SlideShare a Scribd company logo
1 of 47
Download to read offline
SCHOOL OF ARCHITECTURE, BUILDING &
DESIGN BACHELOR OF QUANTITY SURVEYING
(HONOURS)
Lecturer: Dr.Kam Kenn Jhun
Date of Submission: 21st June 2017
B U I L D I N G S E R V I C E S 2
( B L D 6 0 5 0 3 )
Mechanical Ventilation & Air conditioning
- Invented by Willis Carrier in November 26, 1876 .
- Three types of air conditioning such Unitary System,
Package System and centralised system.
- Purposes of Air conditioning are to improve comfort
level, provide fresh air and improve air environment in
a room.
Applied centralised air
conditioning system.
Consists of More powerful compared with
unitary & package system
&
Not suitable for existing
building.
A I R C O N D I T I O N I N G S Y S T E M
in Klang Parade
cooling tower
Chiller
Air Handling Unit (AHU)
Duct
diffuser & so on
C O O L I N G T O W E R
-Height of cooling tower : 3-3.5m height
-Usually located at top/roof floor.
-Prefabricated Machine ( several designs, shapes .)
-Act as a heat exchanger, hot water from condenser
will pass through cooling tower to reduce the
temperature of the water . (evaporation process)
C O M P O N E N T O F C O O L I N G T O W E R
Propeller Fan
Pump
Wet Deck Fill
C H I L L E R
-Water that passed through cooling tower will
transfer to chiller.
-Discharging heat or lower down temperature from
the water and turn it to chill water
-Instead of making water to ice,it produces chilled
water.
-Produce around 10 degree Celsius.
A I R H A N D L I N G U N I T
● An Air Handling Unit (AHU) is used to re-condition
and circulate air as part of a heating, ventilating and
air-conditioning system.
● Take in outside air, recondition it and supply it as
fresh air to a building.
● All exhaust air is removed, which creates an
acceptable indoor air quality.
● A device used to condition and circulate air
● Through air ducts and supply air grilles and air
diffusers
U N I T A R Y S Y S T E M
● A small self-contained electrical unit enclosing a
motor-driven refrigeration compressor, evaporative
cooling coil, air-cooled condenser, filters, fans, and
controls.
● Unitary system consists of two part, indoor and
outdoor
● Outdoor : compressor, condenser and expansion
valve
● Indoor : evaporator and cooling fan
● It cheap , required small place and easy to install
D I F F U S E R
● Common in shopping mall to maintain the internal comfort
● Install in ceiling
● multi-direction
● positive directional control of air discharge
● Blades are individually adjustable
● To ensure air distribution is effective
V E N T I L A T I O N F A N
● absorb the hot air and replace with cool air
● Discharge the polluted air
● prevent the occurrence of incomplete combustion
M E C H A N I C A L T R A N S P O R T A T I O N S Y S T E M
In Klang Parade
E S C A L A T O R
-only allow one movement of direction
S I N G L E E S C A L A T O R
CrissCross Spiral Escalator
-Allow the movement of one bearing
starting with one floor to next floor
M U L T I P L E - P A R R A L L E L E S C A L A T O R
- Can be easily found in mall
- It provide two way for passenger who wan to
going up or down
Spiral Escalator
-Not recommended for shopping center
-It take a high maintenance taken a toll because of
its design
-Can be found normally at the high end hotel
Multi-Level Parallel Stacked Escalators
(interrupted traffic)
- It is the escalator that being
widely using in shopping malls.
-It actually is a up and down
side by side escalator.
E L E C T R I C A L E L E V A T O R
in Klang Parade
-The emergency button and the intercom
microphone
-function can be easily communicate looking for
help when passenger trapped inside the lift
-Electrical motor of lift utilizes electric power
-always maintain the lift motor to avoid the problem
E L E C T R I C A L M O T O R
O F T H E L I F T
- It utilizes electric power of the lift
- It need a particular space for the hydraulic system
and the chamber itself
- It just use a single operation room to put it motor
Emergency Backup Power & The Control Panel
-When the power loss, it will automatically switch on the power
-Make sure that passenger safetly reach the ground floor and exit the lift
The Grease Indicator
-Lift should be re-oil each 8 month to 1 year
-It is important as it kept all the moving part of the motor grease up
F I R E P R O T E C T I O N S Y S T E M
In Klang Parade
● A group of systems that require some amount
of action or motion in order to work efficiently
in the event of a fire.
● An action or motion is required for Active Fire
Protection (AFP) system to work efficiently in
the event of a fire.
● Active method require mechanical, electric or
electronic activation.
● It is the manual or automatic fire protection
systems.
A C T I V E F I R E P R O T E C T I O N
● Water supply system provides the adequate
pressure and flowrate to a water distribution
piping system onto which water sprinklers are
connected.
● 2 Sprinkles distances between them must be at a
maximum distance at 4.6 meters.
● 3 Meters is the amount of distance required for 2
Sprinkles.
W A T E R S P R I N K L E R S Y S T E M
W A T E R T A N K
● Provide fire safety to supply water sprinkler and
other fire safety systems that requires water.
● Water tank is located in the basement in a fire
pump room
● The water in the water tank is reserved to be used
for fire emergencies only
W A T E R S T O R A G E
● Main water storage tank is located within the
building.
● There is no need for replenishment due to the
storage tanks for automatic sprinkler installation
where full capacity and it also will be exempted
from the restriction in their location.
P U M P
● Fire pump room consists a water tank that
supplies water to all the systems that requires
water
● Jockey Pump and Duty Pump
● Helps to pump water from the water tank to fire
safety system that requires water during
emergencies.
Jockey Pump
● Helps to pump water to the water sprinkler.
● If the water pressure is low, the jockey pump will initiate the
pumping process.
● The system will elevate to a specific level even if the system is not
functioning so the water will not run out.
● The pump will shut down when it is not in use.
● If the water pressure in the pipe goes lower than 35 PSI, the duty
pump will be in use as the water pressure allows it operate
smoothly.
● If the starter pump fails to work there is a standby pump to kick in
and help out.
● Jockey Pump and the Duty Pump operates by electricity whereas
the standby pump works by diesel.
Duty Pump
S M O K E D E T E C T O R
● Most common use for fire detection for fire
safety purposes.
● Smoke detector used in the mall is an
ionisation smoke detector.
● If there are smoke particles that enters the
chamber between the electrodes, normal
flow of electrons are interrupted hence
causing the alarm to activate.
● Located at every floor, a certain distance to each fire
shutter should be placed.
● Reduce the spread of fire to other floors and to delay
enough time for customers to evacuate the building.
● Can be shut automatically or manually.
F I R E S H U T T E R
● Will be activated automatically 5 minutes after any fire system is activated.
● It can also be triggered manually by breaking the break glass to alert others.
● Located throughout the mall so everyone else in the mall can hear it.
● There are 2 types of bell - Continuous Bell & Single Stroke bell
● Usually placed below the break glass
● Same function as a hose reel.
● Used to put out early stages of fire which can be operated by an average
person.
● It releases a cloud of carbon dioxide and smothers the fire.
● Gas makes the oxygen goes away and stops the chemical reaction.
F I R E D E T E C T I O N
F I R E E X T I N G U I S H E R S
● Provided in every floors and some fire probable areas where it
distinguishes fire at an early stage
● Dry riser will provide water to the hose reel.
● It is commonly used while waiting for the firefighters to come and it’s
easy to manage one.
H O S E R E E L S Y S T E M
● Categorising building with the help of using fire resistance rated wall
or floor.
● By categorising the in smaller parts it helps to delay the spread of
fire
● Helps to reduce the damage that will be caused by the fire and also
helps victims to escape from the building.
P A S S I V E F I R E P R O T E C T I O N S Y S T E M
● It is a door specially designed to delay or prevent fire from
spreading to the other side of the building.
● Different types of door have different capability of preventing the
fire where some holds the fire longer and some shorter.
● It is for the safety of the customers
● Will lead to the outdoor where everyone can safely evacuate from
danger.
● The emergency route consists of material that can last from a fire
buy enough time for the customers to escape safely.
F I R E R A T E D D O O R
E M E R G E N C Y S T A I R C A S E
● located at the ground floor of the building.
● Controls all the fire protective system.
● Can detect the fire emergency and send a signal and
inform the person in charge.
● provides information to the firefighter to know
where the fire started.
● Consist of fire safety control panel which indicate all
the fire safety system.
● The control panel consist of:
1. Break Glass
2. Flow Switch
3. Wet chemical discharge
F I R E C O N T R O L R O O M
E L E C T R I C A L P O W E R S U P P L Y S Y S T E M
In Klang Parade
● Is an electrical device that transfers electrical energy between circuits
through electromagnetic induction.
● The electric varying current in one coil of the transformer produces a
varying magnetic field, which in turn induces a voltage in the second coil.
● Power is transferred between the two coils through the magnetic field,
without a metallic connection between the two circuits.
● More than one transformer room in Klang Parade, each transformer room
control the electricity of different floor level of the mall.
T R A N S F O R M E R R O O M
● Power Distribution is a system, consisting of a Main
Distribution Board, Sub Main Distribution Boards and Final
Distribution Boards
● Which the electrical energy is transmitted via branches to
reach the exact end user.
● In Klang Parade, all these distribution board are allocated in
a same room which called the voltage room.
V O L T A G E R O O M
● Panel enclosure with the fuses,
circuit breakers and ground
leakage protection units.
M A I N D I S T R I B U T I O N B O A R D S ( D B )
● Used to transfer or distribute
electrical power to numerous
individual circuits or consumer
points were taken from
transformer.
● Has a single or multiple incoming
power sources and includes main
circuit breakers and residual
current or earth leakage
protection devices.
S U B - M A I N D I S T R I B U T I O N B O A R D S ( S M D B )
● The main distribution board also connected with sub-main distribution board
● Using a large distribution cable terminates and several smaller sub-circuits start.
● Switchboards are larger than the final distibution board circuit although they have the similar functions.
F I N A L D I S T R I B U T I O N B O A R D
● Final distribution boards are connected from sub-main distribution board which also feeds electrical
energy to the end user.
E M E R G E N C Y P O W E R S U P P L Y R O O M
● Located just right beside the voltage room which is at the
basement car park.
● Standby power system used is the energy generator.
● Supports important electrical systems on loss of normal power
supply.
● To protect life and property from the consequences of loss of
primary electric power supply.
● When power outage in the mall, the generator will activated
automatically or manually.
● The main emergency electrical supply are lift bomb, basement
parking, bomba piping room and frozen room.
A M P B O A R D
● Allocated in the same room as the generator also act as an
important role when emergency power outage happened.
● To control the voltage and amp from generator to the electric
appliances.
● For the safety purpose of using electric appliances during
emergency, over sufficient of power applied or transferred to an
electric may cause unfortunate accident such as, explosion, fire
accident due to electric leakage.
E M E R G E N C Y L I G H T I N G
( C E I L I N G M O U N T E D )
● Emergency lighting installed at most of the corners in the
malls.
● Does not require any electric power supply.
● It is a battery-backed lighting device that switches on
automatically when a building experiences a power outage.
● Ensure the safety of customers and workers in the mall when
emergencies happened to prevent unwanted accident from
happening.
Recommended Solution
In the mall from our findings there are not many fire extinguishers to be found and the
fire extinguishers are not renewed, fire extinguishers should be located one in every
few small distance apart.Fire usually evolves from small to big where fire extinguishers
are used to smother the fire when it is still small. Having inadequate amount of fire
extinguishers may result to a bigger fire if the fire is not put out. Time is crucial in
these situations.
Fire Protection System Problems
-Should have more fire extinguishers around the mall
- FIre extinguishers cant last forever, it should be renewed every 7 years.
Problem 2
AIR CONDITIONING
There are two types of air conditioning systems in this building which are
centralised air conditioning system and Unitary system. Basically there is no
problem for centralised system but the problem we encountered was about
unitary air conditioning system. The water is keep flowing out from
condenser. Instead of discharging the water to particular place, the water just
drop to the floor which look dirty and poor. So, the management just took a
empty bottle to fill in the water that flow out from the condenser which i
think is wrong instead of repairing it as you can see at the picture.
Recommended Solution
-repair the spoiled condenser
-buy a new set of unitary conditioning system
D e o n g K h a i K e a t 0 3 2 0 0 5 5
S i m S i K a i 0 3 1 8 6 0 9
L e e J i a K i a m 0 3 2 0 0 2 9
C h a n T i a n J i 0 3 2 0 8 3 1
N g o J i a H a u r 0 3 2 0 1 4 4
B o o n Y i C h u n g 0 3 1 8 3 0 0
T a n K e n R i c 0 3 1 8 6 3 1
C h a n W e i L u n 0 3 2 6 1 1 7

More Related Content

Similar to Bs2 presentation slide

Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides마 이환
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!Hasif Alias
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
Cooling Towers; The Important Part Of District Cooling Systems
Cooling Towers; The Important Part Of District Cooling SystemsCooling Towers; The Important Part Of District Cooling Systems
Cooling Towers; The Important Part Of District Cooling Systemshamnajain
 
BS2 Fire protection 1
BS2 Fire protection 1BS2 Fire protection 1
BS2 Fire protection 1Est
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang paradeYap Xin
 
NTPC Major Training Report
NTPC Major Training ReportNTPC Major Training Report
NTPC Major Training ReportAnand Dwivedi
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slidesashleyyeap
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slidesArissa Loh
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finaleTee Joanne
 
Concept of electricity
Concept of electricityConcept of electricity
Concept of electricityjay cerda
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfKj Aswin
 
JAIPUR METRO RAIL CORPORATION.pdf
JAIPUR METRO RAIL CORPORATION.pdfJAIPUR METRO RAIL CORPORATION.pdf
JAIPUR METRO RAIL CORPORATION.pdfDivyanshKhelani1
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 PresentationKellyann Hiew
 

Similar to Bs2 presentation slide (20)

Bs2
Bs2 Bs2
Bs2
 
Bs2 presentation
Bs2 presentation Bs2 presentation
Bs2 presentation
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Cooling Towers; The Important Part Of District Cooling Systems
Cooling Towers; The Important Part Of District Cooling SystemsCooling Towers; The Important Part Of District Cooling Systems
Cooling Towers; The Important Part Of District Cooling Systems
 
BS2 Fire protection 1
BS2 Fire protection 1BS2 Fire protection 1
BS2 Fire protection 1
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang parade
 
NTPC Major Training Report
NTPC Major Training ReportNTPC Major Training Report
NTPC Major Training Report
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slides
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slides
 
Building services
Building servicesBuilding services
Building services
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
Concept of electricity
Concept of electricityConcept of electricity
Concept of electricity
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdf
 
2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
JAIPUR METRO RAIL CORPORATION.pdf
JAIPUR METRO RAIL CORPORATION.pdfJAIPUR METRO RAIL CORPORATION.pdf
JAIPUR METRO RAIL CORPORATION.pdf
 
air driven engines
air driven enginesair driven engines
air driven engines
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 

More from khaikeat16

Bs2 INDIVIDUaL
Bs2 INDIVIDUaLBs2 INDIVIDUaL
Bs2 INDIVIDUaLkhaikeat16
 
Bs2 group report
Bs2 group reportBs2 group report
Bs2 group reportkhaikeat16
 
Presentation bs
Presentation bsPresentation bs
Presentation bskhaikeat16
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-finalkhaikeat16
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdfkhaikeat16
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdfkhaikeat16
 
Chinese Architecture Report
Chinese Architecture ReportChinese Architecture Report
Chinese Architecture Reportkhaikeat16
 
Economics Final - Report
Economics Final - ReportEconomics Final - Report
Economics Final - Reportkhaikeat16
 
Psychology 5 journal
Psychology 5 journalPsychology 5 journal
Psychology 5 journalkhaikeat16
 
English Essay Assignment One
English Essay Assignment OneEnglish Essay Assignment One
English Essay Assignment Onekhaikeat16
 
English Assignment2 - Interview Report
English Assignment2 - Interview ReportEnglish Assignment2 - Interview Report
English Assignment2 - Interview Reportkhaikeat16
 
English Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation SlideEnglish Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation Slidekhaikeat16
 
English II Assignment One
English II Assignment One English II Assignment One
English II Assignment One khaikeat16
 
Final enbe report
Final enbe reportFinal enbe report
Final enbe reportkhaikeat16
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2 khaikeat16
 
ICI final report
ICI final reportICI final report
ICI final reportkhaikeat16
 

More from khaikeat16 (20)

Estimating
EstimatingEstimating
Estimating
 
Bs2 INDIVIDUaL
Bs2 INDIVIDUaLBs2 INDIVIDUaL
Bs2 INDIVIDUaL
 
Bs2 group report
Bs2 group reportBs2 group report
Bs2 group report
 
Ct3
Ct3Ct3
Ct3
 
Presentation bs
Presentation bsPresentation bs
Presentation bs
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-final
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
 
Chinese Architecture Report
Chinese Architecture ReportChinese Architecture Report
Chinese Architecture Report
 
Site Report
Site ReportSite Report
Site Report
 
Economics Final - Report
Economics Final - ReportEconomics Final - Report
Economics Final - Report
 
Psychology 5 journal
Psychology 5 journalPsychology 5 journal
Psychology 5 journal
 
Mural ART
Mural ARTMural ART
Mural ART
 
English Essay Assignment One
English Essay Assignment OneEnglish Essay Assignment One
English Essay Assignment One
 
English Assignment2 - Interview Report
English Assignment2 - Interview ReportEnglish Assignment2 - Interview Report
English Assignment2 - Interview Report
 
English Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation SlideEnglish Assignment2 - Interview Presentation Slide
English Assignment2 - Interview Presentation Slide
 
English II Assignment One
English II Assignment One English II Assignment One
English II Assignment One
 
Final enbe report
Final enbe reportFinal enbe report
Final enbe report
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2
 
ICI final report
ICI final reportICI final report
ICI final report
 

Recently uploaded

Call Girls Near The Suryaa Hotel New Delhi 9873777170
Call Girls Near The Suryaa Hotel New Delhi 9873777170Call Girls Near The Suryaa Hotel New Delhi 9873777170
Call Girls Near The Suryaa Hotel New Delhi 9873777170Sonam Pathan
 
Film cover research (1).pptxsdasdasdasdasdasa
Film cover research (1).pptxsdasdasdasdasdasaFilm cover research (1).pptxsdasdasdasdasdasa
Film cover research (1).pptxsdasdasdasdasdasa494f574xmv
 
PHP-based rendering of TYPO3 Documentation
PHP-based rendering of TYPO3 DocumentationPHP-based rendering of TYPO3 Documentation
PHP-based rendering of TYPO3 DocumentationLinaWolf1
 
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一z xss
 
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书zdzoqco
 
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书rnrncn29
 
Contact Rya Baby for Call Girls New Delhi
Contact Rya Baby for Call Girls New DelhiContact Rya Baby for Call Girls New Delhi
Contact Rya Baby for Call Girls New Delhimiss dipika
 
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书rnrncn29
 
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作ys8omjxb
 
Font Performance - NYC WebPerf Meetup April '24
Font Performance - NYC WebPerf Meetup April '24Font Performance - NYC WebPerf Meetup April '24
Font Performance - NYC WebPerf Meetup April '24Paul Calvano
 
NSX-T and Service Interfaces presentation
NSX-T and Service Interfaces presentationNSX-T and Service Interfaces presentation
NSX-T and Service Interfaces presentationMarko4394
 
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170Sonam Pathan
 
SCM Symposium PPT Format Customer loyalty is predi
SCM Symposium PPT Format Customer loyalty is prediSCM Symposium PPT Format Customer loyalty is predi
SCM Symposium PPT Format Customer loyalty is predieusebiomeyer
 
Q4-1-Illustrating-Hypothesis-Testing.pptx
Q4-1-Illustrating-Hypothesis-Testing.pptxQ4-1-Illustrating-Hypothesis-Testing.pptx
Q4-1-Illustrating-Hypothesis-Testing.pptxeditsforyah
 
Top 10 Interactive Website Design Trends in 2024.pptx
Top 10 Interactive Website Design Trends in 2024.pptxTop 10 Interactive Website Design Trends in 2024.pptx
Top 10 Interactive Website Design Trends in 2024.pptxDyna Gilbert
 

Recently uploaded (17)

Call Girls Near The Suryaa Hotel New Delhi 9873777170
Call Girls Near The Suryaa Hotel New Delhi 9873777170Call Girls Near The Suryaa Hotel New Delhi 9873777170
Call Girls Near The Suryaa Hotel New Delhi 9873777170
 
Film cover research (1).pptxsdasdasdasdasdasa
Film cover research (1).pptxsdasdasdasdasdasaFilm cover research (1).pptxsdasdasdasdasdasa
Film cover research (1).pptxsdasdasdasdasdasa
 
PHP-based rendering of TYPO3 Documentation
PHP-based rendering of TYPO3 DocumentationPHP-based rendering of TYPO3 Documentation
PHP-based rendering of TYPO3 Documentation
 
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一
办理(UofR毕业证书)罗切斯特大学毕业证成绩单原版一比一
 
young call girls in Uttam Nagar🔝 9953056974 🔝 Delhi escort Service
young call girls in Uttam Nagar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Uttam Nagar🔝 9953056974 🔝 Delhi escort Service
young call girls in Uttam Nagar🔝 9953056974 🔝 Delhi escort Service
 
Hot Sexy call girls in Rk Puram 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in  Rk Puram 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in  Rk Puram 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Rk Puram 🔝 9953056974 🔝 Delhi escort Service
 
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书
办理多伦多大学毕业证成绩单|购买加拿大UTSG文凭证书
 
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书
『澳洲文凭』买拉筹伯大学毕业证书成绩单办理澳洲LTU文凭学位证书
 
Contact Rya Baby for Call Girls New Delhi
Contact Rya Baby for Call Girls New DelhiContact Rya Baby for Call Girls New Delhi
Contact Rya Baby for Call Girls New Delhi
 
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书
『澳洲文凭』买詹姆士库克大学毕业证书成绩单办理澳洲JCU文凭学位证书
 
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作
Potsdam FH学位证,波茨坦应用技术大学毕业证书1:1制作
 
Font Performance - NYC WebPerf Meetup April '24
Font Performance - NYC WebPerf Meetup April '24Font Performance - NYC WebPerf Meetup April '24
Font Performance - NYC WebPerf Meetup April '24
 
NSX-T and Service Interfaces presentation
NSX-T and Service Interfaces presentationNSX-T and Service Interfaces presentation
NSX-T and Service Interfaces presentation
 
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170
Call Girls In The Ocean Pearl Retreat Hotel New Delhi 9873777170
 
SCM Symposium PPT Format Customer loyalty is predi
SCM Symposium PPT Format Customer loyalty is prediSCM Symposium PPT Format Customer loyalty is predi
SCM Symposium PPT Format Customer loyalty is predi
 
Q4-1-Illustrating-Hypothesis-Testing.pptx
Q4-1-Illustrating-Hypothesis-Testing.pptxQ4-1-Illustrating-Hypothesis-Testing.pptx
Q4-1-Illustrating-Hypothesis-Testing.pptx
 
Top 10 Interactive Website Design Trends in 2024.pptx
Top 10 Interactive Website Design Trends in 2024.pptxTop 10 Interactive Website Design Trends in 2024.pptx
Top 10 Interactive Website Design Trends in 2024.pptx
 

Bs2 presentation slide

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) Lecturer: Dr.Kam Kenn Jhun Date of Submission: 21st June 2017 B U I L D I N G S E R V I C E S 2 ( B L D 6 0 5 0 3 )
  • 2.
  • 3. Mechanical Ventilation & Air conditioning - Invented by Willis Carrier in November 26, 1876 . - Three types of air conditioning such Unitary System, Package System and centralised system. - Purposes of Air conditioning are to improve comfort level, provide fresh air and improve air environment in a room.
  • 4. Applied centralised air conditioning system. Consists of More powerful compared with unitary & package system & Not suitable for existing building. A I R C O N D I T I O N I N G S Y S T E M in Klang Parade cooling tower Chiller Air Handling Unit (AHU) Duct diffuser & so on
  • 5. C O O L I N G T O W E R -Height of cooling tower : 3-3.5m height -Usually located at top/roof floor. -Prefabricated Machine ( several designs, shapes .) -Act as a heat exchanger, hot water from condenser will pass through cooling tower to reduce the temperature of the water . (evaporation process)
  • 6. C O M P O N E N T O F C O O L I N G T O W E R Propeller Fan Pump Wet Deck Fill
  • 7. C H I L L E R -Water that passed through cooling tower will transfer to chiller. -Discharging heat or lower down temperature from the water and turn it to chill water -Instead of making water to ice,it produces chilled water. -Produce around 10 degree Celsius.
  • 8. A I R H A N D L I N G U N I T ● An Air Handling Unit (AHU) is used to re-condition and circulate air as part of a heating, ventilating and air-conditioning system. ● Take in outside air, recondition it and supply it as fresh air to a building. ● All exhaust air is removed, which creates an acceptable indoor air quality. ● A device used to condition and circulate air ● Through air ducts and supply air grilles and air diffusers
  • 9. U N I T A R Y S Y S T E M ● A small self-contained electrical unit enclosing a motor-driven refrigeration compressor, evaporative cooling coil, air-cooled condenser, filters, fans, and controls. ● Unitary system consists of two part, indoor and outdoor ● Outdoor : compressor, condenser and expansion valve ● Indoor : evaporator and cooling fan ● It cheap , required small place and easy to install
  • 10. D I F F U S E R ● Common in shopping mall to maintain the internal comfort ● Install in ceiling ● multi-direction ● positive directional control of air discharge ● Blades are individually adjustable ● To ensure air distribution is effective
  • 11. V E N T I L A T I O N F A N ● absorb the hot air and replace with cool air ● Discharge the polluted air ● prevent the occurrence of incomplete combustion
  • 12. M E C H A N I C A L T R A N S P O R T A T I O N S Y S T E M In Klang Parade
  • 13. E S C A L A T O R
  • 14. -only allow one movement of direction S I N G L E E S C A L A T O R
  • 15. CrissCross Spiral Escalator -Allow the movement of one bearing starting with one floor to next floor
  • 16. M U L T I P L E - P A R R A L L E L E S C A L A T O R - Can be easily found in mall - It provide two way for passenger who wan to going up or down
  • 17. Spiral Escalator -Not recommended for shopping center -It take a high maintenance taken a toll because of its design -Can be found normally at the high end hotel
  • 18. Multi-Level Parallel Stacked Escalators (interrupted traffic) - It is the escalator that being widely using in shopping malls. -It actually is a up and down side by side escalator.
  • 19. E L E C T R I C A L E L E V A T O R in Klang Parade -The emergency button and the intercom microphone -function can be easily communicate looking for help when passenger trapped inside the lift -Electrical motor of lift utilizes electric power -always maintain the lift motor to avoid the problem
  • 20. E L E C T R I C A L M O T O R O F T H E L I F T - It utilizes electric power of the lift - It need a particular space for the hydraulic system and the chamber itself - It just use a single operation room to put it motor
  • 21. Emergency Backup Power & The Control Panel -When the power loss, it will automatically switch on the power -Make sure that passenger safetly reach the ground floor and exit the lift The Grease Indicator -Lift should be re-oil each 8 month to 1 year -It is important as it kept all the moving part of the motor grease up
  • 22. F I R E P R O T E C T I O N S Y S T E M In Klang Parade
  • 23. ● A group of systems that require some amount of action or motion in order to work efficiently in the event of a fire. ● An action or motion is required for Active Fire Protection (AFP) system to work efficiently in the event of a fire. ● Active method require mechanical, electric or electronic activation. ● It is the manual or automatic fire protection systems. A C T I V E F I R E P R O T E C T I O N
  • 24. ● Water supply system provides the adequate pressure and flowrate to a water distribution piping system onto which water sprinklers are connected. ● 2 Sprinkles distances between them must be at a maximum distance at 4.6 meters. ● 3 Meters is the amount of distance required for 2 Sprinkles. W A T E R S P R I N K L E R S Y S T E M
  • 25. W A T E R T A N K ● Provide fire safety to supply water sprinkler and other fire safety systems that requires water. ● Water tank is located in the basement in a fire pump room ● The water in the water tank is reserved to be used for fire emergencies only
  • 26. W A T E R S T O R A G E ● Main water storage tank is located within the building. ● There is no need for replenishment due to the storage tanks for automatic sprinkler installation where full capacity and it also will be exempted from the restriction in their location.
  • 27. P U M P ● Fire pump room consists a water tank that supplies water to all the systems that requires water ● Jockey Pump and Duty Pump ● Helps to pump water from the water tank to fire safety system that requires water during emergencies.
  • 28. Jockey Pump ● Helps to pump water to the water sprinkler. ● If the water pressure is low, the jockey pump will initiate the pumping process. ● The system will elevate to a specific level even if the system is not functioning so the water will not run out. ● The pump will shut down when it is not in use. ● If the water pressure in the pipe goes lower than 35 PSI, the duty pump will be in use as the water pressure allows it operate smoothly. ● If the starter pump fails to work there is a standby pump to kick in and help out. ● Jockey Pump and the Duty Pump operates by electricity whereas the standby pump works by diesel. Duty Pump
  • 29. S M O K E D E T E C T O R ● Most common use for fire detection for fire safety purposes. ● Smoke detector used in the mall is an ionisation smoke detector. ● If there are smoke particles that enters the chamber between the electrodes, normal flow of electrons are interrupted hence causing the alarm to activate.
  • 30. ● Located at every floor, a certain distance to each fire shutter should be placed. ● Reduce the spread of fire to other floors and to delay enough time for customers to evacuate the building. ● Can be shut automatically or manually. F I R E S H U T T E R
  • 31. ● Will be activated automatically 5 minutes after any fire system is activated. ● It can also be triggered manually by breaking the break glass to alert others. ● Located throughout the mall so everyone else in the mall can hear it. ● There are 2 types of bell - Continuous Bell & Single Stroke bell ● Usually placed below the break glass ● Same function as a hose reel. ● Used to put out early stages of fire which can be operated by an average person. ● It releases a cloud of carbon dioxide and smothers the fire. ● Gas makes the oxygen goes away and stops the chemical reaction. F I R E D E T E C T I O N F I R E E X T I N G U I S H E R S
  • 32. ● Provided in every floors and some fire probable areas where it distinguishes fire at an early stage ● Dry riser will provide water to the hose reel. ● It is commonly used while waiting for the firefighters to come and it’s easy to manage one. H O S E R E E L S Y S T E M
  • 33. ● Categorising building with the help of using fire resistance rated wall or floor. ● By categorising the in smaller parts it helps to delay the spread of fire ● Helps to reduce the damage that will be caused by the fire and also helps victims to escape from the building. P A S S I V E F I R E P R O T E C T I O N S Y S T E M
  • 34. ● It is a door specially designed to delay or prevent fire from spreading to the other side of the building. ● Different types of door have different capability of preventing the fire where some holds the fire longer and some shorter. ● It is for the safety of the customers ● Will lead to the outdoor where everyone can safely evacuate from danger. ● The emergency route consists of material that can last from a fire buy enough time for the customers to escape safely. F I R E R A T E D D O O R E M E R G E N C Y S T A I R C A S E
  • 35. ● located at the ground floor of the building. ● Controls all the fire protective system. ● Can detect the fire emergency and send a signal and inform the person in charge. ● provides information to the firefighter to know where the fire started. ● Consist of fire safety control panel which indicate all the fire safety system. ● The control panel consist of: 1. Break Glass 2. Flow Switch 3. Wet chemical discharge F I R E C O N T R O L R O O M
  • 36. E L E C T R I C A L P O W E R S U P P L Y S Y S T E M In Klang Parade
  • 37. ● Is an electrical device that transfers electrical energy between circuits through electromagnetic induction. ● The electric varying current in one coil of the transformer produces a varying magnetic field, which in turn induces a voltage in the second coil. ● Power is transferred between the two coils through the magnetic field, without a metallic connection between the two circuits. ● More than one transformer room in Klang Parade, each transformer room control the electricity of different floor level of the mall. T R A N S F O R M E R R O O M
  • 38. ● Power Distribution is a system, consisting of a Main Distribution Board, Sub Main Distribution Boards and Final Distribution Boards ● Which the electrical energy is transmitted via branches to reach the exact end user. ● In Klang Parade, all these distribution board are allocated in a same room which called the voltage room. V O L T A G E R O O M
  • 39. ● Panel enclosure with the fuses, circuit breakers and ground leakage protection units. M A I N D I S T R I B U T I O N B O A R D S ( D B ) ● Used to transfer or distribute electrical power to numerous individual circuits or consumer points were taken from transformer. ● Has a single or multiple incoming power sources and includes main circuit breakers and residual current or earth leakage protection devices.
  • 40. S U B - M A I N D I S T R I B U T I O N B O A R D S ( S M D B ) ● The main distribution board also connected with sub-main distribution board ● Using a large distribution cable terminates and several smaller sub-circuits start. ● Switchboards are larger than the final distibution board circuit although they have the similar functions. F I N A L D I S T R I B U T I O N B O A R D ● Final distribution boards are connected from sub-main distribution board which also feeds electrical energy to the end user.
  • 41. E M E R G E N C Y P O W E R S U P P L Y R O O M ● Located just right beside the voltage room which is at the basement car park. ● Standby power system used is the energy generator. ● Supports important electrical systems on loss of normal power supply. ● To protect life and property from the consequences of loss of primary electric power supply. ● When power outage in the mall, the generator will activated automatically or manually. ● The main emergency electrical supply are lift bomb, basement parking, bomba piping room and frozen room.
  • 42. A M P B O A R D ● Allocated in the same room as the generator also act as an important role when emergency power outage happened. ● To control the voltage and amp from generator to the electric appliances. ● For the safety purpose of using electric appliances during emergency, over sufficient of power applied or transferred to an electric may cause unfortunate accident such as, explosion, fire accident due to electric leakage.
  • 43. E M E R G E N C Y L I G H T I N G ( C E I L I N G M O U N T E D ) ● Emergency lighting installed at most of the corners in the malls. ● Does not require any electric power supply. ● It is a battery-backed lighting device that switches on automatically when a building experiences a power outage. ● Ensure the safety of customers and workers in the mall when emergencies happened to prevent unwanted accident from happening.
  • 44. Recommended Solution In the mall from our findings there are not many fire extinguishers to be found and the fire extinguishers are not renewed, fire extinguishers should be located one in every few small distance apart.Fire usually evolves from small to big where fire extinguishers are used to smother the fire when it is still small. Having inadequate amount of fire extinguishers may result to a bigger fire if the fire is not put out. Time is crucial in these situations. Fire Protection System Problems -Should have more fire extinguishers around the mall - FIre extinguishers cant last forever, it should be renewed every 7 years.
  • 45. Problem 2 AIR CONDITIONING There are two types of air conditioning systems in this building which are centralised air conditioning system and Unitary system. Basically there is no problem for centralised system but the problem we encountered was about unitary air conditioning system. The water is keep flowing out from condenser. Instead of discharging the water to particular place, the water just drop to the floor which look dirty and poor. So, the management just took a empty bottle to fill in the water that flow out from the condenser which i think is wrong instead of repairing it as you can see at the picture. Recommended Solution -repair the spoiled condenser -buy a new set of unitary conditioning system
  • 46.
  • 47. D e o n g K h a i K e a t 0 3 2 0 0 5 5 S i m S i K a i 0 3 1 8 6 0 9 L e e J i a K i a m 0 3 2 0 0 2 9 C h a n T i a n J i 0 3 2 0 8 3 1 N g o J i a H a u r 0 3 2 0 1 4 4 B o o n Y i C h u n g 0 3 1 8 3 0 0 T a n K e n R i c 0 3 1 8 6 3 1 C h a n W e i L u n 0 3 2 6 1 1 7