategy Analyst Project Start Date: July 24, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Serial # - Model # Match Customer Profile - 130,000 Seat Health Care Provider Business Problem & Impact The Serial numbers within the current asset management databases Process Capability – Before (NOIS, AssetCenter, USS & DISCO) are not accurately matched to the Success 37 Model numbers (affixed to the servers by the manufacturers). This impacts problem solving, change management and maintenance contract Defects 160 19% management. 81% Measure & Analyze Data Collection: Focused on Servers within the Corona Data Center Root Causes: 1. Multiple Databases 2. Data must be verified across all databases 3. Manual replication of data 4. No documented processes Process Capability – After 5. Databases not accurately maintained 30 Defect Improve & Control 91 Success 1. One Central CMDB established in Asset Center 4.x 25% 2. Any Serial Number to Model Number inaccuracies found in 75% AssetCenter through physical audits will be corrected and root cause analysis done Results/Benefits Multiple CMDB’s consolidated into one definitive CMDB, AssetCenter Process Improvement from Z_ST = 2.5 Sigma to Z_ST = 2.7 Sigma. Reduced Defects and Increased Sigma Level!