Agenda
Goal: to maintain the longer term sustainability
of the Kingston Yacht Club at its current site.
Key elements to achieving the goal include:
Membership
Facilities
Harbour
Finance
Strategic Plan
The Phased Plan
A phased plan was developed with a view to
implementation over a period of about 10 years:
1. Dock at Jemmett’s Landing (2012)
2. Fuel Dock (2012)
3. Expand and enhance our Harbour (Spring 2014)
4. Saint’s Rest Renovation (future)
5. Clubhouse Renovation (future)
Strategic Plan Activities
1. Development of a vision and a phased plan to achieve it
2. Development of conceptual drawings for renovation/enhancement
of club house
3. Determination of club capacity to finance the vision based on:
• Formal appraisal of the property
• Discussions with banks and negotiation of financing
4. Determination of feasibility to expand harbour based on:
• Ability to lease then purchase adjacent water lot
• Engineering/wave climate study
• Preliminary proposals with cost estimates from various firms for design
and installation of wave attenuators and docks
Questions
1. Do you support the idea of moving to an All finger
dock harbour?
2. How many members hold moorings ?
3. How many members have boats moored elsewhere?
4. How many of those would move their boat to the
Club if finger docks were available?
Straw Poll
Research and Engineering
 Wave study (complete)
 Water lot appraisal (due next week)
 Identification of suppliers (complete)
 Analysis of competition (complete)
Where are we now?
 Water lot
 Proposal to lease adjacent water lot has
been submitted to Transport Canada
• Three year lease initially, purchase at end of lease
• Expecting a response in April or May
Where are we now?
Budget & Financing
 Working Budget
 Funding Model includes:
• Fee Structure
• Harbour Fees
Where are we now?
Details to be Finalized
 Finalized harbour plans and engineering
• Attachment point to breakwall
• JS Launch
• Centre dock adjustment
 Updated Costing/Quotes
• Electrical supply to club and docks
• Centre dock
• Gabion repair
Timelines
April-
May 2013
• Town Hall meetings
• Lease from Transport Canada
May 2013 • Special General Meeting
June-July
2013
• Harbour Marketing
begins
• Engineering study
• Electrical
• Centre dock &
harbour soundings
• Design and layout
July 2013
• Finalize Design and
Specifications
• Send out RFP
Aug-Sept
2013
•Select Preferred
Contractor
•Negotiate Contract
Oct 2013
Mar 2014
•Manufacture of
attenuators and
docks
April
2014
• On Site
Installation
~30 new slips
Finger dock moorings
Accommodation of boat lengths of 40’+
Proper electrical & water hookups
 Pedestal/slip ratio needs to be established with input from members
Access to convenient & safe swimming
JS launch facilities, Able Sail & RC access
Guest moorings
Potential for mast crane
Protection from south and east winds.
Harbour Features
Questions
1. How many people would pay market rates (~$350+)
for a dedicated 30amp electrical service?
2. How many members would pay market rates
(~$200) for a dedicated 15amp electrical service?
3. How many would only occasionally use a 15amp
service?
Straw Poll
Sample harbour layouts
 Harbour Design has not been finalized
• Design & Engineering phase begins after approval
• Request member input of design options via
display board in Clubhouse and online.
• Subsequent Town Hall information meetings
 Examples required for water lot lease application
 All options so far include a floating wave attenuator
extending from the existing breakwall
Harbour Layout 1
Harbour Layout 2
Harbour Layout 3
Sample Wave Attenuator
Sample Finger docks
Effects on Club Operations
Haulout plans
 Breakwall access for construction
 Potential relocation of masts
Restricted Access
 Electrical installation
Additional Parking Demands
 Need for optimizing existing club parking
 Exploration of parking options
Financing
A Self Sustaining Model
How much it will cost?
Project Budget
Item Cost
Dock & Breakwall (based on supplied quotes) $1,100,000.00
• Electrical to base of Maitland
• Water lot
• Centre dock work
• Electrical on Docks
• Attachment to existing breakwall
• Gabion repairs
$400,000.00
Sub-total: $1,500,000.00
Contingency @ ~7% $100,000.00
Total: $1,600,000.00
How will it be Funded?
Harbour will be Self Sustaining
 Only new revenues will service debt
Sources of Funding for Project ($1.6M)
 Capital Reserves ($100K)
 Refundable Dock deposit (~$127K)
 Loan at 5% over 30 years (~$1.37M)
Sources of Debt Servicing ($88K/year)
 Fees from ~30 new moorings (~$64K/year)
 Incremental fees for those converted to fingers (~$15K/year)
 Incremental fees from other sources (~$15K)
Refundable Dock Deposit
Proposed Deposit Amounts
<= 25’ $1,000
26’ to 30’ $1,500
31’ to 35’ $1,750
35’+ $2,000
How does it work?
 Deposit paid when you are assigned a mooring
 Refunded when you give up your mooring
Simplified Mooring Fee Structure
Change to per-foot charge based on boat length
Easier to calculate and compare with competition
Fair representation of the costs to the Club
Slips 1-34
• Remain med style moorings
• Fee calculated per foot
(about a 35% discount of finger dock per-foot fee)
Slips 35 – ~110
• Finger docks
• Fee calculated per foot
Mooring Fees - 2014
Example
KYC’s average boat is
• 29.3 feet LOA and
• 9.6 Beam
2014 current
• using current formula
+ finger-dock premium
• Finger Mooring Fee of $ 1721
(equivalent to $59/foot)
2014 proposed
• Finger Mooring Fee of $1,785
• Dock Deposit of $1,500
Proposed Finger Dock fee
• $61/foot
• + Refundable Dock Deposit
• 27 boats experience increase
• 22 boats experience a decrease
• Average increase is $32 (3%)
Competition (2014 estimate)
• Confederation Basin - $69.24
• POH - $64.40
• Collins Bay - $57.10
• Kingston Marina – $56.10
Proposed Entrance Fees
How would they help?
 Improve membership retention
 Provide a strong marketing incentive to help fill harbour
 New member entrance fee would be contributing to the Club’s
infrastructure and value
How would they work?
 Does not apply to existing members
 Family Member: $1000
 Single Member: $600
 Waived for applicants 65 and older
Mitigating Financial Risks
What if interest rates rise?
 Conservative at 5%: expect first 5 years to be 4.5%
 Plan to aggressively pre-pay principal with surplus
What if there is slow up-take on new slips?
 Can manage potential shortfall years with funding from ‘full
harbour’ years in order to be self sustaining.
 Introduction of entrance fees effective March 1, 2014
 Incentive for boaters to join before 2014 season
 Will help with member retention
Summary
 Simplified mooring fee structure
• Finger docks rates competitive
• Remaining med mooring average fee unchanged
 Introduction of Refundable Dock Deposit
 Introduction of Membership Entrance fees
 Result:
 Self Sustaining Harbour
 Increased the value for existing members
 Increased Membership Base
Tonight
Requests for clarification of what we have presented
Between tonight and next Town Hall meeting
 Feedback options
• E-mail: harbourquestions@kingstonyachtclub.ca
• Web: www.kingstonyachtclub.ca/newharbour
• Paper Questionnaire and input form at the bar
• Considering publishing an electronic questionnaire
• Questions & comments and new information from the Strategic
Planning Committee will be addressed at Town Hall #2
Getting your input
KYC	Harbour Redevelopment - Town Hall No 1 Presentation

More Related Content

Viewers also liked

Viewers also liked (20)

Horbour & Dock Engineerin
Horbour & Dock EngineerinHorbour & Dock Engineerin
Horbour & Dock Engineerin
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Harbour
HarbourHarbour
Harbour
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Classification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxClassification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptx
 
Port and Harbor Engineering
Port and Harbor EngineeringPort and Harbor Engineering
Port and Harbor Engineering
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trust
 
Flood Routing using Muskingum Method
Flood Routing using Muskingum MethodFlood Routing using Muskingum Method
Flood Routing using Muskingum Method
 
Routing
RoutingRouting
Routing
 
KYC Harbour Redevelopment - Town Hall No 3 Presentation
KYC	Harbour Redevelopment - Town Hall No 3 PresentationKYC	Harbour Redevelopment - Town Hall No 3 Presentation
KYC Harbour Redevelopment - Town Hall No 3 Presentation
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
 
Breakwaters day 1 - introduction
Breakwaters   day 1 - introductionBreakwaters   day 1 - introduction
Breakwaters day 1 - introduction
 
Ley de darcy
Ley de darcyLey de darcy
Ley de darcy
 
7 routing
7 routing7 routing
7 routing
 
Terms related to docks and harbours
Terms related to docks and harboursTerms related to docks and harbours
Terms related to docks and harbours
 
Floods
FloodsFloods
Floods
 
Channel routing
Channel routingChannel routing
Channel routing
 

Similar to KYC Harbour Redevelopment - Town Hall No 1 Presentation

KYC Harbour Redevelopment - Town Hall No 2 Presentation
KYC	Harbour Redevelopment - Town Hall No 2 PresentationKYC	Harbour Redevelopment - Town Hall No 2 Presentation
KYC Harbour Redevelopment - Town Hall No 2 Presentationkingstonyc
 
Harbour Redevlopment - Town Hall - 2016-02-27
Harbour Redevlopment - Town Hall - 2016-02-27Harbour Redevlopment - Town Hall - 2016-02-27
Harbour Redevlopment - Town Hall - 2016-02-27kingstonyc
 
KYC - Long Term Financial Planing - Town Hall 2014-03-26
KYC - Long Term Financial Planing - Town Hall 2014-03-26KYC - Long Term Financial Planing - Town Hall 2014-03-26
KYC - Long Term Financial Planing - Town Hall 2014-03-26kingstonyc
 
042608 Town Hall Meeting
042608 Town Hall Meeting042608 Town Hall Meeting
042608 Town Hall Meetingbcpoa
 
Revenue Fund
Revenue FundRevenue Fund
Revenue FundMSCSA
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christijeshaml10
 
KYC Strategic Plan - Speaker Series March 23-2011
KYC Strategic Plan -  Speaker Series March 23-2011KYC Strategic Plan -  Speaker Series March 23-2011
KYC Strategic Plan - Speaker Series March 23-2011kingstonyc
 
Kyc strategic plan speaker series march 23 2011
Kyc strategic plan   speaker series march 23 2011Kyc strategic plan   speaker series march 23 2011
Kyc strategic plan speaker series march 23 2011kingstonyc
 
Newport Mooring Association Position on Fees and Transfers 2015-04
Newport Mooring Association Position on Fees and Transfers 2015-04Newport Mooring Association Position on Fees and Transfers 2015-04
Newport Mooring Association Position on Fees and Transfers 2015-04NewportMooring
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major ProjectsEnbridge Inc.
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumGW Solar Institute
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects UpdateTownofAddison
 

Similar to KYC Harbour Redevelopment - Town Hall No 1 Presentation (20)

KYC Harbour Redevelopment - Town Hall No 2 Presentation
KYC	Harbour Redevelopment - Town Hall No 2 PresentationKYC	Harbour Redevelopment - Town Hall No 2 Presentation
KYC Harbour Redevelopment - Town Hall No 2 Presentation
 
Harbour Redevlopment - Town Hall - 2016-02-27
Harbour Redevlopment - Town Hall - 2016-02-27Harbour Redevlopment - Town Hall - 2016-02-27
Harbour Redevlopment - Town Hall - 2016-02-27
 
KYC - Long Term Financial Planing - Town Hall 2014-03-26
KYC - Long Term Financial Planing - Town Hall 2014-03-26KYC - Long Term Financial Planing - Town Hall 2014-03-26
KYC - Long Term Financial Planing - Town Hall 2014-03-26
 
042608 Town Hall Meeting
042608 Town Hall Meeting042608 Town Hall Meeting
042608 Town Hall Meeting
 
2013 Bond Sale and Refunding
2013 Bond Sale and Refunding 2013 Bond Sale and Refunding
2013 Bond Sale and Refunding
 
Item #14 ppt ah pool
Item #14  ppt ah poolItem #14  ppt ah pool
Item #14 ppt ah pool
 
Revenue Fund
Revenue FundRevenue Fund
Revenue Fund
 
2014 Bond Sale and Re-funding
2014 Bond Sale and Re-funding2014 Bond Sale and Re-funding
2014 Bond Sale and Re-funding
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
2017 Bond Sale and Refunding
2017 Bond Sale and Refunding2017 Bond Sale and Refunding
2017 Bond Sale and Refunding
 
2016 Bond Sale and Refunding: Part 1
2016 Bond Sale and Refunding: Part 12016 Bond Sale and Refunding: Part 1
2016 Bond Sale and Refunding: Part 1
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
 
Thomas Pool Options
Thomas Pool OptionsThomas Pool Options
Thomas Pool Options
 
KYC Strategic Plan - Speaker Series March 23-2011
KYC Strategic Plan -  Speaker Series March 23-2011KYC Strategic Plan -  Speaker Series March 23-2011
KYC Strategic Plan - Speaker Series March 23-2011
 
Kyc strategic plan speaker series march 23 2011
Kyc strategic plan   speaker series march 23 2011Kyc strategic plan   speaker series march 23 2011
Kyc strategic plan speaker series march 23 2011
 
Newport Mooring Association Position on Fees and Transfers 2015-04
Newport Mooring Association Position on Fees and Transfers 2015-04Newport Mooring Association Position on Fees and Transfers 2015-04
Newport Mooring Association Position on Fees and Transfers 2015-04
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
 
State of the City 2012
State of the City 2012State of the City 2012
State of the City 2012
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 

Recently uploaded

TheOrmaxSportsAudienceReport2024-MediaHighlights.pdf
TheOrmaxSportsAudienceReport2024-MediaHighlights.pdfTheOrmaxSportsAudienceReport2024-MediaHighlights.pdf
TheOrmaxSportsAudienceReport2024-MediaHighlights.pdfSocial Samosa
 
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...mxmindia
 
Kobe Bryant, The story of the "Black Mamba"
Kobe Bryant, The story of the "Black Mamba"Kobe Bryant, The story of the "Black Mamba"
Kobe Bryant, The story of the "Black Mamba"bmfcavalchini
 
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...mxmindia
 
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...Sportsnewstec24
 
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics Trade
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics TradeInstruction Manual | Nightforce CFS 6-36x50 F1 | Optics Trade
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics TradeOptics-Trade
 
Euro 2024 Serbia's Return to the European Championship.docx
Euro 2024 Serbia's Return to the European Championship.docxEuro 2024 Serbia's Return to the European Championship.docx
Euro 2024 Serbia's Return to the European Championship.docxEticketing.co
 
NCAA Tournament Free Pick, March 22 From Top March Madness Sports Handicapper
NCAA Tournament Free Pick, March 22 From  Top March Madness Sports HandicapperNCAA Tournament Free Pick, March 22 From  Top March Madness Sports Handicapper
NCAA Tournament Free Pick, March 22 From Top March Madness Sports HandicapperJoe Duffy
 

Recently uploaded (8)

TheOrmaxSportsAudienceReport2024-MediaHighlights.pdf
TheOrmaxSportsAudienceReport2024-MediaHighlights.pdfTheOrmaxSportsAudienceReport2024-MediaHighlights.pdf
TheOrmaxSportsAudienceReport2024-MediaHighlights.pdf
 
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
 
Kobe Bryant, The story of the "Black Mamba"
Kobe Bryant, The story of the "Black Mamba"Kobe Bryant, The story of the "Black Mamba"
Kobe Bryant, The story of the "Black Mamba"
 
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
Changing mindsets, rebuilding lives: Celebrating 25 years of First World Cup ...
 
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...
IPL 2024 Fixture List Match Dates, Participating Teams, Stadiums, Venues, and...
 
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics Trade
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics TradeInstruction Manual | Nightforce CFS 6-36x50 F1 | Optics Trade
Instruction Manual | Nightforce CFS 6-36x50 F1 | Optics Trade
 
Euro 2024 Serbia's Return to the European Championship.docx
Euro 2024 Serbia's Return to the European Championship.docxEuro 2024 Serbia's Return to the European Championship.docx
Euro 2024 Serbia's Return to the European Championship.docx
 
NCAA Tournament Free Pick, March 22 From Top March Madness Sports Handicapper
NCAA Tournament Free Pick, March 22 From  Top March Madness Sports HandicapperNCAA Tournament Free Pick, March 22 From  Top March Madness Sports Handicapper
NCAA Tournament Free Pick, March 22 From Top March Madness Sports Handicapper
 

KYC Harbour Redevelopment - Town Hall No 1 Presentation

  • 1. Harbour Redevelopment Town Hall Meeting #1: Information for members 1896-1996: a vision towards 2046
  • 2.  Introduction  Town Halls and Special General Meeting (SGM)  Town Hall #1: Information Session  Town Hall #2: Questions & Discussion  SGM: Approval from Membership  Presentation of Harbour Proposal • Straw Poll  Questions & Clarifications  How to provide feedback Agenda
  • 3. Goal: to maintain the longer term sustainability of the Kingston Yacht Club at its current site. Key elements to achieving the goal include: Membership Facilities Harbour Finance Strategic Plan
  • 4. The Phased Plan A phased plan was developed with a view to implementation over a period of about 10 years: 1. Dock at Jemmett’s Landing (2012) 2. Fuel Dock (2012) 3. Expand and enhance our Harbour (Spring 2014) 4. Saint’s Rest Renovation (future) 5. Clubhouse Renovation (future)
  • 5. Strategic Plan Activities 1. Development of a vision and a phased plan to achieve it 2. Development of conceptual drawings for renovation/enhancement of club house 3. Determination of club capacity to finance the vision based on: • Formal appraisal of the property • Discussions with banks and negotiation of financing 4. Determination of feasibility to expand harbour based on: • Ability to lease then purchase adjacent water lot • Engineering/wave climate study • Preliminary proposals with cost estimates from various firms for design and installation of wave attenuators and docks
  • 6. Questions 1. Do you support the idea of moving to an All finger dock harbour? 2. How many members hold moorings ? 3. How many members have boats moored elsewhere? 4. How many of those would move their boat to the Club if finger docks were available? Straw Poll
  • 7. Research and Engineering  Wave study (complete)  Water lot appraisal (due next week)  Identification of suppliers (complete)  Analysis of competition (complete) Where are we now?
  • 8.  Water lot  Proposal to lease adjacent water lot has been submitted to Transport Canada • Three year lease initially, purchase at end of lease • Expecting a response in April or May Where are we now?
  • 9. Budget & Financing  Working Budget  Funding Model includes: • Fee Structure • Harbour Fees Where are we now?
  • 10. Details to be Finalized  Finalized harbour plans and engineering • Attachment point to breakwall • JS Launch • Centre dock adjustment  Updated Costing/Quotes • Electrical supply to club and docks • Centre dock • Gabion repair
  • 12. April- May 2013 • Town Hall meetings • Lease from Transport Canada May 2013 • Special General Meeting June-July 2013 • Harbour Marketing begins • Engineering study • Electrical • Centre dock & harbour soundings • Design and layout
  • 13. July 2013 • Finalize Design and Specifications • Send out RFP Aug-Sept 2013 •Select Preferred Contractor •Negotiate Contract Oct 2013 Mar 2014 •Manufacture of attenuators and docks April 2014 • On Site Installation
  • 14. ~30 new slips Finger dock moorings Accommodation of boat lengths of 40’+ Proper electrical & water hookups  Pedestal/slip ratio needs to be established with input from members Access to convenient & safe swimming JS launch facilities, Able Sail & RC access Guest moorings Potential for mast crane Protection from south and east winds. Harbour Features
  • 15. Questions 1. How many people would pay market rates (~$350+) for a dedicated 30amp electrical service? 2. How many members would pay market rates (~$200) for a dedicated 15amp electrical service? 3. How many would only occasionally use a 15amp service? Straw Poll
  • 16. Sample harbour layouts  Harbour Design has not been finalized • Design & Engineering phase begins after approval • Request member input of design options via display board in Clubhouse and online. • Subsequent Town Hall information meetings  Examples required for water lot lease application  All options so far include a floating wave attenuator extending from the existing breakwall
  • 22. Effects on Club Operations Haulout plans  Breakwall access for construction  Potential relocation of masts Restricted Access  Electrical installation Additional Parking Demands  Need for optimizing existing club parking  Exploration of parking options
  • 24. How much it will cost? Project Budget Item Cost Dock & Breakwall (based on supplied quotes) $1,100,000.00 • Electrical to base of Maitland • Water lot • Centre dock work • Electrical on Docks • Attachment to existing breakwall • Gabion repairs $400,000.00 Sub-total: $1,500,000.00 Contingency @ ~7% $100,000.00 Total: $1,600,000.00
  • 25. How will it be Funded? Harbour will be Self Sustaining  Only new revenues will service debt Sources of Funding for Project ($1.6M)  Capital Reserves ($100K)  Refundable Dock deposit (~$127K)  Loan at 5% over 30 years (~$1.37M) Sources of Debt Servicing ($88K/year)  Fees from ~30 new moorings (~$64K/year)  Incremental fees for those converted to fingers (~$15K/year)  Incremental fees from other sources (~$15K)
  • 26. Refundable Dock Deposit Proposed Deposit Amounts <= 25’ $1,000 26’ to 30’ $1,500 31’ to 35’ $1,750 35’+ $2,000 How does it work?  Deposit paid when you are assigned a mooring  Refunded when you give up your mooring
  • 27. Simplified Mooring Fee Structure Change to per-foot charge based on boat length Easier to calculate and compare with competition Fair representation of the costs to the Club Slips 1-34 • Remain med style moorings • Fee calculated per foot (about a 35% discount of finger dock per-foot fee) Slips 35 – ~110 • Finger docks • Fee calculated per foot
  • 28. Mooring Fees - 2014 Example KYC’s average boat is • 29.3 feet LOA and • 9.6 Beam 2014 current • using current formula + finger-dock premium • Finger Mooring Fee of $ 1721 (equivalent to $59/foot) 2014 proposed • Finger Mooring Fee of $1,785 • Dock Deposit of $1,500 Proposed Finger Dock fee • $61/foot • + Refundable Dock Deposit • 27 boats experience increase • 22 boats experience a decrease • Average increase is $32 (3%) Competition (2014 estimate) • Confederation Basin - $69.24 • POH - $64.40 • Collins Bay - $57.10 • Kingston Marina – $56.10
  • 29. Proposed Entrance Fees How would they help?  Improve membership retention  Provide a strong marketing incentive to help fill harbour  New member entrance fee would be contributing to the Club’s infrastructure and value How would they work?  Does not apply to existing members  Family Member: $1000  Single Member: $600  Waived for applicants 65 and older
  • 30. Mitigating Financial Risks What if interest rates rise?  Conservative at 5%: expect first 5 years to be 4.5%  Plan to aggressively pre-pay principal with surplus What if there is slow up-take on new slips?  Can manage potential shortfall years with funding from ‘full harbour’ years in order to be self sustaining.  Introduction of entrance fees effective March 1, 2014  Incentive for boaters to join before 2014 season  Will help with member retention
  • 31. Summary  Simplified mooring fee structure • Finger docks rates competitive • Remaining med mooring average fee unchanged  Introduction of Refundable Dock Deposit  Introduction of Membership Entrance fees  Result:  Self Sustaining Harbour  Increased the value for existing members  Increased Membership Base
  • 32. Tonight Requests for clarification of what we have presented Between tonight and next Town Hall meeting  Feedback options • E-mail: harbourquestions@kingstonyachtclub.ca • Web: www.kingstonyachtclub.ca/newharbour • Paper Questionnaire and input form at the bar • Considering publishing an electronic questionnaire • Questions & comments and new information from the Strategic Planning Committee will be addressed at Town Hall #2 Getting your input

Editor's Notes

  1. Town Hall #2 May 2ndSGM scheduled for May 15thSTART ----------------------------------------I’d like to Welcome everyone to the first of 2 planned town hall meetings to present and discuss the Boards harbour redevelopment proposalThis meetings are an opportunity for the board to inform the membership of what we propose to do, how much it will cost, and how we plan to finance itBetween this meeting and the next (2 weeks), we will be providing opportunitiesTo provide feedbackAsk questionsI tell you more about that at the end of the presentationThe Next town hall meeting will be an opportunity to for the boardTo address the concerns and questions from the proposal presented this eveningIncorporate feedbackWhat we are proposing is a large project, maybe the largest single project the Club has undertaken, and as such we will be seeking member approval through motion at an SGM (scheduled for May 15) before proceeding.The core of what I will be talking about is the proposed plans for expansion and enhancement of the harbour, but I will also be talking about membership growth First, I’d like to review how we’ve arrived at this point in timeSome of you may have been following the Strategic Plan process, but for others it I think it important to reviewAs some of you weren’t here when it beganThe work that has lead up to this meeting is a result of an enormous amount of effort from current and past Boards and the strategic planning committee.I would like to introduce the Flags officers and the SP committee are seated to your right (Rosemary, Ross, Bob – Paul, Alison, Rob, MervSuzzane).They are here to help answer question and provide details
  2. The expansion of the harbour is part of a much larger strategic plan that was undertaken to Ensure that the Club’s programs, services and facilities are not only well looked after but continue to meet the evolving needs of the membership over the long term. The Goal is to ensure the long term sustainability of the Club on this site. How did  establish this goal?brain storming session with the board and members, member survey and a town hall meeting. All were aimed at getting detailed input from the membership.We are moving forward on what we heard from you.You told us that we need to achieve our vision of a vibrant and sustainable club by focussing on:Membership retention and recruitmentEnhancements and upgrades to the facilities including the club house and Saint’s RestImprovements to the harbourSound financial planningBased on this input a plan was developed and we’ve made steady progress on it.NEXT Slip
  3. Here is the planWe’ve done some much needed maintenance and upgrades to the gas dock and Jemmett’s Landing.Our focus now is the Harbour.Expand harbourUpgrade facilitiesWe will address Saint’s Rest and the Club House as future projects.I’d like to give you some information on what has been done to assure ourselves of the feasibility and viability of harbour expansion and enhancement.This next slide also shows some of the other activities that were undertaken in the development of the phased plan but this evening the harbour will be the topic of the presentation----------------------------Membership focusedIncreasing BasesImproving Services·         Membership survey and input from Town Hall  (spring 2011)·         Appraisal of club property to facilitate financing (Fall 2010)·         Concepts for upgrade/expansion of clubhouse and Saints Rest developed with Shoalts &amp; Zaback Architects (Fall 2011)·         Initiated negotiations (July 2012) with Transport Canada for lease (&amp; subsequent purchase) of adjacent water lot·         Engineering/wave climate study with Shoreplan Engineering (Fall 2012)·         Identification of attenuator &amp; dock suppliers (Fall 2012)·         Issued Request for Proposals to identified suppliers (Feb 2013)
  4. - [to Review] Development of  a vision and a phased plan to achieve itBrainstorming session led by Queen&apos;s Business School and including Board and a cross section of membersDetailed survey of membersTown Hall session with membersFeedback to members through written reports and presentations including at AGMDevelopment of conceptual drawings for renovation/enhancement of club house based on:engineering assessment of club house status (tendered)assessment of alternative optionspresentation to members for feedbackFirst stepDetermine our ability to finance a new harbour.Property appraisal of the property and this allowed us to approach banks and negotiate a financing agreement at a very reasonable rateWe have also done some research into practices at other clubs, detailed cost/benefit analyses and strategic planning to identify approaches to funding the harbour. Again, I’ll come back to that in more detail for discussion later.What else do we need to know and understand before moving forward?technical information such as a wave attenuation study, preliminary costing of wave attenuators and docks and preliminary harbour designs.The next slides provide an update to where we are right now in the process.---------------------------------------------------------------So that’s a quick overview of what’s been done so far. We think we’re in a very good position to go forward and we need your input and, ultimately, membership approval. The next slides provide you with detail on what a new harbour could look like and how it could be financed.- But first, I’d like to take a short straw poll.
  5. I’d like to take another short moment to ask a few more questionThank you for you feedback.
  6. To be able to develop a proposal, we needed to gather some preliminary informationWave Study: provides guidance for harbour design and planningWater Lot Appraisal: require for lease negotiationIdentification of Potential Suppliers: the committee identified top suppliers and put forward a RFP Received proposals, and initial costing
  7. Obviously key to our ability to expand the harbour, is being able to secure the adjacent waterlotWe are engaged in detailed discussion with Transport Canada toward securing a leasepreliminary discussions with the city and we have a letter of support from a key neighbour.While the process is not complete, we do not expect significant problemsThis the lease/ purchase process requires the submission of appraisals, harbour proposals, anchoring plan
  8. RFPs sent out to potential suppliers on Feb 4From the RFP process, we received proposals that provided enough information to establishRange of costs, Potential harbour size, From this information, we have been able to developWorking BudgetFee structuresThat we are now confident that our model realistic attainableThere is much left to be finalized,
  9. Here are some of the issues that will don’t have the answer for.Shortly, I will be showing you possibly plans for the harbour design, but these are only preliminary, soThe Feedback from the Straw Poll will help guide us on issue such as the degree of electrical service to the docks- Some of these issue will need to be resolved quickly, so next I will talk about the expected timeline for the entire process.[permitting’ which will be expected when we get the RFQ]
  10. There are many steps between this proposal and having docks in the water, The next few slide provide an approximate timeline for the activities starting from this presentation all the way to execution.
  11. Schedule of meetingsTH #2 May 2rdSGM on May 15thExpect to have lease finalized by end of MayWith feedback and input from TH meetings, we would bring a final proposal to the member through a SGMIf approved by the membership and number of activities would begin immediately:Active marketing of the new harbour to fill new slipsDesign and Engineering phase to finalize harbour design and detailsMembership engagement during this processPlans available at the Club, information sessions
  12. By the end of July, we would expect to have finalized the design and specificationSufficient to send out a RFP that would present the harbour we want deliveredFrom RFP responses, we would evaluate and select our preferred contractorImmediately followed by contract negotiationSome components of the harbour have a significant lead time for manufacturer, in particular the attenuators (which you will see shortly),The end goal is to have the harbour in place for the 2014 season.
  13. I have been alluding to a number of aspect of the new harbour such as expansion and electrical, sort of getting ahead of myselfBut here is the list of what are key features of a new harbour30 new slips: more than %35 expansion in capacityFinger docks starting at Slip 35 ElectricalAs you will see shortly, an expanded harbour will impact current:Swimming locationsJunior Sailing Launch and accessAnd may impact Able SailRC Sailing as wellWe will ensure that a new design would account for these important featuresWe want to maintain guest dockingConsider how we might incorporate a mast crane in the designThe harbour must be a safe place for your boats, so protection from waves is critical as wellEtc.
  14. I’d like to take short moment out of my presentation to conduct an informal poll of those presentThe questions about electrical service do impact our project plan, so allowing the board to get a ballpark feel for the interest level will aid in budgeting and modeling.I will read out the questions, and please hold up your voting card until all votes are counted.Thank you for you feedback. As we progress through the harbour development process, we will likely be soliciting more concrete commitments
  15. The next few slide are intended to provide a few “samples” of general harbour layoutBut please note that none of these are final, and each have issues that would need to be addressedAs noted earlier when I was talking about timelines, the Design and Engineering phase would finalize the designs.During this process, we plan to keep the membership informed,Provide updates and design optionsSolicit feedback and inputThe examples that I will show you next were required for planning purposesBudgetingPlanningAnd Lease approvalA common feature you will see in the layout are the use of wave attenuators to protect the expanded portion of the new harbour.I’ll provide an example of these after I show you some of the harbour layout.
  16. This is the initial layout that we provided suppliers in the initial RFP.Key features:Outer harbour is all finger docks or side on mooringsSlip orientation is primarily East-West.Facilitates access given our prevailing windsHarbour is protected by a floating wave attenuatorBuilding are in redWaterlot is outlined in red
  17. This layout was received from one of the suppliers as a result of the RFPNote the 4 sections of wave attenuators on the south side.Note the approximate extent of the water lot
  18. This layout includes a “hockey stick” styled wave attenuators for more east wind protectionThe length of the ‘hockey blade’ varies from zero to completeEast facing attenuator may be of lesser proportion that the south facing attenuator- Engineering and design phase would finalize these details.
  19. Here is a sample wave attenuator from a potential supplier.Anchored in place, Hollow concreteKeel extension below the waterlineNote the calming effect on the water in the top picture.
  20. The following are sample finger docks from some of our potential suppliersThe details of these will be finalized once the second RFP is issued based on the final design plan.
  21. [ Parking doesn’t really fit here ]As we progress through the timeline, we get a better idea on what construction will be required at the clubWe will have to alter haulout details to account for potential construction on the breakwallElectrical system may disrupt area around the club, and possibly leading to the finger docksIn addition to the impact of construction, an ongoing issue will be parking availabilityWe are actively exploring solutions from:Optimization of KYC parking facilitiesEnsuring adequate carts to load/unload boats andExploring nearby offsite parking options
  22. - So the big question is how much will this cost.I’ve noted here that that financial plan we have in place is a “Self Sustaining model”This is a key point to that term is that “we do not want to impact existing Club operations”
  23. This is a high level project budgetBuilt from estimates based on initial RFP responses.We did see a significant price range from suppliers, but our evaluation of the proposals leaves us confident that we can deliver at or less than this budget.Our expectation is that the complete project to come in between 1.3M and 1.5M1.6M has been used to allow for a $100K contingencyThe Financing is based on this maximum but we would work to keep this project under budgetHow will we fund this amount?
  24. Ok, that seems like large amount of money, how do we fund this.Once again, our budgeting and model are based on being able to fund this through new revenuesDownpaymentWould use $100K of the Clubs capital reserves ($250K)The remainder of the downpayment come from a RDDI’ll talk about this in more details laterRemainder of would be a loan of $1.37MAs alluded to earlier, we have gone through the appraisal process andnegotiated with the banks and have effectively been “pre-approved” for more than this amount ($2.2M from property appraisal 2012?)We believe 5% is conservative, and expect less, but we are using this for budgeting purposes.That leaves us with the question of servicing this debt going forward.?Debt ServicingNew moorings Lesser contributions from:50% of incremental membership revenuesSome accounting for increased winter storageModest up-take on electrical serviceNotes:Debt Servicing is ~$88K= 64+15+15 = $94K (surplus of $6K)The next few slide will cover other details of our proposal that related to membership and fees.
  25. We need to provide sufficient funds for our down payment as well as reduce our debt servicing costsWhat we’re proposing is as follows:Deposit is paid the first time you are assigned a mooring (or when you boat changes)This maintains our original loan down payment.The following table is an example of how we might structure this feeNext I would like to talk about our mooring fee structure---------------------------------------------Exact mechanism to be finalized. Per foot might be ok.Notes:Common funding mechanism by other clubs to support harbour redevelopmentNational,Minico, Etobicoke, PCYC, Whitby, FBYC, Brockville
  26. As part of moving to a primarily finger dock harbour we feel we need to simplify our fee structure to beCompetitiveFair representation of costsMed mooring would remain approximately on par with the current formula at least the average wouldboats that are 10% over and above the 3% average we will split their increase over 2 years. That would only be 5 boats: Lou Franchi, Jennifer Ruddy, Mary Wilson, Ralph Shaw plus Tim Garrett.Projected POH $64Kingston Marina $56Collins Bay $57
  27. Here we talk about the proposed fee and provide an exampleEstimated for 2014Example uses current formula including multiplier for total then divided by the LOA to give a comparable price by foot – also includes Bob’s figures with a 2% increase Think we should also state that there are 4 boats that go up more than 10% above the average and we will be spreading their increases over 2 years.boats that are 10% over and above the 3% average we will split their increase over 2 years. That would only be 5 boats: Lou Franchi, Jennifer Ruddy, Mary Wilson, Ralph Shaw plus Tim Garrett.
  28. This presentation is not purely about the harbour expansion and upgrades, it is also about membershipRetentiongrowthWith that in mind, we are proposing the introduction of Entrance fees.There are a few motivation factors behind this decisionMembership turnover averages to 60+ people each yearEvidence from other clubs indicates that entrance fees do help with member retentionSignificant majority of Club on the Lake include entrance fees.KYC is more of an exception.The introduction of entrance fees would provide a powerful incentive for our marketing campaign to fill the harbourMarch 2014 would be the introduction time, and new boat owners would sign up before thenBook value of the club is about $3300 per voting member, this is then a wayto new members to catch up to the investment current members already have in the club.How would entrance fees work?Would not apply to existing members
  29. That concludes our presentationPlease remember that this is our proposal and a proposal that we think is viable, butWe want your feedbackNext we will take questions, but first let me tell you how to provide feedback, and keep up to date on materialWe want as much feedback as is possible – please help us to see all the angles of this project from a membership perspective