SlideShare una empresa de Scribd logo
1 de 22
Descargar para leer sin conexión
‫مشروع‬Live/Work House
‫وع‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬Project Proposal
‫المقرر‬:Design Studio 1
‫اس‬‫ر‬‫الد‬ ‫الفصل‬:‫اس‬‫ر‬‫الد‬ ‫الفصل‬‫الثان‬2nd Semester
‫اس‬‫ر‬‫الد‬ ‫العام‬:2019-2020
‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬
1
.1‫مقدمة‬Introduction
•‫هو‬ ‫ما‬Live/Work House‫؟‬
•‫وع‬ ‫ر‬‫مش‬ ‫لماذا‬Live/Work House‫؟‬
.2‫المشروع‬ ‫معطيات‬
•‫المهمة‬Mission
•‫المواقع‬-‫اض‬‫ر‬‫األ‬ ‫نماذج‬Land Lot Options
•‫البناء‬ ‫اطات‬ ‫ر‬‫اشت‬Building Regulations
•‫الوظيف‬ ‫نامج‬ ‫ر‬‫الت‬–‫وع‬ ‫ر‬‫المش‬‫عنارص‬
.3‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
.4‫العمل‬ ‫خطة‬
.5‫الزمني‬ ‫البرنامج‬Time Schedule‫والتسليمات‬Deliverables
.6‫مشابهة‬ ‫مشروعات‬ ‫من‬ ‫نماذج‬
‫المحتويات‬ ‫قائمة‬Table of Contents
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫السكن‬ ‫اغات‬‫ر‬‫ف‬+‫العمل‬ ‫اغات‬‫ر‬‫ف‬
“A live-work house is a space that combines your
workspace with the living quarters”
The live-work house is an old idea that has been
modernized to meet the needs of entrepreneurs, small
businesses and professionals.
1-‫مقدمة‬Introduction
‫ما‬‫هو‬Live/Work House‫؟‬
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
Live Work
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
Live (Dwelling Unit)
• Entrance lobby
• Living room/space
• Dinning room/space
• Kitchen
• WC
• Master bedroom
• Children bedroom/s
• Bathroom
• Etc.
+
Work (Workspace)
• Office space/s (lawyer, architect, etc.)
• Atelier
• Flower shop
• Organic food shop
• Workshop
• Antique gallery
• Kindergarten
• Specialty Restaurant
• Etc.
1-‫مقدمة‬Introduction
‫ما‬‫هو‬Live/Work House‫؟‬
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
1-‫مقدمة‬Introduction
‫لماذا‬‫مشروع‬Live/Work House‫؟‬
•‫األعمال‬ ‫مجتمع‬ ‫دعم‬–‫األعمال‬ ‫رواد‬ ‫السيما‬entrepreneurs-‫خالل‬ ‫من‬
‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫اتاحة‬–‫العمل‬ ‫فرص‬ ‫وبالتال‬-‫م‬ ‫كأحد‬،‫مناسب‬ ‫بشكل‬‫كونات‬
‫السكنية‬ ‫المبان‬
•‫يتيح‬ ‫ر‬‫الت‬ ‫واالجتماعية‬ ‫واالقتصادية‬ ‫البيئية‬ ‫الفرص‬ ‫تفعيل‬‫مفهوم‬ ‫ها‬
‫المختلطة‬ ‫االستخدامات‬mixed-use developments
•‫التعليم‬ ‫المستوى‬ ‫مع‬ ‫التوافق‬(‫اسية‬‫ر‬‫الد‬ ‫الالئحة‬ ‫حسب‬)
•‫المبت‬ ‫نوعية‬building type‫التصميمية‬ ‫العملية‬ ‫تطبيق‬ ‫تتيح‬Design
Process‫مبسط‬ ‫بشكل‬
•‫الوحدة‬ ‫بي‬ ‫التوازن‬(‫السكن‬ ‫اغات‬‫ر‬‫ف‬)‫واالختالف‬ ‫والتنوع‬(‫و‬ ‫نوعية‬‫أبعاد‬
‫بينها‬ ‫الوظيفية‬ ‫والعالقات‬ ‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫ومتطلبات‬)
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
2-‫المشروع‬ ‫معطيات‬
‫المهمة‬Mission
‫م‬ ‫ر‬‫يعت‬‫جهاز‬‫مدينة‬‫أسيوط‬‫الجديدة‬‫تشييد‬‫نماذج‬‫للسكن‬‫والع‬‫مل‬
‫تخصص‬‫لرواد‬،‫األعمال‬‫عل‬‫اض‬‫ر‬‫أ‬‫تبلغ‬‫مساحة‬‫كل‬‫منها‬225‫م‬2،
‫وذلك‬‫وفق‬‫اطات‬ ‫ر‬‫االشت‬‫البنائية‬‫للمنطقة‬‫المخصصة‬،‫لذلك‬‫ع‬‫ل‬‫أن‬
‫يضم‬‫ل‬‫المت‬‫مساحة‬‫مناسبة‬‫يمكن‬‫من‬‫خاللها‬‫أن‬‫يمارس‬‫صاحب‬‫ال‬‫ل‬‫مت‬
‫نشاطه‬‫المهت‬‫أو‬‫هوايته‬.
•‫يأوي‬‫ل‬‫المت‬‫أرسة‬‫مكونة‬‫من‬‫أب‬‫وأم‬‫وطفلي‬(‫قابلة‬‫للزي‬‫ادة‬)
•‫ال‬‫تزيد‬‫المساحة‬‫المبنية‬‫المخصصة‬‫للنشاط‬‫المهت‬‫أو‬‫ا‬‫لهواية‬
‫عن‬150‫م‬2
•‫للمصمم‬‫حرية‬‫اختيار‬‫المهنة‬(‫الهواية‬)‫ر‬‫الت‬‫يمكن‬‫ممارس‬،‫تها‬‫بما‬
‫ال‬‫يتعارض‬‫مع‬‫متطلبات‬‫الخصوصية‬‫والهدوء‬‫للسكان‬‫أ‬‫و‬‫ان‬‫الجت‬
‫النموذج‬1‫النموذج‬2‫النموذج‬3
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
2-‫المشروع‬ ‫معطيات‬
‫المواقع‬-‫نماذج‬‫األراضي‬Land Lot Options
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
2-‫المشروع‬ ‫معطيات‬
‫اشتراطات‬‫البناء‬Building Regulations
•‫الحد‬‫األقىص‬‫لعدد‬‫األدوار‬‫المسموح‬‫بالبناء‬‫عليها‬‫هو‬‫بدرو‬‫م‬+‫أرض‬
+‫ين‬‫ر‬‫دو‬+‫ملحق‬(‫سطح‬)
•‫يتم‬‫ام‬ ‫ر‬‫االلت‬‫بالنسب‬‫البنائية‬‫المقررة‬‫لكل‬‫دور‬‫كما‬‫بالج‬‫دول‬‫المقابل‬
•‫يجب‬‫تخصيص‬‫موقف‬‫سيارة‬-‫عل‬‫األقل‬-‫داخل‬‫حدود‬‫األرض‬
•‫يجب‬‫توفت‬‫مدخل‬‫مستقل‬‫اغ‬‫ر‬‫لف‬/‫اغات‬‫ر‬‫ف‬‫ممارسة‬‫المهنة‬‫أو‬
،‫الهواية‬‫مع‬‫إمكانية‬‫توفت‬‫اتصال‬‫داخل‬‫اغات‬‫ر‬‫بف‬‫ل‬‫المت‬
•‫ال‬‫يقل‬‫ضلع‬‫منور‬‫الخدمة‬(‫المنور‬‫الذي‬‫تفتح‬‫عليه‬‫المطاب‬‫خ‬
‫والحمامات‬‫ات‬‫ر‬‫والدو‬)‫عن‬2.5،‫م‬‫وال‬‫تقل‬‫مساحته‬‫عن‬7.5‫م‬2
•‫ال‬‫يقل‬‫ضلع‬‫المنور‬‫السكت‬(‫المنور‬‫الذي‬‫تفتح‬‫عليه‬‫ف‬‫اغات‬‫ر‬
‫المعيشة‬‫والطعام‬‫وغرف‬‫النوم‬)‫عن‬3،‫م‬‫وال‬‫تقل‬‫مساحته‬‫عن‬
12‫م‬2
Floor Area (m2) % m2
Basement 225 100% 225.0
Ground Floor 225 60% 135.0
1st Floor 225 60% 135.0
2nd Floor 225 60% 135.0
3rd Floor- Annex 225 30% 67.5
697.5Total Maximum Buildable Area
Max. Built-up area
100%
60% 60% 60%
30%
0%
20%
40%
60%
80%
100%
120%
Basement Ground Floor 1st Floor 2nd Floor 3rd Floor- Annex
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
2-‫المشروع‬ ‫معطيات‬
‫البرنامج‬‫الوظيفي‬–‫عناصر‬‫المشروع‬
‫فراغات‬‫السكن‬
•‫صالة‬‫مدخل‬Lobby
•‫صالة‬‫معيشة‬‫وطعام‬Living & Dining
•‫مطبخ‬Kitchen
•‫دورة‬‫مياه‬WC
•‫غرفة‬‫نوم‬‫ئيسية‬‫ر‬‫بحمام‬‫خاص‬Master bedroom
•2‫غرفة‬‫نوم‬‫أطفال‬
•‫عنص‬‫اتصال‬‫أس‬‫ر‬(‫سلم‬+‫مصعد‬)
‫فراغات‬‫العمل‬
•‫عل‬‫كل‬‫طالب‬‫اح‬ ‫ر‬‫اقت‬‫ع‬‫نو‬‫النشاط‬/‫المهنة‬/‫الهواي‬،‫ة‬
‫وبالتال‬‫جميع‬‫اغات‬‫ر‬‫الف‬‫الوظيفية‬‫والخدمية‬‫ا‬،‫لمطلوبة‬
‫واألبعاد‬‫والمساحات‬‫المناسبة‬‫لها‬
‫مرافق‬‫وخدمات‬‫عامة‬
•‫موقف‬‫سيارة‬(‫عل‬‫األقل‬)‫داخل‬‫األرض‬
•‫للطالب‬‫أن‬‫ح‬ ‫ر‬‫يقت‬‫افق‬‫ر‬‫الم‬‫اغات‬‫ر‬‫والف‬‫والخدمات‬‫ا‬‫لذي‬
‫اها‬‫ر‬‫ي‬‫مهمة‬‫لدعم‬‫الفكرة‬(‫حديقة‬‫أمامية‬‫أو‬،‫خلفية‬‫فناء‬
،‫داخل‬‫حمام‬،‫سباحة‬‫حديقة‬،‫سطح‬‫أو‬‫غت‬‫ذلك‬)
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and site analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
‫النموذج‬1‫النموذج‬2‫النموذج‬3
•‫الشمس‬ ‫كة‬‫حر‬Sun path
•‫التهوية‬Ventilation
•‫الوصولية‬-‫المداخل‬
‫المحتملة‬
Accessibility –
Potential Entrances
•‫والتحديات‬ ‫الفرص‬
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
‫مشروع‬
Live/Work
House
‫الخصوصية‬
Privacy
‫فراغات‬ ‫اتصال‬
‫بالخارج‬ ‫العمل‬
Exposure
‫المرونة‬
Flexibility
‫فراغات‬ ‫جودة‬
‫السكن‬
‫والعمل‬
‫مطالت‬
‫مختلفة‬
‫مداخل‬
‫مستقلة‬
‫تقاطع‬ ‫عدم‬
‫ات‬‫ر‬‫مسا‬
‫كة‬‫الحر‬
‫واجهات‬
‫زجاجية‬
‫وصولية‬
‫ة‬ ‫ر‬‫مبارس‬
‫ممت‬ ‫تكتل‬
‫ومعالجات‬
‫جذابة‬
‫تغت‬ ‫إمكانية‬
‫المساحات‬
‫تعدد‬
‫ات‬‫ر‬‫خيا‬
‫الفرش‬
‫كفاءة‬
‫وظيفية‬
‫مطالت‬
‫داخلية‬
‫اإلضاءة‬
‫والتهوية‬
‫الطبيعية‬
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process
‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬
Case study analysis 3
‫التصميمية‬ ‫المقاييس‬
Design standards 2
‫الموقع‬ ‫وتحليل‬ ‫اختيار‬
Site selection and analysis 1
‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬
Objectives and design criteria 4
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫التصميمية‬ ‫الفكرة‬
Design Concept 5
‫المبدئي‬ ‫التصميم‬
Schematic Design 6
‫المشروع‬ ‫إظهار‬
Project Presentation 7
4-‫العمل‬ ‫خطة‬
‫المهام‬Tasks‫وفرق‬‫العمل‬
‫الجماع‬‫العمل‬
Teamwork
‫الفردي‬‫العمل‬
Individualwork
‫األولى‬ ‫المجموعة‬
‫المواقع‬ ‫تحليل‬(1)–(2)–(3)
Site Analysis
‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬
‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬
‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬
‫وأبعادها‬
‫الثانية‬ ‫المجموعة‬
‫التصميمية‬ ‫المقاييس‬(‫اغات‬‫ر‬‫الف‬ ‫أبعاد‬+‫أب‬‫عاد‬
‫الفرش‬ ‫عنارص‬+‫أسية‬‫ر‬‫ال‬ ‫كة‬‫الحر‬ ‫أكوار‬)‫لجمي‬‫ع‬
‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫باستثناء‬ ‫وع‬ ‫ر‬‫المش‬ ‫اغات‬‫ر‬‫ف‬
‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬
‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬
‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬
‫وأبعادها‬
‫الثالثة‬ ‫المجموعة‬
‫المشابهة‬ ‫األمثلة‬ ‫تحليل‬
(‫أدن‬ ‫بحد‬5‫أمثلة‬)
‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬
‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬
‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬
‫وأبعادها‬
FormatofDeliverables:
PowerPointPresentations
(30Slides)
Formatof
Deliverables:
Boards
Duration:
3Weeks
Duration:
11Weeks
‫المبدئي‬ ‫المعماري‬ ‫التصميم‬(‫المسقط‬ ‫تنظيم‬–‫المبنى‬ ‫شخصية‬)
Architectural Schematic design (plan organization – building character)
‫للمشروع‬ ‫المعماري‬ ‫اإلظهار‬
Project Presentation
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
5-‫الزمني‬ ‫البرنامج‬Time Schedule‫والتسليمات‬Deliverables
)1( ‫سكشن‬)2( ‫سكشن‬
1
2
3
4‫المجموعات‬ ‫ألعمال‬ ‫ي‬‫نهائ‬ ‫عرض‬Design Concept ‫ي‬‫التصميم‬ ‫المفهوم‬ :)2( ‫ة‬ ‫ر‬‫محاض‬PowerPoint Presentation Max. of 30 slides15%
5
6
7
8A2 ‫مقاس‬ ‫شفافات‬15%
9
10
11A2 ‫مقاس‬ ‫شفافات‬20%
12
13
14A2 ‫مقاس‬ ‫لوحات‬50%
‫التواصل‬ ‫وسيلة‬ - ‫المجموعات‬ ‫تشكيل‬ - ‫وع‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬ ‫عرض‬ :)1( ‫ة‬ ‫ر‬‫محاض‬
‫األسبوع‬‫التسليمات‬
)‫حدة‬ ‫عىل‬ ‫مجموعة‬ ‫(كل‬ ‫المجموعات‬ ‫عمل‬ ‫اجعة‬‫ر‬‫م‬
)‫حدة‬ ‫عىل‬ ‫مجموعة‬ ‫(كل‬ ‫المجموعات‬ ‫عمل‬ ‫اجعة‬‫ر‬‫م‬
Final Submission ‫وع‬ ‫ر‬‫للمش‬ ‫ي‬‫النهائ‬ ‫التسليم‬
‫القطاعات‬ - ‫الواجهات‬
‫القطاعات‬ - ‫الواجهات‬
Prefinal - ‫وع‬ ‫ر‬‫المش‬‫عناض‬ ‫لجميع‬ ‫ي‬‫نهائ‬ ‫قبل‬ ‫ما‬ ‫تسليم‬
‫وع‬ ‫ر‬‫للمش‬ ‫المعماري‬‫اإلظهار‬
‫وع‬ ‫ر‬‫للمش‬ ‫المعماري‬‫اإلظهار‬
‫الدرجات‬
)100%(
‫ي‬‫واإلنشائ‬ ‫ي‬
‫ر‬‫الوظيف‬ ‫الموديول‬ - ‫التصميمية‬ ‫الفكرة‬ - ‫الوظيفية‬ ‫-العالقات‬ ‫ي‬
‫ر‬‫الوظيف‬ ‫نامج‬ ‫ر‬‫الت‬
‫الكتلة‬ - ‫األفقية‬ ‫المساقط‬ - ‫التصميمية‬ ‫الفكرة‬
‫الكتلة‬ - ‫األفقية‬ ‫المساقط‬
‫الكتلة‬ - ‫العام‬ ‫الموقع‬ - ‫األفقية‬ ‫المساقط‬ )Midterm( ‫ي‬‫مرحىل‬ ‫تسليم‬
‫المهام‬
‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
6-‫مشابهة‬ ‫مشروعات‬ ‫من‬ ‫نماذج‬
6 Row Live/Work Houses
‫للجميع‬ ‫بالتوفيق‬

Más contenido relacionado

Similar a 1st Year _ Interior Design _ Lecture 01 project proposal

السيرة الذاتيه سليمان 02-2016
السيرة الذاتيه سليمان  02-2016السيرة الذاتيه سليمان  02-2016
السيرة الذاتيه سليمان 02-2016soliman soliman
 
تخصيص الاراضي الصناعيه في الامارات
تخصيص الاراضي الصناعيه في الاماراتتخصيص الاراضي الصناعيه في الامارات
تخصيص الاراضي الصناعيه في الاماراتTarek Barham
 
مبادئ أساسية في الوب
مبادئ أساسية في الوبمبادئ أساسية في الوب
مبادئ أساسية في الوبRanda Basheer
 

Similar a 1st Year _ Interior Design _ Lecture 01 project proposal (6)

السيرة الذاتيه سليمان 02-2016
السيرة الذاتيه سليمان  02-2016السيرة الذاتيه سليمان  02-2016
السيرة الذاتيه سليمان 02-2016
 
ARC-HU_C.V-2014 ar
ARC-HU_C.V-2014 arARC-HU_C.V-2014 ar
ARC-HU_C.V-2014 ar
 
تخصيص الاراضي الصناعيه في الامارات
تخصيص الاراضي الصناعيه في الاماراتتخصيص الاراضي الصناعيه في الامارات
تخصيص الاراضي الصناعيه في الامارات
 
arabic cv
arabic cvarabic cv
arabic cv
 
CV Writing & Interview Skills
CV Writing & Interview SkillsCV Writing & Interview Skills
CV Writing & Interview Skills
 
مبادئ أساسية في الوب
مبادئ أساسية في الوبمبادئ أساسية في الوب
مبادئ أساسية في الوب
 

Más de Khaled Ali

Graduation Project 2019-2020_Project proposal
Graduation Project 2019-2020_Project proposalGraduation Project 2019-2020_Project proposal
Graduation Project 2019-2020_Project proposalKhaled Ali
 
Lecture 05 facades
Lecture 05 facadesLecture 05 facades
Lecture 05 facadesKhaled Ali
 
Lecture 02 structural systems
Lecture 02 structural systemsLecture 02 structural systems
Lecture 02 structural systemsKhaled Ali
 
Architectural design education-Dr. Khaled Ali Youssef
Architectural design education-Dr. Khaled Ali YoussefArchitectural design education-Dr. Khaled Ali Youssef
Architectural design education-Dr. Khaled Ali YoussefKhaled Ali
 
Knowledge management collaboration model for the city of jeddah
Knowledge management collaboration model for the city of jeddahKnowledge management collaboration model for the city of jeddah
Knowledge management collaboration model for the city of jeddahKhaled Ali
 
Advanced architecture theory and criticism lecture 05
Advanced architecture theory and criticism lecture 05Advanced architecture theory and criticism lecture 05
Advanced architecture theory and criticism lecture 05Khaled Ali
 
Advanced architecture theory and criticism lecture 04
Advanced architecture theory and criticism lecture 04Advanced architecture theory and criticism lecture 04
Advanced architecture theory and criticism lecture 04Khaled Ali
 
Advanced architecture theory and criticism lecture 03
Advanced architecture theory and criticism lecture 03Advanced architecture theory and criticism lecture 03
Advanced architecture theory and criticism lecture 03Khaled Ali
 
Advanced architecture theory and criticism lecture 02
Advanced architecture theory and criticism lecture 02Advanced architecture theory and criticism lecture 02
Advanced architecture theory and criticism lecture 02Khaled Ali
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management SystemsKhaled Ali
 
Safety and security for buildings
Safety and security for buildingsSafety and security for buildings
Safety and security for buildingsKhaled Ali
 
Intelligence meets buildings
Intelligence meets buildingsIntelligence meets buildings
Intelligence meets buildingsKhaled Ali
 
Advanced architecture theory and criticism lecture 01
Advanced architecture theory and criticism lecture 01Advanced architecture theory and criticism lecture 01
Advanced architecture theory and criticism lecture 01Khaled Ali
 
1435 2015 presentations review
1435 2015 presentations review1435 2015 presentations review
1435 2015 presentations reviewKhaled Ali
 
Energy Efficient Design Education Through Architectural Design Studio Projects
Energy Efficient Design Education Through Architectural Design Studio ProjectsEnergy Efficient Design Education Through Architectural Design Studio Projects
Energy Efficient Design Education Through Architectural Design Studio ProjectsKhaled Ali
 
Horizontal Design Studio versus Vertical Design Studio: A Tale of Two Archit...
Horizontal Design Studio versus Vertical Design Studio:A Tale of Two Archit...Horizontal Design Studio versus Vertical Design Studio:A Tale of Two Archit...
Horizontal Design Studio versus Vertical Design Studio: A Tale of Two Archit...Khaled Ali
 
Working Drawings lecture 04
Working Drawings lecture 04Working Drawings lecture 04
Working Drawings lecture 04Khaled Ali
 
Working Drawings lecture 03
Working Drawings lecture 03Working Drawings lecture 03
Working Drawings lecture 03Khaled Ali
 
Working Drawings lecture 02
Working Drawings lecture 02Working Drawings lecture 02
Working Drawings lecture 02Khaled Ali
 
Working Drawings lecture 01
Working Drawings lecture 01Working Drawings lecture 01
Working Drawings lecture 01Khaled Ali
 

Más de Khaled Ali (20)

Graduation Project 2019-2020_Project proposal
Graduation Project 2019-2020_Project proposalGraduation Project 2019-2020_Project proposal
Graduation Project 2019-2020_Project proposal
 
Lecture 05 facades
Lecture 05 facadesLecture 05 facades
Lecture 05 facades
 
Lecture 02 structural systems
Lecture 02 structural systemsLecture 02 structural systems
Lecture 02 structural systems
 
Architectural design education-Dr. Khaled Ali Youssef
Architectural design education-Dr. Khaled Ali YoussefArchitectural design education-Dr. Khaled Ali Youssef
Architectural design education-Dr. Khaled Ali Youssef
 
Knowledge management collaboration model for the city of jeddah
Knowledge management collaboration model for the city of jeddahKnowledge management collaboration model for the city of jeddah
Knowledge management collaboration model for the city of jeddah
 
Advanced architecture theory and criticism lecture 05
Advanced architecture theory and criticism lecture 05Advanced architecture theory and criticism lecture 05
Advanced architecture theory and criticism lecture 05
 
Advanced architecture theory and criticism lecture 04
Advanced architecture theory and criticism lecture 04Advanced architecture theory and criticism lecture 04
Advanced architecture theory and criticism lecture 04
 
Advanced architecture theory and criticism lecture 03
Advanced architecture theory and criticism lecture 03Advanced architecture theory and criticism lecture 03
Advanced architecture theory and criticism lecture 03
 
Advanced architecture theory and criticism lecture 02
Advanced architecture theory and criticism lecture 02Advanced architecture theory and criticism lecture 02
Advanced architecture theory and criticism lecture 02
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 
Safety and security for buildings
Safety and security for buildingsSafety and security for buildings
Safety and security for buildings
 
Intelligence meets buildings
Intelligence meets buildingsIntelligence meets buildings
Intelligence meets buildings
 
Advanced architecture theory and criticism lecture 01
Advanced architecture theory and criticism lecture 01Advanced architecture theory and criticism lecture 01
Advanced architecture theory and criticism lecture 01
 
1435 2015 presentations review
1435 2015 presentations review1435 2015 presentations review
1435 2015 presentations review
 
Energy Efficient Design Education Through Architectural Design Studio Projects
Energy Efficient Design Education Through Architectural Design Studio ProjectsEnergy Efficient Design Education Through Architectural Design Studio Projects
Energy Efficient Design Education Through Architectural Design Studio Projects
 
Horizontal Design Studio versus Vertical Design Studio: A Tale of Two Archit...
Horizontal Design Studio versus Vertical Design Studio:A Tale of Two Archit...Horizontal Design Studio versus Vertical Design Studio:A Tale of Two Archit...
Horizontal Design Studio versus Vertical Design Studio: A Tale of Two Archit...
 
Working Drawings lecture 04
Working Drawings lecture 04Working Drawings lecture 04
Working Drawings lecture 04
 
Working Drawings lecture 03
Working Drawings lecture 03Working Drawings lecture 03
Working Drawings lecture 03
 
Working Drawings lecture 02
Working Drawings lecture 02Working Drawings lecture 02
Working Drawings lecture 02
 
Working Drawings lecture 01
Working Drawings lecture 01Working Drawings lecture 01
Working Drawings lecture 01
 

1st Year _ Interior Design _ Lecture 01 project proposal

  • 1. ‫مشروع‬Live/Work House ‫وع‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬Project Proposal ‫المقرر‬:Design Studio 1 ‫اس‬‫ر‬‫الد‬ ‫الفصل‬:‫اس‬‫ر‬‫الد‬ ‫الفصل‬‫الثان‬2nd Semester ‫اس‬‫ر‬‫الد‬ ‫العام‬:2019-2020 ‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬ 1
  • 2. .1‫مقدمة‬Introduction •‫هو‬ ‫ما‬Live/Work House‫؟‬ •‫وع‬ ‫ر‬‫مش‬ ‫لماذا‬Live/Work House‫؟‬ .2‫المشروع‬ ‫معطيات‬ •‫المهمة‬Mission •‫المواقع‬-‫اض‬‫ر‬‫األ‬ ‫نماذج‬Land Lot Options •‫البناء‬ ‫اطات‬ ‫ر‬‫اشت‬Building Regulations •‫الوظيف‬ ‫نامج‬ ‫ر‬‫الت‬–‫وع‬ ‫ر‬‫المش‬‫عنارص‬ .3‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process .4‫العمل‬ ‫خطة‬ .5‫الزمني‬ ‫البرنامج‬Time Schedule‫والتسليمات‬Deliverables .6‫مشابهة‬ ‫مشروعات‬ ‫من‬ ‫نماذج‬ ‫المحتويات‬ ‫قائمة‬Table of Contents ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 3. ‫السكن‬ ‫اغات‬‫ر‬‫ف‬+‫العمل‬ ‫اغات‬‫ر‬‫ف‬ “A live-work house is a space that combines your workspace with the living quarters” The live-work house is an old idea that has been modernized to meet the needs of entrepreneurs, small businesses and professionals. 1-‫مقدمة‬Introduction ‫ما‬‫هو‬Live/Work House‫؟‬ ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 4. Live Work ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 5. Live (Dwelling Unit) • Entrance lobby • Living room/space • Dinning room/space • Kitchen • WC • Master bedroom • Children bedroom/s • Bathroom • Etc. + Work (Workspace) • Office space/s (lawyer, architect, etc.) • Atelier • Flower shop • Organic food shop • Workshop • Antique gallery • Kindergarten • Specialty Restaurant • Etc. 1-‫مقدمة‬Introduction ‫ما‬‫هو‬Live/Work House‫؟‬ ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 6. 1-‫مقدمة‬Introduction ‫لماذا‬‫مشروع‬Live/Work House‫؟‬ •‫األعمال‬ ‫مجتمع‬ ‫دعم‬–‫األعمال‬ ‫رواد‬ ‫السيما‬entrepreneurs-‫خالل‬ ‫من‬ ‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫اتاحة‬–‫العمل‬ ‫فرص‬ ‫وبالتال‬-‫م‬ ‫كأحد‬،‫مناسب‬ ‫بشكل‬‫كونات‬ ‫السكنية‬ ‫المبان‬ •‫يتيح‬ ‫ر‬‫الت‬ ‫واالجتماعية‬ ‫واالقتصادية‬ ‫البيئية‬ ‫الفرص‬ ‫تفعيل‬‫مفهوم‬ ‫ها‬ ‫المختلطة‬ ‫االستخدامات‬mixed-use developments •‫التعليم‬ ‫المستوى‬ ‫مع‬ ‫التوافق‬(‫اسية‬‫ر‬‫الد‬ ‫الالئحة‬ ‫حسب‬) •‫المبت‬ ‫نوعية‬building type‫التصميمية‬ ‫العملية‬ ‫تطبيق‬ ‫تتيح‬Design Process‫مبسط‬ ‫بشكل‬ •‫الوحدة‬ ‫بي‬ ‫التوازن‬(‫السكن‬ ‫اغات‬‫ر‬‫ف‬)‫واالختالف‬ ‫والتنوع‬(‫و‬ ‫نوعية‬‫أبعاد‬ ‫بينها‬ ‫الوظيفية‬ ‫والعالقات‬ ‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫ومتطلبات‬) ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 7. ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 2-‫المشروع‬ ‫معطيات‬ ‫المهمة‬Mission ‫م‬ ‫ر‬‫يعت‬‫جهاز‬‫مدينة‬‫أسيوط‬‫الجديدة‬‫تشييد‬‫نماذج‬‫للسكن‬‫والع‬‫مل‬ ‫تخصص‬‫لرواد‬،‫األعمال‬‫عل‬‫اض‬‫ر‬‫أ‬‫تبلغ‬‫مساحة‬‫كل‬‫منها‬225‫م‬2، ‫وذلك‬‫وفق‬‫اطات‬ ‫ر‬‫االشت‬‫البنائية‬‫للمنطقة‬‫المخصصة‬،‫لذلك‬‫ع‬‫ل‬‫أن‬ ‫يضم‬‫ل‬‫المت‬‫مساحة‬‫مناسبة‬‫يمكن‬‫من‬‫خاللها‬‫أن‬‫يمارس‬‫صاحب‬‫ال‬‫ل‬‫مت‬ ‫نشاطه‬‫المهت‬‫أو‬‫هوايته‬. •‫يأوي‬‫ل‬‫المت‬‫أرسة‬‫مكونة‬‫من‬‫أب‬‫وأم‬‫وطفلي‬(‫قابلة‬‫للزي‬‫ادة‬) •‫ال‬‫تزيد‬‫المساحة‬‫المبنية‬‫المخصصة‬‫للنشاط‬‫المهت‬‫أو‬‫ا‬‫لهواية‬ ‫عن‬150‫م‬2 •‫للمصمم‬‫حرية‬‫اختيار‬‫المهنة‬(‫الهواية‬)‫ر‬‫الت‬‫يمكن‬‫ممارس‬،‫تها‬‫بما‬ ‫ال‬‫يتعارض‬‫مع‬‫متطلبات‬‫الخصوصية‬‫والهدوء‬‫للسكان‬‫أ‬‫و‬‫ان‬‫الجت‬
  • 8. ‫النموذج‬1‫النموذج‬2‫النموذج‬3 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 2-‫المشروع‬ ‫معطيات‬ ‫المواقع‬-‫نماذج‬‫األراضي‬Land Lot Options
  • 9. ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 2-‫المشروع‬ ‫معطيات‬ ‫اشتراطات‬‫البناء‬Building Regulations •‫الحد‬‫األقىص‬‫لعدد‬‫األدوار‬‫المسموح‬‫بالبناء‬‫عليها‬‫هو‬‫بدرو‬‫م‬+‫أرض‬ +‫ين‬‫ر‬‫دو‬+‫ملحق‬(‫سطح‬) •‫يتم‬‫ام‬ ‫ر‬‫االلت‬‫بالنسب‬‫البنائية‬‫المقررة‬‫لكل‬‫دور‬‫كما‬‫بالج‬‫دول‬‫المقابل‬ •‫يجب‬‫تخصيص‬‫موقف‬‫سيارة‬-‫عل‬‫األقل‬-‫داخل‬‫حدود‬‫األرض‬ •‫يجب‬‫توفت‬‫مدخل‬‫مستقل‬‫اغ‬‫ر‬‫لف‬/‫اغات‬‫ر‬‫ف‬‫ممارسة‬‫المهنة‬‫أو‬ ،‫الهواية‬‫مع‬‫إمكانية‬‫توفت‬‫اتصال‬‫داخل‬‫اغات‬‫ر‬‫بف‬‫ل‬‫المت‬ •‫ال‬‫يقل‬‫ضلع‬‫منور‬‫الخدمة‬(‫المنور‬‫الذي‬‫تفتح‬‫عليه‬‫المطاب‬‫خ‬ ‫والحمامات‬‫ات‬‫ر‬‫والدو‬)‫عن‬2.5،‫م‬‫وال‬‫تقل‬‫مساحته‬‫عن‬7.5‫م‬2 •‫ال‬‫يقل‬‫ضلع‬‫المنور‬‫السكت‬(‫المنور‬‫الذي‬‫تفتح‬‫عليه‬‫ف‬‫اغات‬‫ر‬ ‫المعيشة‬‫والطعام‬‫وغرف‬‫النوم‬)‫عن‬3،‫م‬‫وال‬‫تقل‬‫مساحته‬‫عن‬ 12‫م‬2 Floor Area (m2) % m2 Basement 225 100% 225.0 Ground Floor 225 60% 135.0 1st Floor 225 60% 135.0 2nd Floor 225 60% 135.0 3rd Floor- Annex 225 30% 67.5 697.5Total Maximum Buildable Area Max. Built-up area 100% 60% 60% 60% 30% 0% 20% 40% 60% 80% 100% 120% Basement Ground Floor 1st Floor 2nd Floor 3rd Floor- Annex
  • 10. ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 2-‫المشروع‬ ‫معطيات‬ ‫البرنامج‬‫الوظيفي‬–‫عناصر‬‫المشروع‬ ‫فراغات‬‫السكن‬ •‫صالة‬‫مدخل‬Lobby •‫صالة‬‫معيشة‬‫وطعام‬Living & Dining •‫مطبخ‬Kitchen •‫دورة‬‫مياه‬WC •‫غرفة‬‫نوم‬‫ئيسية‬‫ر‬‫بحمام‬‫خاص‬Master bedroom •2‫غرفة‬‫نوم‬‫أطفال‬ •‫عنص‬‫اتصال‬‫أس‬‫ر‬(‫سلم‬+‫مصعد‬) ‫فراغات‬‫العمل‬ •‫عل‬‫كل‬‫طالب‬‫اح‬ ‫ر‬‫اقت‬‫ع‬‫نو‬‫النشاط‬/‫المهنة‬/‫الهواي‬،‫ة‬ ‫وبالتال‬‫جميع‬‫اغات‬‫ر‬‫الف‬‫الوظيفية‬‫والخدمية‬‫ا‬،‫لمطلوبة‬ ‫واألبعاد‬‫والمساحات‬‫المناسبة‬‫لها‬ ‫مرافق‬‫وخدمات‬‫عامة‬ •‫موقف‬‫سيارة‬(‫عل‬‫األقل‬)‫داخل‬‫األرض‬ •‫للطالب‬‫أن‬‫ح‬ ‫ر‬‫يقت‬‫افق‬‫ر‬‫الم‬‫اغات‬‫ر‬‫والف‬‫والخدمات‬‫ا‬‫لذي‬ ‫اها‬‫ر‬‫ي‬‫مهمة‬‫لدعم‬‫الفكرة‬(‫حديقة‬‫أمامية‬‫أو‬،‫خلفية‬‫فناء‬ ،‫داخل‬‫حمام‬،‫سباحة‬‫حديقة‬،‫سطح‬‫أو‬‫غت‬‫ذلك‬)
  • 11. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and site analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 12. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7 ‫النموذج‬1‫النموذج‬2‫النموذج‬3 •‫الشمس‬ ‫كة‬‫حر‬Sun path •‫التهوية‬Ventilation •‫الوصولية‬-‫المداخل‬ ‫المحتملة‬ Accessibility – Potential Entrances •‫والتحديات‬ ‫الفرص‬
  • 13. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 14. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 15. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7 ‫مشروع‬ Live/Work House ‫الخصوصية‬ Privacy ‫فراغات‬ ‫اتصال‬ ‫بالخارج‬ ‫العمل‬ Exposure ‫المرونة‬ Flexibility ‫فراغات‬ ‫جودة‬ ‫السكن‬ ‫والعمل‬ ‫مطالت‬ ‫مختلفة‬ ‫مداخل‬ ‫مستقلة‬ ‫تقاطع‬ ‫عدم‬ ‫ات‬‫ر‬‫مسا‬ ‫كة‬‫الحر‬ ‫واجهات‬ ‫زجاجية‬ ‫وصولية‬ ‫ة‬ ‫ر‬‫مبارس‬ ‫ممت‬ ‫تكتل‬ ‫ومعالجات‬ ‫جذابة‬ ‫تغت‬ ‫إمكانية‬ ‫المساحات‬ ‫تعدد‬ ‫ات‬‫ر‬‫خيا‬ ‫الفرش‬ ‫كفاءة‬ ‫وظيفية‬ ‫مطالت‬ ‫داخلية‬ ‫اإلضاءة‬ ‫والتهوية‬ ‫الطبيعية‬
  • 16. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 17. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 18. 3-‫التصميمية‬ ‫العملية‬ ‫مراحل‬Design Process ‫المشابهة‬ ‫األمثلة‬ ‫دراسة‬ Case study analysis 3 ‫التصميمية‬ ‫المقاييس‬ Design standards 2 ‫الموقع‬ ‫وتحليل‬ ‫اختيار‬ Site selection and analysis 1 ‫التصميمية‬ ‫والمعايير‬ ‫األهداف‬ Objectives and design criteria 4 ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 ‫التصميمية‬ ‫الفكرة‬ Design Concept 5 ‫المبدئي‬ ‫التصميم‬ Schematic Design 6 ‫المشروع‬ ‫إظهار‬ Project Presentation 7
  • 19. 4-‫العمل‬ ‫خطة‬ ‫المهام‬Tasks‫وفرق‬‫العمل‬ ‫الجماع‬‫العمل‬ Teamwork ‫الفردي‬‫العمل‬ Individualwork ‫األولى‬ ‫المجموعة‬ ‫المواقع‬ ‫تحليل‬(1)–(2)–(3) Site Analysis ‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬ ‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬ ‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬ ‫وأبعادها‬ ‫الثانية‬ ‫المجموعة‬ ‫التصميمية‬ ‫المقاييس‬(‫اغات‬‫ر‬‫الف‬ ‫أبعاد‬+‫أب‬‫عاد‬ ‫الفرش‬ ‫عنارص‬+‫أسية‬‫ر‬‫ال‬ ‫كة‬‫الحر‬ ‫أكوار‬)‫لجمي‬‫ع‬ ‫العمل‬ ‫اغات‬‫ر‬‫ف‬ ‫باستثناء‬ ‫وع‬ ‫ر‬‫المش‬ ‫اغات‬‫ر‬‫ف‬ ‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬ ‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬ ‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬ ‫وأبعادها‬ ‫الثالثة‬ ‫المجموعة‬ ‫المشابهة‬ ‫األمثلة‬ ‫تحليل‬ (‫أدن‬ ‫بحد‬5‫أمثلة‬) ‫المهنة‬ ‫ع‬‫نو‬ ‫تحديد‬/،‫طالب‬ ‫لكل‬ ‫الهواية‬ ‫الخاص‬ ‫اغية‬‫ر‬‫والف‬ ‫الوظيفية‬ ‫المتطلبات‬ ‫عرض‬ ‫مع‬‫ة‬ ‫مهنة‬ ‫بكل‬/‫وموا‬ ‫المطلوبة‬ ‫الفرش‬ ‫وعنارص‬ ،‫هواية‬‫صفاتها‬ ‫وأبعادها‬ FormatofDeliverables: PowerPointPresentations (30Slides) Formatof Deliverables: Boards Duration: 3Weeks Duration: 11Weeks ‫المبدئي‬ ‫المعماري‬ ‫التصميم‬(‫المسقط‬ ‫تنظيم‬–‫المبنى‬ ‫شخصية‬) Architectural Schematic design (plan organization – building character) ‫للمشروع‬ ‫المعماري‬ ‫اإلظهار‬ Project Presentation ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020
  • 20. ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 5-‫الزمني‬ ‫البرنامج‬Time Schedule‫والتسليمات‬Deliverables )1( ‫سكشن‬)2( ‫سكشن‬ 1 2 3 4‫المجموعات‬ ‫ألعمال‬ ‫ي‬‫نهائ‬ ‫عرض‬Design Concept ‫ي‬‫التصميم‬ ‫المفهوم‬ :)2( ‫ة‬ ‫ر‬‫محاض‬PowerPoint Presentation Max. of 30 slides15% 5 6 7 8A2 ‫مقاس‬ ‫شفافات‬15% 9 10 11A2 ‫مقاس‬ ‫شفافات‬20% 12 13 14A2 ‫مقاس‬ ‫لوحات‬50% ‫التواصل‬ ‫وسيلة‬ - ‫المجموعات‬ ‫تشكيل‬ - ‫وع‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬ ‫عرض‬ :)1( ‫ة‬ ‫ر‬‫محاض‬ ‫األسبوع‬‫التسليمات‬ )‫حدة‬ ‫عىل‬ ‫مجموعة‬ ‫(كل‬ ‫المجموعات‬ ‫عمل‬ ‫اجعة‬‫ر‬‫م‬ )‫حدة‬ ‫عىل‬ ‫مجموعة‬ ‫(كل‬ ‫المجموعات‬ ‫عمل‬ ‫اجعة‬‫ر‬‫م‬ Final Submission ‫وع‬ ‫ر‬‫للمش‬ ‫ي‬‫النهائ‬ ‫التسليم‬ ‫القطاعات‬ - ‫الواجهات‬ ‫القطاعات‬ - ‫الواجهات‬ Prefinal - ‫وع‬ ‫ر‬‫المش‬‫عناض‬ ‫لجميع‬ ‫ي‬‫نهائ‬ ‫قبل‬ ‫ما‬ ‫تسليم‬ ‫وع‬ ‫ر‬‫للمش‬ ‫المعماري‬‫اإلظهار‬ ‫وع‬ ‫ر‬‫للمش‬ ‫المعماري‬‫اإلظهار‬ ‫الدرجات‬ )100%( ‫ي‬‫واإلنشائ‬ ‫ي‬ ‫ر‬‫الوظيف‬ ‫الموديول‬ - ‫التصميمية‬ ‫الفكرة‬ - ‫الوظيفية‬ ‫-العالقات‬ ‫ي‬ ‫ر‬‫الوظيف‬ ‫نامج‬ ‫ر‬‫الت‬ ‫الكتلة‬ - ‫األفقية‬ ‫المساقط‬ - ‫التصميمية‬ ‫الفكرة‬ ‫الكتلة‬ - ‫األفقية‬ ‫المساقط‬ ‫الكتلة‬ - ‫العام‬ ‫الموقع‬ - ‫األفقية‬ ‫المساقط‬ )Midterm( ‫ي‬‫مرحىل‬ ‫تسليم‬ ‫المهام‬
  • 21. ‫ع‬‫و‬ ‫ر‬‫مش‬Live/Work House-‫ع‬‫و‬ ‫ر‬‫المش‬ ‫ح‬ ‫ر‬‫مقت‬‫أ‬.‫د‬.‫يوسف‬ ‫عل‬ ‫خالد‬-2019-2020 6-‫مشابهة‬ ‫مشروعات‬ ‫من‬ ‫نماذج‬ 6 Row Live/Work Houses