This document outlines an SEO plan consisting of on-page and off-page optimization activities over 12 months. It begins with analyzing the website and keywords. On-page optimization includes technical changes like meta tags and content editing. Off-page activities to build links include article posting, directories, and social media. Results are expected within 3 months, with 30-50% traffic increases by 6-12 months as keywords rank higher in search engines. Ongoing maintenance keeps rankings and traffic growing throughout the year-long plan.
2. Why Search Engine Optimization & Marketing?
•85% of all traffic on the Internet is referred from search engines
•90% of all users don’t look past the first 30 results (most view only top 10)
•Many websites aren’t even indexed, are poorly optimized and get very little traffic
•Cost-effective advertising
•Clear and measurable ROI
• Operates under this assumption:
–More (relevant) traffic + Good Conv. Rate = More Sales/Leads
3. Objectives of SEO
To Make your website easily findable over the web.
To Increase the Visibility
To Get More Traffic/Visitors to the Website.
To Get More Leads/Sales from Search Engines/Online.
4. Successful SEO Program Specification
• Our SEO Program is designed to address search engine algorithms of all top Search Engines.
The Scope of the SEO Program is customized according to the needs of the website, target
audience and the online competition associate with it.
• The SEO process is divided into the following Stages:
• 1. Stage I - Evaluation & Planning
• 2. Stage II - Execution
• 3. Stage III - SEO Implementation
• 4. Stage IV – Completion
• 5. Stage V – Off-page optimization
• 6. Stage VI – Monitoring
5. Our Approach On Page SEO
Competitor analysis
Keyword analysis
Title Tag Optimization
Meta Tag Optimization
Canonicalization
Site content text tuning/Page Content Optimization (Using Keyword Architecture)
Web page tuning and root files restructuring
Landing Page creation and Optimization
Creating Keyword Rich Page URL
Bread Crumbs for Each Page
Page Loading Time Optimization
Optimizing Usability and Navigation.
6. Our Approach On Page SEO
Webmaster Tool Log in/verification – Google, Bing
Robot file Optimization
Sitemap.xml Creation
Social Sharing Options
Suggestion for Customized 404 Error Page Creation
302 Redirection
Image Optimization
Alt Text and Alt Title Optimization
Optimizing In the site linking structure for better crawling and Ranking
Heading Tag Optimization
Google and Yahoo Local/Map Listings
Call to Action Optimization
SEO testing and analysis
7. Our Approach Link Building/Off Page SEO
Web 2.0 site creation and Promotion
Social Media Marketing Promotion
Guest Blogging
PPT and Document Sharing/Submission
Video Creation and Optimization
Press release distribution
Unique Article syndication
Info graphics Creation and Submission
Yahoo and Wiki Q n A for back links
Content Based/Theme based Forum Submission
Local and International Business directory listing
8. Our Approach Link Building/Off Page SEO
Blog promotion
Blog commenting
Online book marking
Classified Posting
High Page Rank Directory submission
Cross linking between existing domains.
Yellow pages & wiki sites submission Online reviews for products and services
Updating off page factors according to the change in search algorithm
Link and competitor analysis and link submission. (on going process)
Maintenance of keyword ranking in Search Engine Result Page
9. When Can you See Rankings?
Realistically, you can expect to see results for some keywords starting 6-9 weeks after the
final submission.
Organic or Natural Search Engine rankings are achieved due to a combination of both OnPage optimization (SEO) and Off-Page Optimization (Link Building).
Rankings usually stabilize after about three months after the implementation phase.
However, your traffic rises continuously since more and more search engines index more
and more optimized pages of your website
Guarantees
We will include all keywords give by the client in the optimization
Unethical SEO techniques will not be used in our SEO
We will not carry out any changes on your website without prior approval.
We do not give false ranking guarantees.
11. 1 to 3 Month Activities
1. Business Analysis
2. Keyword Analysis
3. Content Analysis
4. SEO Friendly Design Changes
5. Robots Writing
6. HTML and XML Site Map Creation
7. Meta Tag Creation
8. Title Tag
9. Alt Tag
10. SEO Friendly Content Editing
11. Link Submission
12. 1 to 3 Month Activities
Set Up Link Campaign Account start Link Campaign
Directory Submission
Listing of all the Directory
Follow Up every day
Online Book Marking Account Creation
Link Submission for Product and Service Pages.
Article Setup
Listing of all the Article site where we are going to post article every month
Article Post every
Press Release Account Setup
Press Release Distribution
Blog Commenting
Other Link Building Campaigns as mentioned in Approach
On page 2-3 hr per day to follow up the changes
13. 1 to 3 Month Activities
Traffic Source –
Referral Sites (Article, Press Release, Book Marking, Directory)
Search Engines
Projected Traffic
10-15% Increase in Referral site and Search Engine Traffic
Keywords Ranking Report in xls
Link Submission and Approved detail Report in xls
Google Analytics/Web Traffic Report in PDF/xls
14. 1 to 3 Month Activities
Link Campaign and On page activity will be same as 1nd and 3rd month targeted pages
will be different
Traffic Source –
Referral Sites (Article, Press Release, Book Marking, Directory)
Search Engines
Projected Traffic
30% Increase in Referral site and Search Engine Traffic
Projected Keywords Ranking Report in xls
50% of Keywords will be in Top 10 of Search Engine and 70% of Keywords will be in Top
20 of Search Engine
Link Submission and Approved detail Report in xls
Google Analytics/Web Traffic Report in pdf/xls
15. 1 to 3 Month Activities
Link Campaign and On page activities will be same as, targeted pages will be
different
Traffic Sources:
Referral Sites (Article, Press Release, Book Marking, Directory)
Search Engines
Projected Traffic
30 - 50% Increase in Referral site and Search Engine Traffic
Projected Keyword Ranking Report in xls
50% of Targeted Keywords will be in Top 10 of SERP(Search Engine Result Pages)
and 70% of Keywords will be in Top 20 of the SERP
Detailed link Submission and Approval Report in xls
Google Analytics/Web Traffic Report in pdf/xls
16. 6 to 12 Month Activities
On Going SEO Activites
On Going Link building Activites
On Going Social Media activities
All other activities to Maintain Keyword ranking in 1st Page of Google.
Implement the on page & off page changes as Per Google Algorithm
Changes.
Recommend Design Changes as per Google guidelines.